CN1191914A - Building method of mart and underground parking lot in single-layer fly-over - Google Patents

Building method of mart and underground parking lot in single-layer fly-over Download PDF

Info

Publication number
CN1191914A
CN1191914A CN98113735A CN98113735A CN1191914A CN 1191914 A CN1191914 A CN 1191914A CN 98113735 A CN98113735 A CN 98113735A CN 98113735 A CN98113735 A CN 98113735A CN 1191914 A CN1191914 A CN 1191914A
Authority
CN
China
Prior art keywords
bridge
underground parking
building
city
construction company
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN98113735A
Other languages
Chinese (zh)
Inventor
薛武昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN98113735A priority Critical patent/CN1191914A/en
Publication of CN1191914A publication Critical patent/CN1191914A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The building method builds mart over the single-layer flyover and underground parking lot below the flyover. The mart is over the center section of main bridge, and pavement platforms beside the mart are connected to outer pavement through stairs. The parking lot is built below the bridge and road with the entrance and the elevator being in the right side of turning bridge. In this way, the mart is also used as overbridge. The present invention can reduce flyover building cost and solve the problem of parking.

Description

The method of construction company tall building and underground parking on the single-deck stereo cross bridge of city
The present invention relates to a kind of above the single-deck stereo cross bridge of city sparetime university of construction company tall building and pedestrian's street crossing overline bridge, the method for building the underground parking under the bridge.
The bridge constructing method patent that I once applied for a kind of single-deck stereo cross bridge, the patent No. is 97105178.X, this single-deck stereo cross bridge both had been suitable in the open air road junction and had built, also being suitable in the city road junction builds, but this single-deck stereo cross bridge of building in the city has only solved the driving problem, also is necessary for the pedestrian and builds overpass, has increased the bridge construction cost so again, as single-deck stereo cross bridge, very not high its superjacent air space of bridge floor wastes unfortunate too; The land for building, city is more and more expensive in addition, can by this single-deck stereo cross bridge particularly the facility of underground single-deck stereo cross bridge to build the underground parking also be the problem that needs solve.
The objective of the invention is to design a kind of method that sparetime university of overpass construction company of People's Bank of China tall building is built in combination on the single-deck stereo cross bridge of city.
Another object of the present invention is a kind of method of building the underground parking under the single-deck stereo cross bridge of city of design.
At first be described in the method that sparetime university of overpass construction company of People's Bank of China tall building is built in combination on the single-deck stereo cross bridge of city: city single-deck stereo cross bridge on the ground comprises main bridge 1, access bridge 2, turns to bridge opening 3, turns to fare 4, main bridge opening 5 etc. up and down, we build commercial building 6 in the top of main bridge central segment, People's Bank of China's platform 7 is established in the commercial building both sides, and People's Bank of China's platform links to each other with the sidewalk, ground by stair 8.Owing to communicate in People's Bank of China's platform and the commercial building, the pedestrian both can do shopping again so as to the mistake street, and was very convenient.
Can build the underground parking under bridge and road surface in construction company tall building on bridge, method is to establish the access and the motor well of underground parking on the right side that turns to bridge opening 3, and the underground parking is located at the underground of bridge and road surface.
Be example with underground single-deck stereo cross bridge below, the narration build the underground parking method: underground single-deck stereo cross bridge comprise main bridge 1 ', sloping highway section 2 ', turn to bridge opening 3 ', up and down turn to fare 4 ' etc., we establish the access 10 and the motor well of underground parking on the right side that turns to 3 ' two ends, bridge opening, underground parking 9 is located at the underground of bridge and road surface.
Can be above main bridge central segment when building the underground parking construction company tall building, People's Bank of China's platform is established in the commercial building both sides, People's Bank of China's platform links to each other with the sidewalk, ground by stair.
Advantage of the present invention is: People's Bank of China's overpass has been built with regard to generation when sparetime university of construction company tall building, thus saved the bridge construction cost, and commercial building does not account for the land for building, city, is suitable for people's shopping again, so kill two birds with one stone; Can alleviate the city parking difficulty, the contradiction of land for building anxiety in the underground parking lot of building.
Fig. 1 is the schematic diagram that sparetime university of construction company tall building building is provided with the position on bridge on the single-deck stereo cross bridge of ground, city, among the figure: 1. main bridge; 2. access bridge; 3. turn to the bridge opening; 4. turn to fare up and down; 5. main bridge opening; 6. commercial building; 7. People's Bank of China's platform; 8. stair.
Fig. 2 builds the underground parking under the underground single-deck stereo cross bridge in city, the position view of parking lot and access etc., among the figure: 1 '. main bridge; 2 '. sloping highway section; 3 '. turn to the bridge opening; 4 '. turn to fare up and down; 9. underground parking; 10. access.
Embodiment one, in conjunction with the accompanying drawings 1 pair in the city on the ground on the single-deck stereo cross bridge method in sparetime university of construction company tall building specifically describe as follows: sparetime university of construction company tall building above main bridge section, in order not influence vehicle pass-through, need to drive piles and establish and stride beam, commercial building 6 built in stride on the beam, commercial building one flooring links to each other with People's Bank of China platform 7, and People's Bank of China's platform links to each other with the sidewalk, ground by stair (elevator); In construction company tall building, under bridge and road surface, build the underground parking, establish the access and the motor well of underground parking on the right side that turns to bridge opening 3.
Embodiment two, 2 pairs of methods of building the underground parking under the underground single-deck stereo cross bridge in city are described below in conjunction with the accompanying drawings: establish the access 10 and the motor well of underground parking on the right side that turns to 3 ' two ends, bridge opening, underground parking 9 is located at the underground of bridge and road surface; When building the underground parking, piling and establish and stride beam above main bridge central segment, construction company tall building in the above, commercial building one flooring links to each other with the People's Bank of China platform, and People's Bank of China's platform passes through stair (elevator) and links to each other with the sidewalk, ground.

Claims (4)

1, the method in construction company tall building and underground parking on the single-deck stereo cross bridge of city relate to a kind of above the single-deck stereo cross bridge of city sparetime university of construction company tall building and pedestrian's street crossing overline bridge, build the method for underground parking under the bridge, it is characterized in that commercial building [6] is built in the top of main bridge central segment, People's Bank of China's platform [7] is established in the mansion both sides, and People's Bank of China's platform links to each other with the sidewalk, ground by stair [8].
2, according to claim 1 said on the single-deck stereo cross bridge of city the method for construction company tall building and underground parking, it is characterized in that on bridge, under bridge He under the road surface, building the underground parking in construction company tall building, establish the access and the motor well of underground parking on the right side that turns to bridge opening [3].
3, the method in construction company tall building and underground parking on the single-deck stereo cross bridge of city relate to a kind of above the single-deck stereo cross bridge of city sparetime university of construction company tall building and pedestrian's street crossing overline bridge, build the method for underground parking under the bridge, it is characterized in that establishing on the right side that turns to two ends, bridge opening [3 '] access [10] and the motor well of underground parking, underground parking [9] are located at the underground of bridge and road surface.
4, according to claim 3 said on the single-deck stereo cross bridge of city the method for construction company tall building and underground parking, it is characterized in that when building the underground parking construction company tall building above main bridge central segment, People's Bank of China's platform is established in the commercial building both sides, and People's Bank of China's platform links to each other with the sidewalk, ground by stair.
CN98113735A 1998-01-21 1998-01-21 Building method of mart and underground parking lot in single-layer fly-over Pending CN1191914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN98113735A CN1191914A (en) 1998-01-21 1998-01-21 Building method of mart and underground parking lot in single-layer fly-over

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN98113735A CN1191914A (en) 1998-01-21 1998-01-21 Building method of mart and underground parking lot in single-layer fly-over

Publications (1)

Publication Number Publication Date
CN1191914A true CN1191914A (en) 1998-09-02

Family

ID=5223438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN98113735A Pending CN1191914A (en) 1998-01-21 1998-01-21 Building method of mart and underground parking lot in single-layer fly-over

Country Status (1)

Country Link
CN (1) CN1191914A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008089646A1 (en) * 2007-01-18 2008-07-31 Baomin Wang City road intersection
CN103590292A (en) * 2013-11-29 2014-02-19 郑勤民 Unblocked overpass at intersection
CN105019325A (en) * 2015-06-09 2015-11-04 高正强 Three-dimensional traffic system capable of solving problem of traffic jams at city crossroads

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008089646A1 (en) * 2007-01-18 2008-07-31 Baomin Wang City road intersection
CN103590292A (en) * 2013-11-29 2014-02-19 郑勤民 Unblocked overpass at intersection
CN105019325A (en) * 2015-06-09 2015-11-04 高正强 Three-dimensional traffic system capable of solving problem of traffic jams at city crossroads

Similar Documents

Publication Publication Date Title
US7210183B2 (en) Method and installation for building a highway and a highway
JP6093871B2 (en) Urban intersection structure
JPH04336102A (en) Intersection structure separating sidewalk and driveway above and under
CN1236853A (en) Design method for building parking tower at intersection
CN1191914A (en) Building method of mart and underground parking lot in single-layer fly-over
CN103469707A (en) Multifunctional urban road
CN207121770U (en) A kind of municipal road pavement
CN103215867B (en) Assembled type intersected road system of bridge floor supporting band traveling device
CN1123859A (en) Crossroad bridge
CN2535437Y (en) Semi-sink internal circuit type overpass
CN1065014C (en) Miniature road crossing system
CN1150199A (en) Universal multi-level space city traffic engineering
WO2008009192A1 (en) An urban system with separated roads for walkers and vehicles respectively
WO2008025201A1 (en) An overhead low-speed road
JPH11172946A (en) Underground parking method below road and underground parking lot below road
JP4367138B2 (en) How to create a new station square
CN1080793C (en) Outer-race shaped road grade separation traffic system and construction method thereof
CN1076771C (en) Design plan of highway turnable single-deck stereo cross bridge
CN219315941U (en) Rainwater side ditch device for intersection turning part
CN211848846U (en) Pedestrian and vehicle dual-purpose overpass
CN200946230Y (en) All-interflow crossroads for T-shaped crossing
CN102226327A (en) Urban elevated pedestrian passageway
KR200258940Y1 (en) Under way structure of semicircular types for a walker of road
CN1378016A (en) Three-layer overpass and small car overpass and path
West et al. Integration of transportation and land use planning through residential street design

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication