CN117670250B - Intelligent supervision system based on Beidou system - Google Patents

Intelligent supervision system based on Beidou system Download PDF

Info

Publication number
CN117670250B
CN117670250B CN202311739954.XA CN202311739954A CN117670250B CN 117670250 B CN117670250 B CN 117670250B CN 202311739954 A CN202311739954 A CN 202311739954A CN 117670250 B CN117670250 B CN 117670250B
Authority
CN
China
Prior art keywords
signal
data
signals
early warning
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311739954.XA
Other languages
Chinese (zh)
Other versions
CN117670250A (en
Inventor
孙宗伟
李洁
王铃
王树康
张波克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zelan Construction Consulting Co ltd
Original Assignee
Zelan Construction Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zelan Construction Consulting Co ltd filed Critical Zelan Construction Consulting Co ltd
Priority to CN202311739954.XA priority Critical patent/CN117670250B/en
Publication of CN117670250A publication Critical patent/CN117670250A/en
Application granted granted Critical
Publication of CN117670250B publication Critical patent/CN117670250B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/029Location-based management or tracking services
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/13Receivers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Signal Processing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Remote Sensing (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Databases & Information Systems (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses an intelligent supervision system based on a Beidou system, which comprises a signal acquisition module, a time module, a Beidou positioning module, a signal receiving module, a database, a management system terminal, a signal analysis module, a data analysis module, a frequency acquisition module and a frequency judgment module, wherein the data analysis module is used for carrying out preliminary checking and examining on engineering point data, meanwhile, in order to prevent interference of abnormal signal transmission factors, the frequency judgment module is used for automatically judging and analyzing frequency signals of data information packet carriers, and the data analysis module is used for analyzing and judging, so that the checking and examining of the direct system is normal, a supervision team is not required to manually check or carry out yellow early warning according to the type of the data signals required, the supervision team manually judges the data signals of the yellow early warning to the whole engineering data influencing program, and carries out decision of eliminating the yellow early warning or manually checking and examining the data, or sends red early warning of the supervision team, and the supervision team manually checking and examining the data.

Description

Intelligent supervision system based on Beidou system
Technical Field
The invention relates to the technical field of intelligent supervision, in particular to an intelligent supervision system based on a Beidou system.
Background
In three major controls of project management, namely investment control, progress control and quality control, progress monitoring of project projects occupies very important roles, various factors influencing construction progress and quality often exist in the construction process, the construction site range is huge, inspection and examination are required to be carried out on a plurality of engineering points by a supervision team, data detection is required to be carried out on the engineering sites in the engineering inspection and examination process, the Beidou system is based on an intelligent supervision system of the Beidou system, all participants in the construction process are concentrated in a common intelligent supervision system of the Beidou system to cooperate and transfer information, unification of project targets in implementation is guaranteed, and the construction plan can be adjusted in real time due to planning defects, construction environment changes, on-site condition adjustment, resource supply influence and the like.
Disclosure of Invention
Aiming at the situation, the invention aims to provide the intelligent supervision system based on the Beidou system, which can automatically check and examine a plurality of engineering point data, and simultaneously combines with the manual check of the supervision team, thereby greatly saving the time of the supervision team for manually checking through the existing intelligent supervision system.
The technical scheme is that the intelligent supervision system based on the Beidou system comprises a signal acquisition module, a time module, a Beidou positioning module, a signal receiving module, a database, a management system terminal, a signal analysis module, a data analysis module, a frequency acquisition module and a frequency judgment module, and the specific steps are as follows;
S1, a Beidou positioning module positions a position signal G acquired by engineering point data in real time; the time module updates a time signal T of engineering point data acquisition in real time;
The signal sampling module collects engineering point construction data signals A1 in real time, packages the data signals A1, the position signals G and the time signals T into data information packets, and sends the data information packets to the signal receiving module in a 5G communication transmission mode;
S2, the signal analysis module extracts a data information packet in the signal receiving module and analyzes the data information packet into a data signal A1, a position signal G and a time signal T; the frequency acquisition module acquires a frequency signal B1 of a data information packet carrier in the signal receiving module;
s3, the data analysis module receives the data signal A1, the position signal G and the time signal T, extracts data signals A2 and A3 of engineering points corresponding to the time signal T in the database according to the position signal G, and sends signals A-M to the management system terminal when the data signals A1 are normal and the construction data updated by the engineering points corresponding to the position signal G in the time signal T are normal when the data signals A1 are more than A2 and less than A3; when 0.5 x A2< A1< A2 or 1.5 x a3> A1> a3, indicating that the data signal A1 is abnormal, transmitting the signal a-N to the management system terminal; a1<0.5 A2 or A1>1.5 A3, indicating that the data signal A1 is particularly abnormal, transmitting the signal A-T to the management system terminal;
S4, the frequency judging module receives the frequency signal B1, the position signal G and the time signal T, extracts a corresponding frequency signal B2 in the database according to the position signal G and the time signal T, and when B1 is smaller than B2, indicates that the frequency signal B1 is normal, and sends a signal B-M to the management system terminal; b1 is larger than B2 and smaller than 2 x B2, which indicates that the frequency signal B1 is abnormal, and sends a signal B-N to a management system terminal; when B1 is larger than 2 x B2, the frequency signal B1 is abnormal, and a signal B-T is sent to a management system terminal;
s5, the management system terminal receives the signals A-M and B-M, and indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T is normal, and the inspection and the acceptance inspection of the direct system are normal without manual inspection of a supervision team;
the management system terminal receives the signals A-M and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are normal, and the direct system checking and accepting inspection is normal without manual inspection by a supervision team, but the early warning signal is required to be sent to related personnel to check the abnormal condition of the signal transmission channel;
The management system terminal receives the signals A-M and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
2. The intelligent supervision system based on the Beidou system according to claim 1 is characterized in that a management system terminal receives signals A-N and B-M, construction data updated by an engineering point corresponding to a position signal G in a time signal T are abnormal, yellow early warning of a supervision team is sent, the supervision team manually judges that the data signal of the yellow early warning influences the whole engineering data program according to the type of the data signal of the early warning, and a decision for eliminating the yellow early warning or manually auditing the data is made;
The management system terminal receives signals A-N and B-N, indicates that construction data updated by an engineering point corresponding to a position signal G in a time signal T are abnormal, sends yellow early warning to a supervision team, and the supervision team manually judges a program for influencing the whole engineering data by the data signal of the yellow early warning according to the type of the data signal of the early warning, makes a decision for eliminating the yellow early warning or manually checking the data, and simultaneously sends an early warning signal to related personnel to check the abnormal condition of a signal transmission channel;
The management system terminal receives the signals A-N and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
Due to the adoption of the technical scheme, compared with the prior art, the invention has the following advantages;
1. And meanwhile, in order to prevent interference of abnormal factors of signal transmission, the frequency signal of the data packet carrier is automatically judged and analyzed by the frequency judging module, and the frequency signal is analyzed and judged by the data analyzing module, so that the inspection and the examination of a direct system are normal, the inspection and the examination of a supervision team are not needed, or the supervision team manually judges the influence program of the yellow early-warning data signal on the whole engineering data according to the type of the early-warning data signal, and the decision of eliminating the yellow early-warning or manually examining and examining the data is made, or red early-warning is sent to the supervision team, and the manual examining and examining data of the supervision team can be automatically examined and examined on a plurality of engineering point data, and meanwhile, the time of the supervision team manually examining and examining through the existing intelligent supervision system is greatly saved.
Drawings
Fig. 1 is a block diagram of an intelligent supervision system based on a Beidou system.
Detailed Description
The foregoing and other features, aspects and advantages of the present invention will become more apparent from the following detailed description of the embodiments, which proceeds with reference to the accompanying fig. 1. The following embodiments are described in detail with reference to the drawings.
In order to solve the problem that the existing intelligent supervision system is still manually checked by a supervision team through the intelligent supervision system to cause accumulation of engineering data, the invention comprises a signal acquisition module, a time module, a Beidou positioning module, a signal receiving module, a database and a management system terminal, and further comprises a signal analysis module, a data analysis module, a frequency acquisition module and a frequency judgment module, wherein the specific steps are as follows;
S1, a Beidou positioning module positions a position signal G acquired by engineering point data in real time; the time module updates a time signal T of engineering point data acquisition in real time;
The signal sampling module collects engineering point construction data signals A1 in real time, packages the data signals A1, the position signals G and the time signals T into data information packets, and sends the data information packets to the signal receiving module in a 5G communication transmission mode;
S2, the signal analysis module extracts a data information packet in the signal receiving module and analyzes the data information packet into a data signal A1, a position signal G and a time signal T; the frequency acquisition module acquires a frequency signal B1 of a data information packet carrier in the signal receiving module;
s3, the data analysis module receives the data signal A1, the position signal G and the time signal T, extracts data signals A2 and A3 of engineering points corresponding to the time signal T in the database according to the position signal G, and sends signals A-M to the management system terminal when the data signals A1 are normal and the construction data updated by the engineering points corresponding to the position signal G in the time signal T are normal when the data signals A1 are more than A2 and less than A3; when 0.5 x A2< A1< A2 or 1.5 x a3> A1> a3, indicating that the data signal A1 is abnormal, transmitting the signal a-N to the management system terminal; a1<0.5 A2 or A1>1.5 A3, indicating that the data signal A1 is particularly abnormal, transmitting the signal A-T to the management system terminal;
S4, the frequency judging module receives the frequency signal B1, the position signal G and the time signal T, extracts a corresponding frequency signal B2 in the database according to the position signal G and the time signal T, and when B1 is smaller than B2, indicates that the frequency signal B1 is normal, and sends a signal B-M to the management system terminal; b1 is larger than B2 and smaller than 2 x B2, which indicates that the frequency signal B1 is abnormal, and sends a signal B-N to a management system terminal; when B1 is larger than 2 x B2, the frequency signal B1 is abnormal, and a signal B-T is sent to a management system terminal;
s5, the management system terminal receives the signals A-M and B-M, and indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T is normal, and the inspection and the acceptance inspection of the direct system are normal without manual inspection of a supervision team;
the management system terminal receives the signals A-M and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are normal, and the direct system checking and accepting inspection is normal without manual inspection by a supervision team, but the early warning signal is required to be sent to related personnel to check the abnormal condition of the signal transmission channel;
The management system terminal receives the signals A-M and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
The management system terminal receives the signals A-N and B-M, indicates that construction data updated by the engineering point corresponding to the position signal G in the time signal T are abnormal, sends yellow early warning to a supervision team, and the supervision team manually judges the influence program of the data signal of the yellow early warning on the whole engineering data according to the type of the data signal of the early warning to make a decision of eliminating the yellow early warning or manually checking the data;
The management system terminal receives signals A-N and B-N, indicates that construction data updated by an engineering point corresponding to a position signal G in a time signal T are abnormal, sends yellow early warning to a supervision team, and the supervision team manually judges a program for influencing the whole engineering data by the data signal of the yellow early warning according to the type of the data signal of the early warning, makes a decision for eliminating the yellow early warning or manually checking the data, and simultaneously sends an early warning signal to related personnel to check the abnormal condition of a signal transmission channel;
The management system terminal receives the signals A-N and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
The management system terminal receives the signals A-T and B-M, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are abnormal, and sends red early warning to the supervision team, and the supervision team manually audits the data;
The management system terminal receives the signals A-T and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are particularly abnormal, sends red early warning to a supervision team, manually audits the data, and simultaneously sends early warning signals to related personnel to check the abnormal condition of the signal transmission channel;
The management system terminal receives the signals A-T and B-T, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T is particularly abnormal, simultaneously, the signal transmission channel is particularly abnormal, red early warning of a supervision team is sent, the supervision team manually reviews the data, and early warning signals are sent to related personnel to check the particularly abnormal condition of the signal transmission channel.
The data signals A2 and A3 in the database are updated along with the continuous change of the data signal A1 and the time signal T of the construction progress, and the updated data signals are continuously adjusted according to the construction environment change of the position signal G, the resource supply influence and the planning.
When the system is particularly used, on the basis of the prior art, the system comprises a signal acquisition module, a time module, a Beidou positioning module, a signal receiving module, a database and a management system terminal, and further comprises a signal analysis module, a data analysis module, a frequency acquisition module and a frequency judgment module, wherein data signals A2 and A3 in the database can be updated along with the continuous change of a data signal A1 and a time signal T of a construction progress, and the data signals can be continuously adjusted and updated according to the construction environment change of a position signal G, the influence of resource supply and the planning.
The management system terminal receives the signals A-M and B-M, and indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T is normal, and the direct system checking and accepting inspection is normal without manual checking by a supervision team; the management system terminal receives the signals A-M and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are normal, and the direct system checking and accepting inspection is normal without manual inspection by a supervision team, but the early warning signal is required to be sent to related personnel to check the abnormal condition of the signal transmission channel; the management system terminal receives the signals A-M and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
The management system terminal receives the signals A-N and B-M, indicates that construction data updated by the engineering point corresponding to the position signal G in the time signal T are abnormal, sends yellow early warning to a supervision team, and the supervision team manually judges the influence program of the data signal of the yellow early warning on the whole engineering data according to the type of the data signal of the early warning to make a decision of eliminating the yellow early warning or manually checking the data; the management system terminal receives signals A-N and B-N, indicates that construction data updated by an engineering point corresponding to a position signal G in a time signal T are abnormal, sends yellow early warning to a supervision team, and the supervision team manually judges a program for influencing the whole engineering data by the data signal of the yellow early warning according to the type of the data signal of the early warning, makes a decision for eliminating the yellow early warning or manually checking the data, and simultaneously sends an early warning signal to related personnel to check the abnormal condition of a signal transmission channel; the management system terminal receives the signals A-N and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
The management system terminal receives the signals A-T and B-M, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are abnormal, and sends red early warning to the supervision team, and the supervision team manually audits the data; the management system terminal receives the signals A-T and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are particularly abnormal, sends red early warning to a supervision team, manually audits the data, and simultaneously sends early warning signals to related personnel to check the abnormal condition of the signal transmission channel; the management system terminal receives the signals A-T and B-T, indicates that the construction data updated by the engineering points corresponding to the position signals G in the time signals T are particularly abnormal, meanwhile, the signal transmission channel is particularly abnormal, red early warning is sent to the supervision team, manual auditing data of the supervision team are sent, and early warning signals are sent to related personnel to check the particularly abnormal condition of the signal transmission channel, so that automatic acceptance auditing can be carried out on a plurality of engineering point data, and meanwhile, the time of manual auditing by the supervision team through the existing intelligent supervision system is greatly saved.
While the invention has been described in connection with certain embodiments, it is not intended that the invention be limited thereto; for those skilled in the art to which the present invention pertains and the related art, on the premise of based on the technical scheme of the present invention, the expansion, the operation method and the data replacement should all fall within the protection scope of the present invention.

Claims (4)

1. The intelligent supervision system based on the Beidou system comprises a signal acquisition module, a time module, a Beidou positioning module, a signal receiving module, a database and a management system terminal, and is characterized by also comprising a signal analysis module, a data analysis module, a frequency acquisition module and a frequency judgment module, wherein the specific steps are as follows;
S1, a Beidou positioning module positions a position signal G acquired by engineering point data in real time; the time module updates a time signal T of engineering point data acquisition in real time;
The signal sampling module collects engineering point construction data signals A1 in real time, packages the data signals A1, the position signals G and the time signals T into data information packets, and sends the data information packets to the signal receiving module in a 5G communication transmission mode;
S2, the signal analysis module extracts a data information packet in the signal receiving module and analyzes the data information packet into a data signal A1, a position signal G and a time signal T; the frequency acquisition module acquires a frequency signal B1 of a data information packet carrier in the signal receiving module;
S3, the data analysis module receives the data signal A1, the position signal G and the time signal T, extracts data signals A2 and A3 of engineering points corresponding to the time signal T in the database according to the position signal G, and sends signals A-M to the management system terminal when the data signals A1 are normal and the construction data updated by the engineering points corresponding to the position signal G in the time signal T are normal when the data signals A1 are more than A2 and less than A3; when 0.5 A2< A1< A2 or 1.5 A3> A1> A3, indicating that the data signal A1 is abnormal, transmitting the signal a-N to the management system terminal; a1< 0.5 A2 or A1>1.5 A3, indicating that the data signal A1 is particularly abnormal, transmitting the signal A-T to the management system terminal;
S4, the frequency judging module receives the frequency signal B1, the position signal G and the time signal T, extracts a corresponding frequency signal B2 in the database according to the position signal G and the time signal T, and when B1 is smaller than B2, indicates that the frequency signal B1 is normal, and sends a signal B-M to the management system terminal; b1 is larger than B2 and smaller than 2 x B2, which indicates that the frequency signal B1 is abnormal, and sends a signal B-N to a management system terminal; when B1 is larger than 2 x B2, the frequency signal B1 is abnormal, and a signal B-T is sent to a management system terminal;
s5, the management system terminal receives the signals A-M and B-M, and indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T is normal, and the inspection and the acceptance inspection of the direct system are normal without manual inspection of a supervision team;
the management system terminal receives the signals A-M and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are normal, and the direct system checking and accepting inspection is normal without manual inspection by a supervision team, but the early warning signal is required to be sent to related personnel to check the abnormal condition of the signal transmission channel;
The management system terminal receives the signals A-M and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
2. The intelligent supervision system based on the Beidou system according to claim 1 is characterized in that a management system terminal receives signals A-N and B-M, construction data updated by an engineering point corresponding to a position signal G in a time signal T are abnormal, yellow early warning of a supervision team is sent, the supervision team manually judges that the data signal of the yellow early warning influences the whole engineering data program according to the type of the data signal of the early warning, and a decision for eliminating the yellow early warning or manually auditing the data is made;
The management system terminal receives signals A-N and B-N, indicates that construction data updated by an engineering point corresponding to a position signal G in a time signal T are abnormal, sends yellow early warning to a supervision team, and the supervision team manually judges a program for influencing the whole engineering data by the data signal of the yellow early warning according to the type of the data signal of the early warning, makes a decision for eliminating the yellow early warning or manually checking the data, and simultaneously sends an early warning signal to related personnel to check the abnormal condition of a signal transmission channel;
The management system terminal receives the signals A-N and B-T, indicates that the signal transmission channel is abnormal particularly, influences the data signal A1, needs to send the data signal A1 to the supervision team for manual verification, and sends the early warning signal to related personnel to check the abnormal condition of the signal transmission channel particularly.
3. The intelligent supervision system based on the Beidou system according to claim 2 is characterized in that a management system terminal receives signals A-T and B-M, construction data updated by an engineering point corresponding to a position signal G in a time signal T are particularly abnormal, red early warning of a supervision team is sent, and manual auditing data of the supervision team are sent;
The management system terminal receives the signals A-T and B-N, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T are particularly abnormal, sends red early warning to a supervision team, manually audits the data, and simultaneously sends early warning signals to related personnel to check the abnormal condition of the signal transmission channel;
The management system terminal receives the signals A-T and B-T, indicates that the construction data updated by the engineering point corresponding to the position signal G in the time signal T is particularly abnormal, simultaneously, the signal transmission channel is particularly abnormal, red early warning of a supervision team is sent, the supervision team manually reviews the data, and early warning signals are sent to related personnel to check the particularly abnormal condition of the signal transmission channel.
4. The intelligent supervision system based on the Beidou system according to claim 1, wherein the data signals A2 and A3 in the database are updated along with the continuous change of the data signal A1 and the time signal T of the construction progress, and the updated data signals are continuously adjusted according to the construction environment change of the position signal G, the resource supply influence and the planning.
CN202311739954.XA 2023-12-18 2023-12-18 Intelligent supervision system based on Beidou system Active CN117670250B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311739954.XA CN117670250B (en) 2023-12-18 2023-12-18 Intelligent supervision system based on Beidou system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311739954.XA CN117670250B (en) 2023-12-18 2023-12-18 Intelligent supervision system based on Beidou system

Publications (2)

Publication Number Publication Date
CN117670250A CN117670250A (en) 2024-03-08
CN117670250B true CN117670250B (en) 2024-06-04

Family

ID=90076933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311739954.XA Active CN117670250B (en) 2023-12-18 2023-12-18 Intelligent supervision system based on Beidou system

Country Status (1)

Country Link
CN (1) CN117670250B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003264639A (en) * 2002-03-07 2003-09-19 Okura Ind Co Ltd Abnormality report system
WO2017118184A1 (en) * 2016-01-07 2017-07-13 上海斐讯数据通信技术有限公司 Position monitoring method, intelligent wear apparatus, mobile terminal apparatus and monitoring apparatus
WO2017163819A1 (en) * 2016-03-23 2017-09-28 Ntn株式会社 Railway abnormality diagnosing system and data collecting device
CN109407117A (en) * 2018-09-07 2019-03-01 安徽大禹安全技术有限公司 Earthquake emergency communication management system based on big-dipper satellite
CN111918235A (en) * 2020-07-20 2020-11-10 南京暴走团电子商务有限公司 Data monitoring system for wireless communication and monitoring method thereof
CN111934751A (en) * 2020-08-28 2020-11-13 中南民族大学 Agricultural environment data acquisition system and method based on Beidou short message
WO2021237804A1 (en) * 2020-05-29 2021-12-02 湖南联智科技股份有限公司 Infrastructure structure deformation monitoring method based on beidou high-precision positioning
CN116016274A (en) * 2022-12-29 2023-04-25 南京融军建科技有限公司 Abnormal communication detection method and system
CN116488702A (en) * 2023-02-07 2023-07-25 湖北省测绘工程院 Multi-source navigation satellite reference station data real-time supervision system and supervision method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003264639A (en) * 2002-03-07 2003-09-19 Okura Ind Co Ltd Abnormality report system
WO2017118184A1 (en) * 2016-01-07 2017-07-13 上海斐讯数据通信技术有限公司 Position monitoring method, intelligent wear apparatus, mobile terminal apparatus and monitoring apparatus
WO2017163819A1 (en) * 2016-03-23 2017-09-28 Ntn株式会社 Railway abnormality diagnosing system and data collecting device
CN109407117A (en) * 2018-09-07 2019-03-01 安徽大禹安全技术有限公司 Earthquake emergency communication management system based on big-dipper satellite
WO2021237804A1 (en) * 2020-05-29 2021-12-02 湖南联智科技股份有限公司 Infrastructure structure deformation monitoring method based on beidou high-precision positioning
CN111918235A (en) * 2020-07-20 2020-11-10 南京暴走团电子商务有限公司 Data monitoring system for wireless communication and monitoring method thereof
CN111934751A (en) * 2020-08-28 2020-11-13 中南民族大学 Agricultural environment data acquisition system and method based on Beidou short message
CN116016274A (en) * 2022-12-29 2023-04-25 南京融军建科技有限公司 Abnormal communication detection method and system
CN116488702A (en) * 2023-02-07 2023-07-25 湖北省测绘工程院 Multi-source navigation satellite reference station data real-time supervision system and supervision method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于北斗卫星通信技术的自动抄表系统研究;付瑶;温酬钦;孙汉威;张捷;杨林;;自动化与仪表;20180415(04);全文 *
基于北斗短报文的泥石流监测预警系统;吴悦;任涛;王璇;;自动化与仪表;20140315(03);全文 *

Also Published As

Publication number Publication date
CN117670250A (en) 2024-03-08

Similar Documents

Publication Publication Date Title
CN109413614B (en) Integrated vehicle-ground comprehensive analysis platform
US20140045438A1 (en) Method and system for optimizing wireless network based on antenna feeder apparatus
CN115528810B (en) Temperature measurement data operation analysis management system based on power equipment
CN115452046A (en) Environment-friendly monitoring system and method based on Internet of things
CN117670250B (en) Intelligent supervision system based on Beidou system
CN116050940A (en) Labor dispatch winner and winner management system of mechanic platform
CN114741255A (en) Fault self-healing technology based on automatic execution of service scene
CN117176466B (en) Information communication technology safety monitoring system and monitoring method thereof
CN111522277B (en) Network signal control system and method adopting MCU control unit
CN115996259B (en) Smart phone communication test system based on communication monitoring technology
CN117423225A (en) Disaster remote sensing early warning system based on high-speed railway operation
CN114449445B (en) Ultra-long distance tunnel personnel positioning system based on UWB technology
CN115086391A (en) Fault expert system based on wearable distribution network inspection equipment and use method thereof
CN113036917B (en) Power distribution network monitoring information monitoring system and method based on machine learning
CN111898916A (en) Coal industry chain risk monitoring system and monitoring method thereof
CN111309556A (en) Credible operating system maintenance system based on internet
CN115694846A (en) Safety detection system and method based on industrial protocol
CN116032430B (en) Information transmission supervision system of signature machine
CN118226793B (en) Automatic synchronization station control method and system
CN113589341B (en) High-precision positioning method, device and system
CN118134269B (en) Land power generation safety intelligent supervision system based on data analysis
CN110175127B (en) Method for remotely and automatically inspecting installation quality of EMS (energy management system) equipment
CN109862077B (en) Power distribution and utilization equipment management method based on Internet of things communication and container technology
CN118444619A (en) Borosilicate glass processing intelligent management system based on Internet of things
CN118316838A (en) Public service management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant