CN1370896A - Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete - Google Patents
Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete Download PDFInfo
- Publication number
- CN1370896A CN1370896A CN 01145370 CN01145370A CN1370896A CN 1370896 A CN1370896 A CN 1370896A CN 01145370 CN01145370 CN 01145370 CN 01145370 A CN01145370 A CN 01145370A CN 1370896 A CN1370896 A CN 1370896A
- Authority
- CN
- China
- Prior art keywords
- shaft tower
- foundation
- construction
- stone
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The construction method of the present invention includes cutting stone into one block or two blocks to be assembled in the designed size, drilling holes for foundation bolts; hoisting the stone into the foundation pit, back filling and densifying; fixing the foundation bolts; and assembling the pole or tower in the method similar to fixing railway tracks. The said method can be used in construction electrical power pole and tower as well as other buildings in cold area in winter.
Description
The invention belongs to the construction of power engineering pole and tower foundation adopts rubble to substitute the poured in place concrete foundation construction method.
The prior art power engineering shaft tower built-up foundation of setting up routinely all is the concrete foundation of cast in situs by design, selecting for use of its medium sand, building stones, reinforcing bar, the cement and the water ratio requirement that are applicable to highland and severe cold are very strict, after building, concrete foundation to pass through preserving period, reaching the shaft tower assembling that just can carry out after designing quality requires more than the basis, needing after the often basic cast in situs just can reach prescribed strength more than 28 days.And on-the-spot proportioning to cement, sand, stone, water also is difficult to grasp, also Qinghai-Tibet Railway this natural conditions very under the condition of severe construction be difficult to ensure the quality of products.
The objective of the invention is to for outside the deficiency that overcomes above-mentioned prior art, especially construct because of being subjected to the influence of natural conditions in the Qinghai-Tibet Railway power engineering, cause the construction period short, long construction period, programming and difficult quality guarantee, therefore at Qinghai-Tibet Railway natural conditions and construction particularity duration to engineering construction, progress, quality is because the unfavorable factor that environment brings has been carried out thematic tackling key problem, and according to the experience of constructing for many years in Qinghai-Tibet Railway and grasping, examination, checking thinks that can make full use of natural rubble is the basis that can substitute poured in place concrete fully as the power engineering pole and tower foundation through the exploitation back, it is short convenient to have the construction haul distance, characteristics such as on-the-spot easily grasp.Technical method of the present invention is: this method is the pole and tower foundation size of giving by design department, the stone cutting is become an integral body that conforms to size with designing institute, bigger basis is divided into two parts up and down, installed surface intelligibility chipping, and press the shaft tower installation requirement, the stone bolt hole drill is good, transport the scene to, hang in the foundation pit that digs by design, after backfill and the compacting shaft tower stone bolt is fixed, by the railway concrete sleeper fixedly track bolt construction method (sulfur cement mortar anchorage method) carry out site operation, just can carry out the shaft tower assembly working immediately.Technique effect of the present invention: component on site construction method of the present invention simply, easily grasp, need not to carry out cumbersome preparation of construction, get the raw materials ready.And will dig good rubble-mound foundation and transport the scene to, in place, installing only is about 4 hours, just can carry out the above work in basis, the concrete foundation more cast-in-place than the scene saved time and reached 668 hours, saved the time greatly, improved construction efficiency, accelerating construction progress.With shaft tower formation integral body in back is being installed because of pole and tower foundation, shaft tower produces power to the basis, is shaft tower self, and the weight of insulator, lead and the bending moment force that produced by wind-force act on foundation bearing capacity.Do not have excessive impact force, from building stones natures intensity, the hardness integrality, easily exploit pollution-free, select fully can with concrete foundation one's deceased mother U.S., can reach the select requirement of design fully to pole and tower foundation.And be not subjected to after the interference of external environments such as time, season, weather and influence, and have higher anticorrosive, cold resistance.Highland and severe cold area and winter time carry out constructional difficulties under the long natural environment ten minutes unfavorable conditions thereby effectively solved, overcome the unfavorable factor of bringing in the cast of frozen soil layer section concrete basis.The harm of natural zone is given in improvement because of cast-in-place concrete.The construction works quality, benefit is improved greatly.
Description of drawings:
Accompanying drawing is a structural representation of the present invention.
Below the present invention is described in further detail: as shown in drawings to closing the given embodiment of accompanying drawing, this method is: by the pole and tower foundation size that design department gave, stone 1 cutting is become an integral body that conforms to size with designing institute, (bigger basis can be divided into two parts up and down) installed surface intelligibility chipping, and press the shaft tower installation requirement, the stone bolt hole drill is good, transport the scene to, hang in the foundation pit 3 that digs by design, after backfill and the compacting that shaft tower stone bolt 2 is fixing, by railway coagulate native sleeper fixedly track bolt construction method (sulfur cement mortar anchorage method) carry out site operation, just can carry out the shaft tower assembly working immediately.Utilize the rubble-mound foundation to substitute concrete cast-in-site basis, from component on site construction method simply, easily grasp, need not to carry out cumbersome preparation of construction, get the raw materials ready.And will dig good rubble-mound foundation and transport the scene to, in place, installing only is about 4 hours, just can carry out the above work in basis, the concrete foundation more cast-in-place than the scene saved time and reached 668 hours, saved the time greatly, improve construction efficiency, accelerated construction speed.
Claims (1)
1. a power engineering shaft tower adopts rubble to substitute the poured in place concrete foundation construction method, it is characterized in that this method is: by the pole and tower foundation size that design department gave, stone (1) cutting is become an integral body that conforms to size with designing institute, or bigger basis can be divided into two parts up and down, installed surface intelligibility chipping, and press the shaft tower installation requirement, the stone bolt hole drill is good, transport the scene to, hang in the foundation pit (3) that has dug by design, after backfill and the compacting that shaft tower stone bolt (2) is fixing, by the railway concrete sleeper fixedly track bolt construction sulfur cement mortar anchorage method carry out site operation, just can carry out the shaft tower assembling immediately and construct.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01145370 CN1370896A (en) | 2001-12-31 | 2001-12-31 | Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01145370 CN1370896A (en) | 2001-12-31 | 2001-12-31 | Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1370896A true CN1370896A (en) | 2002-09-25 |
Family
ID=4678163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01145370 Pending CN1370896A (en) | 2001-12-31 | 2001-12-31 | Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1370896A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705692B (en) * | 2009-11-27 | 2011-02-09 | 温州中城建设集团有限公司 | Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole |
CN103696611A (en) * | 2013-12-03 | 2014-04-02 | 新安县电业公司 | Base structure for steel tube tower |
CN106120842A (en) * | 2016-07-31 | 2016-11-16 | 成都聚合追阳科技有限公司 | A kind of light gathering photovoltaic power generating system stone ground manufacturing process |
-
2001
- 2001-12-31 CN CN 01145370 patent/CN1370896A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705692B (en) * | 2009-11-27 | 2011-02-09 | 温州中城建设集团有限公司 | Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole |
CN103696611A (en) * | 2013-12-03 | 2014-04-02 | 新安县电业公司 | Base structure for steel tube tower |
CN106120842A (en) * | 2016-07-31 | 2016-11-16 | 成都聚合追阳科技有限公司 | A kind of light gathering photovoltaic power generating system stone ground manufacturing process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wyllie | Stabilisation of rock slopes | |
CN110344400B (en) | Hole-forming pile-forming construction process for rotary drilling rig in hard rock | |
CN108360972A (en) | Method for constructing bored pile by combining rotary drilling rig and impact drilling rig | |
CN103147442B (en) | Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method | |
CN205638237U (en) | Rock -entering tamps drill bit | |
CA2942801A1 (en) | Method for installing metal piles in permafrost soil | |
CN103195060B (en) | Soft soil foundation prestressing bolt anchorage structure and uses thereof | |
CN103276645B (en) | Precast pile, beam and slab renovation technology for diseases of existing line tunnel base | |
CN1370896A (en) | Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete | |
CN110512594B (en) | Simple method for forming hole and pile in cavity of rotary drilling rig | |
CN101906774A (en) | Hammerblow tamper of excavator | |
EP1521886A1 (en) | Method for increasing load-bearing capacity of soil | |
Bredenberg et al. | Dry mix methods for deep soil stabilization | |
RU2510441C1 (en) | Erection method of pile of shallow embedding | |
CN202626979U (en) | High-pressure rotary jet grouting stiffening pile construction equipment with rib drilling method | |
CN106223345A (en) | A kind of length interleaved formula Soil-cement piling wall construction equipment and construction method | |
CN102660944B (en) | Equipment and method for constructing high-pressure rotary jet stiffening pile by using ribbed drilling method | |
CN112377093A (en) | Relates to a rotary drilling construction method for deep concrete blocks and gravel layers and special rotary drilling equipment | |
CN104988981A (en) | Construction method of riding well on existing shield drainage pipeline | |
Kovacs et al. | On the theory of ground anchors | |
Gupta et al. | Design of underground artificial dams for mine water storage | |
CN217810998U (en) | Construction device for improving bearing capacity of rock-socketed pile by utilizing sediments | |
CN213867908U (en) | Multisection expands dish assembled hollow excavation class basis | |
CN215715540U (en) | Simple prefabricated inspection well | |
CN114215961B (en) | Construction method suitable for landslide area pipeline engineering supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |