CN203145953U - Tunnel portal earth-retaining device and pedestrian underpass construction system - Google Patents

Tunnel portal earth-retaining device and pedestrian underpass construction system Download PDF

Info

Publication number
CN203145953U
CN203145953U CN2012207436450U CN201220743645U CN203145953U CN 203145953 U CN203145953 U CN 203145953U CN 2012207436450 U CN2012207436450 U CN 2012207436450U CN 201220743645 U CN201220743645 U CN 201220743645U CN 203145953 U CN203145953 U CN 203145953U
Authority
CN
China
Prior art keywords
earth
construction
shaped steel
section steels
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012207436450U
Other languages
Chinese (zh)
Inventor
吴金山
吴欣之
金中林
孙继辉
应建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN2012207436450U priority Critical patent/CN203145953U/en
Application granted granted Critical
Publication of CN203145953U publication Critical patent/CN203145953U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a tunnel portal earth-retaining device and a pedestrian underpass construction system. The tunnel portal earth-retaining device is used for performing construction of a pedestrian underpass by a push bench and a pipe joint, and comprises an upper embedded steel plate arranged at the upper end of the inner side of a tunnel portal and a lower embedded steel plate arranged at the lower end of the inner side of the tunnel portal; a plurality of vertical section steels are welded between the upper embedded steel plate and the lower embedded steel plate; each two adjacent vertical section steels are connected through horizontal section steels by means of welding; and a plurality of square holes in the vertical direction are formed between each vertical section steel and the corresponding horizontal section steel. In construction, the square holes are used for the pipe joint and the push bench to penetrate through. The vertical section steels and the horizontal section steels are used for substituting for H-section steels, further the pipe joint penetrates through the vertical section steels and the horizontal section steels to be driven into earth, and accordingly earth can be retained, and shortcomings caused by large-area gas cutting of the section steels can be avoided. The tunnel portal earth-retaining device and the pedestrian underpass construction system have the advantages that construction efficiency is improved, construction difficulty is lowered, and construction cost is saved.

Description

Portal keeps off native device and underground pedestrian passageway construction system
Technical field
The utility model relates to the realm of building construction, relates in particular to a kind of construction of underground pedestrian passageway.
Background technology
Carry out at present the general job practices that adopts non-excavation of construction of walkway below road, railway, it can be constructed under the situation of not blocking traffic.Specifically be at first to do two foundation ditches at road or railway both sides, with rectangle unit head and back tube coupling, be placed in the foundation ditch, unit head cuts earth preceding, the after-applied thrust of tube coupling makes unit head and tube coupling stretch the foundation ditch that leads to the opposite forward, and so circulation makes tube coupling be covered with whole passage, replace whole tube coupling with concrete box culvert at last, form the walkway.
In practice of construction, face down from ground and dig the dark 8m~10m of foundation ditch, put push-bench and tube coupling is constructed, in order not allow earth landslide and infiltration that H shaped steel will be inserted, when push-bench advances around foundation ditch, the retaining soil type steel that is positioned at the propelling front end face must cut off several times, can allow push-bench tunnel.The cross section of whole passage is pressed 13.62m х 7.6m and is calculated, and the weight that need cut off shaped steel is 87000kg, and owing to the concrete of shaped steel and bracing of foundation pit is close to, relatively more difficult when implementing gas cutting, prolonged the duration of construction greatly.
The utility model content
The technical problems to be solved in the utility model provides a kind of large tracts of land gas cutting shaped steel of avoiding, so improve efficiency of construction, reduced difficulty of construction, the portal of saving construction cost keeps off native device and underground pedestrian passageway construction system.
In order to solve this technical problem, the utility model provides a kind of portal to keep off native device, be used for using push-bench and tube coupling to carry out the construction of underground pedestrian passageway, comprise the last pre-embedded steel slab of being located at the door opening inner top side and the following pre-embedded steel slab of lower end, pre-embedded steel slab and the described vertical shaped steel that is welded with some vertical settings down between the pre-embedded steel slab on described, be welded to connect by horizontally disposed horizontal shaped steel between two adjacent vertical shaped steel, form the square hole that some vertical directions arrange between described vertical shaped steel and the described horizontal shaped steel, when construction, described square hole passes for described tube coupling and push-bench.
When not constructing, in the described square hole plate is installed.
Described plate is connected with earth with press strip by bolt.
Described plate is light material.
The utility model also provides a kind of underground pedestrian passageway construction system, be included in two foundation ditches that the road both sides arrange, be used for connecting the door opening of waiting to dig earth, described door opening is positioned at described foundation ditch, wherein constructs for described push-bench in the foundation ditch of a side, comprise also that the utility model provides portal keep off native device.
The underground pedestrian passageway construction system that the utility model provides also comprises concrete box culvert, in order to replace the tube coupling in the earth, forms underground pedestrian passageway.
The underground pedestrian passageway construction system that the utility model provides also comprises the top, back, and described tube coupling is connected with other box culverts by top, described back after passing earth.
The vertical shaped steel of the utility model utilization and horizontal shaped steel have replaced H shaped steel, and then tube coupling passed vertical shaped steel and horizontal shaped steel, head in the earth, can realize keeping off the effect of soil, the drawback that can also avoid large tracts of land gas cutting shaped steel to bring, so provide a kind of and improved efficiency of construction, reduced difficulty of construction, the portal of saving construction cost keeps off native device and underground pedestrian passageway construction system.
Description of drawings
Fig. 1 is the structural representation of the underground pedestrian passageway construction system that provides of the utility model one embodiment;
Fig. 2 is the A-A schematic cross-section of Fig. 1 of the utility model one embodiment;
Fig. 3 is the B-B schematic cross-section of Fig. 2 of the utility model one embodiment;
Among the figure, 1-laterally shaped steel; 2-press strip; 3-vertically shaped steel; 4-push-bench; 5-foundation ditch; 6-portal keeps off native device; 7-upward pre-embedded steel slab, 8-retaining soil type steel; 9-road; 10-tube coupling; 11-bolt; 12-box culvert; Top, 13-back; 14-following pre-embedded steel slab; 15-plate.
The specific embodiment
The portal that the utility model is provided below with reference to Fig. 1 to Fig. 3 keeps off native device and the underground pedestrian passageway construction system is described in detail, it is the utility model one optional embodiment, can think that those skilled in the art can make amendment to it in not revising scope sound in content of the present utility model and polishes according to known general knowledge.
Please refer to Fig. 2, and in conjunction with Fig. 1 and Fig. 3, present embodiment provides a kind of portal to keep off native device, be used for using push-bench 4 and tube coupling 10 to carry out the construction of underground pedestrian passageway, comprise the last pre-embedded steel slab 7 of being located at the door opening inner top side and the following pre-embedded steel slab 14 of lower end, pre-embedded steel slab 7 and the described vertical shaped steel 3 that is welded with some vertical settings down between the pre-embedded steel slab 14 on described, be welded to connect by horizontally disposed horizontal shaped steel 1 between two adjacent vertical shaped steel 3, form the square hole that some vertical directions arrange between described vertical shaped steel 3 and the described horizontal shaped steel 1, when construction, be that push-bench 4 is when tunneling, described square hole passes for described tube coupling 10 and push-bench 4, the more important thing is the effect of having played retaining soil well.Push-bench in the present embodiment is the rectangular top pipe machine.
The vertical shaped steel 3 of present embodiment utilization and horizontal shaped steel 1 have replaced H shaped steel, and then tube coupling 10 passed vertical shaped steel 3 and horizontal shaped steel 1, head in the earth, can realize keeping off the effect of soil, the drawback that can also avoid large tracts of land gas cutting shaped steel to bring, so provide a kind of and improved efficiency of construction, reduced difficulty of construction, the portal of saving construction cost keeps off native device and underground pedestrian passageway construction system.
Please refer to Fig. 3, and in conjunction with Fig. 1, when not constructing, plate 15 is installed in the described square hole.Described plate 15 is connected with earth with press strip 2 by bolt 11.Described plate 15 is light material.Plate 15 is detachably reused, easy construction.
Please refer to Fig. 1, present embodiment also provides a kind of underground pedestrian passageway construction system, be included in two foundation ditches 5 that road 9 both sides arrange, be used for connecting the door opening of waiting to dig earth, described door opening is positioned at described foundation ditch 5, wherein constructs for described push-bench 4 in the foundation ditch of a side, comprise also that present embodiment provides portal keep off native device 6.
The underground pedestrian passageway construction system that present embodiment provides also comprises the concrete box culvert (not shown), in order to replace the tube coupling 10 in the earth, forms underground pedestrian passageway.
The underground pedestrian passageway construction system that present embodiment provides also comprises back top 13, and described tube coupling 10 passes behind the earth by top, described back 13 and is connected with other box culverts 12.
Please refer to Fig. 1, and in conjunction with Fig. 2,3, present embodiment also provides a kind of underground pedestrian passageway job practices, the portal that has adopted present embodiment to provide keeps off native device, comprise the steps: S01: remove described plate 15, utilize described push-bench 4 and tube coupling 10 to carry out cutting and the driving of earth, described tube coupling 10 is passed described square hole jacking earth, in described tube coupling 10 complete jacking earth;
S02: the horizontal shaped steel 1 or the vertical shaped steel 3 that cut off correspondence position, namely cut off the parts transversely shaped steel 1 or the vertical shaped steel 3 that hinder described push-bench 4 and tube coupling 10 jackings, utilize described push-bench 4 and tube coupling 10 to carry out cutting and the driving of earth, in described tube coupling 10 jacking earth; Can be understood as, in the present embodiment, in order to make tube coupling 10 jacking earth as much as possible, the laterally jacking of shaped steel 1 or vertical shaped steel 3 meeting obstruction tube couplings 10 sometimes, at this moment, the horizontal shaped steel 1 by cutting off correspondence position or vertical shaped steel 3 make that tube coupling 10 can the jacking earth.Then, horizontal shaped steel 1 or vertical shaped steel 3 and the tube coupling welding of having finished construction with remainder make and keep off unlikely weakening of native effect.
S03: repeat the step of S01 and S02, with in the complete jacking earth of other tube couplings, take earth until described tube coupling successively;
S04: utilize a concrete box culvert to replace all tube couplings, form underground pedestrian passageway.
After whole completions, remaining shaped steel can be removed, select the shaped steel that can reuse, in order in follow-up construction, use, play the effect of saving cost.

Claims (4)

1. a portal keeps off native device, be used for using push-bench and tube coupling to carry out the construction of underground pedestrian passageway, comprise the last pre-embedded steel slab of being located at the door opening inner top side and the following pre-embedded steel slab of lower end, it is characterized in that: pre-embedded steel slab and the described vertical shaped steel that is welded with some vertical settings down between the pre-embedded steel slab on described, be welded to connect by horizontally disposed horizontal shaped steel between two adjacent vertical shaped steel, form the square hole that some vertical directions arrange between described vertical shaped steel and the described horizontal shaped steel, when construction, described square hole passes for described tube coupling and push-bench, when not constructing, in the described square hole plate is installed.
2. portal as claimed in claim 1 keeps off native device, it is characterized in that: described plate is connected with earth with press strip by bolt.
3. underground pedestrian passageway construction system, be included in two foundation ditches that the road both sides arrange, be used for connecting the door opening of waiting to dig earth, described door opening is positioned at described foundation ditch, wherein construct for described push-bench in the foundation ditch of a side, it is characterized in that: comprise that also portal as claimed in claim 1 or 2 keeps off native device.
4. underground pedestrian passageway construction system as claimed in claim 3 is characterized in that: also comprise the top, back, described tube coupling is connected with other box culverts by top, described back after passing earth.
CN2012207436450U 2012-12-29 2012-12-29 Tunnel portal earth-retaining device and pedestrian underpass construction system Expired - Fee Related CN203145953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012207436450U CN203145953U (en) 2012-12-29 2012-12-29 Tunnel portal earth-retaining device and pedestrian underpass construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012207436450U CN203145953U (en) 2012-12-29 2012-12-29 Tunnel portal earth-retaining device and pedestrian underpass construction system

Publications (1)

Publication Number Publication Date
CN203145953U true CN203145953U (en) 2013-08-21

Family

ID=48973489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012207436450U Expired - Fee Related CN203145953U (en) 2012-12-29 2012-12-29 Tunnel portal earth-retaining device and pedestrian underpass construction system

Country Status (1)

Country Link
CN (1) CN203145953U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075162A (en) * 2012-12-29 2013-05-01 上海市机械施工有限公司 Tunnel portal earth retaining device as well as underground pedestrian passageway construction system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075162A (en) * 2012-12-29 2013-05-01 上海市机械施工有限公司 Tunnel portal earth retaining device as well as underground pedestrian passageway construction system and method

Similar Documents

Publication Publication Date Title
CN206800412U (en) The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft
CN107119711B (en) Connecting structure for large-range adjacent existing transfer station and construction method
CN107664035B (en) Shield-well-after-shield construction method for shield pipe gallery
CN106223967B (en) A kind of great burying rectangle or class rectangle tunneling shield constructing device and method
CN107524141B (en) Construction method of cast-in-situ bored pile of rock soil foundation
WO2018133740A1 (en) Underground building and construction method for same
CN102286980A (en) Steel truss foundation pit supporting structure
WO2018177307A1 (en) Fabricated underground building and construction method thereof
CN113266392B (en) Pipe jacking construction method for penetrating through existing anchor cable group
CN107905814A (en) Large span loess tunnel top bar CD construction methods
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN217580865U (en) Large-diameter steel casing drilling platform under deep water slope bare rock geological condition
CN112096419A (en) Supporting structure and method for repairing tunnel secondary lining damage
CN111005381A (en) Bottom-pocket type vibration hammer profile steel pile extractor and pile extracting method thereof
CN109356193B (en) Prefabricated piping lane propelling movement construction equipment
KR20110088326A (en) Construction method for underground structure using pressed pipe
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN206816278U (en) Novel recoverable supporting steel arch frame for excavating transverse channel
CN211621598U (en) A foundation ditch structure for hole passes steel pipe installation
WO2018177304A1 (en) Fabricated underground building and construction method thereof
CN203145953U (en) Tunnel portal earth-retaining device and pedestrian underpass construction system
CN210829267U (en) Shield constructs interval back construction air shaft structure
KR101118100B1 (en) Pipe roof structures and its construction method
KR20130014160A (en) The tunel execution method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20161229

CF01 Termination of patent right due to non-payment of annual fee