CN1456424A - Concrete building block preparing method - Google Patents
Concrete building block preparing method Download PDFInfo
- Publication number
- CN1456424A CN1456424A CN 03117680 CN03117680A CN1456424A CN 1456424 A CN1456424 A CN 1456424A CN 03117680 CN03117680 CN 03117680 CN 03117680 A CN03117680 A CN 03117680A CN 1456424 A CN1456424 A CN 1456424A
- Authority
- CN
- China
- Prior art keywords
- mould
- insert
- concrete
- building block
- positioner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Press-Shaping Or Shaping Using Conveyers (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
A technology for producing the building block of concrete includes such steps as pouring a decorative layer on the bottom of mould, putting a locator with the embedded objects in the mould, pouring concrete in the mould, vibrating or pressing, taking the embedded objects out by said locator to form holes, filling form plastics in the holes, pouring concrete again, vibrating or pressing, curing and demoulding.
Description
The present invention relates to the production method of the concrete segment that uses in a kind of architectural engineering.
As the concrete segment production method of materials for wall, be to adopt drawing method production in the current architectural engineering by block machine.This mode of production equipment investment is big, and product is because the short surface ratio of molding time is more coarse.Adopt independent die casting production building block, owing to do not use positioner yet, but fillers such as foamed plastics are directly put into concrete surface, such mode of production makes the wall thickness of building block and reins in thick can not being consistent, be unfavorable for the stable of product quality, and filler such as foamed plastics can only service regeulations block, and serve as filler after can't using discarded foamed plastics to pulverize.
Produce the new concrete building block by the present invention, be in mould, to pour into a mould one deck decorative layer earlier, by vibration or the positioner set up of pressurized equipment mould is fixed on certain position then, and then the positioner of the activity by connecting insert is put insert in the mould into by the position of design in advance.The size shape of insert should with the hole basically identical of normal concrete building block.And then at mould gap cast concrete, the mould gap is filled with, utilize vibration or pressurized equipment to make it closely knit.Positioner by activity takes out insert in mould then.In the hole of its formation, insert foamed plastics again.Hole is filled up, then cast concrete for the second time.Water fill with mould and make concrete exceed mould a little, again with the vibration or pressurized equipment make its closely knit moulding, become product after the maintenance demoulding.
By the concrete segment that above method is produced, the wall thickness that can make building block when producing in batches thickly remains to consistently with reining in, and the quality of building block has reduced randomness when having guaranteed batch process.And can use a large amount of discarded foamed plastics.Help reducing cost and twice laid.
Produce concrete segment with this method, also can not pour into a mould decorative layer earlier, directly cast concrete in mould utilizes aforesaid way to produce the true qualities building block, again at its surface spraying and decorating layer.Or transport to and carry out the appearance decoration after site operation is installed.
If foamed plastics is that the block reinforcing bar that also can adopt couples together them earlier in upper type, insert in the hole again.Insert can do also that to grow into two hole sum Galles thick in, wide the wide rectangle of hole.If filler is chunky shape or broken foam shape, then insert should be designed to convex, and the filler quantity of inserting when producing can be determined according to pre-designed position.
Can add color sand in the production in the decorative layer prescription, demoulding rear surface can and be polished with the grinding machine polishing.
The concrete of pouring into a mould in the production can mix an amount of industrial residue (as: flyash, gangue, slag, kiln ash, lime, slag etc.), lightweight aggregate (haydite, pottery sand, expanded perlite, Peng Zhang Chi stone, shale, scoria, float stone, cinder etc.), additive (early strength agent etc.).
Produce the mould of this kind building block and can use mould of plastics, composite material mould, swage, punching block etc.The insert material should be that hard is high-strength.As steel etc.
Fig. 1 is the cutaway view after pouring into a mould decorative layer and making it closely knit.
Fig. 2 is for putting into the cutaway view of insert by the position of design in advance.
Fig. 3 is the cutaway view behind the cast concrete.
Fig. 4 is the cutaway view after vibration or pressurization make it closely knit.
Fig. 5 is for adding the cutaway view of foamed plastics.
Fig. 6 is for cast concrete for the second time and the cutaway view after making it closely knit.
The decorative layer 1 of cast earlier shown in Figure 1.Mould is by the national standard design.The raw material of decorative layer should be mixed in proportion and stirs before the cast.The decorative layer prescription is: white cement: quartz sand: resin (brightener): pigment=1: 1-1.5: 0.02-0.03: 0.01-0.03, ratio can be according to the actual conditions adjustment.Earlier above raw material is stirred, add an amount of furnishing pasty state of water.Cast thickness is 2-5MM, gets rid of bubble through vibration.Placed about one hour on indoor level land then, till feeling to be difficult for squishing with its surface of hand.
The positioner 2 that is connected with insert of putting into shown in Figure 2.The position of insert should be pre-designed.Its position in mould should with the hole location basically identical of ordinary concrete building block.
Shown in Figure 3 at the gap of mould cast concrete 3, mould should be filled with as far as possible.Concrete label is by the requirement preparation of country to the ordinary concrete building block.Dried wetting should be suitable.
Utilization vibration shown in Figure 4 or pressurized equipment vibrate it or pressurize, and make it closely knit.
Shown in Figure 5, the head by positioning equipment takes out insert in mould.Just two shape sizes and the basic the same hole of ordinary concrete building block have been formed like this in the concrete.In its hole, foam-plastic blocks 4 and 5 is filled up again.
Shown in Figure 6, continue second batch of concrete 6 of cast on the top of mould, mould is filled up and exceed mould a little.Adopt vibration or pressurized equipment to make its closely knit moulding.But the just demoulding after maintenance 3-5 days under the normal temperature laboratory continues under normal temperature laboratory the maintenance sale of just can dispatching from the factory about 10 days after the demoulding.
In addition, in order to improve product quality and production efficiency better, can on the said equipment and production technology, to carry out computer and improve automatically.Can adopt computer to all around position of positioner insert in mould, each cast concrete amount what, put into the filler amount what, the size of volume, at every turn vibration or the length of pressing time, strength size, insert put into take-off time and concrete material prescription, the decorative layer composition of raw materials is controlled.In addition, can utilize automatics to make the putting into and take out and all realize automation, computerized control of conveying, cast and insert of raw material and product.Reach full automation production.
Claims (10)
1, a kind of production method of new concrete building block is to add chemical industry auxiliary material, pigment by sandstone, cement, and injection molding is produced the building block with certain decoration function after stirring.It is characterized in that: earlier at mold bottom cast decorative layer.Re-use a positioner that is connecting the insert of following concrete segment hole size basically identical, insert is put into mould by the position of design in advance by this device.At mould internal pore part cast concrete, after employing vibration or pressurized equipment made it closely knit, the positioner of utilization activity left mould with the insert lifting, inserts foamed plastics again in the hole of its formation then.Cast concrete in mould makes its closely knit moulding through vibration or pressurization again.After the maintenance demoulding, form product.
2, a kind of production method of new concrete building block is to add water stirring back injection molding by cement, sandstone to produce the true qualities concrete segment, becomes product at its surface spraying and decorating layer again.It is characterized in that: use a positioner that is connecting the insert of following normal concrete building block hole size basically identical earlier, insert is put into mould by the position of design in advance.At mould internal pore part cast concrete, after employing vibration or pressurized equipment make it closely knit, make insert leave mould by positioner more then, in the hole of its formation, insert foamed plastics again.And then in mould cast concrete, adopt vibration or pressue device to make its closely knit moulding.After the maintenance demoulding, become product at its surface spraying and decorating layer.
3, injection molding was produced after a kind of production method of concrete segment added the water stirring by cement, sandstone.It is characterized in that: use a positioner that is connecting the insert of following concrete segment hole size basically identical earlier, insert is put into mould by the position of design in advance.At mould internal pore part cast concrete, after employing vibration or pressurized equipment make it closely knit, make insert leave mould by positioner more then.In the hole of its formation, put into foamed plastics again, and then in mould cast concrete.Adopt vibration or pressue device to make its closely knit moulding.After the maintenance demoulding, become product.
4, a kind of production force method of new concrete building block is to add that by cement, sandstone chemical industry auxiliary material, pigment production go out to have the concrete segment of decoration function, it is characterized in that pouring into a mould one deck decorative layer at mold bottom earlier, contains color sand in the decorative layer prescription.Re-use one and connecting the positioner of following concrete segment hole size basically identical insert, insert is put into mould by the position of pre-design, then at mould internal pore part cast concrete by this device.After adopting vibration or pressurized equipment to make it closely knit, the positioner of utilization activity leaves mould with the insert lifting.In the hole of its formation, put into foamed plastics again.Cast concrete in mould makes its closely knit moulding through vibration or pressurization again.After the maintenance demoulding surface decoration layer is become product with sander polishing, polishing.
5, coagulate the production method of earth building blocks according to claim 1,2,3 or 4 described novel mud, it is characterized in that: when the foamed plastics of inserting is chunky shape or powder shape, insert is designed to convex, so that the foamed plastics amount of putting into what can judge when producing.
6, according to the production method of claim 1,2,3 or 4 described new concrete building blocks, it is characterized in that: on vibration or pressurized equipment, a positioner is set earlier, die location is fixed.Its mould adopts mould of plastics, composite material mould, swage tool, steel mold.Its positioner that is connecting insert is movable.
7, a kind of production method of new concrete building block is will put in the mould of having poured into a mould decorative layer in the mould or with the insert of normal concrete building block hole size basically identical earlier by positioner, cast concrete again, and make it closely knit, take out insert then, in the hole of its formation, insert foamed plastics, pour into a mould second batch of concrete again and make its closely knit moulding, the maintenance demoulding becomes product.It is characterized in that: the size design of insert is that two hole sizes of ordinary concrete building block add the rectangle that the side of body is thick.When filler was the relatively large shape of volume, filler can connect with reinforcing bar.
8, a kind of production method of new concrete building block is to pass through positioner, to put in the mould or poured into a mould in the mould of decorative layer with the insert of normal concrete building block hole size basically identical earlier, cast concrete again, and make it closely knit, take out insert then, in the hole of its formation, insert foamed plastics, pour into a mould second batch of concrete again and make its closely knit moulding.It is characterized in that: in concrete, can add an amount of industrial residue (as: gangue, flyash, kiln ash, slag, lime, slag etc.), lightweight aggregate (haydite, pottery sand, expanded perlite, Peng Zhang Chi stone, shale, scoria, float stone, cinder etc.), additive (early strength agent etc.).
9, a kind of positioning equipment of producing the new concrete building block is characterized in that: it is linking the insert of following ordinary concrete building block hole size basically identical.It is movable, before cast concrete, insert can be put into mould by the position of design in advance, cast concrete and make it closely knit after this insert can be taken out in the mould and form hole.Simple production can be designed to positioner the back-shaped article of a band handgrip, earlier the ground floor concrete is poured into a mould at mold bottom, will return and directly put in the mould, with middle cast concrete, puts into foamed plastics in the hole that returns around returning.
10, a kind of production method of new concrete building block is to pass through positioner, to put in the mould or poured into a mould in the mould of decorative layer with the insert of normal concrete building block hole size basically identical earlier, cast concrete again, and make it closely knit, take out insert then, in the hole of its formation, insert foamed plastics, pour into a mould second batch of concrete again and make its closely knit moulding.It is characterized in that: utilize computer equipment that the quantity of putting raw material in take-off time, concrete and the decorative layer prescription into of time of the position up and down of quantity, volume and the positioner insert of the quantity of each concrete cast, time, filler, vibration or pressurization at every turn, strength size, insert is controlled.Utilize automatics that putting into taking-up of raw-material allotment, conveying, cast and insert controlled automatically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03117680 CN1456424A (en) | 2003-04-14 | 2003-04-14 | Concrete building block preparing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03117680 CN1456424A (en) | 2003-04-14 | 2003-04-14 | Concrete building block preparing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1456424A true CN1456424A (en) | 2003-11-19 |
Family
ID=29411253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03117680 Pending CN1456424A (en) | 2003-04-14 | 2003-04-14 | Concrete building block preparing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1456424A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102102418A (en) * | 2009-12-17 | 2011-06-22 | 穆建春 | Steaming/firing-free wall brick prepared from oil shale waste and preparation method thereof |
CN102875191A (en) * | 2012-08-25 | 2013-01-16 | 马鞍山豹龙新型建材有限公司 | Preparation process for aerated concrete block |
CN103072186A (en) * | 2012-12-21 | 2013-05-01 | 山东大学 | Precise shaping method for high-damping machine tool component |
CN110682407A (en) * | 2019-10-20 | 2020-01-14 | 江龙 | Concrete prefabricated part production mold and concrete prefabricated part production method |
-
2003
- 2003-04-14 CN CN 03117680 patent/CN1456424A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102102418A (en) * | 2009-12-17 | 2011-06-22 | 穆建春 | Steaming/firing-free wall brick prepared from oil shale waste and preparation method thereof |
CN102875191A (en) * | 2012-08-25 | 2013-01-16 | 马鞍山豹龙新型建材有限公司 | Preparation process for aerated concrete block |
CN103072186A (en) * | 2012-12-21 | 2013-05-01 | 山东大学 | Precise shaping method for high-damping machine tool component |
CN103072186B (en) * | 2012-12-21 | 2015-04-01 | 山东大学 | Precise shaping method for high-damping machine tool component |
CN110682407A (en) * | 2019-10-20 | 2020-01-14 | 江龙 | Concrete prefabricated part production mold and concrete prefabricated part production method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105625720B (en) | More materials build 3 D-printing forming method | |
Pacewicz et al. | Characteristic of materials for the 3D printed building constructions by additive printing | |
CN102531508A (en) | Self-leveling terrace mortar powder and preparation method thereof, and terrace construction method | |
CN101439953A (en) | Agglomerated rock pavior brick with pervious function and preparation thereof | |
CN107640943A (en) | A kind of Self-decorating regeneration aggregate porous concrete product and preparation method thereof | |
CN104743988A (en) | Inorganic artificial stone accessories and preparation method thereof | |
CN106747134A (en) | A kind of artificial marble and its manufacture method with decorative effect | |
CN104230256A (en) | Self-compaction concrete and production technique of prefabricated municipal quadrate culvert component | |
CN101100090A (en) | Method for manufacturing imitating natural cultural stone | |
CN1328204C (en) | Heat insulating bearing concrete brick and its production process | |
CN102806599A (en) | Quartz stone with predetermined three-dimensional colored patterns and linear patterns and preparation method thereof | |
CN102950955A (en) | Quartz stone containing patterns formed through random distribution of color powder or color slurry, and its making method | |
CN1456424A (en) | Concrete building block preparing method | |
US5478390A (en) | Cuttable concrete, its process of manufacture and its process of molding | |
CN1102610A (en) | Prefabricating method and die set for decorative concrete products | |
CN1476965A (en) | Production method of multifunctional concrete block | |
CN104589466B (en) | Mechanical clay molding method and device | |
CN108863236B (en) | Preparation method of stirring-free ultralight ceramsite concrete cutting board and stirring-free ultralight ceramsite concrete cutting board | |
CN218812956U (en) | UHPC stone-like building material structure | |
CN103147551B (en) | Decorative floor block and preparation method thereof | |
CN1413813A (en) | Method for producing colour concrete building blocks | |
CN1307029C (en) | Method for manufacturing light conccrete product | |
CN1978366A (en) | Calcium carbide dregs concrete pedestrian path brick and its preparing method | |
RU2245784C2 (en) | Method of production of decorative facade made out of architectural concrete and a form for its realization | |
CN101634182B (en) | Decorative brick and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |