CN107190756A - Anchor system and slope retaining system - Google Patents

Anchor system and slope retaining system Download PDF

Info

Publication number
CN107190756A
CN107190756A CN201710616772.1A CN201710616772A CN107190756A CN 107190756 A CN107190756 A CN 107190756A CN 201710616772 A CN201710616772 A CN 201710616772A CN 107190756 A CN107190756 A CN 107190756A
Authority
CN
China
Prior art keywords
anchor
main body
anchor cable
fixture
cable main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710616772.1A
Other languages
Chinese (zh)
Inventor
赵晓东
郭密文
闫德刚
王晓杰
尹文彪
张志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aerospace Foundation Engineering Co Ltd
Original Assignee
Beijing Aerospace Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Aerospace Foundation Engineering Co Ltd filed Critical Beijing Aerospace Foundation Engineering Co Ltd
Priority to CN201710616772.1A priority Critical patent/CN107190756A/en
Publication of CN107190756A publication Critical patent/CN107190756A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a kind of anchor system and slope retaining system, belong to the realm of building construction, including anchor rope component and anchor pile, anchor rope component includes anchor cable main body and fixture, fixture is fixed on anchor cable main body, fixture is embedded in anchor pile, and end of the anchor cable main body away from fixture is anchored.The anchor system can be anchored conveniently to pattern foundation pit supporting structure when in use, and the scope used is wide, be affected by small, the quality height of anchoring.

Description

Anchor system and slope retaining system
Technical field
The present invention relates to the realm of building construction, in particular to a kind of anchor system and slope retaining system.
Background technology
With metropolitan development, high building stands in great numbers, increasing along with the often foundation depth of high building, the underground space Utilization rate more and more higher, anchor cable is more and more extensive as the important means application of pattern foundation pit supporting structure, but the use of anchor cable is also deposited In drawback.
Inventor has found that traditional pattern foundation pit supporting structure at least had the disadvantage that during anchorage cable anchoring under study for action:
There is the problem of pulling capacity is extremely difficult to design requirement in artificial earth fill's layer in one, anchor cable:Due to artificial earth fill's layer The spoir generally having bad luck, soil layer property discreteness is big, owes consolidation, and the frictional resistance provided for anchor cable is small;
Secondly, when having Nearby Structure on foundation ditch periphery, foundation ditch is nearer apart from building, Nearby Structure ground according to Pile foundation is treated using the method for composite foundation, and anchor cable can not pass through building and its basis, limit the design of anchor cable Length, it is impossible to which enough anchor forces are provided;
Thirdly, anchorage cable design it is long when, particularly first of anchor cable of foundation ditch, typically all can through closing in place, if When closing on place and also carrying out excavation construction, deep pit monitor can be caused to have a strong impact on.
The content of the invention
It is an object of the invention to provide a kind of anchor system, to improve outside during traditional pattern foundation pit supporting structure progress anchorage cable anchoring Portion's environmental factor influences larger, the unstable problem of anchoring on anchoring quality.
It is an object of the invention to provide a kind of slope retaining system, anchorage cable anchoring is carried out to improve traditional pattern foundation pit supporting structure When external environmental factor anchoring quality is influenceed it is larger, anchor unstable problem.
What embodiments of the invention were realized in:
It is described the invention provides a kind of anchor system, including anchor rope component and anchor pile based on above-mentioned first purpose Anchor rope component includes anchor cable main body and fixture, and the fixture is fixed on the anchor cable main body, and the fixture is embedded in In the anchor pile, the end of the anchor cable main body away from the fixture is anchored.
In preferred embodiments of the present invention, the fixture is steel reinforcement cage.
In preferred embodiments of the present invention, the steel reinforcement cage includes multiple retainer rings and many fix bars, Duo Gesuo State retainer ring coaxially and be arranged at intervals, multiple retainer rings are connected by the fix bar, many fix bars surround institute The axis for stating retainer ring is intervally arranged.
In preferred embodiments of the present invention, the fix bar includes fixing pipe, attachment and sliding part, the fixation Pipe is provided with tube chamber and the telescopic mouth being connected with the tube chamber, and the telescopic mouth is located on the tube wall of the fixing pipe, described Attachment is arranged in the telescopic mouth, and the sliding part is inserted into the tube chamber, and the sliding part is relative to the fixation Pipe slides the protrusion telescopic mouth for making the attachment selectivity or withdrawn in the telescopic mouth.
In preferred embodiments of the present invention, the attachment includes the first cursor and the second cursor, the cunning Moving part is slidably connected with the fixing pipe, and first cursor is hinged with the sliding part, the attachment and the fixation Pipe is hinged, and the attachment and the fixing pipe articulated position be located at first cursor and second cursor it Between, the sliding part is relative to making the stretching telescopic mouth of second cursor selectivity in the fixing pipe sliding process Or withdraw in the telescopic mouth.
In preferred embodiments of the present invention, one end of the anchor cable main body is connection end, and the connection end is provided with many Individual connection pawl, each connection pawl is hook-type, and multiple connection pawls are connected to the fixture.
In preferred embodiments of the present invention, the anchor rope component also includes connecting seat, the connection end of the anchor cable main body Positive stop lug boss is provided with, the external diameter of the positive stop lug boss is more than outside the external diameter of the other parts of the anchor cable main body, the anchor cable The connecting seat is arranged with, axis direction of the connecting seat along the anchor cable main body is slidably connected to the anchor cable main body;It is many The individual connection pawl is installed on the connecting seat.
In preferred embodiments of the present invention, multiple installation projections are provided with the connecting seat, each installation is convex Installation groove is provided with rising, multiple connection pawls, which are corresponded, to be articulated with multiple installation projections.
In preferred embodiments of the present invention, the connection pawl includes connecting portion and hook portion, and the hook portion rotates connection In on the end face along its axis direction of the connecting portion, the pivot center of the hook portion and the connecting portion is parallel to described The axis of connecting portion.
Based on above-mentioned second purpose, the invention provides a kind of slope retaining system, including described anchor system.
The beneficial effect of the embodiment of the present invention is:
In summary, the embodiments of the invention provide a kind of anchor system, its is simple and reasonable, is easy to manufacture to process, Install with it is easy to use, meanwhile, the anchor system can be anchored conveniently to pattern foundation pit supporting structure when in use, be used Scope is wide, is affected by small, the quality height of anchoring.It is specific as follows:
The anchor system that the present embodiment is provided, includes anchor rope component and anchor pile, anchor pile uses concreting Formed.Anchor rope component includes anchor cable main body and fixture, and one end of anchor cable main body is connected with fixture, the other end of anchor cable main body Anchored after through pattern foundation pit supporting structure.Casting concrete is provided in the corresponding position of pattern foundation pit supporting structure for needing to anchor and is formed The preformed hole of anchor pile, the end of anchor cable main body is extend into preformed hole, in the end stretched into preformed hole of anchor cable main body Fixture is caused to be fixed on concrete formation after mounting fixing parts, the then casting concrete in preformed hole, concrete coagulation In anchor pile, the anchoring of anchor cable main body is then carried out.Pulling capacity in anchor cable main body anchoring procedure is acted on anchor pile, is passed through Anchor pile is carried, and the position of anchor pile is solid and reliable, and not easily shifted, anchoring effect is good, using the teaching of the invention it is possible to provide bigger pulling capacity.It is actual During construction, as needed in setting position setting anchor pile, the position flexibility and reliability of anchor pile, whole anchor system is in construction It is effected by environmental factors to greatly reduce, and the length of anchor cable main body can be shortened, material is saved, construction quality is improved.
The slope retaining system that the present embodiment is provided includes above-mentioned anchor system, with all excellent of above-mentioned anchor system Point.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the schematic diagram of the anchor system of the embodiment of the present invention;
Fig. 2 is the schematic diagram of the anchor cable main body of the embodiment of the present invention;
Fig. 3 installs the raised connection diagram with being connected pawl for the embodiment of the present invention;
Fig. 4 is the schematic cross-sectional view of the connection pawl of the embodiment of the present invention;
Fig. 5 is the schematic diagram of the fixture of the embodiment of the present invention;
Fig. 6 is the schematic cross-sectional view of the fix bar of the embodiment of the present invention;
Fig. 7 is the first cursor of the embodiment of the present invention and the schematic diagram of mounting blocks.
Icon:100- anchor rope components;110- anchor cable main bodys;111- positive stop lug boss;120- connecting seats;121- is installed It is raised;122- installs groove;130- connection pawls;131- connecting portions;132- hook portions;133- annular slots;134- is housed Groove;135- snap rings;140- sleeve pipes;150- fixtures;151- retainer rings;152- fix bars;153- fixing pipes;1531- Tube chamber;1532- telescopic mouths;154- attachments;The cursors of 1541- first;The cursors of 1542- second;1543- mounting blocks; 155- sliding parts;1551- installs bar portion;1552- screws bar portion;1553- chutes;200- anchor piles;300- foundation ditch branch Shield.
Embodiment
There is the problem of pulling capacity is extremely difficult to design requirement in artificial earth fill's layer in anchor cable:Because artificial earth fill's layer is generally The spoir having bad luck, soil layer property discreteness is big, owes consolidation, and the frictional resistance provided for anchor cable is small;Have on foundation ditch periphery and close on building During thing, foundation ditch is nearer apart from building, and structure foundation is treated according to pile foundation or using the method for composite foundation, anchor cable Building and its basis can not be passed through, the design length of anchor cable is limited, it is impossible to provide enough anchor forces;Anchorage cable design ratio When longer, particularly first of anchor cable of foundation ditch typically all can be through closing in place, if excavation construction will also be carried out by closing on place When, deep pit monitor can be caused to have a strong impact on.
In consideration of it, inventor devises a kind of anchor system and slope retaining system, by the position for needing to anchor Anchor pile 200 is pre-set, the pulling capacity produced during anchorage cable anchoring, the construction of anchor pile 200 are carried using anchor pile 200 Flexibility and reliability, saves anchor cable length, saves material, and substantially increase construction quality.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, the term " orientation or position of the instruction such as " center ", " interior ", " outer " Relation is or the orientation or position that the invention product is usually put when using based on orientation shown in the drawings or position relationship Relation, is for only for ease of the description present invention and simplifies description, rather than indicate or imply that the device or element of meaning must have There is specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.
Anchor system embodiment
Referring to Fig. 1, present embodiments providing a kind of anchor system, include anchor rope component 100 and anchor pile 200.
Fig. 1-Fig. 6 is referred to, anchor rope component 100 includes anchor cable main body 110, connecting seat 120, connection pawl 130, sleeve pipe 140 and fixture 150.
Referring to Fig. 2, anchor cable main body 110 is shaft-like, the section perpendicular to its axis direction of anchor cable main body 110 is circle Shape, one end of anchor cable main body 110 is the positive stop lug boss 111 that ring-type is provided with connection end, the connection end of anchor cable main body 110, limit The cross section perpendicular to anchor cable main body 110 of position boss 111 is shaped as circle, and the external diameter of positive stop lug boss 111 is more than anchor cable master The external diameter of the other parts of body 110.
Fig. 2 and Fig. 3 are referred to, connecting seat 120 is discoid, and connecting seat 120 has sleeve joint hole and installed in connecting seat Multiple installation projections 121 in 120 plate face, sleeve joint hole is circular port, and the internal diameter of sleeve joint hole is not less than anchor cable main body 110 External diameter, and it is not more than the external diameter of the positive stop lug boss 111 positioned at the end of anchor cable main body 110, multiple installation projections 121 surround sleeve joint hole Set, optionally, projection 121 is installed and is provided with four, projection 121 is installed four and uniformly arranged around the axis of sleeve joint hole, four Individual projection 121 of installing is located on using the center of circle of sleeve joint hole as the circumference in the center of circle.Projection 121 is installed along the axis parallel to sleeve joint hole The plate face of connecting seat 120 is protruded in direction, meanwhile, install and installation groove 122 is provided with projection 121, installation groove 122 is rectangle Groove, installing groove 122 has two rectangular-shaped groove sidewalls, installs projection 121 and is provided with two through holes, two through holes are coaxially set Put, the Single port of two through holes is located in two groove sidewalls respectively, each through hole is connected with installing groove 122.
Fig. 2 and Fig. 4 are referred to, connection pawl 130 includes shaft-like connecting portion 131 and hook-shaped hook portion 132, connecting portion 131 are connected with hook portion 132.One end of hook portion 132 has annular slot 133, and the shape of cross section of annular slot 133 is circle, One end of connecting portion 131 is provided with storage tank 134 and snap ring 135, and storage tank 134 is circular trough, and snap ring 135 is circle, hook The end with circular trough in portion 132 is plugged in storage tank 134 and snap ring 135 is connected in annular slot 133, snap ring 135 Hook portion 132 can be limited to come off from storage tank 134, and connecting portion 131 is connected with hook portion 132 to rotate, connecting portion 131 and hook Axis of the pivot center in portion 132 parallel to connecting portion 131.
Connecting seat 120 is set in the outside of anchor cable main body 110 by sleeve joint hole, and by spacing preiection limit sleeve joint hole from The corresponding end of anchor cable main body 110 is skidded off, and connecting seat 120 can be in the outer slip of anchor cable main body 110.Multiple connection pawls 130 1 One correspondence is arranged in multiple installation projections 121, and the one end for connecting the remote hook portion 132 of the connecting portion 131 of pawl 130 is hinged on peace In dress projection 121, the end of connecting portion 131, which is located at, is installed in groove 122, and installation projection 121 is rotationally connected with by rotary shaft, Mutually it can draw close or scatter centered on the center of circle of sleeve joint hole in multiple connection rotation processes of pawl 130.In practice of construction, Connection pawl 130 can realize rotation in two different directions relative to connecting seat 120, be easy to its adjustment position, reduce overall Structure is more safe and reliable after the completion of the stress of structure, construction, is hardly damaged.
Sleeve pipe 140 is the tubular structure with tube chamber 1531, the anchor cable hole for supporting grafting anchor cable main body 110.
Referring to Fig. 5, fixture 150 is reinforcement cage structure.Fixture 150 includes multiple retainer rings 151 and many solid Fixed pole 152, multiple retainer rings 151 are coaxial and are arranged at intervals, and multiple retainer rings 151 are connected by fix bar 152, many fix bars 152 axis for surrounding retainer ring 151 are intervally arranged.Optionally, bar-mat reinforcement or steel are set in the region that retainer ring 151 is surrounded Rib, the structural strength of reinforcing steel bar cage.
Fig. 6 and Fig. 7 are referred to, optionally, retainer ring 151 is annulus, and fix bar 152 includes fixing pipe 153, attachment 154 and sliding part 155, fixing pipe 153 is provided with tube chamber 1531 and the telescopic mouth 1532 being connected with the tube chamber 1531, stretched Necking 1532 is located on the tube wall of fixing pipe 153, and attachment 154 is arranged in telescopic mouth 1532, and sliding part 155 is inserted into tube chamber In 1531, sliding part 155 slides the protrusion telescopic mouth 1532 for making the selectivity of attachment 154 relative to fixing pipe 153 or withdrawn In telescopic mouth 1532.Optionally, attachment 154 include the first cursor 1541 and the second cursor 1542, sliding part 155 with Fixing pipe 153 is slidably connected, and the first cursor 1541 is hinged with sliding part 155, and the first cursor 1541 is relative to slip It can be slided in the rotation process of part 155 relative to sliding part 155, need further exist for explanation, the first cursor 1541 is along cunning The radial direction of moving part 155 is slided.Attachment 154 is hinged with fixing pipe 153, attachment 154 and the articulated position of fixing pipe 153 Between the first cursor 1541 and the second cursor 1542, sliding part 155 is relative to making in the sliding process of fixing pipe 153 The stretching telescopic mouth 1532 of the selectivity of two cursor 1542 is withdrawn in telescopic mouth 1532.Optionally, fixing pipe 153 is circle Pipe, fixing pipe 153 is welded on annulus, and the contact position of fixing pipe 153 and annulus, which is used, to be welded to connect.Sliding part 155 is Cylindrical bar, sliding part 155 includes installing bar portion 1551 and screws bar portion 1552, installs bar portion 1551 and is slidably connected to fixation Pipe 153, the first cursor 1541 is hinged in installation bar portion 1551, meanwhile, with the first cursor on bar portion 1551 is installed 1541 corresponding positions are provided with chute 1553, and the length direction of chute 1553 extends along the radial direction for installing bar portion 1551, Optionally, one end of the first cursor 1541 is rotatably connected to mounting blocks 1543, remote first cursor of mounting blocks 1543 1541 one end cooperatively forms oat tail groove structure or T-slot structure with chute 1553.Bar portion 1552 is screwed with installing bar portion 1551 rotate connection and axial limiting is connected, that is, installing bar portion 1551 and screwing bar portion 1552 can relatively rotate and along fixing pipe 153 axis direction synchronous slide.The outer peripheral face for screwing bar portion 1552 is provided with external screw thread, and the inner peripheral surface of fixing pipe 153 is set There is the internal thread matched with external screw thread, screw bar portion 1552 and be spirally connected with fixing pipe 153, when rotation screws bar portion 1552, screw bar Portion 1552 is slided relative to fixing pipe 153 drives mounting rod portion 1551 to be slided relative to fixing pipe 153, drives the first cursor 1541 rotate, and then realize that the second cursor 1542 stretches out or withdrawn the action of telescopic mouth 1532.
Anchor pile 200 is that concrete or mortar pour to be formed.
The anchor system that the present embodiment is provided, can be anchored to pattern foundation pit supporting structure 300, after foundation ditch is dug, in foundation ditch Surrounding arrangement slope stake, sets the anchor cable hole passed through for anchor cable, then in anchor cable hole in the soil layer of the correspondence position of slope stake Middle plug-in-sleeve 140, sleeve pipe 140 plays a part of supporting soil layer, prevents that soil layer from caving in blocking anchor cable hole.Then by anchor cable main body 110 are inserted into sleeve pipe 140, and the angle after the insertion of anchor cable main body 110 with level ground is substantially in 5 degree of -10 degree, anchor cable main body 110 position is substantially between below ground 0.5m-3.0m.After the depth that anchor cable main body 110 is inserted is suitable, detection is utilized Equipment is detected to anchor cable main body 110, is detected, detected mainly for the end for stretching into soil layer of anchor cable main body 110 To after the home position of anchor cable main body 110, it is marked on ground, is that subsequent construction is prepared.Determine the position of anchor cable main body 110 Put after (sleeve pipe 140), carry out anchor pile 200 and construct.Borehole is first carried out near mark position, can using manually digging hole or Mechanical borehole, optionally, digs circular port, matches with reinforcement cage structure.After the depth in hole is suitable, and anchor cable main body 110 End is located in hole, is arranged in the end being located in hole of anchor cable main body 110 on connecting seat 120, connecting seat 120 and is provided with connection Pawl 130.Then steel reinforcement cage is vertically placed in hole, be hooked in using multiple connection pawls 130 on steel reinforcement cage, many fixations of steel reinforcement cage Bar 152 is vertically arranged, the telescopic mouth 1532 in fixing pipe 153 in every fix bar 152 be located at steel reinforcement cage outside, i.e., along Outwardly, after reinforcing bar cage location is installed, every fix bar 152 of operation screws bar portion 1552, rotation to the radial direction of steel reinforcement cage Bar portion 1552 is screwed so that attachment 154 is moved downward, the second cursor 1542 is stretched out from telescopic mouth 1532, then poured Concrete, concrete connects as one steel reinforcement cage, connection pawl 130.In concreting process, because steel reinforcement cage passes through even Connect pawl 130 to be connected with anchor cable main body 110, in concreting process under the impact force action of concrete, steel reinforcement cage can be sent out Raw certain displacement, steel reinforcement cage can adjust its position, reduce answering between connection pawl 130, steel reinforcement cage and anchor cable main body 110 Power, overall structure is solid and reliable after the completion of pouring, not easy to crack, after concrete coagulation, and anchor cable main body 110 is anchored, Anchoring effect is good, and anchor pile 200 can provide bigger pulling capacity.
Because fix bar 152 can adjust its shape, in transport and placement process, the second cursor 1542 is retracted to In telescopic mouth 1532, small volume saves space resources.
Obviously, during practice of construction, the shape of anchor pile 200 can be selected on demand, be also designed to not The shape of rule, can equally provide larger pulling capacity.
Slope retaining system embodiment
Present embodiments provide a kind of slope retaining system, including the anchor system that above-described embodiment is provided.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of anchor system, it is characterised in that including anchor rope component and anchor pile, the anchor rope component includes anchor cable main body And fixture, the fixture is fixed on the anchor cable main body, and the fixture is embedded in the anchor pile, the anchor cable End of the main body away from the fixture is anchored.
2. anchor system according to claim 1, it is characterised in that the fixture is steel reinforcement cage.
3. anchor system according to claim 2, it is characterised in that the steel reinforcement cage includes multiple retainer rings and many Fix bar, multiple retainer rings are coaxial and are arranged at intervals, and multiple retainer rings are connected by the fix bar, described in many Fix bar is intervally arranged around the axis of the retainer ring.
4. anchor system according to claim 3, it is characterised in that the fix bar include fixing pipe, attachment and Sliding part, the fixing pipe is provided with tube chamber and the telescopic mouth being connected with the tube chamber, and the telescopic mouth is located at the fixation On the tube wall of pipe, the attachment is arranged in the telescopic mouth, and the sliding part is inserted into the tube chamber, the sliding part The protrusion telescopic mouth for making the attachment selectivity is slided relative to the fixing pipe or is withdrawn in the telescopic mouth.
5. anchor system according to claim 4, it is characterised in that the attachment includes the first cursor and second Cursor, the sliding part is slidably connected with the fixing pipe, and first cursor is hinged with the sliding part, the attachment Part is hinged with the fixing pipe, and the attachment and the fixing pipe articulated position be located at first cursor with it is described Between second cursor, relative to making in the fixing pipe sliding process, second cursor is selective to be stretched the sliding part Go out the telescopic mouth or withdraw in the telescopic mouth.
6. the anchor system according to claim any one of 1-5, it is characterised in that one end of the anchor cable main body is company End is connect, the connection end is provided with multiple connection pawls, each connection pawl is hook-type, multiple connection pawls are connected to described Fixture.
7. anchor system according to claim 6, it is characterised in that the anchor rope component also includes connecting seat, the anchor The connection end of rope main body is provided with positive stop lug boss, and the external diameter of the positive stop lug boss is more than the outer of the other parts of the anchor cable main body The connecting seat is arranged with outside footpath, the anchor cable, axis direction of the connecting seat along the anchor cable main body is slidably connected to institute State anchor cable main body;Multiple connection pawls are installed on the connecting seat.
8. anchor system according to claim 7, it is characterised in that multiple installation projections are provided with the connecting seat, Each described install is provided with installation groove in projection, and it is raised that multiple connection pawls one-to-one corresponding are articulated with multiple installations On.
9. anchor system according to claim 8, it is characterised in that the connection pawl includes connecting portion and hook portion, institute State hook portion to be rotationally connected with the end face along its axis direction of the connecting portion, the hook portion and the rotation of the connecting portion Diameter parallel is in the axis of the connecting portion.
10. a kind of slope retaining system, it is characterised in that including the anchor system according to claim any one of 1-9.
CN201710616772.1A 2017-07-25 2017-07-25 Anchor system and slope retaining system Pending CN107190756A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710616772.1A CN107190756A (en) 2017-07-25 2017-07-25 Anchor system and slope retaining system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710616772.1A CN107190756A (en) 2017-07-25 2017-07-25 Anchor system and slope retaining system

Publications (1)

Publication Number Publication Date
CN107190756A true CN107190756A (en) 2017-09-22

Family

ID=59884861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710616772.1A Pending CN107190756A (en) 2017-07-25 2017-07-25 Anchor system and slope retaining system

Country Status (1)

Country Link
CN (1) CN107190756A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532595A (en) * 2018-03-12 2018-09-14 沙洲职业工学院 A kind of three-dimensional reinforcing prevents the mine slope reinforcement structure of unstability
CN109914422A (en) * 2019-03-01 2019-06-21 华北水利水电大学 A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN111335329A (en) * 2020-03-31 2020-06-26 江苏东合南岩土科技股份有限公司 Foundation pit supporting system and construction method thereof
CN113279416A (en) * 2021-04-23 2021-08-20 游永华 Highway side slope reinforcing apparatus
CN113605212A (en) * 2021-07-29 2021-11-05 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for single-box double-chamber prefabricated segment box girder in construction period and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332296A (en) * 2001-08-16 2002-01-23 吕怀民 Construction process of retaining wall with inner anchoring wall
GB0513438D0 (en) * 2005-06-30 2005-08-10 Balfour Beatty Plc Concrete pile connections
CN103541339A (en) * 2012-07-17 2014-01-29 兰州理工大学 Pull rod type testing device and method for unsaturated undisturbed loess slope soil pressure
CN103898906A (en) * 2012-12-31 2014-07-02 李晓彬 Man-made root for fixing objects
CN203939034U (en) * 2014-05-13 2014-11-12 中国水电顾问集团华东勘测设计研究院有限公司 The slope treatment structure that a kind of antislide pile is combined with anchor cable, anchor caverns
CN204780939U (en) * 2015-06-12 2015-11-18 谢纯 Masts type double row pile struts system
CN105155548A (en) * 2015-06-02 2015-12-16 谢纯 Cable double-row pile (wall) supporting structure
CN207193984U (en) * 2017-07-25 2018-04-06 北京航天地基工程有限责任公司 Anchor system and slope retaining system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332296A (en) * 2001-08-16 2002-01-23 吕怀民 Construction process of retaining wall with inner anchoring wall
GB0513438D0 (en) * 2005-06-30 2005-08-10 Balfour Beatty Plc Concrete pile connections
CN103541339A (en) * 2012-07-17 2014-01-29 兰州理工大学 Pull rod type testing device and method for unsaturated undisturbed loess slope soil pressure
CN103898906A (en) * 2012-12-31 2014-07-02 李晓彬 Man-made root for fixing objects
CN203939034U (en) * 2014-05-13 2014-11-12 中国水电顾问集团华东勘测设计研究院有限公司 The slope treatment structure that a kind of antislide pile is combined with anchor cable, anchor caverns
CN105155548A (en) * 2015-06-02 2015-12-16 谢纯 Cable double-row pile (wall) supporting structure
CN204780939U (en) * 2015-06-12 2015-11-18 谢纯 Masts type double row pile struts system
CN207193984U (en) * 2017-07-25 2018-04-06 北京航天地基工程有限责任公司 Anchor system and slope retaining system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532595A (en) * 2018-03-12 2018-09-14 沙洲职业工学院 A kind of three-dimensional reinforcing prevents the mine slope reinforcement structure of unstability
CN109914422A (en) * 2019-03-01 2019-06-21 华北水利水电大学 A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN111335329A (en) * 2020-03-31 2020-06-26 江苏东合南岩土科技股份有限公司 Foundation pit supporting system and construction method thereof
WO2021196449A1 (en) * 2020-03-31 2021-10-07 江苏东合南岩土科技股份有限公司 Foundation pit supporting system and construction method therefor
CN111335329B (en) * 2020-03-31 2024-06-14 江苏东合南岩土科技股份有限公司 Construction method of foundation pit supporting system
CN113279416A (en) * 2021-04-23 2021-08-20 游永华 Highway side slope reinforcing apparatus
CN113605212A (en) * 2021-07-29 2021-11-05 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for single-box double-chamber prefabricated segment box girder in construction period and construction method thereof

Similar Documents

Publication Publication Date Title
CN107190756A (en) Anchor system and slope retaining system
CN104179178B (en) A kind of flexible umbrella support anchor rod and the method for supporting soil level sideslope
CN101638891B (en) Construction method of all casing precessing isolation pile
CN106760219A (en) A kind of reducing steel reinforcement cage and its enlarging anchor rod or pile foundation
CN204080802U (en) A kind of flexible umbrella support anchor rod
CN103669346B (en) A kind of tuck inside the sleeve raft pipe and the application in landslide control
CN106193030A (en) The prestressing force grouted anchor bar of a kind of band agnail head and construction method
CN207193984U (en) Anchor system and slope retaining system
CN207278276U (en) Cross the shallow-depth-excavation tunnel supporting construction of ground fissure crushed zone
CN105544603A (en) Construction method for underground pipeline reinforcement
CN112681341A (en) Deep foundation pit collapse prevention structure for building construction
CN206521873U (en) A kind of reducing steel reinforcement cage and its enlarging anchor rod or pile foundation
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN210104735U (en) Rotary type ground anchor device for burying sleeve in deep drilling of geotechnical engineering
CN205858371U (en) A kind of colliery big cross section digging laneway combined support structure
CN110004927A (en) Prestressing force miniature pile construction method
CN205116159U (en) Supporting rig dry process pore -forming bored concrete pile that digs soon of back slip casting
CN209368877U (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN105822333B (en) Mechanical linkage Pulling-Resistant Anchor Rod
JP2013155577A (en) Construction method for pile using anchor in combination
CN105064357A (en) Embedding type anchoring device and anchoring method for pre-stressed anchor cable
CN214994477U (en) Pipeline changes structure in foundation ditch
KR101951684B1 (en) Expandable cast-in-place pile construction method
CN106545018A (en) Excavation slope excavation construction process and excavation slope
CN208870044U (en) Support system with underground horizontal support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination