CN207988292U - Prefabricated stacking floor - Google Patents
Prefabricated stacking floor Download PDFInfo
- Publication number
- CN207988292U CN207988292U CN201720459049.2U CN201720459049U CN207988292U CN 207988292 U CN207988292 U CN 207988292U CN 201720459049 U CN201720459049 U CN 201720459049U CN 207988292 U CN207988292 U CN 207988292U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- polystyrene foam
- foam block
- slab
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型涉及一种建筑楼板施工构件,具体的说是一种预制叠合楼板;包括预制底板以及沿预制底板长度方向设置的桁架钢筋,其中,预制底板中设有钢筋网,所述桁架钢筋包括位于预制底板上方并沿其长度方向设置的上层钢筋以及沿上层钢筋长度方向均匀分布的支腿组,支腿组由位于上层钢筋两侧的两个倒V形钢筋组成,倒V形钢筋底端向外弯折并与钢筋网焊接,桁架钢筋间设有聚苯乙烯泡沫块,聚苯乙烯泡沫块沿相邻两组桁架钢筋间隔设置,聚苯乙烯泡沫块的底部嵌入在预制底板上表面,相邻聚苯乙烯泡沫块间的预制底板的上层设置有玻璃纤维;采用本实用新型技术方案的预制叠合楼板,自身加工方便,且便于空心楼板施工,能够与现浇注混凝土保持较强连接。
The utility model relates to a building floor construction component, in particular to a prefabricated laminated floor; comprising a prefabricated bottom slab and truss reinforcements arranged along the length direction of the prefabricated bottom slab, wherein a steel mesh is arranged in the prefabricated bottom slab, and the truss reinforcement It includes the upper layer of reinforcement located above the prefabricated bottom plate and arranged along its length direction and the outrigger group evenly distributed along the length direction of the upper layer of reinforcement. The outrigger group is composed of two inverted V-shaped reinforcements located on both sides of the upper layer of reinforcement. The end is bent outwards and welded with the steel mesh. There are polystyrene foam blocks between the truss bars. The polystyrene foam blocks are arranged at intervals along two adjacent groups of truss bars. The bottom of the polystyrene foam blocks is embedded in the upper surface of the prefabricated floor. , the upper layer of the prefabricated bottom slab between adjacent polystyrene foam blocks is provided with glass fiber; the prefabricated laminated floor slab adopting the technical scheme of the utility model is convenient to process itself, and is convenient for the construction of the hollow floor slab, and can maintain a strong strength with the cast-in-place concrete connect.
Description
技术领域technical field
本实用新型涉及一种建筑楼板施工构件,具体的说是一种预制叠合楼板。The utility model relates to a building floor construction component, in particular to a prefabricated laminated floor.
背景技术Background technique
随着我国建筑业的不断发展,建筑工业化成为未来建筑发展的方向。在工厂制作的装配式的预制叠合楼板作为替代现浇高层建筑的楼板、屋盖的新型产品能够减少支模、拆模的繁琐工序、缩短施工周期等优势。With the continuous development of my country's construction industry, construction industrialization has become the direction of future construction development. The prefabricated prefabricated laminated floor slab produced in the factory is a new product that replaces the floor and roof of cast-in-place high-rise buildings, which can reduce the cumbersome procedures of formwork support and formwork removal, and shorten the construction period.
为了保证叠合楼板与后浇混凝土叠合层间具有足够的连接力,需要将预制叠合楼板上表面构造成粗糙面,粗糙面的面积不宜小于结合面的80%,预制板的粗糙面凹凸深度不应小于4mm。粗糙面可采用拉毛或凿毛方法处理,也可采用专用的混凝土露骨料药剂,06SG439-1《预应力混凝土叠合楼板》介绍,可采用网状滚筒等方法成型。但由于构件厂采用的工具、技术等参差不齐(如有预制构件厂采用扫把、钢刷等扫毛),不仅效率低下,质量也难以保证,化学处理方法成本又较高,目前的网状滚筒多采用把手式,由于把手较短,对于大块构件操作不便。In order to ensure sufficient connection between the laminated floor and the post-cast concrete laminated floor, it is necessary to construct the upper surface of the prefabricated laminated floor into a rough surface. The area of the rough surface should not be less than 80% of the joint surface. The depth should not be less than 4mm. The rough surface can be processed by roughening or chiseling, or special concrete exposed aggregate agent can be used, as introduced in 06SG439-1 "Prestressed Concrete Laminated Floor", and it can be formed by methods such as mesh rollers. However, due to the uneven tools and technologies used by component factories (such as brooms, steel brushes, etc. used by prefabricated component factories), not only the efficiency is low, but the quality is also difficult to guarantee, and the cost of chemical treatment methods is high. Most of the rollers are handle-type, and because the handle is short, it is inconvenient to operate large components.
此外,现有的预制叠合楼板在浇注时常常需要在其上方安置空心模芯,以便于形成空心楼板,但是由于浇注的混凝土常常挤入空心模芯下方,从而使得空心模芯在承受较大浮力后上移,难以实现较好的定位,而通常采用的将模芯固定在上部配筋上的做法,不仅增加劳动量,而且常常会导致配筋变形损坏。In addition, the existing prefabricated laminated slabs often need to place a hollow mold core above it during pouring, so as to form a hollow slab. After the buoyancy moves up, it is difficult to achieve better positioning, and the usual method of fixing the mold core on the upper reinforcement not only increases the labor load, but also often leads to deformation and damage to the reinforcement.
在预制叠合楼板应用愈来愈广之际,急需要提出一种新的预制叠合楼板以满足上述需求。When the application of prefabricated laminated slabs is becoming more and more widespread, it is urgent to propose a new prefabricated laminated slab to meet the above-mentioned requirements.
实用新型内容Utility model content
本实用新型的目的在于提供一种自身加工方便,且便于空心楼板施工,能够与现浇注混凝土保持较强连接的预制叠合楼板。The purpose of the utility model is to provide a prefabricated laminated floor slab which is convenient for processing itself, convenient for the construction of the hollow floor slab, and capable of maintaining a strong connection with the cast-in-place concrete.
为实现上述目的,本实用新型提供一种预制叠合楼板,包括预制底板以及沿预制底板长度方向设置的桁架钢筋,其中,预制底板中设置有钢筋网,所述桁架钢筋包括位于预制底板上方并沿其长度方向设置的上层钢筋以及沿上层钢筋长度方向均匀分布的支腿组,支腿组由位于上层钢筋两侧的两个倒V形钢筋组成,倒V形钢筋底端向外弯折并与钢筋网焊接,所述桁架钢筋间设置有聚苯乙烯泡沫块,所述聚苯乙烯泡沫块沿相邻两组桁架钢筋间隔设置,聚苯乙烯泡沫块的底部嵌入在预制底板上表面,相邻聚苯乙烯泡沫块间的预制底板的上层设置有玻璃纤维。In order to achieve the above purpose, the utility model provides a prefabricated laminated floor, which includes a prefabricated bottom slab and truss reinforcements arranged along the length direction of the prefabricated bottom slab, wherein a reinforcement mesh is arranged in the prefabricated bottom slab, and the truss steel bars are located above the prefabricated bottom slab and The upper layer of reinforcement arranged along its length direction and the outrigger group evenly distributed along the length direction of the upper layer of reinforcement, the outrigger group is composed of two inverted V-shaped reinforcements located on both sides of the upper layer of reinforcement, the bottom of the inverted V-shaped reinforcement is bent outwards and Welded with steel mesh, polystyrene foam blocks are arranged between the truss steel bars, and the polystyrene foam blocks are arranged at intervals along two adjacent groups of truss steel bars. The upper layer of the prefabricated floor between adjacent polystyrene foam blocks is provided with fiberglass.
采用本实用新型技术方案的预制叠合楼板具有如下特点:由于桁架钢筋间设置有聚苯乙烯泡沫块,且聚苯乙烯泡沫块的底部嵌入在预制底板上表面,这样聚苯乙烯泡沫块底部与预制底板密闭连接,当在预制叠合板上方浇注混凝土时,混凝土不会进入聚苯乙烯泡沫块下方,从而避免混凝土对聚苯乙烯泡沫块产生较大浮力而使其上移,因此可以稳固定位以保证形成空心楼板;上述施工过程还不需要进行聚苯乙烯泡沫块的安装定位与固定,因此施工非常方便;由于相邻聚苯乙烯泡沫块间的预制底板的上层设置有玻璃纤维,这样在浇注混凝土形成楼板时,后浇注的混凝土可以通过玻璃纤维的连接与下层的预制楼板形成额外的连接,从而提高成型后楼板的层间连接力;相邻聚苯乙烯泡沫块间的预制底板的上层设置的玻璃纤维,可以通过预制底板在自身浇注成型时在上方喷洒玻璃纤维形成。The prefabricated laminated floor slab adopting the technical scheme of the utility model has the following characteristics: since the polystyrene foam block is arranged between the truss reinforcements, and the bottom of the polystyrene foam block is embedded in the upper surface of the prefabricated floor, the bottom of the polystyrene foam block is connected to the upper surface of the prefabricated floor. The prefabricated bottom slab is airtightly connected. When pouring concrete above the prefabricated laminated slab, the concrete will not enter under the polystyrene foam block, thereby preventing the concrete from having a large buoyancy on the polystyrene foam block and causing it to move upward, so it can be fixed in place for Guaranteed to form a hollow floor; the above construction process does not need to install, locate and fix polystyrene foam blocks, so the construction is very convenient; since the upper layer of the prefabricated floor between adjacent polystyrene foam When the concrete forms the slab, the post-cast concrete can form an additional connection with the prefabricated slab of the lower floor through the connection of glass fibers, thereby improving the interlayer connection force of the formed slab; the upper layer of the prefabricated floor between adjacent polystyrene foam blocks is set The glass fiber can be formed by spraying glass fiber on the prefabricated bottom plate when it is pouring itself.
作为优选方案,为了保证玻璃纤维对于预制底板和后来浇注的混凝土的连接强度,同时降低玻璃纤维的使用成本,所述玻璃纤维的长度不超过5mm。As a preferred solution, in order to ensure the connection strength of the glass fiber to the prefabricated base plate and the concrete poured later, and reduce the cost of using the glass fiber, the length of the glass fiber is not more than 5mm.
作为优选方案,为了增强聚苯乙烯泡沫块与预制底板的连接强度,避免后来在预制底板上方浇注混凝土时,发生混凝土进入增强聚苯乙烯泡沫块下方将其顶起的现象,所述聚苯乙烯泡沫块底面设置有连接预制底板的凸起。As a preferred solution, in order to enhance the connection strength between the polystyrene foam block and the prefabricated floor, avoid the phenomenon that the concrete enters under the reinforced polystyrene foam block and lifts it up when pouring concrete above the prefabricated floor. The bottom surface of the foam block is provided with a protrusion connected to the prefabricated base plate.
作为优选方案,为了减小后来浇注的混凝土对可以对聚苯乙烯泡沫块的浮力影响,所述聚苯乙烯泡沫块底层横截面积大于其上方任意一层的横截面积,这样可以使得聚苯乙烯泡沫块受到向下的压力而非向上的浮力。As a preferred solution, in order to reduce the impact of poured concrete on the buoyancy of the polystyrene foam block, the cross-sectional area of the bottom layer of the polystyrene foam block is greater than the cross-sectional area of any layer above it, which can make the polystyrene foam The vinyl foam blocks are subject to downward pressure rather than upward buoyancy.
作为优选方案,所述聚苯乙烯泡沫块横截面积自下而上逐渐减小。As a preferred solution, the cross-sectional area of the polystyrene foam block decreases gradually from bottom to top.
作为优选方案,为了增强聚苯乙烯泡沫块与预制底板的连接强度,避免后来在预制底板上方浇注混凝土时,发生混凝土进入聚苯乙烯泡沫块下方将其顶起的现象,所述聚苯乙烯泡沫块底粘接有一层玻璃纤维,粘结胶可采用环氧结构胶,丙烯酸结构胶。As a preferred solution, in order to enhance the connection strength between the polystyrene foam block and the prefabricated bottom plate, avoid the phenomenon that the concrete enters under the polystyrene foam block and lifts it up when pouring concrete above the prefabricated bottom plate. A layer of glass fiber is bonded to the bottom of the block, and the adhesive can be epoxy structural adhesive or acrylic structural adhesive.
作为优选方案,为了保证后来浇注的混凝土可以覆盖聚苯乙烯泡沫块,并形成足够强度的覆盖层,所述聚苯乙烯泡沫块的顶部高度不超过上层钢筋。As a preferred solution, in order to ensure that the poured concrete can cover the polystyrene foam block and form a covering layer with sufficient strength, the height of the top of the polystyrene foam block does not exceed the upper steel bar.
上述后来浇注的混凝土为预制叠合楼板安装完成后,在其上方浇注以形成楼板的混凝土。The concrete poured later is the concrete poured on top of the prefabricated laminated floor slab to form the floor slab after the installation is completed.
附图说明Description of drawings
图1为本实用新型实施例的预制叠合楼板横截面示意图;Fig. 1 is a schematic cross-sectional view of a prefabricated laminated floor slab according to an embodiment of the present invention;
图2为本实用新型实施例中预制叠合楼板俯视示意图;Fig. 2 is a schematic top view of the prefabricated laminated floor in the embodiment of the present invention;
图3为本实用新型实施例中预制叠合楼板浇注混凝土后的横截面示意图。Fig. 3 is a schematic cross-sectional view of the prefabricated laminated floor slab poured with concrete in the embodiment of the present invention.
其中,预制底板1,钢筋网2,上层钢筋3,倒V形钢筋4,聚苯乙烯泡沫块5,玻璃纤维6。Among them, prefabricated base plate 1, steel mesh 2, upper steel bar 3, inverted V-shaped steel bar 4, polystyrene foam block 5, glass fiber 6.
具体实施方式Detailed ways
下面结合附图和具体实施方式对本实用新型作进一步详细的说明:Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail:
如图1、图2所示:本实用新型提供一种预制叠合楼板,包括采用模具成型的预制底板1以及沿预制底板1长度方向设置的桁架钢筋,其中,预制底板1内部设有钢筋网2,桁架钢筋包括位于预制底板1上方并沿其长度方向设置的上层钢筋3以及沿上层钢筋3长度方向均匀分布的支腿组,支腿组由位于上层钢筋3两侧的两个倒V形钢筋4组成,倒V形钢筋4底端向外弯折并与钢筋网2焊接,倒V形钢筋4的顶部焊接到上层钢筋3上,为方便倒V形钢筋4的制作和焊接,同侧的倒V形钢筋4可以由连续弯折的钢筋代替,桁架钢筋间还设有聚苯乙烯泡沫块5,在预制底板1浇注成型时,将聚苯乙烯泡沫块5沿相邻两组桁架钢筋均匀间隔安放,安放的间距不大于200mm,同时应保证聚苯乙烯泡沫块5的体积与现浇混凝土体积的比值不大于0.4,以保证成型后楼板的强度,聚苯乙烯泡沫块5的底部嵌入在预制底板1成型的混凝土上表面,为了增强聚苯乙烯泡沫块5与预制底板1的连接强度,避免后来在预制底板1上方浇注混凝土时,混凝土进入聚苯乙烯泡沫块1下方将其顶起,聚苯乙烯泡沫块1底面可设置凸起,或者在聚苯乙烯泡沫块1底面粘接一层玻璃纤维,粘结胶可采用环氧结构胶或丙烯酸结构胶,本实施例采用第二种方式。此外为了保证玻璃纤维6对于预制底板1和后来浇注的混凝土的连接强度,相邻聚苯乙烯泡沫块5间的预制底板1的上层还设有玻璃纤维6,玻璃纤维6的长度不超过5mm,本实施例旋选为5mm。As shown in Figure 1 and Figure 2: the utility model provides a prefabricated laminated floor, including a prefabricated bottom slab 1 formed by a mold and truss reinforcements arranged along the length direction of the prefabricated bottom slab 1, wherein the prefabricated bottom slab 1 is internally provided with steel mesh 2. The truss reinforcement includes the upper steel bar 3 located above the prefabricated floor 1 and arranged along its length direction, and the outrigger group uniformly distributed along the length direction of the upper layer steel bar 3. The outrigger group consists of two inverted V-shaped bars located on both sides of the upper layer steel bar 3. Composed of steel bars 4, the bottom of the inverted V-shaped steel bars 4 is bent outwards and welded to the steel mesh 2, and the top of the inverted V-shaped steel bars 4 is welded to the upper layer of steel bars 3. For the convenience of making and welding the inverted V-shaped steel bars 4, the same side The inverted V-shaped steel bars 4 can be replaced by continuously bent steel bars, and polystyrene foam blocks 5 are also arranged between the truss bars. Place them at even intervals, and the distance between them should not be greater than 200mm. At the same time, it should be ensured that the ratio of the volume of the polystyrene foam block 5 to the volume of the cast-in-place concrete is not greater than 0.4, so as to ensure the strength of the floor after forming. The bottom of the polystyrene foam block 5 is embedded On the upper surface of the concrete formed on the prefabricated bottom slab 1, in order to enhance the connection strength between the polystyrene foam block 5 and the prefabricated bottom slab 1, it is avoided that when concrete is poured on the prefabricated bottom slab 1 later, the concrete enters the bottom of the polystyrene foam block 1 to jack it up , the bottom surface of the polystyrene foam block 1 can be provided with a protrusion, or a layer of glass fiber can be bonded to the bottom surface of the polystyrene foam block 1, and the bonding glue can be epoxy structural adhesive or acrylic structural adhesive. Way. In addition, in order to ensure the connection strength of the glass fiber 6 to the prefabricated bottom plate 1 and the concrete poured later, the upper layer of the prefabricated bottom plate 1 between the adjacent polystyrene foam blocks 5 is also provided with a glass fiber 6, and the length of the glass fiber 6 is no more than 5mm. The present embodiment is spin-selected as 5mm.
为减小后来浇注的混凝土对聚苯乙烯泡沫块5的浮力影响,聚苯乙烯泡沫块5底层横截面积大于其上方任意一层的横截面积,且聚苯乙烯泡沫块5横截面积自下而上逐渐减小,这样可以使得聚苯乙烯泡沫块受到向下的压力而非向上的浮力,本实施例优选的方式为圆台形或锥台形。In order to reduce the buoyancy influence of poured concrete on the polystyrene foam block 5 later, the cross-sectional area of the bottom layer of the polystyrene foam block 5 is greater than the cross-sectional area of any layer above it, and the polystyrene foam block 5 cross-sectional area is from It gradually decreases from bottom to top, so that the polystyrene foam block can be subjected to downward pressure instead of upward buoyancy. The preferred form of this embodiment is a conical or conical truncated shape.
为保证后来浇注的混凝土覆盖聚苯乙烯泡沫块5以形成足够强度的覆盖层,此处覆盖层厚度优选不小于20mm,因此聚苯乙烯泡沫块5的顶部高度不超过上层钢筋3。In order to ensure that the poured concrete covers the polystyrene foam block 5 to form a covering layer of sufficient strength, the thickness of the covering layer here is preferably not less than 20mm, so the top height of the polystyrene foam block 5 does not exceed the upper steel bar 3.
上述预制底板1,钢筋网2,上层钢筋3,倒V形钢筋4的具体规格可参照传统的预制叠合楼板的设计规范要求,本申请未做详细描述。The specific specifications of the above-mentioned prefabricated floor 1, steel mesh 2, upper steel bar 3, and inverted V-shaped steel bar 4 can refer to the design specification requirements of traditional prefabricated laminated floor slabs, which are not described in detail in this application.
如图3所示,本新型技术方案的预制叠合楼板是这样制作和使用的:首先将钢筋网2以及上层钢筋3,倒V形钢筋4焊接形成整体,然后将其放置在预制底板1的成型模板中,再向其中浇注成型的混凝土,之后将底部粘附了玻璃纤维的聚苯乙烯泡沫块5根据实际设计要求安放在混凝土上方,同时将玻璃纤维6通过吹风机分布与混凝土的上表面,然后正常养护最终得到预制叠合楼板。本实施例的预制叠合楼板使用方法与现有预制叠合楼板相同,只是不再需要在施工现场再安装和固定空心楼板成型用的模芯,因此施工速度更快,效果更好。As shown in Figure 3, the prefabricated laminated floor slab of the new technical solution is made and used in this way: first, the steel mesh 2, the upper steel bar 3, and the inverted V-shaped steel bar 4 are welded to form a whole, and then they are placed on the prefabricated floor 1. In the forming formwork, the formed concrete is poured into it, and then the polystyrene foam block 5 with glass fiber attached to the bottom is placed on the top of the concrete according to the actual design requirements, and the glass fiber 6 is distributed on the upper surface of the concrete through a blower, Then normal maintenance finally gets the prefabricated laminated slab. The method of using the prefabricated laminated slab in this embodiment is the same as that of the existing prefabricated laminated slab, except that it is no longer necessary to install and fix the mold core for forming the hollow slab at the construction site, so the construction speed is faster and the effect is better.
以上所述的仅是本实用新型的优选实施方式,方案中公知的具体结构及特性等常识在此未作过多描述,应当指出,对于本领域的技术人员来说,在不脱离本实用新型结构的前提下,还可以作出若干变形和改进,这些也应该视为本实用新型的保护范围,这些都不会影响本实用新型实施的效果和专利的实用性。What is described above is only the preferred embodiment of the present utility model, and the common knowledge such as the specific structure and characteristics known in the scheme is not described too much here, it should be pointed out that for those skilled in the art, without departing from the present utility model Under the premise of the structure, some deformations and improvements can also be made, which should also be regarded as the protection scope of the present utility model, and these will not affect the effect of the utility model implementation and the practicability of the patent.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720459049.2U CN207988292U (en) | 2017-04-27 | 2017-04-27 | Prefabricated stacking floor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720459049.2U CN207988292U (en) | 2017-04-27 | 2017-04-27 | Prefabricated stacking floor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207988292U true CN207988292U (en) | 2018-10-19 |
Family
ID=63804096
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720459049.2U Expired - Fee Related CN207988292U (en) | 2017-04-27 | 2017-04-27 | Prefabricated stacking floor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207988292U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110306801A (en) * | 2019-07-25 | 2019-10-08 | 河南绿建建筑科技有限公司 | The construction method of box overlapping heat preservation floor slab |
| CN110565863A (en) * | 2019-09-27 | 2019-12-13 | 华东建筑设计研究院有限公司 | Laminated floor and building and frame for preparing laminated floor |
| CN114457950A (en) * | 2022-03-23 | 2022-05-10 | 天一建设发展有限公司 | Assembled precast concrete floor slab and production method thereof |
| CN114734532A (en) * | 2022-05-09 | 2022-07-12 | 浙江杭加泽通建筑节能新材料有限公司 | Production method of autoclaved aerated concrete composite floor truss bottom plate based on aluminum die |
| CN116044082A (en) * | 2022-12-23 | 2023-05-02 | 重庆建工建材物流有限公司 | Ceramsite concrete external wall panel |
| WO2025176134A1 (en) * | 2024-02-23 | 2025-08-28 | 重庆万虎机电有限责任公司 | Cast-in-place prefabricated building formwork component |
-
2017
- 2017-04-27 CN CN201720459049.2U patent/CN207988292U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110306801A (en) * | 2019-07-25 | 2019-10-08 | 河南绿建建筑科技有限公司 | The construction method of box overlapping heat preservation floor slab |
| CN110565863A (en) * | 2019-09-27 | 2019-12-13 | 华东建筑设计研究院有限公司 | Laminated floor and building and frame for preparing laminated floor |
| CN114457950A (en) * | 2022-03-23 | 2022-05-10 | 天一建设发展有限公司 | Assembled precast concrete floor slab and production method thereof |
| CN114734532A (en) * | 2022-05-09 | 2022-07-12 | 浙江杭加泽通建筑节能新材料有限公司 | Production method of autoclaved aerated concrete composite floor truss bottom plate based on aluminum die |
| CN114734532B (en) * | 2022-05-09 | 2024-04-16 | 浙江杭加泽通建筑节能新材料有限公司 | Production method of autoclaved aerated concrete composite floor truss bottom plate based on aluminum mould |
| CN116044082A (en) * | 2022-12-23 | 2023-05-02 | 重庆建工建材物流有限公司 | Ceramsite concrete external wall panel |
| WO2025176134A1 (en) * | 2024-02-23 | 2025-08-28 | 重庆万虎机电有限责任公司 | Cast-in-place prefabricated building formwork component |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201087480Y (en) | Prestressed concrete composite beam | |
| CN113123506B (en) | Prefabricated die-removal-free steel bar truss floor bearing plate based on uhpc and using method | |
| CN104594557A (en) | Prefabricated reinforced concrete beam with transverse steel partition boards and construction method | |
| CN101858119A (en) | Reinforced concrete hollow floor slab and construction method | |
| CN217461124U (en) | Light and thin type concrete rib truss floor bearing plate | |
| CN108104284A (en) | Shear wall steel arm is embedded in the wallboard connecting structure and assembly method of floor | |
| CN109469242A (en) | A kind of profiled sheet-regeneration concrete composite floor and its construction method | |
| CN207812307U (en) | The construction system of Cable stayed Bridge Main Tower and steel anchor beam | |
| CN110284729A (en) | A block-by-block cutting and demolition method for walls of historic buildings | |
| CN219033728U (en) | A new type of laminated floor slab based on UHPC | |
| CN110792221A (en) | A kind of prefabricated laminated board with anti-leakage slurry and construction method thereof | |
| CN206722216U (en) | A kind of prefabricated girder of laminated floor slab | |
| CN103758036B (en) | Thin-walled fin-plate type super high strength concrete integrated deck plate | |
| CN108316469A (en) | A kind of prefabrication system and its construction technology | |
| CN221118904U (en) | Truss superimposed sheet | |
| CN207647033U (en) | A kind of precast reinforced basket structure | |
| CN212001831U (en) | A leak-proof prefabricated laminated board | |
| CN214941494U (en) | Recycled concrete laminated slab containing prestressed FRP tendon fiber | |
| CN109853793A (en) | A kind of self-compacting recycled block concrete composite shear wall and construction method thereof | |
| CN104727444A (en) | Construction method for frame structure broad-flat-beam | |
| CN211714007U (en) | A construction elevator infrastructure | |
| CN103437558B (en) | A kind of construction method preventing resonance damage | |
| CN210508479U (en) | Reinforcement structure of a historic building unit wall | |
| CN116657791A (en) | Anti-buckling steel plate shear wall and its manufacturing method and installation method | |
| CN102535851A (en) | Board integrated construction process of prefabricated floor board of masonry house |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250609 Address after: No.1 Yuanjiagang, Yuzhong District, Chongqing 400042 Patentee after: NO.3 CONSTRUCTION CO., LTD. OF CHONGQING CONSTRUCTION ENGINEERING Group Country or region after: China Patentee after: CHONGQING CONSTRUCTION ENGINEERING BUILDING MATERIALS & LOGISTICS CO.,LTD. Patentee after: CHONGQING CONSTRUCTION ENGINEERING GROUP Co.,Ltd. Address before: 401420 Chongqing City Qijiang County Qijiang District Qijiang Industrial Park Area A Patentee before: CHONGQING CONSTRUCTION ENGINEERING HIGH-TECH BUILDING MATERIALS CO.,LTD. Country or region before: China Patentee before: CHONGQING CONSTRUCTION ENGINEERING BUILDING MATERIALS & LOGISTICS CO.,LTD. Patentee before: CHONGQING CONSTRUCTION ENGINEERING GROUP Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |