CN1370896A - Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete - Google Patents

Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete Download PDF

Info

Publication number
CN1370896A
CN1370896A CN 01145370 CN01145370A CN1370896A CN 1370896 A CN1370896 A CN 1370896A CN 01145370 CN01145370 CN 01145370 CN 01145370 A CN01145370 A CN 01145370A CN 1370896 A CN1370896 A CN 1370896A
Authority
CN
China
Prior art keywords
shaft tower
foundation
construction
stone
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01145370
Other languages
Chinese (zh)
Inventor
芦卢宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LOCOMOTIVE DEPARTMENT XINING RAILWAY SUB-BUREAU
Original Assignee
LOCOMOTIVE DEPARTMENT XINING RAILWAY SUB-BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LOCOMOTIVE DEPARTMENT XINING RAILWAY SUB-BUREAU filed Critical LOCOMOTIVE DEPARTMENT XINING RAILWAY SUB-BUREAU
Priority to CN 01145370 priority Critical patent/CN1370896A/en
Publication of CN1370896A publication Critical patent/CN1370896A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The construction method of the present invention includes cutting stone into one block or two blocks to be assembled in the designed size, drilling holes for foundation bolts; hoisting the stone into the foundation pit, back filling and densifying; fixing the foundation bolts; and assembling the pole or tower in the method similar to fixing railway tracks. The said method can be used in construction electrical power pole and tower as well as other buildings in cold area in winter.

Description

The power engineering shaft tower adopts rubble to substitute the poured in place concrete foundation construction method
The invention belongs to the construction of power engineering pole and tower foundation adopts rubble to substitute the poured in place concrete foundation construction method.
The prior art power engineering shaft tower built-up foundation of setting up routinely all is the concrete foundation of cast in situs by design, selecting for use of its medium sand, building stones, reinforcing bar, the cement and the water ratio requirement that are applicable to highland and severe cold are very strict, after building, concrete foundation to pass through preserving period, reaching the shaft tower assembling that just can carry out after designing quality requires more than the basis, needing after the often basic cast in situs just can reach prescribed strength more than 28 days.And on-the-spot proportioning to cement, sand, stone, water also is difficult to grasp, also Qinghai-Tibet Railway this natural conditions very under the condition of severe construction be difficult to ensure the quality of products.
The objective of the invention is to for outside the deficiency that overcomes above-mentioned prior art, especially construct because of being subjected to the influence of natural conditions in the Qinghai-Tibet Railway power engineering, cause the construction period short, long construction period, programming and difficult quality guarantee, therefore at Qinghai-Tibet Railway natural conditions and construction particularity duration to engineering construction, progress, quality is because the unfavorable factor that environment brings has been carried out thematic tackling key problem, and according to the experience of constructing for many years in Qinghai-Tibet Railway and grasping, examination, checking thinks that can make full use of natural rubble is the basis that can substitute poured in place concrete fully as the power engineering pole and tower foundation through the exploitation back, it is short convenient to have the construction haul distance, characteristics such as on-the-spot easily grasp.Technical method of the present invention is: this method is the pole and tower foundation size of giving by design department, the stone cutting is become an integral body that conforms to size with designing institute, bigger basis is divided into two parts up and down, installed surface intelligibility chipping, and press the shaft tower installation requirement, the stone bolt hole drill is good, transport the scene to, hang in the foundation pit that digs by design, after backfill and the compacting shaft tower stone bolt is fixed, by the railway concrete sleeper fixedly track bolt construction method (sulfur cement mortar anchorage method) carry out site operation, just can carry out the shaft tower assembly working immediately.Technique effect of the present invention: component on site construction method of the present invention simply, easily grasp, need not to carry out cumbersome preparation of construction, get the raw materials ready.And will dig good rubble-mound foundation and transport the scene to, in place, installing only is about 4 hours, just can carry out the above work in basis, the concrete foundation more cast-in-place than the scene saved time and reached 668 hours, saved the time greatly, improved construction efficiency, accelerating construction progress.With shaft tower formation integral body in back is being installed because of pole and tower foundation, shaft tower produces power to the basis, is shaft tower self, and the weight of insulator, lead and the bending moment force that produced by wind-force act on foundation bearing capacity.Do not have excessive impact force, from building stones natures intensity, the hardness integrality, easily exploit pollution-free, select fully can with concrete foundation one's deceased mother U.S., can reach the select requirement of design fully to pole and tower foundation.And be not subjected to after the interference of external environments such as time, season, weather and influence, and have higher anticorrosive, cold resistance.Highland and severe cold area and winter time carry out constructional difficulties under the long natural environment ten minutes unfavorable conditions thereby effectively solved, overcome the unfavorable factor of bringing in the cast of frozen soil layer section concrete basis.The harm of natural zone is given in improvement because of cast-in-place concrete.The construction works quality, benefit is improved greatly.
Description of drawings:
Accompanying drawing is a structural representation of the present invention.
Below the present invention is described in further detail: as shown in drawings to closing the given embodiment of accompanying drawing, this method is: by the pole and tower foundation size that design department gave, stone 1 cutting is become an integral body that conforms to size with designing institute, (bigger basis can be divided into two parts up and down) installed surface intelligibility chipping, and press the shaft tower installation requirement, the stone bolt hole drill is good, transport the scene to, hang in the foundation pit 3 that digs by design, after backfill and the compacting that shaft tower stone bolt 2 is fixing, by railway coagulate native sleeper fixedly track bolt construction method (sulfur cement mortar anchorage method) carry out site operation, just can carry out the shaft tower assembly working immediately.Utilize the rubble-mound foundation to substitute concrete cast-in-site basis, from component on site construction method simply, easily grasp, need not to carry out cumbersome preparation of construction, get the raw materials ready.And will dig good rubble-mound foundation and transport the scene to, in place, installing only is about 4 hours, just can carry out the above work in basis, the concrete foundation more cast-in-place than the scene saved time and reached 668 hours, saved the time greatly, improve construction efficiency, accelerated construction speed.

Claims (1)

1. a power engineering shaft tower adopts rubble to substitute the poured in place concrete foundation construction method, it is characterized in that this method is: by the pole and tower foundation size that design department gave, stone (1) cutting is become an integral body that conforms to size with designing institute, or bigger basis can be divided into two parts up and down, installed surface intelligibility chipping, and press the shaft tower installation requirement, the stone bolt hole drill is good, transport the scene to, hang in the foundation pit (3) that has dug by design, after backfill and the compacting that shaft tower stone bolt (2) is fixing, by the railway concrete sleeper fixedly track bolt construction sulfur cement mortar anchorage method carry out site operation, just can carry out the shaft tower assembling immediately and construct.
CN 01145370 2001-12-31 2001-12-31 Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete Pending CN1370896A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01145370 CN1370896A (en) 2001-12-31 2001-12-31 Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01145370 CN1370896A (en) 2001-12-31 2001-12-31 Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete

Publications (1)

Publication Number Publication Date
CN1370896A true CN1370896A (en) 2002-09-25

Family

ID=4678163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01145370 Pending CN1370896A (en) 2001-12-31 2001-12-31 Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete

Country Status (1)

Country Link
CN (1) CN1370896A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705692B (en) * 2009-11-27 2011-02-09 温州中城建设集团有限公司 Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole
CN103696611A (en) * 2013-12-03 2014-04-02 新安县电业公司 Base structure for steel tube tower
CN106120842A (en) * 2016-07-31 2016-11-16 成都聚合追阳科技有限公司 A kind of light gathering photovoltaic power generating system stone ground manufacturing process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705692B (en) * 2009-11-27 2011-02-09 温州中城建设集团有限公司 Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole
CN103696611A (en) * 2013-12-03 2014-04-02 新安县电业公司 Base structure for steel tube tower
CN106120842A (en) * 2016-07-31 2016-11-16 成都聚合追阳科技有限公司 A kind of light gathering photovoltaic power generating system stone ground manufacturing process

Similar Documents

Publication Publication Date Title
Wyllie Stabilisation of rock slopes
CN110344400B (en) Hole-forming pile-forming construction process for rotary drilling rig in hard rock
CN108360972A (en) Method for constructing bored pile by combining rotary drilling rig and impact drilling rig
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN205638237U (en) Rock -entering tamps drill bit
CA2942801A1 (en) Method for installing metal piles in permafrost soil
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN103276645B (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN1370896A (en) Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete
CN110512594B (en) Simple method for forming hole and pile in cavity of rotary drilling rig
CN101906774A (en) Hammerblow tamper of excavator
EP1521886A1 (en) Method for increasing load-bearing capacity of soil
Bredenberg et al. Dry mix methods for deep soil stabilization
RU2510441C1 (en) Erection method of pile of shallow embedding
CN202626979U (en) High-pressure rotary jet grouting stiffening pile construction equipment with rib drilling method
CN106223345A (en) A kind of length interleaved formula Soil-cement piling wall construction equipment and construction method
CN102660944B (en) Equipment and method for constructing high-pressure rotary jet stiffening pile by using ribbed drilling method
CN112377093A (en) Relates to a rotary drilling construction method for deep concrete blocks and gravel layers and special rotary drilling equipment
CN104988981A (en) Construction method of riding well on existing shield drainage pipeline
Kovacs et al. On the theory of ground anchors
Gupta et al. Design of underground artificial dams for mine water storage
CN217810998U (en) Construction device for improving bearing capacity of rock-socketed pile by utilizing sediments
CN213867908U (en) Multisection expands dish assembled hollow excavation class basis
CN215715540U (en) Simple prefabricated inspection well
CN114215961B (en) Construction method suitable for landslide area pipeline engineering supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication