CN1215966C - Automatic track alignment method for trackway of crane - Google Patents

Automatic track alignment method for trackway of crane Download PDF

Info

Publication number
CN1215966C
CN1215966C CN 02151913 CN02151913A CN1215966C CN 1215966 C CN1215966 C CN 1215966C CN 02151913 CN02151913 CN 02151913 CN 02151913 A CN02151913 A CN 02151913A CN 1215966 C CN1215966 C CN 1215966C
Authority
CN
China
Prior art keywords
rail
tooth bar
track
transmission gear
orbit determination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02151913
Other languages
Chinese (zh)
Other versions
CN1483656A (en
Inventor
付双俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02151913 priority Critical patent/CN1215966C/en
Publication of CN1483656A publication Critical patent/CN1483656A/en
Application granted granted Critical
Publication of CN1215966C publication Critical patent/CN1215966C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to an automatic track alignment method for an over-track lift of a crane and a device thereof. The method comprises: a driving device on a moveable track drives a transverse rack and a vertical rack to move simultaneously through a speed reducer and a transmission gear; the transverse rack moves towards the direction of a fixed track during the process of track alignment, the front end of the transverse rack is inserted into a positioning base of the fixed track, the vertical rack moves upwards and withdraws from the stopping position, and the driving device is turned off after the tracks are butted; the transverse rack moves towards the direction of the moveable track and is disengage from the positioning base of the fixed track to reach initial position during the process of track separation, the vertical rack moves downwards and reaches the stopping position, and the driving device is turned off after the tracks complete track returning. The present invention has the advantages of novel design and compact structure. The transverse rack is used for track alignment, and the vertical rack is used for stopping to prevent an electric hoist from falling off. The transverse rack and the positioning base are tightly jointed after the track alignment is achieved, so that the down deflection and the track gnawing between the tracks are avoided. The electric automatic track alignment device has the advantages of stable performance and reliable motions of track alignment and track separation according to running results.

Description

Hoisting crane cross that rail hangs automatically to rail method and device thereof
Technical field
The present invention relates to that hoisting crane crosses that rail hangs to the rail technology, specifically be a kind of hoisting crane cross that rail hangs automatically to rail method and device thereof.
Background technology
At present, China produces crosses rail and hangs that the branch suspension type monorail hangs, double track hangs two kinds, applying unit spreads all over thermal power plant, nuclear power plant, aircraft factory and all two tracks and needs the producer of automatic butt to rail, its objective is: the hoisting crane on the track can freely be entered on another track after butt joint, and work freely back and forth, place the dolly that moves on the track, electric block can winch to the other end from this end to tens of tons of equipment with one ton, and reliable, safety, stable.When needs can freely separate separate operaton again during separate operaton separately.That therefore, gives hoisting crane has proposed quite sharp-pointed problem to rail and self-protection.
One, when automatically to rail, two lock on tracks, alignment should be able to be convenient to running trolley and electric block hoisting heavy back and forth, downwarp does not have at two rail joint places.
Two, when minute open shop, the most important thing is should have the anti-derailing of failure-free stop crossing end that rail hangs trolley travelling, prevent that electric block derailing from breaking, and be the requirement of this stop: (1) during to rail stop remove automatically, run between two tracks for the dolly electric block.(2) turn back to formerly when crossing rail and hanging on the branch open shop when the dolly electric block, terminal stop can automatically reset again, derail because of no stop excess of stroke operation when preventing trolley travelling will lift by crane thing and dolly, cucurbit is broken.(3) behind the orbital docking, when electric block with the weight of lifting during through the joint of two tracks, downwarp and gnaw rail does not have.If to gnaw rail serious, will hinder the loop wheel machine that will hang weight and reach another track smoothly and get on, operation is also like this back and forth.
Up to the present, also do not have which producer of family fundamentally to address the above problem, have to adopt original craft to the rail method, labour intensity is big, and operating efficiency is low, poor stability.It is reported in higher (more than the 6-9m) place of lifting altitude, the operative employee of a lot of producers is stricken especially, the hoisting crane derailing all took place and fell down the incident of breaking in many producers, the grave accident that the dolly derailing causes Hitachi's board 10T Electric Chain Blocks to break just occurred as Dongguan power plant, what it adopted is designed and constructed by external certain Crane Factory to the rail device.
Summary of the invention
In view of the prior art above shortcomings, the present invention propose that a kind of hoisting crane crosses that rail hangs automatically to the rail method and automatically to the rail device, cross safety that rail hangs automatically to rail to realize the crane-suspended formula, it is big to reduce labour intensity, improves operating efficiency.
The hoisting crane that the present invention proposes is crossed automatically the rail method being comprised the steps: that rail hangs
Cross the actuating device that rail hangs on the rail for one and drive transmission gear by retarder, again by transmission gear drive horizontal tooth bar and vertically tooth bar be synchronized with the movement;
During to rail, laterally tooth bar is crossed the orbit determination direction motion that rail hangs to another, and laterally the tooth bar leading portion inserts in the positioning seat on the described orbit determination, and vertical tooth bar upward movement withdraws from the stop position, moves until moving rail and orbit determination butt joint limit switch and closes actuating device;
When dividing rail, laterally tooth bar is to its moving rail direction motion, and the positioning seat that breaks away from the described orbit determination is got back to original position, and vertical tooth bar moves downward gear to end, closes actuating device until the action of return limit switch.Described actuating device is a motor, or pneumatics, or hydraulic efficiency gear.
A kind of hoisting crane cross that rail hangs automatically to the rail device, it is characterized in that having a load bearing seat 10 that is fastened on the moving rail, on load bearing seat 10, be horizontally installed with horizontal tooth bar 3, retarder 7 and the perpendicular tooth bar seat 12 that is driven by motor 8 is installed in the side of load bearing seat 10, the transmission gear 5 that is driven by retarder is installed on load bearing seat 10 by bearing seat 4, perpendicular tooth bar seat 12 is provided with perpendicular tooth cover 11, the vertical tooth bar 6 and the horizontal tooth bar 3 that are arranged in perpendicular tooth cover 11 all mesh with transmission gear 5, on orbit determination, be fixed with the positioning seat 1 of band, pass through retarder 7 by a control setup control motor 8 to the rail hole, transmission gear 5 drives horizontal tooth bar 3 and vertical tooth bar 6 is synchronized with the movement.
The present invention drives transmission gear by crossing the actuating device that rail hangs on the rail by retarder, drives horizontal tooth bar by transmission gear again and vertical tooth bar is synchronized with the movement, and laterally tooth bar is used for to rail, and vertical tooth bar is used as stop, prevents that electric block from coming off.Novel, compact conformation to horizontal being combined closely in the rail hole of the positioning seat of tooth bar leading portion and orbit determination behind the rail, makes two not downwarps of interorbital, gnaws rail.Its actuating device has multiple choices, can adopt motor, pneumatics and hydraulic efficiency gear.
Its electric travelling crane cross that rail hangs automatically to the rail device in the in-place test operation of mother gulf, Shenzhen power plant, operation result shows that device performance is stable, to rail, divide the rail reliable in action.We can say the invention solves the lifting industry for a long time automatic safe to the difficult problem of rail.
Description of drawings
Fig. 1 a for exemplary embodiments of the present invention automatically to the constructional drawing of rail device (to the rail state);
Fig. 1 b is the birds-eye view of Fig. 1 a;
Fig. 1 c is the A-A cutaway view of Fig. 1 a;
Fig. 1 d is the B-B cutaway view of Fig. 1 a;
Fig. 2 a, b divide the constructional drawing of rail state automatically for this to the rail device;
Fig. 3 be this automatically to the rail device to the rail principle schematic;
Fig. 4 divides the rail principle schematic to the rail device automatically for this;
Fig. 5 is that this is automatically to the circuit diagram of the control setup of rail device.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described in detail.
Fig. 1, Fig. 2 for the present invention automatically to the constructional drawing of rail device, wherein main portion is: positioning seat 1, lock bolt 2, laterally tooth bar 3, bearing seat 4, transmission gear 5, vertical tooth bar 6, reductor 7, motor 8, to rail limit switch 9, load bearing seat 10, perpendicular tooth cover 11, perpendicular tooth bar seat 12, return limit switch 13, electric block 14, I-beam section 15.
Automatically the rail device is comprised a load bearing seat 10, load bearing seat 10 was fastened on above the moving rail that rail hangs, on load bearing seat 10, be horizontally installed with horizontal tooth bar 3, retarder 7 and perpendicular tooth bar seat 12 are installed in side at load bearing seat 10, motor 8 drives retarder 7, the transmission gear 5 that retarder drives is installed on the load bearing seat 10 by bearing seat 4, perpendicular tooth bar seat 12 is provided with perpendicular tooth cover 11, the vertical tooth bar 6 and the horizontal tooth bar 3 that are arranged in perpendicular tooth cover 11 all mesh with transmission gear 5, the orbit determination end of hanging at another mistake rail is fixed with the positioning seat 1 of band to rail hole 21, and motor 8 is by retarder 7, transmission gear 5 drives horizontal rack 3 and perpendicular tooth bar 6 is synchronized with the movement.Engagement between described retarder 7 and transmission gear 5 bonding states, transmission gear 5 and horizontal rack 3, the perpendicular tooth bar 6 is shown in Fig. 1 d.
Fig. 1 c is the A-A cutaway view of Fig. 1 a, wherein is with the cross section to the positioning seat 1 in rail hole 21
Figure C0215191300061
Shape, positioning seat 1 are adopted bolt 22 to be fastened on another and are crossed the orbit determination 15 ' end that rail hangs, the leading portion of rail hole 21 with horizontal tooth bar 3 cooperated in it, location when being used for moving rail and orbit determination butt joint and auxiliary carrying.
Fig. 3 be this automatically to the rail device to the rail principle schematic.When needs during to rail, press the rail order button, by cart operation button the cart operation is crossed about the orbit determination 100mm that rail hangs from another simultaneously and locates automatic deceleration (carrying out) by electric system, until moving rail with another spacing the stopping in the parallel place of orbit determination that hang of rail.
Press again rail is inserted the button unlatching to rail motor 8, drive transmission gear 5 right-hand revolutions by reductor 7, drive horizontal tooth bar 3 along X2 '-X2 direction motion, front end inject another cross rail hang orbit determination go up positioning seat 1 in the rail hole, simultaneously vertical tooth bar 6 is along Y1 '-Y1 direction motion, rise in 2/3 position, I-beam section lateral edge top, stop to limit switch 9 action, this moment is former to be crossed cucurbit that rail hangs on and not to reach another with having stop and cross rail and hang on, two loop wheel machines just can up, down, left, right, before and after move simultaneously lifting cargo to need the place.
Automatically divide the rail process to be described as follows to the rail device with reference to a minute rail principle schematic 4:
When the need isolated operation, press branch rail dolly return button, cucurbit gets back on the moving rail, automatic command makes to be opened rail motor 8, drives the rotation of transmission gears 5 anticlockwise directions by reductor 7, and then drives horizontal tooth bar 3 and move along X2-X2 ' direction, vertical tooth bar 6 moves along Y1-Y1 ' direction, after action arrives the desired location simultaneously, 13 actions of return limit switch, laterally tooth bar 3 front ends with cross rail and hang rail (upward I-shaped) front end and align; Vertical tooth bar 6 one ends are in I-beam section lateral edge 2/3 position (being the stop position), make to allow cucurbit open to pass by, and have played safest stop effect.Cross that rail hangs and can front, rear, left and right isolated operation lifting cargo.
Because transmission gear drives horizontal rack and perpendicular tooth bar is synchronized with the movement, when being in to the rail latched position, laterally tooth bar be inserted in orbit determination in the rail hole, wanting isolated operation can't carry out, having only horizontal tooth bar to recall not just can isolated operation in to the rail hole at it, and when laterally tooth bar was recalled, vertical tooth bar also was returned to the stop position simultaneously, to stop the electric block slippage.The invention solves China and even external lifting industry automatically to rail and the insurmountable in decades significant problem of safety system.
Fig. 5 is that this is automatically to the circuit diagram of the control setup of rail device.With reference to Fig. 5, HA 1Be the total button of self-locking, KM 1For always opening/stop contactless switch, HA 2For to rail self-locking order button, ST 1For ear magnetic control suddenly crosses that rail hangs that cart stops and to rail instruction limit switch, KA 1For to rail commands relays, QA 1For rail is inserted button (unclamp and automatically reset), ST 2Be ear magnetic control limit switch suddenly after rail is inserted, MK 2For rail is inserted contactless switch, QA 2For rail being recalled button, ST 3Be ear magnetic control return limit switch suddenly, MK 3For rail being recalled contactless switch, T 1Be control transformer, M 1For to the rail motor, QS1 automatic air-break switch etc.
When needs during, press rail order button HA to rail 2, cross rail hanging to cart and stop limit switch ST 1Cart stops automatically during the place, to rail relay K A 1Adhesive and self-insurance, this moment is to rail instruction contactless switch KA 1Open contact KA 1-1-KA 1-3Closed.Press rail is inserted button QA 1, voltage transformer T 1Secondary X 1End, QA 1, MK 3-1, KA 1-2, ST 2, MK 2To X 0End forms loop, MK 2The adhesive motor M 1Entry into service drives reductor, rail gear clockwise direction is moved, and drive horizontal tooth bar again and advance (in the insertion orbit determination positioning seat) to the orbit determination positioning seat, the upwards operation of vertical tooth bar, disengaging stop position row is ear magnetic control limit switch ST extremely suddenly 2(be Fig. 1 9) locates ST 2KM is cut off in the limit switch action 2Coil circuit, motor M 1Stop operating, rail is finished, enter lifting job.
After the operation completion, press rail is recalled button QA 2, voltage transformer T 1Secondary X 1End, QA 2, MK 2-1, KA 1-3, ST 3, MK 3To X 0End forms loop, MK 3The adhesive motor M 1Antiport drives reductor, rail gear anticlockwise direction is moved, and makes horizontal tooth bar and vertical tooth bar return, when being withdrawn into return limit switch ST 3(be Fig. 1 13) cuts off KM when locating 3The coil circuit return stops, horizontal, vertical tooth bar is got back to virgin state (seeing Fig. 2, Fig. 4) and is crossed rail and hang cart and do not insert in the orbit determination positioning seat because of horizontal tooth bar, and cart just can be worked front and back freely, and dolly has vertical tooth bar to make stop again, but the yet relieved work in the left and right sides can not have an accident because of derailing.
Above-mentioned limit switch ST 2, return limit switch ST 3All adopt ear magnetic control limit switch suddenly, ST 2And ST 3Normality is a closure state.All the other control apparatus circuit all adopt tradition to cross the control apparatus circuit that rail hangs, can be with reference to the operator's hand book of Related product.

Claims (4)

1, a kind of hoisting crane cross that rail hangs automatically to the rail method, comprise the steps:
Cross the actuating device that rail hangs on the rail for one and drive transmission gear by retarder, again by transmission gear drive horizontal tooth bar and vertically tooth bar be synchronized with the movement;
During to rail, laterally tooth bar is crossed the orbit determination direction motion that rail hangs to another, and laterally the tooth bar leading portion inserts in the positioning seat on the described orbit determination, and vertical tooth bar upward movement withdraws from the stop position, moves until moving rail and orbit determination butt joint limit switch and closes actuating device;
When dividing rail, laterally tooth bar is to its moving rail direction motion, and the positioning seat that breaks away from the described orbit determination is got back to original position, and vertical tooth bar moves downward gear to end, closes actuating device until the action of return limit switch.
2, according to the described hoisting crane of claim 1 cross that rail hangs automatically to the rail method, it is characterized in that: described actuating device is a motor, or pneumatics, or hydraulic efficiency gear.
3, a kind of hoisting crane cross that rail hangs automatically to the rail device, it is characterized in that: have a load bearing seat (10) that is fastened on the moving rail, on load bearing seat (10), be horizontally installed with horizontal tooth bar (3), retarder (7) and the perpendicular tooth bar seat (12) that is driven by motor (8) installed in side at load bearing seat (10), the transmission gear (5) that is driven by retarder is installed on load bearing seat (10) by bearing seat (4), perpendicular tooth bar seat (12) is provided with perpendicular tooth cover (11), the vertical tooth bar (6) and the horizontal tooth bar (3) that are arranged in perpendicular tooth cover (11) all mesh with transmission gear (5), on orbit determination, be fixed with the positioning seat (1) of band, pass through retarder (7) by a control setup control motor (8) to the rail hole, transmission gear (5) drives horizontal tooth bar (3) and vertical tooth bar (6) is synchronized with the movement.
4, according to the described hoisting crane of claim 3 cross that rail hangs automatically to the rail device, it is characterized in that: the cross section of positioning seat (1) is Shape, the leading portion of rail hole with horizontal tooth bar (3) cooperated in it, location when being used for moving rail and orbit determination butt joint and auxiliary carrying.
CN 02151913 2002-11-11 2002-11-11 Automatic track alignment method for trackway of crane Expired - Fee Related CN1215966C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02151913 CN1215966C (en) 2002-11-11 2002-11-11 Automatic track alignment method for trackway of crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02151913 CN1215966C (en) 2002-11-11 2002-11-11 Automatic track alignment method for trackway of crane

Publications (2)

Publication Number Publication Date
CN1483656A CN1483656A (en) 2004-03-24
CN1215966C true CN1215966C (en) 2005-08-24

Family

ID=34148768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02151913 Expired - Fee Related CN1215966C (en) 2002-11-11 2002-11-11 Automatic track alignment method for trackway of crane

Country Status (1)

Country Link
CN (1) CN1215966C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103171971B (en) * 2013-03-19 2016-01-20 河南省矿山起重机有限公司 Crane cross track hangs and automatic centering system
CN103274306B (en) * 2013-06-18 2014-12-10 山东丰汇设备技术有限公司 Automatic rail aligning device and method for combined rail crane
CN103407899A (en) * 2013-09-03 2013-11-27 河南机电高等专科学校 Bridge crane off-track locking device
CN103663162B (en) * 2013-11-13 2015-08-05 中国电器科学研究院有限公司 A kind of track lifting device for station place, workshop
CN107758501B (en) * 2017-09-27 2019-03-15 铜陵海源超微粉体有限公司 A kind of crane cross track hangs automatic centering system
CN108147279A (en) * 2017-12-31 2018-06-12 浙江杭钻机械制造股份有限公司 Lifting crosses rail and hangs automatic locking lug-latch switching device
CN108373103A (en) * 2018-04-20 2018-08-07 蔡德贤 Realize the hanger rail system of transregional all standing of hanger movement

Also Published As

Publication number Publication date
CN1483656A (en) 2004-03-24

Similar Documents

Publication Publication Date Title
RU2595232C2 (en) Jointing platform of shaft hoist flexible guide for, and method of splicing for shaft hoist
CN1215966C (en) Automatic track alignment method for trackway of crane
CN201835659U (en) Locking and unlocking mechanism of electronic sliding plug door
CN106639425A (en) Up-down and translation grabbing mechanical tridimensional parking equipment
CN103286281A (en) Servo stacking machine used for aluminum ingot on continuous castcontinuous casting production line for aluminum ingots
EP0275004A1 (en) Automatic silo for automobiles
CN201520594U (en) Multi-rail mechanical automatic steel rail clamp
CN102261055B (en) Pull rod moving method of hydraulic hoist for gate
JPH10265148A (en) Elevator system
CN2584584Y (en) Automatic rail fitting device for crane
CN202779632U (en) Sand box moving device of molding line
CN205170212U (en) Semi -portal crane
CN201972434U (en) Multi-row parking space roadway stacking mechanical garage
CN114044446B (en) Large irregular box body lifting, moving and overturning device
CN1250852C (en) Lifting horizontal moving multi-storey garage and its coming in and going out method
JP3580877B2 (en) Take-out and press-out mechanism of reinforcing material used in equipment for manufacturing large steel structures
CN211813098U (en) Circulating pump overhauling and lifting facility for flue gas desulfurization treatment of sintering machine
EP1582495A2 (en) Load grasping device
CN211769706U (en) Automatic pile hanging hook
CN114211764A (en) Automatic system suitable for air entrainment brick production line cylinder mould buckle installation
CN105905804A (en) Hybrid differential driving mechanism for controlling lifting of crane and transverse moving of trolley
CN112027936A (en) Hoist for high-speed rail prefabricated box girder construction
CN208345607U (en) Automatic yard high-speed track hangs safety work with self-service pusher
CN206000224U (en) A kind of up-down cross sliding type multi-storied garage
CN215093664U (en) Handling anchor clamps of hoist wheel processing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant