CN1436705A - 一种大型超高、超重搁置物的整体平移方法及设备 - Google Patents
一种大型超高、超重搁置物的整体平移方法及设备 Download PDFInfo
- Publication number
- CN1436705A CN1436705A CN 02100592 CN02100592A CN1436705A CN 1436705 A CN1436705 A CN 1436705A CN 02100592 CN02100592 CN 02100592 CN 02100592 A CN02100592 A CN 02100592A CN 1436705 A CN1436705 A CN 1436705A
- Authority
- CN
- China
- Prior art keywords
- jack
- raceway plate
- moved
- things posited
- translation device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种大型超高、超重搁置物的整体平移方法及设备,是由临时基础、下滚道板、滚杠、上滚道板、千斤顶、液压控制系统一起构成搁置物的整体移动装置,在移动方法上采用首先设置临时基础,在临时基础上放置下滚道板,在下滚道板上面间隔放置滚杠,在滚杠上放置上滚道板,然后放置被移搁置物,用千斤顶进行牵引,用液压控制系统来调整千斤顶的牵引力和方向。本发明简单易行,省工省时,经济效益明显,特别适合化工设备中大型塔、容器的整体移动。
Description
技术领域
本发明涉及一种大型超高,超重搁置物的整体平移方法及设备。
背景技术
大型物体移动方法有很多,如吊装(吊车、大型桅杆吊)、轨道滑动、利用水的浮力移动等方法,采用吊装要受到场地环境的限制,而且有些装置不能倾斜旋转,因而吊装就不适宜。采用轨道滑动移动物体的方法,所需设备复杂,若用滑轮拖动,人为控制因素较多,拉力不均匀,不好控制,对大型(重量超过80吨和/或高度大于60米)的超高超重搁置的整体平移方法和装置,查阅现有技术资料,发现建筑物的整体移动方法及装置专利比较多,例专利申请号为98115864.1公开日:1999年2月17日,发明名称为:“建筑物整体平移的装置和方法”采用现场浇注钢筋砼行走承载粱结构、行走基础、液压动力装置一起构成建筑物平移装置,移动方法上采用对建筑物加固处理、浇注钢筋砼行走承载粱结构、利用液压动力装置平移建筑物,但大型搁置物与建筑物结构特点不同,采用建筑物的搬迁方法一般不适宜,例如在大型石油化工设备中新旧设备的更换,移动高40-50米重500吨以上的水洗塔、油洗塔,此种设备超高超重,而且高重心,要在旧设备拆除后,安装新塔,费工费时,影响生产。
发明内容
本发明的目的是提供一种大型超高超重搁置物的整体平移方法及设备。
对于大型超高超重物体的整体平移,被移搁置物的拉力计算:
水平拉力计算K起:启动系数(由变速运动力、滚杠平行度,受力等因素决定)P:为水平拉力Q:为重量(被移物体重量、加固重量、滚杠重量)f1:滚杠与上滚道板摩擦系数f2=滚杠与下滚道板摩擦系数D:滚杠直径
根据动力学原理及公式,通过计算,求出拉动被移搁置物所用力的大小及速度与加速度值,来确定千斤顶的配置,通过控制系统控制移动物体的速度与加速度,来保证物体的稳定性。
本发明任务是按如下方式完成的:在设备上采用,由临时基础、下滚道板、滚杠、上滚道板、千斤顶、液压控制系统一起构成搁置物的整体移动装置。
在移动方法上采用:首先设置临时基础,在临时基础上放置下滚道板,下滚道板也为移动走道,在下滚道板上面间隔放置滚杠,在滚杠上放置上滚道板,然后放置被移搁置物,上滚道板与搁置物焊接在一起,用千斤顶进行牵引,用液压控制系统来调整千斤顶的牵引力和方向。
本发明施工成本低,工期短,工效高,简单易行;尤其创造了一种适用于移动现场场地狭小、复杂、现场施工工程量大,设备制造、组装周期长,不适合现场组装,现场施工要求工期短的大型搁置物的移动,特别适合大型超高超重化工设备中塔、容器的预建整体移动,经济效益显著。
附图说明
图1一种大型超高、超重物体立式整体平移示意图
具体实施方式
下面结合附图对本发明做进一步的详细说明
1、临时基础6由足够承载被移物重量的钢筋混凝土构成,临时
基础上放置下滚道板5,下滚道板由钢板制成,行走通道为
下滚道板。
2、在下滚道板上间隔设置滚杠2,滚杠的强度应足以承载被移
物重量,以实心圆钢为宜。
3、滚杠上设置上滚道板4,上滚道板为能够承载被移搁置物重
量的平面钢板,并与搁置物焊接在一起,若被移搁置物底面
为平面,其强度足以承受牵引力的拉力及被移物的重量,搁
置物的底面可作为上滚道板,在上滚道板上设置与千斤顶连
接的连接件。
4、牵引装置为卧式千斤顶7,优选松卡式卧式千斤顶,用实心
圆钢作为牵引拉杆4,或用绳索式千斤顶,千斤顶的数量,
配置应根据牵引搁置物的牵引力确定。
5、用液压控制系统随时调整移动搁置物的速度与加速度,液压
装置由液压油泵、分配阀、管路组成,液压油泵通过其上的
调速阀调节千斤顶的速度与加速度。
6、当被移搁置物1方向发生偏移时可采用通过与油泵相连分配
阀调整不同千斤顶受力,调整被移搁置物的移动方向。
实施例
以北京燕化公司66万吨/年乙烯改扩建装置,乙烯急冷区水洗塔(DA-103N)的立式整体平移方法与装置来详细说明。
DA-103N水洗塔,外型尺寸:φ10.8.0/8.5×48.7米,重603.302吨,重心高度为25.413米,DN103N水洗塔受力计算K=2Q为(塔重与滚杠重)f为0.1滚杠直径D:10.8 1、临时基础设置:设置混凝土临时基础基础要求:基础顶面误差应小于5毫米,2、设置下滚道板:在临时基础上水平放置下滚道钢板,钢板厚度δ=30毫米,长27.5米、宽14.2米,平面度小于3毫米,板四边与混凝土基础搭接焊牢,使其成为整体。3、滚杠为直径108毫米的元钢,直径偏差0-1毫米,材质16Mn,在下滚道钢板上摆放滚杠,滚杠之间中心距500毫米,划线定位, 偏差不大于1毫米,滚杠长12.1米,数量36根。4、在滚杠上安置上滚道板,上滚道板与被移物牢固焊接一体,因水洗塔下底面设置为平面钢板,塔底面即为上滚道板,其长13.4米、宽11.29米,塔裙做加固处理。5、前牵系统:前进方向设置4台卧式松卡式千斤顶,上滚道上设置千斤顶拉杆连接点。6、塔前进时方向偏移时,可用液压控制系统调整千斤顶受力与移动方向,使塔不偏离前进方向。
临时基础中心与新塔就位安装位置中心之间的连线标出,与临时基础中心和安装基础中心之间连线相对应的上滚道板塔中心线前方和后方作出标志点,移动过程中,前方和后方各设一台经纬仪进行观察平移方向,以便及时纠偏。塔的运行方向应使塔的中心线与塔临时基础中心与安装基础中心之间连线在同一个垂面内。
调整使前进方向的4台松卡式千斤顶受力相同。同时启动前进方向的千斤顶;启动和停止的加速度不大于1mm/s2,平均速度不大于0.5mm/s。
塔平移时,吃进滚杠时,滚杠必须在垂直于临时基础和安装基础两基础的中心连线方向上吃进,如果由于上、下滚道不平或滚杠的原因于上下滚道板不接触,可用楔子垫平、塞紧使滚杠两端同时向前转动。
平移到目的地后,安装垫铁或采用千斤顶,使被移物底面略高于滚杠,即可抽出滚杠,完成平移。
在乙烯扩大生产能力而进行改造时,要在拆出旧水洗塔上直接建造新水洗塔,一般要用110天,时间长,对于生产装置要停车这么长时间,经济损失太大,若分段预制,现场组装,也至少要用29天,而在不影响旧塔的正常生产运转情况下,先在要拆除旧塔的旁侧建造新塔,新塔建造好后,再拆除旧塔后,将新塔就位,用本发明所用的方法,新塔移动时间为7小时,这样大大减少了停止生产时间,提高了经济效益,因在生产装置区,受场地条件限制,不适宜吊装方式移动,采用本发明所用整体平移方法是水洗塔的移动的最佳选择。
Claims (9)
1、一种大型超高、超重搁置物的整体平移装置,其特征在于由临时基础、下滚道板、滚杠、上滚道板、千斤顶、液压控制系统一起构成搁置物的整体移动装置。
2、如权利要求1所述整体平移装置,其特征在于临时基础为钢筋混凝土基础;
3、如权利要求1所述整体平移装置,其特征在于下滚道板为能够承载被移搁置物及滚杠、上滚道板重量的平面钢板。
4、如权利要求1所述整体平移装置,其特征在于上滚道板为能够承载被移搁置物重量的平面钢板,并与搁置物焊接在一起,若被移搁置物底面为平面,其强度足以承受牵引力的拉力及被移物的重量,搁置物的底面可作为上滚道板,上滚道板设置与千斤顶连接的连接件。
5、如权利要求1所述整体平移装置,其特征在于千斤顶为卧式松卡式千斤顶或钢筋绳索式千斤顶。
6、如权利要求4所述卧式松卡式千斤顶,其特征在于千斤顶的拉杆为实心圆钢。
7、如权利要求1所述整体平移装置,其特征在于液压控制系统由液压泵和分配阀及管线组成。
8、如权利要求1所述整体平移装置,其特征在于可用经纬仪观察被移搁置物的方向。
9、一种大型超高、超重搁置物的整体平移方法,其特征在于:首先设置临时基础,在临时基础上放置下滚道板,下滚道板也为移动走道,在下滚道板上面间隔放置滚杠,在滚杠上放置上滚道板,然后放置被移搁置物,用千斤顶进行牵引,用液压控制系统来调整千斤顶的牵引力和方向。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02100592 CN1436705A (zh) | 2002-02-07 | 2002-02-07 | 一种大型超高、超重搁置物的整体平移方法及设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02100592 CN1436705A (zh) | 2002-02-07 | 2002-02-07 | 一种大型超高、超重搁置物的整体平移方法及设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1436705A true CN1436705A (zh) | 2003-08-20 |
Family
ID=27627172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02100592 Pending CN1436705A (zh) | 2002-02-07 | 2002-02-07 | 一种大型超高、超重搁置物的整体平移方法及设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1436705A (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101837261A (zh) * | 2010-04-02 | 2010-09-22 | 攀钢集团冶金工程技术有限公司 | 圆筒混合机筒体安装方法 |
CN102765576A (zh) * | 2012-07-25 | 2012-11-07 | 中国海洋石油总公司 | 设备安装移动装置 |
CN103552800A (zh) * | 2013-10-31 | 2014-02-05 | 中国化学工程第三建设有限公司 | 大型罐状设备平移方法 |
CN103708381A (zh) * | 2013-12-17 | 2014-04-09 | 天津大学 | 具有自导向功能的滚轴移位系统 |
CN103824691A (zh) * | 2014-02-28 | 2014-05-28 | 中冶天工上海十三冶建设有限公司 | 变压器的液压顶推滑移安装方法 |
CN104787554A (zh) * | 2015-05-12 | 2015-07-22 | 中国化学工程第三建设有限公司 | 一种卧式设备平移装置 |
CN106044665A (zh) * | 2016-05-26 | 2016-10-26 | 中国建筑第二工程局有限公司 | 特重型构件小空间移位装置及其实现方法 |
CN108033395A (zh) * | 2017-12-15 | 2018-05-15 | 中国化学工程第三建设有限公司 | 一种干燥机整体平移安装设备及方法 |
CN111571206A (zh) * | 2020-05-21 | 2020-08-25 | 中国十九冶集团有限公司 | 挤压机前横梁和后横梁的安装方法 |
CN113200453A (zh) * | 2021-05-07 | 2021-08-03 | 中国十五冶金建设集团有限公司 | 一种混凝土预制柱脱模翻身的方法 |
CN115229477A (zh) * | 2022-07-31 | 2022-10-25 | 中冶建工集团有限公司 | 一种烧结机头上部系统模块化整体拆除安装工艺方法 |
-
2002
- 2002-02-07 CN CN 02100592 patent/CN1436705A/zh active Pending
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101837261B (zh) * | 2010-04-02 | 2011-10-19 | 攀钢集团冶金工程技术有限公司 | 圆筒混合机筒体安装方法 |
CN101837261A (zh) * | 2010-04-02 | 2010-09-22 | 攀钢集团冶金工程技术有限公司 | 圆筒混合机筒体安装方法 |
CN102765576A (zh) * | 2012-07-25 | 2012-11-07 | 中国海洋石油总公司 | 设备安装移动装置 |
CN103552800B (zh) * | 2013-10-31 | 2016-01-20 | 中国化学工程第三建设有限公司 | 大型罐状设备平移方法 |
CN103552800A (zh) * | 2013-10-31 | 2014-02-05 | 中国化学工程第三建设有限公司 | 大型罐状设备平移方法 |
CN103708381A (zh) * | 2013-12-17 | 2014-04-09 | 天津大学 | 具有自导向功能的滚轴移位系统 |
CN103824691A (zh) * | 2014-02-28 | 2014-05-28 | 中冶天工上海十三冶建设有限公司 | 变压器的液压顶推滑移安装方法 |
CN104787554A (zh) * | 2015-05-12 | 2015-07-22 | 中国化学工程第三建设有限公司 | 一种卧式设备平移装置 |
CN106044665A (zh) * | 2016-05-26 | 2016-10-26 | 中国建筑第二工程局有限公司 | 特重型构件小空间移位装置及其实现方法 |
CN108033395A (zh) * | 2017-12-15 | 2018-05-15 | 中国化学工程第三建设有限公司 | 一种干燥机整体平移安装设备及方法 |
CN111571206A (zh) * | 2020-05-21 | 2020-08-25 | 中国十九冶集团有限公司 | 挤压机前横梁和后横梁的安装方法 |
CN111571206B (zh) * | 2020-05-21 | 2021-09-28 | 中国十九冶集团有限公司 | 挤压机前横梁和后横梁的安装方法 |
CN113200453A (zh) * | 2021-05-07 | 2021-08-03 | 中国十五冶金建设集团有限公司 | 一种混凝土预制柱脱模翻身的方法 |
CN115229477A (zh) * | 2022-07-31 | 2022-10-25 | 中冶建工集团有限公司 | 一种烧结机头上部系统模块化整体拆除安装工艺方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108677720B (zh) | 吊装构件顶升架设施工工艺 | |
CN1436705A (zh) | 一种大型超高、超重搁置物的整体平移方法及设备 | |
CN107338963A (zh) | 一种超大跨度张弦桁架场外吊装施工方法 | |
CN102530732A (zh) | 大型压力机部件液压提升滑移就位方法及设备 | |
CN103061264B (zh) | 水中高位支架单柱预压方法及装置 | |
CN1609363A (zh) | 建筑物桁架整体提升方法及其设备 | |
WO2022199617A1 (zh) | 一种智能道路施工交通荷载工程检测试验系统 | |
CN110331670A (zh) | 等高双箱组合梁结构拼装工艺 | |
CN104591003B (zh) | 万吨级可移动式门式起重机 | |
CN102496329B (zh) | 一种泥岩涂抹形成演化物理模拟实验装置及使用方法 | |
CN113356056B (zh) | 一种大跨径钢桥工厂装配化整体制造方法 | |
CN212925811U (zh) | 一种用于预制多边形桥墩拼装定位的导向装置 | |
CN115744033A (zh) | 覆土子弹罐平移就位方法 | |
CN1034210C (zh) | 炼铁高炉的整体滑移安装推移设备 | |
CN211848999U (zh) | 一种钢结构框架桥双边平衡牵引装置 | |
CN208251191U (zh) | 土木工程大吨位静载系统移动底盘 | |
CN1162586C (zh) | 系杆拱桥吊杆无损伤更换的动态控制方法 | |
CN2797277Y (zh) | 辊子式重物移动装置 | |
CN1645069A (zh) | 远距离传输钢砼台面电子汽车衡及其钢砼台面制作方法 | |
CN202753110U (zh) | 带式输送机的托辊更换装置 | |
CN206654672U (zh) | 一种建筑机械用支撑装置 | |
CN101476282B (zh) | 长大重型构件下河施工方法 | |
CN111287224A (zh) | 一种利用杠杆原理的竖向静载荷试验装置 | |
CN211255184U (zh) | 机械设备底座中心调整装置 | |
CN221625653U (zh) | 地下厂房直臂式岩锚墩台结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |