CN1231363A - Three-layer three-purpose bridge - Google Patents
Three-layer three-purpose bridge Download PDFInfo
- Publication number
- CN1231363A CN1231363A CN 99113645 CN99113645A CN1231363A CN 1231363 A CN1231363 A CN 1231363A CN 99113645 CN99113645 CN 99113645 CN 99113645 A CN99113645 A CN 99113645A CN 1231363 A CN1231363 A CN 1231363A
- Authority
- CN
- China
- Prior art keywords
- bridge
- sightseeing
- bank
- china
- people
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invented tri-layer three-purpose bridge relates to a main bridge structure of suspension bridge integrating sightseeing function and traffic function into one body. It is characterized by that said main bridge is divided into upper layer as pedestrain sightseeing bridge and lower layer as vehicle running bridge, and the bottom portion of said main bridge is equipped with suspended cable. The pedestrain sightseeing bridge possesses an enclosed structure.Said invention also integrates the functions of large bridge, tunnel and ferry into one body, so that it provides convenience and joys for tourists.
Description
Three-layer three-purpose bridge of the present invention relates to a kind of suspension bridge structure of main bridge that integrates sightseeing, leisure, communication function.
General bridge only has communication function, as: be used for driving or pedestrian, but do not have sightseeing, recreational functions, along with social development needs, on the land or the water surface, set up sky way, elevated bridge increases, and is to the functional exploitation of bridge, more and more, the present invention is based on the social development needs, providing a kind of has traffic, sightseeing function in the structure of main bridge of one.
The objective of the invention is to: a kind of three-layer three-purpose bridge structure of main bridge that sightseeing, communication function are arranged is provided, promptly has People's Bank of China's bridge floor, driving bridge floor and pars basilaris pontis to have the structure of main bridge of cable car.
Purpose of the present invention can be achieved through the following technical solutions: three-layer three-purpose bridge of the present invention, be the suspension bridge structure, characteristics are: main bridge is divided into the People's Bank of China's sightseeing bridge on upper strata and the bridge of overhead travelling crane of lower floor, in the bottom of bridge track is set, be used to hang cable car, described People's Bank of China sightseeing bridge is an enclosed construction.The pedestrian can be passed a bridge by three approach.
On the technique scheme basis, the sightseeing corridor is respectively left in the People's Bank of China sightseeing bridge both sides of three-layer three-purpose bridge of the present invention, upper section is by the automatic transport tape of dress crawler type, can be in setting in the middle of People's Bank of China's sightseeing bridge for the aspect more than one deck of shopping, leisure, make People's Bank of China's sightseeing bridge have sightseeing, amusement function, bottom surface at People's Bank of China's sightseeing bridge is a mechanical floor, is used to lay various pipelines.
On the technique scheme basis, the girder of three-layer three-purpose bridge of the present invention adopts steel truss, top surface of the beam is installed glass fiber reinforced plastic wing rack, two-way lane is set in the steel truss, the truss on top, track has the spatial altitude that can arrange various pipelines, as People's Bank of China's sightseeing bridge device layer, full-bridge is provided with two main push-towing ropes, long hoist cable adopts the prefabricated parallel steel wire rope of PE material protection, the drop shot rope adopts thick diameter galvanized steel wire rope, the anchor ingot is divided into anchor body, three parts of anchor system and basis, and the anchor system in the anchor body adopts anchor pole-prestress anchoraging system.
Superiority of the present invention is: integrate sightseeing, communication function, integrate the sight seeing and pastime shopping function on bridge, tunnel, ferry function, especially upper strata, the track traffic function of bottom is for the visitor provides convenience and enjoyment.Describe in detail below by drawings and Examples.
Accompanying drawing 1, body of a bridge cross section structure schematic diagram.
Accompanying drawing 2, main bridge cross section steel truss structure schematic diagram.
Accompanying drawing 3, body of a bridge longitudinal profile user mode schematic diagram.
Accompanying drawing 4, the application examples structural representation.
Accompanying drawing 5, access bridge continuous beam cross-sectional drawing.
Accompanying drawing 6, access bridge hollowcore slab cross-sectional drawing.
Embodiment 1, as Fig. 1 body of a bridge cross section structure schematic diagram, Fig. 2 master's bridge cross section steel truss structure schematic diagram, shown in Fig. 3 body of a bridge longitudinal profile user mode schematic diagram, a kind of three-layer three-purpose bridge, its structure of main bridge is the suspension bridge structure, characteristics are: main bridge is divided into the People's Bank of China's sightseeing bridge 1 on upper strata and the bridge of overhead travelling crane 2 of lower floor, at pars basilaris pontis suspension type cable car 3 is set, People's Bank of China's sightseeing bridge is an enclosed construction.Respectively leave sightseeing corridor 11,12 in People's Bank of China sightseeing bridge 1 both sides, upper section is by dress crawler type automatic transport tape 111,121, and setting can be for two faces 13 layer by layer of shopping, leisure in the middle of People's Bank of China's sightseeing bridge, and the bottom surface of People's Bank of China's sightseeing bridge 1 is a mechanical floor 14; Girder 4 adopts steel truss, top surface of the beam is installed glass fiber reinforced plastic wing rack 5, two-way lane 2 is set in the steel truss, the truss on 2 tops, track has the spatial altitude that can arrange various pipelines, becomes mechanical floor 14, and full-bridge is provided with two main push-towing ropes 6, long hoist cable 7 adopts the prefabricated parallel steel wire rope of PE material protection, drop shot rope 8 adopts thick diameter galvanized steel wire rope, and the anchor ingot is divided into anchor body, three parts of anchor system and basis, and the anchor system in the anchor body adopts anchor pole-prestress anchoraging system.
Application examples 1, as Fig. 4 application examples structural representation, Fig. 5 access bridge continuous beam cross-sectional drawing, shown in Fig. 6 access bridge hollowcore slab cross-sectional drawing, three-layer three-purpose bridge adopts the suspension bridge structure, and one strides across the river, main bridge is divided into the People's Bank of China's sightseeing bridge 1 on upper strata and the bridge of overhead travelling crane 2 of lower floor, at pars basilaris pontis suspension type cable car 3 is set, the visitor can walk, ride or sit cable car and cross the river, and People's Bank of China's sightseeing bridge 1 is an enclosed construction.Respectively leave 6 meters wide sightseeing corridor 11,12 in People's Bank of China sightseeing bridge 1 both sides, upper section is by having adorned the automatic transport tape 111,121 of crawler type, but one section of visitor's walking, take advantage of one section elevator again, can to one's heart's content enjoy beautiful sceneries and city beautiful scenery on the river, sightseeing bridge central authorities of People's Bank of China are 18 meters wide, two faces 13 layer by layer of shopping, leisure are set, one deck, two layers different-style shop are in picturesque disorder, the view of on two aspects, can drinking tea, more beautiful things than one can take in also can be planted some flowers and plants, potted landscape etc. on People's Bank of China's sightseeing bridge 1, make it become an air corridor full of life, that artistic environment is strong.The bottom surface of People's Bank of China's sightseeing bridge is a mechanical floor 14, and water, electricity, communication, blowdown pipeline are installed in this layer.The ventilating heat-proof layer that is provided with on People's Bank of China's sightseeing bridge utilizes adjustable metal fever baffle reflection heat, simultaneously, allows air flow freely betwixt, has both taken away heat, reduces the wind load of bridge again.Girder 4 adopts steel truss, 10 meters of deck-moldings, 36 meters of top widths, 30 meters of bottom width, top surface of the beam is installed glass fiber reinforced plastic wing rack 5, two-way lane 2 is set, 5 meters of track 2 clear height, 3.75 meters of per car road clear span in the steel truss, 2.4 meters of the rise of a truss on 2 tops, track can be arranged various pipelines etc. therebetween, become mechanical floor 14.Full-bridge is provided with two main push-towing ropes 6, is made up of the parallel steel wire strand.The per share zinc-plated high tensile steel wire that contains 127 diameters 5.53, intensity is 1600Mpa.Long hoist cable 7 adopts the prefabricated parallel steel wire rope of PE material protection, and drop shot rope 8 adopts thick diameter galvanized steel wire rope.East, west anchor ingot all adopt gravity anchor ingot, and the anchor ingot is divided into anchor body, three parts of anchor system and basis, and the anchor system in the anchor body adopts anchor pole-prestress anchoraging system.Access bridge adopts two kinds of forms: the Gao Dun position is adopted 40 meters and is striden the equal altitudes continuous box girder, and section adopts big arm single box single chamber pattern, 16 meters of the top widths of case beam, case wide 8 meters, 4 meters of jib-lengths, 2 meters of the case depth of beams of jumping.
Three-layer three-purpose bridge for densely populated, building in groups, bridging on the river, metropolis of business prosperity, heavy traffic, or viaduct increases new function, new landscape reference, promotional value is arranged very much.
Claims (3)
1. a three-layer three-purpose bridge is the suspension bridge structure, it is characterized in that: main bridge is divided into the People's Bank of China's sightseeing bridge on upper strata and the bridge of overhead travelling crane of lower floor, at main pars basilaris pontis the suspension type cable car is set, and described People's Bank of China sightseeing bridge is an enclosed construction.
2. three-layer three-purpose bridge according to claim 1, it is characterized in that: People's Bank of China respectively leaves the sightseeing corridor in sightseeing bridge both sides, upper section is by the automatic transport tape of dress crawler type, and setting can be for the above aspect of one deck of shopping, leisure in the middle of People's Bank of China's sightseeing bridge, and the bottom surface of People's Bank of China's sightseeing bridge is a mechanical floor.
3. according to claim 1,2 described three-layer three-purpose bridges, it is characterized in that: girder adopts steel truss, top surface of the beam is installed glass fiber reinforced plastic wing rack, two-way lane is set in the steel truss, the truss on top, track has the spatial altitude that can arrange various pipelines, become mechanical floor, full-bridge is provided with two main push-towing ropes, long hoist cable adopts the prefabricated parallel steel wire rope of PE material protection, the drop shot rope adopts thick diameter galvanized steel wire rope, the anchor ingot is divided into anchor body, three parts of anchor system and basis, and the anchor system in the anchor body adopts anchor pole-prestress anchoraging system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99113645 CN1231363A (en) | 1999-04-19 | 1999-04-19 | Three-layer three-purpose bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99113645 CN1231363A (en) | 1999-04-19 | 1999-04-19 | Three-layer three-purpose bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1231363A true CN1231363A (en) | 1999-10-13 |
Family
ID=5276814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 99113645 Pending CN1231363A (en) | 1999-04-19 | 1999-04-19 | Three-layer three-purpose bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1231363A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839599A (en) * | 2012-09-04 | 2012-12-26 | 俞礼杰 | Multifunctional corridor bridge |
CN104195946A (en) * | 2014-07-04 | 2014-12-10 | 林同棪国际工程咨询(中国)有限公司 | Staged implementation method of multi-bridge-floor-layer suspension bridge for highway and rail |
CN107245938A (en) * | 2017-08-08 | 2017-10-13 | 中机中联工程有限公司 | A kind of telescopic Long-span Cantilever view shelter bridge |
CN108103947A (en) * | 2017-12-21 | 2018-06-01 | 芜湖铁路桥梁制造有限公司 | The construction method of three layers of bridge |
CN114622473A (en) * | 2022-02-15 | 2022-06-14 | 中国建筑第二工程局有限公司 | Side-bent arc-forked composite box girder bridge body steel structure and construction method thereof |
-
1999
- 1999-04-19 CN CN 99113645 patent/CN1231363A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839599A (en) * | 2012-09-04 | 2012-12-26 | 俞礼杰 | Multifunctional corridor bridge |
CN104195946A (en) * | 2014-07-04 | 2014-12-10 | 林同棪国际工程咨询(中国)有限公司 | Staged implementation method of multi-bridge-floor-layer suspension bridge for highway and rail |
CN107245938A (en) * | 2017-08-08 | 2017-10-13 | 中机中联工程有限公司 | A kind of telescopic Long-span Cantilever view shelter bridge |
CN108103947A (en) * | 2017-12-21 | 2018-06-01 | 芜湖铁路桥梁制造有限公司 | The construction method of three layers of bridge |
CN114622473A (en) * | 2022-02-15 | 2022-06-14 | 中国建筑第二工程局有限公司 | Side-bent arc-forked composite box girder bridge body steel structure and construction method thereof |
CN114622473B (en) * | 2022-02-15 | 2022-12-13 | 中国建筑第二工程局有限公司 | Side-bent arc-forked composite box girder bridge body steel structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102359044B (en) | A kind of public transportation system and its method of construction | |
CN102619366A (en) | Direct parking type stereo garage spanned over road and using method thereof | |
CN201077456Y (en) | Public function net girders rail suspension up-down traffic system | |
CN1170714C (en) | Platform system for stereo city viaduct steel network | |
CN207453078U (en) | Go sight-seeing sports Multifunctional road corridor apparatus for building, product and system | |
CN111608069B (en) | Concrete filled steel tube cable-stayed arched pedestrian landscape gallery bridge with saddle shell-shaped ceiling | |
Talbot | Railway wonders of the world | |
CA2672928A1 (en) | People & cargo transit systems & vehicles | |
CN105755946A (en) | Arch-pylon involute curved surface stay cable main-ramp overpass | |
CN1231363A (en) | Three-layer three-purpose bridge | |
CN109680598B (en) | Pedestrian suspension chain bridge adopting glass bridge deck | |
CN104895396A (en) | First-tower skyscraping diagonal-tensile upright grid urban sky railway | |
CN100379619C (en) | Suspension cable traffic system | |
CN105270416A (en) | Pipeline network for traffic and pipeline traffic system | |
CN206157500U (en) | Bridging apparatus | |
CN102839599A (en) | Multifunctional corridor bridge | |
CN209082324U (en) | Glass suspension bridge | |
CN207594964U (en) | A kind of micro- rail support device | |
CN2420208Y (en) | Tracting manned two-way slide cable by using gravity | |
CN210122679U (en) | Semicircular cable-stayed bridge structure | |
CN103726423A (en) | Cable-stayed dual-energy Ferris road for streets and alleyways | |
CN108677684A (en) | Glass suspension bridge | |
CN105464459A (en) | Large-span invisible sky train | |
CN215629282U (en) | Double-tower cable-stayed overpass | |
CN213823433U (en) | Canyon bungee jumping and swing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |