CN1209533C - 桩间混凝土壳组合护坡桩 - Google Patents
桩间混凝土壳组合护坡桩 Download PDFInfo
- Publication number
- CN1209533C CN1209533C CN 03100268 CN03100268A CN1209533C CN 1209533 C CN1209533 C CN 1209533C CN 03100268 CN03100268 CN 03100268 CN 03100268 A CN03100268 A CN 03100268A CN 1209533 C CN1209533 C CN 1209533C
- Authority
- CN
- China
- Prior art keywords
- piles
- slope protection
- concrete
- protection pile
- ensure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Piles And Underground Anchors (AREA)
Abstract
常规的基础护坡桩采用有间隔桩体排列,并通过拉梁连接,其桩间采用混凝土喷射面层,保证土体不外泄,这种传统护坡方式缺点在于整体工作性能差,混凝土面层因受力不合理,难于保证桩间土体稳定;土方开挖时会因边坡喷锚延误工期。本方法在桩间采用柱壳体结构,因壳体结构具有抗压能力强的特性,足以承载桩间混凝土的侧压力,保证了桩间土体的相对稳定性,使护坡桩协同工作,边坡更加安全可靠。同时,因不必进行边坡喷锚,使土方开挖连续施工,可有效缩短工期。
Description
(一)技术领域
本发明涉及一种基坑支护形式,采用护坡桩与圆柱壳体的联合支护。
(二)背景技术
常规的基础护坡桩采用有间隔桩体排列,并通过拉梁连接,其桩间采用混凝土喷射面层,保证土体不外泄,这种传统护坡方式缺点在于整体工作性能差,混凝土面层因受力不合理,难于保证桩间土体稳定。同时,在土方开挖期间需跟随边坡喷射混凝土,影响工作效率。
(三)发明内容
本方法在桩间采用柱壳体结构,护坡桩施工完毕后,在桩间成孔,进而浇筑钢筋混凝土壳体结构(采用壳体为了节约材料投入,并保证合理的受力性能),壳体结构将桩间土体的侧压力传递到护坡桩。
因壳体结构具有抗压能力强的特性,足以承载桩间混凝土的侧压力,解决了桩间土体的相对稳定性,同时保证了护坡桩的协同工作。使边坡更加安全可靠。为长期的基础施工创造条件。同时,保证了土方开挖可连续进行,不必为桩间土喷锚延误工期。
(四)附图说明
图1a:圆筒形桩间体平面构造
图1b:圆筒形桩间体透视图
图中:1:常规护坡桩体;2:桩间圆柱壳体。
(五)最佳实施方式
根据工程经验,桩径为800mm,桩心距为2000mm,桩间圆柱壳体直径1400mm,壁厚100mm。
Claims (2)
1、一种桩间混凝土壳组合护坡桩,在常规的护坡桩中间进一步成孔,并浇筑圆柱混凝土壳体,使护坡体系成为严密的整体,其特征在于将不同的护坡桩通过壳体结构联系起来,形成封闭的受力整体。
2、按权利要求1的桩间混凝土壳组合护坡桩,其特征在于桩间浇筑圆筒形壳体结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03100268 CN1209533C (zh) | 2003-01-10 | 2003-01-10 | 桩间混凝土壳组合护坡桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03100268 CN1209533C (zh) | 2003-01-10 | 2003-01-10 | 桩间混凝土壳组合护坡桩 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1515755A CN1515755A (zh) | 2004-07-28 |
CN1209533C true CN1209533C (zh) | 2005-07-06 |
Family
ID=34238958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03100268 Expired - Fee Related CN1209533C (zh) | 2003-01-10 | 2003-01-10 | 桩间混凝土壳组合护坡桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1209533C (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100360745C (zh) * | 2004-12-28 | 2008-01-09 | 王继忠 | 混凝土桩的施工方法 |
CN102587411A (zh) * | 2012-02-13 | 2012-07-18 | 中天建设集团有限公司 | 一种软土中围护桩间挂网浇砼挡土方法 |
-
2003
- 2003-01-10 CN CN 03100268 patent/CN1209533C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1515755A (zh) | 2004-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100543239C (zh) | 一种地下工程中一桩三用的方法 | |
CN101914925B (zh) | 利用优化复合预制拱墙作外墙的地下室 | |
CN110004919B (zh) | 一种用于管线影响范围内的基坑围护施工方法 | |
CN201891116U (zh) | 柔性面层土钉墙支护体系 | |
CN102162258B (zh) | 一种塔吊钢管混凝土高桩塔基结构及构建方法 | |
CN102051881A (zh) | 柔性面层土钉墙支护体系及其施工方法 | |
CN203222809U (zh) | 一种输电线路杆塔预应力混凝土管桩基础 | |
CN103015414A (zh) | 一种预制混凝土后注浆桩及注浆工艺 | |
CN110374111A (zh) | 一种放坡与钢管桩锚协同支护体系 | |
CN201520969U (zh) | 预制空腹地连墙体 | |
CN109024609A (zh) | 一种基于老旧排桩的基坑支护结构及其施工方法 | |
CN106193644B (zh) | 带筏板基础建筑物的地下室改造结构 | |
CN102330436A (zh) | 一种用于半岩土层超深圆形旋流池的组合支护结构及方法 | |
CN107326932B (zh) | 一种地下车库的准半逆作施工方法 | |
CN201077988Y (zh) | 暗梁柱式预应力土钉墙 | |
CN1209533C (zh) | 桩间混凝土壳组合护坡桩 | |
CN211174126U (zh) | 隧道明洞结构 | |
CN108999196A (zh) | 一种桩间网喷混凝土支护施工方法 | |
CN112681376A (zh) | 一种井筒式地下立体车库的施工方法 | |
CN101793032A (zh) | 一种小场地深基坑施工方法 | |
CN101245601A (zh) | 水平向水泥土搅拌桩及其桩棚的施工方法 | |
CN217150275U (zh) | 一种高水位软弱地基基坑支护装置 | |
CN110318419B (zh) | 下穿式管廊一衬门洞支护的施工方法 | |
CN203096746U (zh) | 加筋约束土复合支护结构 | |
CN107542094A (zh) | 与地下室外墙结构相结合的嵌入隐蔽式土钉施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |