CN1332296A - Construction process of retaining wall with inner anchoring wall - Google Patents
Construction process of retaining wall with inner anchoring wall Download PDFInfo
- Publication number
- CN1332296A CN1332296A CN 01127738 CN01127738A CN1332296A CN 1332296 A CN1332296 A CN 1332296A CN 01127738 CN01127738 CN 01127738 CN 01127738 A CN01127738 A CN 01127738A CN 1332296 A CN1332296 A CN 1332296A
- Authority
- CN
- China
- Prior art keywords
- wall
- anchor
- interior anchor
- soil body
- anchor wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention involves a method used to build a kind of blocking soil wall by use of inner anchor wall. One or multi anchor walls are built within blocked soil mass to provide stretching resistance for anchor rod and anchor line. The inner anchor wall, anchor rod and anchor line, outer locking wall together form a blocking soil wall to clamp blocked soil mass. The outer blocking wall is mainly made from stirred cement pile. The inner anchor wall is mainly made from vertical steel pile, from horizontal seizing & expanding dish supporting pile or horizontal stirred cement pile. Because of easy and simple construction of the inner anchor wall, high anchor-hold of the ground anchor and being reused of the anchor rod and the anchor line, the cost is lowered to 50% and constructing time is shortened to half period of original one. Moreover, the stress situation is clear and designing calculation is simplified for such form of structure.
Description
The present invention relates to field of civil engineering, particularly the soil body supporting field of foundation ditch and side slope.
The retaining wall that tradition has earth anchor and soil nailing has following shortcoming: 1. cost height, and many anchor poles (rope) can not reclaim, and the grouting cement amount is very big; Engineering time long, manufacturing an anchor pole (rope) approximately needed more than 3 hours, to consume man-hour also longer; 3. designing and calculating complexity; 4. because the uplift resistance that single anchor pole (rope) is provided is little, so the anchor pole consumption is many; 5. quality is wayward, is easier to that accidents happened.
The objective of the invention is to: provide a kind of retaining wall method for production that interior anchor wall is arranged in order to overcome above-mentioned deficiency.This method simplicity of design and construction can reduce cost and reduction of erection time easily greatly when guaranteeing quality.
Purpose of the present invention reaches by following measure: a kind of retaining wall method for production that interior anchor wall is arranged, according to different operating modes, the intersection time is manufactured the outer barricade 1 that can keep off soil at the same time or successively, cut out or layering cuts out the soil body 2 of (or side slope is outer) in the foundation ditch, be arranged on by anchor pole, rope 4 in the supporting soil body 3, it is characterized in that: same time or the front and back of stating action on the implementation intersect the time, manufacture by anchor wall 5 in the supporting soil body 3 one or more surfaces, multilayer anchor pole, rope 4 connect outer barricade 1 and interior anchor walls 5.Interior anchor wall 5 provides effective anti-drag anchoring power for anchor pole, rope 4, clamps by the retaining wall of the wall-anchor of the supporting soil body 3-wall construction form by anchor wall 5 and outer barricade 1 this two face wall in usefulness of pulling force formation of anchor pole, rope 4.
Purpose of the present invention can also reach by taking following measure:
On the ground, adopt hole digging pile, drilled pile, punching stake, pipeline sinking pile, compaction pile, agitation pile, concrete preformed pile, piling bar, conventional methods such as diaphragm wall, anchor wall 5 in manufacturing from top to bottom.
Shaped steel is sunk to by in the supporting soil body 3 by root, forms discontinuous interior anchor wall 5, anchor pole, rope 4 are to pass in slit 7 between the shaped steel, the hole 8 on the shaped steel to connect with shaped steel.
Connecting piece 9 passes in the hole 8 on the shaped steel, and two adjacent shaped steel are connect mutually.
Passing outer barricade 1 enters by the supporting soil body 3, in by the supporting soil body 3, put into explosive or pressure fluid or squeezed facility 11, utilize the pressure or the fluid pressure of blast then or mechanical pressure is squeezed is formed soil body cavitys by the supporting soil body 3, in soil body cavity, inject the mixture that contains cement or lime or water glass form in anchor wall 5.
In by the soil body cavity of squeezed formation, put into open umbrella stand formula muscle cage 10 of energy and cloth capsule, umbrella stand formula muscle cage 10 connects with anchor pole, rope 4.Umbrella stand formula muscle cage 9 has increased the anchoring ability with back anchor wall 5, and the material of anchor wall 5 mixed in the cloth capsule stoped diffusing soil and manufactures.
After the retaining wall function was finished, the shaped steel that interior anchor wall 5 adopts and anchor pole, rope 4 were taken out to transfer to reclaim and are used.
The invention has the advantages that the anti-power of dialling of earth anchor improves and reduced quantity owing to increased interior anchor wall, most steel of anchor wall can reclaim in the while.This two aspect has reduced the cost of retaining wall effectively and has shortened the engineering time.Interior exterior wall folder soil structure form is stressed short and sweet, calculates and has also simplified.Interior anchor wall job practices is simple, and quality has also had assurance.
Describe the present invention below in conjunction with accompanying drawing:
Fig. 1 is the vertical cross section schematic diagram of the embodiment of the invention 1
Fig. 2 is that the level of the embodiment of the invention 1 is to generalized section
Fig. 3 is that the interior anchor wall level of the embodiment of the invention 2 is to generalized section
Fig. 4 is the interior anchor wall vertical cross section schematic diagram of the embodiment of the invention 3 and embodiment 4
As depicted in figs. 1 and 2, the content of present embodiment 1 and step are as follows:
Adopt paddling process to form the outer barricade 1 of cement-soil on the ground, the vertical tensile strength of channel-section steel with the increase cement-soil is inserted in the outside of barricade outside, the soil body 2 in the stage excavation foundation ditch, and the method that pierces forms anchor hole 6 and waist rail is set, and forms outer barricade 1; At the same time, sink to by the discrete interior anchor wall 5 of formation one side in the soil body 3 of supporting with steel pipe, discharge the soil body in the steel pipe, from anchor hole 6, deliver between two steel pipes head collar of anchor cable 4, again with a thin rod iron or steel pipe as connecting piece 9 from two adjacent steel pipes hole 8 and the head collar of anchor cable 4 pass in the lump, adjacent two steel pipes and anchor cable 4 anchorings are connect, again the waist rail anchoring connection in the afterbody of anchor cable 4 and the outer barricade outside and apply prestressing force; Down successively construct to the foundation ditch bottom, clamp by the order ground of the supporting soil body 3 by anchor cable 4, formed the gravity retaining wall of a joist anchor wall construction form thereby reach with outer barricade 1 and interior anchor wall 5 by above-mentioned processing step circulation.
As shown in Figure 3, the content of present embodiment 2 and step are as follows:
With channel-section steel or i iron or steel sheet pile replace steel pipe manufacture in anchor wall 5, have pair head of barb-like anchor cable 4 to pass the narrow gap 7 of vertical plane appearance mode between adjacent two i iron or channel-section steel or steel sheet pile, revolve and be horizontal plane after turning 90 degrees and connect mutually with the edge of a wing of two i iron or channel-section steel or steel sheet pile, the head of anchor cable 4 tightly hooks i iron or channel-section steel or steel sheet pile when prestressed stretch-draw like this, and other content and step are with embodiment 1.
As shown in Figure 4, the content of present embodiment 3 and step are as follows:
In established anchor hole 6, put into squeezed facility 11, squeezed facility 11 are through repeatedly squeezed and rotation, in by the supporting soil body 3, form a garden disc type cavity more much bigger than anchor hole 6, take out squeezed facility 11, in cavity, put into umbrella stand formula reinforcing cage 10 and cloth capsule, reinforcing cage 10 connects mutually with anchor cable 4, be surrounded by and the close cloth capsule of cavity volume size in its outside, open reinforcing cage 10, concrete that injects by anchor hole 6 pressure or cement mortar or cement paste have been full of whole cloth capsule, fixed back forms a discrete interior anchor wall 5 of garden dish type that volume is bigger, and other content and step are with embodiment 1 and embodiment 2.Present embodiment 3 is exactly in fact that vertical dish extruded and extended pile method become a laterally dish extruded and extended pile method.
As shown in Figure 4, content of this example 4 and step are as follows:
Claims (10)
1. retaining wall method for production that interior anchor wall is arranged, according to different operating modes, the intersection time is manufactured the outer barricade (1) that can keep off soil at the same time or successively, cut out or layering cuts out the soil body (2) of (or side slope is outer) in the foundation ditch, be arranged on by anchor pole, rope (4) in the supporting soil body (3), it is characterized in that: same time or the front and back of stating action on the implementation intersect the time, manufacture by anchor wall (5) in the supporting soil body (3) one or more surfaces, multilayer anchor pole, rope (4) connect outer barricade (1) and interior anchor wall (5).
2. a kind of retaining wall method for production that interior anchor wall is arranged according to claim 1 is characterized in that: interior anchor wall (5) is between 0.3 times to 2 times of foundation depth (or slope height) to the distance between the outer barricade (1); The plane of interior anchor wall (5), its length direction are parallel or approaching parallel with the length direction of outer barricade (1), and its depth direction vertically downward or under oblique, the angle between interior anchor wall (5) plane and outer barricade (1) plane is no more than 35 degree.
3. a kind of retaining wall method for production that interior anchor wall is arranged according to claim 1, it is characterized in that: on the ground, adopt hole digging pile, drilled pile, punching stake, pipeline sinking pile, compaction pile, agitation pile, concrete preformed pile, piling bar, conventional methods such as diaphragm wall are manufactured interior anchor wall (5) from top to bottom.
4. a kind of retaining wall method for production that interior anchor wall is arranged according to claim 1, it is characterized in that: interior anchor wall (5) is continuous or discrete, is solid or hollow; Interior anchor wall (5) is mixture or the steel and the assembly that contains the mixture of cement that adopt steel or contain cement; Anchor pole, rope (4) adopt prestressed or non-prestressed.
5. according to claim 1 and 2 and 3 or 4 described a kind of retaining wall method for production that interior anchor wall is arranged, it is characterized in that: shaped steel is sunk to by in the supporting soil body (3) by root, form discontinuous in anchor wall (5), anchor pole, rope (4) are to pass in slit (7) between the shaped steel, the hole (8) on the shaped steel to connect with shaped steel.
6. a kind of retaining wall method for production that interior anchor wall is arranged according to claim 5 is characterized in that: connecting piece (9) passes in the hole (8) on the shaped steel, and two adjacent shaped steel are connect mutually.
7. according to claim 1 and 2 and 3 and 4 described a kind of retaining wall method for production that interior anchor wall is arranged, it is characterized in that: pass outer barricade (1) and enter by the supporting soil body (3), in by the supporting soil body (3), put into explosive or pressure fluid or squeezed facility (11), the pressure of utilization blast or fluid pressure or mechanical pressure are squeezed is then formed soil body cavity by the supporting soil body (3), injects the mixture that contains cement or lime or water glass and form interior anchor wall (5) in soil body cavity.
8. a kind of retaining wall method for production that interior anchor wall is arranged according to claim 7 is characterized in that: in by the soil body cavity of squeezed formation, put into energy open umbrella stand formula muscle cage (10) and cloth capsule, umbrella stand formula muscle cage (10) connects with anchor pole, rope (4).
9. a kind of retaining wall job practices that interior anchor wall is arranged according to claim 7, it is characterized in that: the mechanical pressure of squeezed facility (11) is squeezed during by the supporting soil body (3), squeezed facility (11) are that rotation is squeezed, simultaneously injection is contained the mixture of cement or lime or water glass and mixed stirring and mix by the supporting soil body (3), form the interior anchor wall (5) that contains cement or lime or water glass and soil.
10. a kind of retaining wall job practices that interior anchor wall is arranged according to claim 1 is characterized in that: after the retaining wall function was finished, shaped steel that interior anchor wall (5) adopts and anchor pole, rope (4) were taken out to transfer to reclaim and are used.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01127738 CN1332296A (en) | 2001-08-16 | 2001-08-16 | Construction process of retaining wall with inner anchoring wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01127738 CN1332296A (en) | 2001-08-16 | 2001-08-16 | Construction process of retaining wall with inner anchoring wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1332296A true CN1332296A (en) | 2002-01-23 |
Family
ID=4667655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01127738 Pending CN1332296A (en) | 2001-08-16 | 2001-08-16 | Construction process of retaining wall with inner anchoring wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1332296A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101899839A (en) * | 2010-03-30 | 2010-12-01 | 山东大学 | Counter-pulled type rib retaining wall of pre-stressing force cantilever |
CN101748741B (en) * | 2009-12-18 | 2012-04-18 | 中冶交通工程技术有限公司 | Construction method of concrete supporting structure |
CN102425174A (en) * | 2011-12-10 | 2012-04-25 | 中国建筑西南勘察设计研究院有限公司 | Drainage tubular pile and soil nailing wall composite supporting structure |
CN102605779A (en) * | 2012-04-02 | 2012-07-25 | 胡忠志 | High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure |
CN105113522A (en) * | 2015-09-22 | 2015-12-02 | 河南万泰建安开发有限公司 | Space composite supporting structure |
CN106638619A (en) * | 2016-12-20 | 2017-05-10 | 王志华 | Foundation-pit support building structure |
CN107130612A (en) * | 2017-05-10 | 2017-09-05 | 广东省建筑设计研究院 | A kind of slopes reinforced construction method |
CN107190756A (en) * | 2017-07-25 | 2017-09-22 | 北京航天地基工程有限责任公司 | Anchor system and slope retaining system |
CN107227750A (en) * | 2017-06-30 | 2017-10-03 | 十九冶成都建设有限公司 | Retaining wall structure for road and construction method thereof |
CN107740422A (en) * | 2017-09-25 | 2018-02-27 | 谭增红 | A kind of foundation ditch protective stent of high safety performance |
CN111218871A (en) * | 2020-02-26 | 2020-06-02 | 中铁二院工程集团有限责任公司 | Design method of friction stress type embankment pile plate wall structure |
CN111560962A (en) * | 2020-04-25 | 2020-08-21 | 北京市地质工程公司 | Backfill area foundation pit supporting structure and construction method thereof |
CN113622435A (en) * | 2021-09-17 | 2021-11-09 | 中煤长江基础建设有限公司 | Multistage expansion supporting device and construction method thereof |
-
2001
- 2001-08-16 CN CN 01127738 patent/CN1332296A/en active Pending
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101748741B (en) * | 2009-12-18 | 2012-04-18 | 中冶交通工程技术有限公司 | Construction method of concrete supporting structure |
CN101899839A (en) * | 2010-03-30 | 2010-12-01 | 山东大学 | Counter-pulled type rib retaining wall of pre-stressing force cantilever |
CN102425174A (en) * | 2011-12-10 | 2012-04-25 | 中国建筑西南勘察设计研究院有限公司 | Drainage tubular pile and soil nailing wall composite supporting structure |
CN102605779A (en) * | 2012-04-02 | 2012-07-25 | 胡忠志 | High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure |
CN102605779B (en) * | 2012-04-02 | 2014-11-26 | 胡忠志 | High-anti-pulling anchor rod supporting structure for soft soil foundation pit and construction method of high-anti-pulling anchor rod supporting structure |
CN105113522A (en) * | 2015-09-22 | 2015-12-02 | 河南万泰建安开发有限公司 | Space composite supporting structure |
CN106638619B (en) * | 2016-12-20 | 2018-12-14 | 王志华 | A kind of pattern foundation pit supporting structure building structure |
CN106638619A (en) * | 2016-12-20 | 2017-05-10 | 王志华 | Foundation-pit support building structure |
CN107130612A (en) * | 2017-05-10 | 2017-09-05 | 广东省建筑设计研究院 | A kind of slopes reinforced construction method |
CN107227750B (en) * | 2017-06-30 | 2019-06-04 | 十九冶成都建设有限公司 | Retaining wall structure for road and construction method thereof |
CN107227750A (en) * | 2017-06-30 | 2017-10-03 | 十九冶成都建设有限公司 | Retaining wall structure for road and construction method thereof |
CN107190756A (en) * | 2017-07-25 | 2017-09-22 | 北京航天地基工程有限责任公司 | Anchor system and slope retaining system |
CN107740422A (en) * | 2017-09-25 | 2018-02-27 | 谭增红 | A kind of foundation ditch protective stent of high safety performance |
CN111218871A (en) * | 2020-02-26 | 2020-06-02 | 中铁二院工程集团有限责任公司 | Design method of friction stress type embankment pile plate wall structure |
CN111560962A (en) * | 2020-04-25 | 2020-08-21 | 北京市地质工程公司 | Backfill area foundation pit supporting structure and construction method thereof |
CN113622435A (en) * | 2021-09-17 | 2021-11-09 | 中煤长江基础建设有限公司 | Multistage expansion supporting device and construction method thereof |
CN113622435B (en) * | 2021-09-17 | 2023-02-28 | 中煤长江基础建设有限公司 | Multistage expansion supporting device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107227808B (en) | A kind of buckling-restrained steel plate shear force wall system of full assembled | |
CN201512810U (en) | Retaining wall | |
CN207194006U (en) | A kind of prefabricated concrete retaining wall | |
CN1332296A (en) | Construction process of retaining wall with inner anchoring wall | |
CN110106896A (en) | A kind of prefabricated card slot type anchor pier lattice girder construction and assembling constructing method of slope reinforcement | |
CN103993611A (en) | Anti-floating piled raft structure combining deep-layer jet-grouting cement-soil board and anchor and construction method | |
CN203701334U (en) | Reinforced and prefabricated type shear wall structure | |
CN101942830A (en) | Combined concrete soil pile with core pile and construction method as well as construction device thereof | |
CN1127596C (en) | Continuous wall foundation pit supporting method with short brad | |
CN203866852U (en) | Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod | |
CN207176718U (en) | A kind of assembled heel join node | |
CN205776152U (en) | Prestressed anchor waveform sheet pile retaining structure | |
CN207176910U (en) | A kind of foundation-free node | |
CN108755937A (en) | A kind of steel core concrete column connect cross abnormity node with box-girder and I-beam | |
CN209368838U (en) | A kind of reinforced cement-soil pile anchor support structure | |
CN1514073A (en) | Supporitng structure of breast wall | |
CN211113733U (en) | Pull anchor type self-balancing retaining plate | |
CN85108550A (en) | Prestressed concrete foundation pile | |
CN209670134U (en) | Assembled wall right angle connecting structure | |
CN203096746U (en) | Reinforced rib soil restraining composite supporting structure | |
CN207143937U (en) | A kind of prestressed concrete pipe pile pile top | |
CN206941600U (en) | A kind of prestress anchorage cable stirring pile pit enclosure | |
CN217580247U (en) | Prefabricated reinforced concrete foundation structure that can splice | |
CN217105190U (en) | Splitting grouting rock anchor pile foundation suitable for complex geological conditions | |
CN200955146Y (en) | Multi-stage sink-pipe bored concrete pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |