CN1216332A - Formwork and its use method in building construction and outside decoration - Google Patents

Formwork and its use method in building construction and outside decoration Download PDF

Info

Publication number
CN1216332A
CN1216332A CN 97106191 CN97106191A CN1216332A CN 1216332 A CN1216332 A CN 1216332A CN 97106191 CN97106191 CN 97106191 CN 97106191 A CN97106191 A CN 97106191A CN 1216332 A CN1216332 A CN 1216332A
Authority
CN
China
Prior art keywords
mould
hollow
wall outer
outer mold
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 97106191
Other languages
Chinese (zh)
Other versions
CN1132985C (en
Inventor
刘方俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97106191 priority Critical patent/CN1132985C/en
Publication of CN1216332A publication Critical patent/CN1216332A/en
Application granted granted Critical
Publication of CN1132985C publication Critical patent/CN1132985C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Filling concrete up to national standard into the steel formwork can build hollow wall in one single process. When outside decoration material, such as ceramic tile, mosaic, quartz stone, is placed into the formwork, outside decoration is also completed while the hollow wall is built. The method can shorten construction period and reduce construction cost.

Description

Mould and the method and the exterior decoration method of building the building with this mould
The invention belongs to the building trade field, exactly belong to instrument for building and the method that builds a building thereof and exterior decoration method.
At present, the domestic existing method that builds a building all be adopt brick, watt, raw material such as cement, sand, reinforcing bar, make by artificial assembling and to form.In the process that builds a building, need repeatedly prick shelf, tear shelf open, when the needs exterior decoration, as paste porcelain watt or masaic, granitic plaster diamond stone etc., and all be after building is built completion, prick shelf again, carry out these exterior decoration operations by high-caliber construction worker, so not only waste of manpower, material resources, and building costs is improved, construction period increases.Purpose of the present invention just provides a kind ofly can accelerate construction period, reduces the mould of building costs and the method and the exterior decoration method of building the building with this mould thereof.
This mould provided by the invention, it is made up of wall outer mold, hollow mould, lever, connecting rod, frame plate, protective screening.
Introduce this mould in detail below in conjunction with accompanying drawing.
Fig. 1 is the schematic diagram of mould.
Fig. 2 is the hollow mould schematic diagram.
Fig. 3 is the lever schematic diagram.
Fig. 4 is that protective screening is not intended to.
Fig. 5 is the plank schematic diagram.
Among the figure: 1 is the wall outer mold, and 2 is hollow mould, and 3 is lever, and 4 is connecting rod, and 5 is frame plate, and 6 is protective screening, and 7 are the button nose, and 8 are center button nose, and 9 is antiskid glue cushion, and 10 is hitch, and 11 is firm muscle, and 12 is triangular groove.
This mould of the present invention is formed (seeing Fig. 1 and Fig. 5) by wall outer mold (1), hollow mould (2), lever (3), connecting rod (4), frame plate (5), protective screening (6).Hollow mould (2) is placed in the middle of two wall outer molds (1), connecting rod (4) couples together two wall outer molds (1) and hollow mould (2), lever (3) is positioned at the bottom of wall outer mold (1), lever (3) is connected by pin with wall outer mold (1), frame plate (5) is placed on the lever (3), and protective screening (4) is enclosed within lever (3) external end head.Wherein, wall outer mold (1) is the cuboid of being made by steel form, be added with firm muscle (11) around the wall outer mold (1), there is button nose (7) top and bottom of wall outer mold (1), have triangular groove (12) on two end faces about wall outer mold (1), the upper end button nose (7) of wall outer mold (1) links to each other with connecting rod (4), and lower end button nose (7) links to each other with lever (3); Hollow mould (2) is the hollow cuboid of being made by steel form, and there is center button nose (8) upper end of hollow mould (2); Lever (3) has pinhole for two ends and has the rigidity body of antiskid glue cushion (9) in the bottom of one end pinhole; Connecting rod (4) has the rod iron of pinhole for two ends; Frame plate (5) is rectangular plank, and frame plate (5) directly lies on the lever (3), so that go up people's operation; The plane reticulate body that protective screening (6) is made up of reinforcing bar, wire has hitch (10) in its underpart, hitch (10) is connected by pin with the external end head of lever (3).
Be described in detail the method for building the building with this mould below:
At first coat the soap slurry in wall outer mold (1) inboard of mould, the many groups wall outer mold (1) that scribbles the soap slurry is fixed on the ground collar tie beam of handling well, the position of the column that the building building is used is in two wall outer molds (1), and building bar is fixed on upright living on the position, reinforcing bar combines with the ground collar tie beam, will organize hollow mould (2) more again and use connecting rod (4) to be fixed in two wall outer molds (1) equally spacedly; Then, the build concrete that in the mould that fixes, adds national Specification, after filling up, with concrete jolt ramming, will grow is 200 millimeters dark 100 millimeters-200 millimeters places of concrete after-400 millimeters building bars insertion jolt ramming again, after 20 minutes-40 minutes with vibrating head, earlier hollow mould (2) is extracted, after treating concrete setting, again wall outer mold (1) is dismantled, form first section hollow wall; After 1 day-2 days, topped up with water in first section empty interior walls, hollow wall is carried out maintenance, after first section hollow wall of maintenance, on first section hollow wall, fix mould again, to organize the inboard of wall outer mold (1) more earlier and coat the soap slurry, the bottom of wall outer mold (1) be adjacent to first section hollow wall apart from the upper end 90 millimeters-100 millimeters places, move the lever (3) on the wall outer mold (1) vertical again with wall outer mold (1), antiskid glue cushion (9) on the lever (3) is close on first section hollow wall, prevent that wall outer mold (1) from gliding, simultaneously protective screening (6) is enclosed within the outer end of lever (3), frame plate (5) is placed on the lever (3), like this, wall outer mold (1) just is fixed on first section hollow wall, then, hollow mould (2) is inserted in 90 millimeters-110 millimeters suitable for reading of the hollow distance of first section hollow wall, use connecting rod (4) that wall outer mold (1) and hollow mould and (2) are connected and fixed again, continue to fix building bar building on the position of building with column, can carry out the making of second section hollow wall, up to meeting the requirements of the wall height; Maintenance is well all after the hollow wall, hollow position in hollow wall is dosed heat insulating material, seal the hollow upper top of wall afterwards, carry out the making of floor roof, the steel form of earlier prefabricated top board being used supports to level, on horizontal plane, complete the three-ply board that scribbles the soap slurry, around prefabricated top board, fix the special-purpose steel template, the height of special-purpose steel template is identical with the thickness that top board requires, and to have spacing on two relative special-purpose steel templates be 20 millimeters-50 millimeters, diameter is 40 millimeters-70 millimeters hole, a plurality of garden, the flat frame of isodiametric many steel pipes is dosed then the build concrete of national Specification in the special-purpose steel template on the hole, garden of steel form, fill up the back and use vibrator jolt ramming, and with the horizontal plane levelling of top board, after 25 minutes-35 minutes, extract hollow steel pipe out, the good top board of maintenance is promptly finished the making of first floor, on the basis of first floor, can build second floor with identical method, the third story layer is up to meeting the requirements of floor.
Be described in detail the exterior decoration method of carrying out below, comprise porcelain watt or the exterior decoration method of masaic and the exterior decoration method of granitic plaster diamond stone with this mould:
The exterior decoration method of porcelain watt or masaic is to stick one deck ground paper in wall outer mold (1) inboard of mould, one deck paper is also sticked in front at porcelain watt or masaic, the porcelain watt or the masaic that will stick paper then are attached on the inboard ground paper of wall outer mold (1) equably, again the wall outer mold (1) that posts porcelain watt or masaic is fixed on the ground collar tie beam of handling well according to the method for building the building with this mould, protect with sheet iron plate and to be attached to inboard porcelain of wall outer mold (1) watt or masaic, after fixing hollow mould (2) again, dose the build concrete of national Specification in the mould, after filling up concrete, sheet iron plate is slowly taken out, use the vibrating head vibrated concrete then, porcelain watt or masaic just are attached on the hollow wall like this; The exterior decoration method of granitic plaster diamond stone is earlier mould to be fixed on the ground collar tie beam of handling well according to the method for building the building with this mould, respectively being adjacent in the inboard of two wall outer molds (1) of mould and putting into a thickness is 15 millimeters-25 millimeters plank, the size of this plank and wall outer mold (1) measure-alike, fill up the build concrete of national Specification then in the mould, and use the vibrating head vibrated concrete, extract plank afterwards at leisure out, again the quartz that mixes is poured into the space that plank stays in mould, after filling up quartz, stopped 25 minutes-40 minutes, wall outer mold (1) is dismantled, keep hollow mould (2) here, the water brush pours into the quartz in the mould, extracts hollow mould (2) again out, has just finished the making of granitic plaster diamond stone outside hollow wall.
The present invention is owing to having adopted particular manufacturing craft to build building and having carried out exterior decoration, do not need tile floor of an artificial brick to assemble, but the disposable hollow wall of making is starched owing to scribble soap in wall outer mold (1) inboard, this can increase the slickness of wall, the skin of needn't plastering a wall again; When building a building, can finish the exterior decoration operation of porcelain watt or masaic, granitic plaster diamond stone, can not only shorten construction period, also can reduce by 50% building costs simultaneously.Build a building with this mould, owing to be whole reinforced concrete structure, have effects such as good antidetonation, protection against the tide, sound insulation, insulation, the present invention already provides a kind of novel mould and the new method of building and decorating with this mould for modern architecture.

Claims (9)

1, a kind of mould, it is characterized in that it is made up of wall outer mold [l], hollow, mould [2], lever [3], connecting rod [4], frame plate [5], protective screening [6], hollow mould [2] is placed in the middle of two wall outer molds [1], connecting rod [4] couples together two wall outer molds [1] and hollow mould [2], lever [3] is positioned at the bottom of wall outer mold [1], lever [3] is connected by pin with wall outer mold [1], and frame plate [5] is placed on the lever [3], and protective screening [4] is enclosed within lever [3] external end head.
2, mould according to claim 1, it is characterized in that described wall outer mold [1] is the cuboid of being made by steel form, be added with firm muscle [11] around the wall outer mold [1], there is button nose [7] top and bottom of wall outer mold [1], have triangular groove [12] on two end faces about wall outer mold [1].
3, mould according to claim 1 is characterized in that described hollow mould [2] is the hollow cuboid of being made by steel form, and there is center button nose [8] upper end of hollow mould [2].
4, mould according to claim 1 is characterized in that described lever [3] has pinhole for two ends and has the rigidity body of antiskid glue cushion [9] in the bottom of one end pinhole.
5, mould according to claim 1 is characterized in that described connecting rod [4] has the rod iron of pinhole for two ends.
6, mould according to claim 1 is characterized in that described frame plate [5] is rectangular plank.
7, mould according to claim 1 is characterized in that the plane reticulate body that described protective screening [6] is made up of reinforcing bar, wire, and hitch [10] is arranged in its underpart.
8, a kind of method of using mould as claimed in claim 1 to build the building is characterized in that:
A, coat the soap slurry in wall outer mold [1] inboard of mould, the many groups wall outer mold [1] that scribbles the soap slurry is fixed on the ground collar tie beam of handling well, the position of the column that the building building is used is in two wall outer molds [1], and building bar is fixed on upright living on the position, reinforcing bar combines with the ground collar tie beam, will organize hollow mould [2] more again and use connecting rod [4] to be fixed in two wall outer molds [1] equally spacedly;
B, in the many groups mould that fixes, add the build concrete of national Specification, after filling up, with vibrating head with concrete jolt ramming, to grow is 200 millimeters dark 100 millimeters-200 millimeters places of concrete after-400 millimeters building bars insertion jolt ramming again, after 20 minutes-40 minutes, earlier hollow mould [2] is extracted, treat concrete setting after, again wall outer mold [1] is dismantled, form first section hollow wall;
C, after 1 day-2 days, topped up with water in first section empty interior walls, hollow wall is carried out maintenance, after first section hollow wall of maintenance, on first section hollow wall, fix mould again, to organize the inboard of wall outer mold [1] more earlier and coat the soap slurry, the bottom of wall outer mold [1] be adjacent to first section hollow wall apart from the upper end 90 millimeters-100 millimeters places, move the lever [3] on the wall outer mold [1] vertical again with wall outer mold [1], antiskid glue cushion [9] on the lever [3] is close on first section hollow wall, simultaneously protective screening [6] is enclosed within the outer end of lever [3], frame plate [5] is placed on the lever [3], like this, wall outer mold [1] just is fixed on first section hollow wall, hollow mould [2] is inserted in 90 millimeters-110 millimeters suitable for reading of the hollow distance of first section hollow wall, use connecting rod [4] that wall outer mold [1] and hollow mould [2] are connected and fixed again, continue to fix building bar building on the position of building with column, can carry out the making of second section hollow wall, up to meeting the requirements of the wall height;
D, after the well whole hollow wall of maintenance, hollow position in hollow wall is dosed heat insulating material, seal the hollow upper top of wall afterwards, carry out the making of floor roof, the steel form of earlier prefabricated top board being used supports to level, on horizontal plane, complete the three-ply board that scribbles the soap slurry, around prefabricated top board, fix the special-purpose steel template, the height of special-purpose steel template is identical with the thickness that pre-plate requires, and to have spacing on two relative special-purpose steel templates be 20 millimeters-50 millimeters, diameter is 40 millimeters-70 millimeters hole, a plurality of garden, with the flat frame of isodiametric many steel pipes on the hole, garden of special-purpose steel template, in the special-purpose steel template, dose the build concrete of national Specification then, fill up the back and use vibrator jolt ramming, and with the horizontal plane levelling of top board, after 25 minutes-35 minutes, extract hollow steel pipe out, the good top board of maintenance is promptly finished the making of first floor;
E, on the basis of first floor, can build second floor, third story layer with identical method, up to meeting the requirements of floor.
9, a kind of exterior decoration method of using the described mould of claim 1 to carry out comprises porcelain watt or the exterior decoration method of masaic and the exterior decoration method of granitic plaster diamond stone, it is characterized in that:
A, the exterior decoration method of porcelain watt or masaic is to stick one deck ground paper in wall outer mold [1] inboard of mould, one deck paper is also sticked in front at porcelain watt or masaic, the porcelain watt or the masaic that will stick paper then are attached on the inboard ground paper of wall outer mold [1] equably, holding the wall outer mold [1] that pastes porcelain watt or masaic again is fixed on the ground collar tie beam of handling well according to the method for building the building with this mould, protect with sheet iron plate and to be attached to inboard porcelain of wall outer mold [1] watt or masaic, after fixing hollow mould [2] again, dose the build concrete of national Specification in the mould, after filling up concrete, sheet iron plate is slowly extracted out, use the vibrating head vibrated concrete then, like this, porcelain watt or masaic just are attached on the hollow wall;
B, the exterior decoration method of granitic plaster diamond stone is earlier mould to be fixed on the ground collar tie beam of handling well according to the method for building the building with this mould, respectively be adjacent in the inboard of two wall outer molds [1] of mould and put into a thickness and be, 15 millimeters-25 millimeters plank, the size of this plank and wall outer mold [1] measure-alike, fill up the build concrete of national Specification then in the mould, and use the vibrating head vibrated concrete, extract plank afterwards at leisure out, again the quartz that mixes is poured into the space that plank stays in mould, after filling up quartz, stopped 25 minutes-40 minutes, wall outer mold [1] is dismantled, keep hollow mould [2] here, the water brush pours into the quartz in the mould, extracts hollow mould [2] again out, has just finished the making of granitic plaster diamond stone outside hollow wall.
CN 97106191 1997-11-04 1997-11-04 Formwork and its use method in building construction and outside decoration Expired - Fee Related CN1132985C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97106191 CN1132985C (en) 1997-11-04 1997-11-04 Formwork and its use method in building construction and outside decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97106191 CN1132985C (en) 1997-11-04 1997-11-04 Formwork and its use method in building construction and outside decoration

Publications (2)

Publication Number Publication Date
CN1216332A true CN1216332A (en) 1999-05-12
CN1132985C CN1132985C (en) 2003-12-31

Family

ID=5168456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97106191 Expired - Fee Related CN1132985C (en) 1997-11-04 1997-11-04 Formwork and its use method in building construction and outside decoration

Country Status (1)

Country Link
CN (1) CN1132985C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892743A (en) * 2010-06-19 2010-11-24 张培霞 Construction method of permanent housing
CN102383590A (en) * 2011-07-11 2012-03-21 雷灿波 Combined system of split building template
CN104612288A (en) * 2014-10-17 2015-05-13 孟宪庆 Waste residue light reinforced concrete shockproof hollow wall preparation method and vibration compressor
CN105464255A (en) * 2014-04-15 2016-04-06 刘令 Production method of insulation-board foaming-cement cast-in-situ hollow wall
CN108978944A (en) * 2018-09-27 2018-12-11 彭国洪 The wall of the fixed ceramic tile casting foamed cement of adhesive strip
CN109441031A (en) * 2018-12-18 2019-03-08 中铁建工集团有限公司 The open spiral stairs structure of the concealed overhanging type of structural beams and its construction method
CN111648593A (en) * 2020-06-18 2020-09-11 桐乡市佳盛塑料制品有限公司 Hollow plastic formwork

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892743A (en) * 2010-06-19 2010-11-24 张培霞 Construction method of permanent housing
CN101892743B (en) * 2010-06-19 2013-09-11 张培霞 Construction method of permanent housing
CN102383590A (en) * 2011-07-11 2012-03-21 雷灿波 Combined system of split building template
CN102383590B (en) * 2011-07-11 2015-11-25 雷灿波 A kind of split construction formwork combined system
CN105464255A (en) * 2014-04-15 2016-04-06 刘令 Production method of insulation-board foaming-cement cast-in-situ hollow wall
CN104612288A (en) * 2014-10-17 2015-05-13 孟宪庆 Waste residue light reinforced concrete shockproof hollow wall preparation method and vibration compressor
CN108978944A (en) * 2018-09-27 2018-12-11 彭国洪 The wall of the fixed ceramic tile casting foamed cement of adhesive strip
CN109441031A (en) * 2018-12-18 2019-03-08 中铁建工集团有限公司 The open spiral stairs structure of the concealed overhanging type of structural beams and its construction method
CN109441031B (en) * 2018-12-18 2023-11-14 中铁建工集团有限公司 Structure Liang Yincang type overhanging type open rotary stair structure and construction method thereof
CN111648593A (en) * 2020-06-18 2020-09-11 桐乡市佳盛塑料制品有限公司 Hollow plastic formwork
CN111648593B (en) * 2020-06-18 2021-10-08 桐乡市佳盛塑料制品有限公司 Hollow plastic formwork

Also Published As

Publication number Publication date
CN1132985C (en) 2003-12-31

Similar Documents

Publication Publication Date Title
CN102003069B (en) Construction method and pouring device for framework masonry infill wall structure
CN103015717B (en) Rear superelevation steel pipe column outsourcing Construction technology of fair-faced concrete closed by a kind of floor
CN108412093A (en) A kind of Modern Landscape decoration loam wall and its construction method
CN106939663A (en) A kind of concrete hollow double-storied floor and its construction method
CN1132985C (en) Formwork and its use method in building construction and outside decoration
CN204266136U (en) Stone arch bridge cover arch rib shotcrete ruggedized construction
CN109129826A (en) Precast concrete alcove production method as the indoor strong and weak electronic box of house
CN201850773U (en) Pouring device for constructional column of frame masonry infilled wall
CN207988292U (en) Prefabricated stacking floor
CN110145059B (en) Construction process of antique soil wall
CN109630364B (en) Wind generating set, wind turbine foundation of wind generating set and manufacturing method of wind generating set
CN105984015B (en) One collects together sets of brackets on top of the columns prefabricated concrete element preparation method in building in the style of the ancients
CN105926657A (en) Concrete foundation prefabricated slab and construction method thereof
CN206873731U (en) A kind of concrete hollow double-storied floor
CN206070485U (en) Assembled ecological revetment
CN108457427A (en) A kind of sealing sizing cushion block and production method for building concrete formwork erection
CN209397710U (en) Novel pre-fabricated one
CN1264775A (en) High-speed building technology by permanent pattern plates, predecoration, self solidification and silkworm-like advance
CN208267093U (en) A kind of Precast Concrete Frame
CN106948534A (en) Mesh sheet forms hollow dark contignation and technique with spacer bar cast-in-place concrete
CN102322022A (en) Construction method for concrete of decorative housing of cable stayed bridge
CN101210442B (en) Construction method for column and architrave cornice
CN200975101Y (en) Building moulds for storied building and outdoor decoration
CN101240569A (en) In-situ integrated placing construction method for aerated concrete wall
CN211714342U (en) Formwork-supporting-free constructional column prefabricated hollow brick

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee