CN1384251A - Fast closure plant for barrage gate in damming river and its use - Google Patents

Fast closure plant for barrage gate in damming river and its use Download PDF

Info

Publication number
CN1384251A
CN1384251A CN 01117281 CN01117281A CN1384251A CN 1384251 A CN1384251 A CN 1384251A CN 01117281 CN01117281 CN 01117281 CN 01117281 A CN01117281 A CN 01117281A CN 1384251 A CN1384251 A CN 1384251A
Authority
CN
China
Prior art keywords
dam
steel
steel mesh
cage
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01117281
Other languages
Chinese (zh)
Inventor
史建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01117281 priority Critical patent/CN1384251A/en
Publication of CN1384251A publication Critical patent/CN1384251A/en
Pending legal-status Critical Current

Links

Abstract

The fast closure plant includes combining piles, cross beam, steel net, positioning piles, ballast cage and block stone. After the fast closure plant is set in the dragon's mouth, the thrown block stone will be clamped by the steel net, the impact force to the block stone with be absorbed by the steel net, ballast cage, cross beam, combined piles and dam, and the water flow will be reduced. So, the block stone thrown to the downstream of the steel net will be fixed in the dam and the river will be dammed stably.

Description

Join the two sections of a bridge, etc fast device and using method thereof of dam mouth door during river cut-off
Join the two sections of a bridge, etc fast device and using method thereof of dam mouth door belongs to the hydrotechnics field during river cut-off of the present invention.
The closure of dam mouth door is the key of damming, at present to 10000m 3The above river of/second flow amount dams just very difficult, when the very moment door joins the two sections of a bridge, etc certain distance, because current are anxious especially, the concrete polyhedron of jettisoninging down, ratchel, metaling etc. are washed away by anxious current in a large number, only take tactics of human sea at last, the concrete polyhedron of the long-time very large amount of jettisoninging incessantly of employing, ratchel, metaling etc., dam is attacked and occupied forward very difficultly, until the dam closure, though the closure success has consumed great amount of manpower and material resources and financial resources.
Purpose of the present invention is exactly the problem at above appearance, and join the two sections of a bridge, etc fast device and using method thereof of dam mouth door makes the closure that can make dam mouth door fast and stable in this way when createing a kind of river cut-off.
Join the two sections of a bridge, etc fast device and using method thereof of dam mouth door during river cut-off of the present invention, mainly comprise: compound pile, crossbeam, steel mesh, guide pile, the ballast cage, stone, it is characterized in that: in advance at the good dam mouth door place of damming of prospecting, compound pile more than two groups or two groups is set in the riverbed respectively, distance between them is about 10 meters to 30 meters, be connected and fixed with it by crossbeam, guide pile is located at two groups of downstreams between the compound pile, steel mesh is connected on the ballast cage on one side, after sinking under water along guide pile, another side is connected on the crossbeam, is thrown to a large amount of stones in the ballast cage and all around with ship in the both sides upstream and downstream.Compound pile is made up of a plurality of stakes or a pier, and its top firmly connects into platform by steel work welding or concrete casting, and it highly approximates the height of the dam that dams; Crossbeam is to be made by steel structure girder or precast concrete beam, is provided with a plurality of lacing holes or suspension hook below it; Steel mesh is a rectangle, can be made into wire rope net, steel chain net or wire rope and steel chain shuffling net, the upper end of its vertical wire rope or steel chain is connected on the lacing hole or suspension hook of crossbeam, the lower end is connected on the steel structure frame of ballast cage, and the area of steel mesh mesh is between 0.5 square metre to 2.5 square metres; Pressing cage is to piece together structure by one or more cuboid steel structure frames to become, reach all around on the framework at the end and be welded into a rule crosspiece or perpendicular shelves with the steel material, the distance of shelves and shelves is between 0.2 meter to 0.4 meter, after the ballast cage sinks under water, it must be filled with the stone that ship is thrown into, and around it, form left, right, front and rear in an opposite direction.Its using method is: a mouthful door closure device is set at the good dam mouth door place of damming of prospecting in advance, when dam begins to join the two sections of a bridge, etc, assemble large-scale section heavy dump truck, bulldozer, loader, scraper, motor-driven cargo ships etc. carry out integration of operation, with the compound pile of ship at mouth door closure device, a large amount of around the ballast cage, the stone of jettisoninging in large area, make its left side, right, before, the back is firm in an opposite direction, when both sides closure dam is attacked and occupied to compound pile simultaneously, in its both sides elder generation upstream, back downstream is to the centre ratchel of jettisoninging, metaling etc., the ratchel of jettisoninging in the upstream is stuck on the steel mesh, thereafter a large amount of ratchels, metalings etc. are jettisoninged in the downstream of steel mesh, and be fixed on abutment firmly with being stuck in ratchel on the steel mesh and other building stones of upstream, stably attack and occupy forward step by step like this, join the two sections of a bridge, etc until dam.Because the effect of steel mesh, needn't worry that the stone of jettisoninging can be washed away by current, the impact force that is stuck in the stone on the steel mesh is fully absorbed decomposition by steel mesh, ballast cage, crossbeam, compound pile and dam body, the current of its back obviously weaken, the steel mesh downstream stone of jettisoninging down just can steadily be fixed on abutment like this, it is attacked and occupied forward step by step steadily, join the two sections of a bridge, etc until dam.
Join the two sections of a bridge, etc the fast advantage of device and using method thereof of dam mouth door is when adopting river cut-off of the present invention:
1, big to flow, just the time spent effect is obvious especially for river that current are anxious, rapidly and efficiently rate, safety are finished with saving time, guarantee both quality and quantity smoothly in the closure of dam mouth door when guaranteeing to dam.
2, can save a large amount of building stones, cost obviously reduces.
The dam mouth door structural profile schematic diagram of device that joins the two sections of a bridge, etc fast when accompanying drawing is river cut-off, shown in accompanying drawing: compound pile 1., crossbeam 2., guide pile 3., steel mesh 4., the ballast cage 5., stone 6..
Embodiment of the present invention are described further as follows in conjunction with the accompanying drawings:
In advance at the good dam mouth door place of damming of prospecting, in the riverbed, be provided with respectively more than two groups or two groups compound pile 1., distance between them is about 10 meters to 30 meters, 2. be connected and fixed with it by crossbeam, 3. guide pile is located at the downstream of two groups of compound piles between 1., 5. goes up Yi Bian 4. steel mesh is connected the ballast cage, after 3. sinking under water along guide pile, another side is connected crossbeam and 2. goes up, with ship the both sides upstream and downstream 6. a large amount of stones is thrown to the ballast cage 5. in and all around.Its using method is: a mouthful door closure device is set at the good dam mouth door place of damming of prospecting in advance, when dam begins to join the two sections of a bridge, etc, assemble large-scale section heavy dump truck, bulldozer, loader, scraper, motor-driven cargo ships etc. carry out integration of operation, with ship 1. at the compound pile of mouth door closure device, the ballast cage is 5. a large amount of all around, the stone of jettisoninging in large area, make its left side, right, before, the back is firm in an opposite direction, when closures dam in both sides is attacked and occupied simultaneously to compound pile 1. the time, in its both sides elder generation upstream, back downstream is to the centre ratchel of jettisoninging, metaling etc., the ratchel of jettisoninging in the upstream is stuck in steel mesh and 4. goes up, thereafter a large amount of ratchels, metalings etc. are jettisoninged in steel mesh downstream 4., and be fixed on abutment firmly with being stuck in ratchel that 4. steel mesh go up and other building stones of upstream, stably attack and occupy forward step by step like this, join the two sections of a bridge, etc until dam.

Claims (6)

1, join the two sections of a bridge, etc fast device and using method thereof of dam mouth door during river cut-off of the present invention, mainly comprise: compound pile, crossbeam, steel mesh, guide pile, the ballast cage, stone, it is characterized in that: in advance at the good dam mouth door place of damming of prospecting, compound pile more than two groups or two groups is set in the riverbed respectively, distance between them is about 10 meters to 30 meters, be connected and fixed with it by crossbeam, guide pile is located at two groups of downstreams between the compound pile, steel mesh is connected on the ballast cage on one side, after sinking under water along guide pile, another side is connected on the crossbeam, is thrown to a large amount of stones in the ballast cage and all around with ship in the both sides upstream and downstream.
2, compound pile is made up of a plurality of stakes or a pier, and its top firmly connects into platform by steel work welding or concrete casting, and it highly approximates the height of the dam that dams.
3, crossbeam is to be made by steel structure girder or precast concrete beam, is provided with a plurality of lacing holes or suspension hook below it.
4, steel mesh is a rectangle, can be made into wire rope net, steel chain net or wire rope and steel chain shuffling net, the upper end of its vertical wire rope or steel chain is connected on the lacing hole or suspension hook of crossbeam, the lower end is connected on the steel structure frame of ballast cage, and the area of steel mesh mesh is between 0.5 square metre to 2.5 square metres.
5, pressing cage is to piece together structure by one or more cuboid steel structure frames to become, reach all around on the framework at the end and be welded into a rule crosspiece or perpendicular shelves with the steel material, the distance of shelves and shelves is between 0.2 meter to 0.4 meter, after the ballast cage sinks under water, it must be filled with the stone that ship is thrown into, and around it, form left, right, front and rear in an opposite direction.
6, its using method is: a mouthful door closure device is set at the good dam mouth door place of damming of prospecting in advance, when dam begins to join the two sections of a bridge, etc, assemble large-scale section heavy dump truck, bulldozer, loader, scraper, motor-driven cargo ships etc. carry out integration of operation, with the compound pile of ship at mouth door closure device, a large amount of around the ballast cage, the stone of jettisoninging in large area, make its left side, right, before, the back is firm in an opposite direction, when both sides closure dam is attacked and occupied to compound pile simultaneously, in its both sides elder generation upstream, back downstream is to the centre ratchel of jettisoninging, metaling etc., the ratchel of jettisoninging in the upstream is stuck on the steel mesh, thereafter a large amount of ratchels, metalings etc. are jettisoninged in the downstream of steel mesh, and be fixed on abutment firmly with being stuck in ratchel on the steel mesh and other building stones of upstream, stably attack and occupy forward step by step like this, join the two sections of a bridge, etc until dam.
CN 01117281 2001-04-27 2001-04-27 Fast closure plant for barrage gate in damming river and its use Pending CN1384251A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01117281 CN1384251A (en) 2001-04-27 2001-04-27 Fast closure plant for barrage gate in damming river and its use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01117281 CN1384251A (en) 2001-04-27 2001-04-27 Fast closure plant for barrage gate in damming river and its use

Publications (1)

Publication Number Publication Date
CN1384251A true CN1384251A (en) 2002-12-11

Family

ID=4662684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01117281 Pending CN1384251A (en) 2001-04-27 2001-04-27 Fast closure plant for barrage gate in damming river and its use

Country Status (1)

Country Link
CN (1) CN1384251A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100451246C (en) * 2005-06-10 2009-01-14 上海勘测设计研究院 Water-retaining cofferdam structure and construction method thereof
CN102206935A (en) * 2010-03-30 2011-10-05 马兴华 Cage and method for closing closure gap by combining cage with filler
CN102747706A (en) * 2011-04-20 2012-10-24 中交上海航道局有限公司 Section steel frame cage stone-dumping closure construction method
CN106245584A (en) * 2016-08-12 2016-12-21 李志英 A kind of for building dykes and dams or the double jaw rack blocked up that dams

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100451246C (en) * 2005-06-10 2009-01-14 上海勘测设计研究院 Water-retaining cofferdam structure and construction method thereof
CN102206935A (en) * 2010-03-30 2011-10-05 马兴华 Cage and method for closing closure gap by combining cage with filler
CN102747706A (en) * 2011-04-20 2012-10-24 中交上海航道局有限公司 Section steel frame cage stone-dumping closure construction method
CN106245584A (en) * 2016-08-12 2016-12-21 李志英 A kind of for building dykes and dams or the double jaw rack blocked up that dams
CN106245584B (en) * 2016-08-12 2018-06-19 重庆市万闸防汛器材有限责任公司 It is a kind of for building dykes and dams or the double jaw rack blocked up that shuts off

Similar Documents

Publication Publication Date Title
CN207193982U (en) A kind of dam slope slope concrete pours transporting equipment
CN204898602U (en) Emergent stifled waterwall
CN1384251A (en) Fast closure plant for barrage gate in damming river and its use
CN1069718C (en) Construction method while river cut-off dam closured
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN202787190U (en) Frame used in riprap closure method for high flow rate closure gap
CN204738299U (en) Form album device of sediment platform fast in steep side slope of height
CN1473994A (en) Movable combined flood cut-off dam
CN204875664U (en) A retaining wall structure for interim pier in bay
CN208949951U (en) A kind of riverway sludge cleaning plant
CN210066762U (en) Elevator system suitable for deep foundation pit load-carrying vehicle vertical transportation
CN201915390U (en) Double-H-shaped and U-shaped combined steel sheet pile with tubular fasteners
CN2391910Y (en) Truss for blocking break of a dike
CN208039210U (en) A kind of boulder bed large-sized deep water foundation construction platform
CN217231696U (en) Plugging device for dike breach cage sinking method of river
CN106854864A (en) Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction
CN201686965U (en) Cast-in-situ reinforced concrete strobe for diversion tunnel
CN215887944U (en) Island platform is built in advancing of deep water high flow velocity river course embankment
CN115125902B (en) Method for rapidly blocking river breach based on blocking self-closing
CN203846552U (en) Hydraulic grab bucket electric transmission tool
CN217839889U (en) Dam breach quick plugging device and block structure
CN215562322U (en) Cut off and flood fighting uses shaped steel gabion
CN115030090B (en) Quick blockage system for river breach based on blocking self-closing
CN203145953U (en) Tunnel portal earth-retaining device and pedestrian underpass construction system
CN1202316C (en) Method for reducing loss of closure material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication