CN117114603A - Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing - Google Patents

Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing Download PDF

Info

Publication number
CN117114603A
CN117114603A CN202310991000.1A CN202310991000A CN117114603A CN 117114603 A CN117114603 A CN 117114603A CN 202310991000 A CN202310991000 A CN 202310991000A CN 117114603 A CN117114603 A CN 117114603A
Authority
CN
China
Prior art keywords
electronic
electronic drawing
information
auditing
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310991000.1A
Other languages
Chinese (zh)
Inventor
燕鹏
银柳
蒋朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jincheng Information Technology Co ltd
Original Assignee
Guangzhou Jincheng Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jincheng Information Technology Co ltd filed Critical Guangzhou Jincheng Information Technology Co ltd
Priority to CN202310991000.1A priority Critical patent/CN117114603A/en
Publication of CN117114603A publication Critical patent/CN117114603A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/11File system administration, e.g. details of archiving or snapshots
    • G06F16/113Details of archiving
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/11File system administration, e.g. details of archiving or snapshots
    • G06F16/122File system administration, e.g. details of archiving or snapshots using management policies
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Databases & Information Systems (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to the technical field of engineering drawing management, and particularly relates to a single-rail management method, a single-rail management device, a storage medium and single-rail management equipment for an electronic drawing, wherein the method comprises the following steps: acquiring an electronic drawing and storing the electronic drawing in a database after marking the electronic drawing as a first state; identifying project information in the electronic drawing and configuring an audit template; receiving a modification application based on the auditing template and outputting feedback information; updating the electronic drawing marked as the first state in the database according to the modification request, and pushing the electronic drawing marked as the first state; integrating the archive information and storing the archive information in an archive system. The problem existing in the traditional drawing management mode can be effectively solved, the latest version of the electronic drawing can be quickly consulted, and the working efficiency is improved. Meanwhile, by auditing and modifying the electronic drawing, the drawing quality is ensured, and the engineering quality problem caused by drawing errors is reduced.

Description

Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing
Technical Field
The invention belongs to the technical field of engineering drawing management, and particularly relates to a monorail management method, a monorail management device, a storage medium and monorail management equipment for electronic drawings.
Background
In the traditional drawing management mode, the modification and verification of the drawing is mainly carried out by relying on paper version files, the modification and verification process is complicated, after a design unit initiates a drawing update request, the drawing update request cannot be timely notified to a responsible person of a construction unit, and the responsible person cannot timely process the drawing update request, so that the drawing verification time is long, the updating speed of the drawing is slow, and the construction efficiency of engineering projects is affected.
And after the design unit modifies the updated drawing and passes the verification of the construction unit, the updated drawing cannot be timely pushed to the construction unit, so that the drawing of the construction unit is not timely updated, and the efficiency and quality of engineering projects can be affected by drawing errors.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides a single-rail management method, a single-rail management device, a storage medium and single-rail management equipment for an electronic drawing, which are used for solving the problems of the prior art.
The invention provides a monorail management method for an electronic drawing, which comprises the following steps:
acquiring an electronic drawing and storing the electronic drawing in a local database;
identifying project information in the electronic drawing and configuring an audit template;
receiving a modification application based on the auditing template and outputting feedback information;
when the feedback information contains permission information, updating the electronic drawing according to the modification request, and pushing the updated electronic drawing;
and receiving an archiving request, integrating all electronic drawings corresponding to the archiving request, the modification application and the feedback information to form archiving information, and storing the archiving information to an archive system.
In the scheme, a single-rail management mode is adopted to perform unified management on electronic drawings related to engineering projects, and specifically, a database for specially storing the electronic drawings is established to store the electronic drawings of all the engineering projects; when the electronic drawing is uploaded for the first time, an auditing template is configured according to project information and the electronic drawing, and the subsequently uploaded electronic drawing is audited, so that the drawing quality is ensured; receiving a modification application based on the auditing template, and ensuring that each modification is audited in a mode of firstly auditing and then signing, so that drawing errors are reduced; after the drawing is modified, the updated electronic drawing is pushed in time, so that the engineering quality problem caused by the hysteresis of drawing updating is avoided; and finally, after receiving the archiving request, integrating the electronic file to be archived and the corresponding metadata into an archiving information package, and realizing information exchange by communication with an electronic archive system to finish the archiving action.
By adopting the scheme to carry out electronic drawing management, the problem existing in the traditional drawing management mode can be effectively solved. In the project implementation process, related personnel can quickly review the latest version of electronic drawing, so that the working efficiency is improved. Meanwhile, by auditing and modifying the electronic drawing, the drawing quality is ensured, and the engineering quality problem caused by drawing errors is reduced.
In one preferable embodiment of the present invention, the acquiring the electronic drawing and storing the electronic drawing in a local database includes:
identifying a drawing catalog and an engineering project number of the electronic drawing;
creating a storage space corresponding to a target segment in the engineering project based on the engineering project number;
splitting the electronic drawing into an album corresponding to the project label segments based on the drawing catalog;
and storing the album into a storage space corresponding to the project number according to the project standard section.
According to the technical scheme, the drawing catalog of the electronic drawing and the project number are identified, then the storage space corresponding to the project target section in the project is created based on the project number, finally the album obtained by splitting the electronic drawing based on the drawing catalog is stored in the storage space corresponding to the project number, and when the electronic drawing of all the project is stored, the electronic drawing or album of a certain contract section or standard section in the project is conveniently called, so that the corresponding calling or inquiring speed is improved.
In one preferable scheme of the invention, the identifying the project information in the electronic drawing and configuring the audit template comprises:
acquiring the project information, and matching a reference template consistent with the project information as an auditing template;
and/or acquiring the project information, matching a reference template with the highest overlapping degree with the project information, and adjusting auditing node information of the reference template based on the project information to obtain an auditing template.
In the scheme, the reference template is obtained by desensitizing an audit template according to a historical engineering project, and the reference template is provided with a plurality of reference templates. When a new engineering project is created, the auditing template with the highest overlap ratio with the engineering project can be obtained by matching according to basic information of multiple dimensions such as responsible person information, auditor information, project specification, construction unit number and construction unit number of the engineering project, and can be used after the auditing template is selected and an auditing flow is configured, and the auditing template can be reused under the condition that the auditor is not changed, and a user only needs to select a corresponding auditing flow when requesting auditing, so that the auditing flow is simpler and more standard.
In one of the application scenarios of the scheme, when the audit template of the project sub-project is configured based on the current project, if the basic information of the project sub-project information in the audit dimension is consistent with the basic information of the current project, the audit template of the current project can be used as a reference template of the project sub-project, so that the time required for configuring the audit template is reduced, and the working efficiency is improved
In one preferred embodiment of the present invention, the receiving a modification application based on the audit template and outputting feedback information includes:
receiving a modification application, creating an auditing flow based on the auditing template, and sending auditing requests to at least two auditing nodes;
if the auditing feedback is not received within the first preset time, a first auditing prompt is sent to the auditing node;
if the first audit prompt is sent and audit feedback is not received within a second preset time, sending a second audit prompt to the audit node;
receiving audit feedback of any one audit node, outputting feedback information and ending the audit flow;
the modification application comprises a change order and designed service function information, and the modification mode of the modification application at least comprises one of the following steps: the method comprises the steps of replacing a drawing, modifying a drawing name and drawing number, adding a drawing, modifying the state of the drawing and canceling the state of the drawing.
In the scheme, the same node is supported to send an auditing request to at least two auditing nodes in an auditing flow, and any one auditing node passes the auditing, so that the auditing time is greatly shortened compared with the traditional auditing; meanwhile, the quality of the drawing can be ensured by adopting a mode of checking before signing.
In one preferred embodiment of the present invention, the method further comprises constructing a reference authority, wherein the reference authority at least comprises one of the following: a full member disclosure level, a project disclosure level, a punctuation disclosure level, a job level disclosure level, and a custom disclosure level.
The scheme can realize unified management on the electronic drawings, thereby avoiding drawing leakage and avoiding that a construction unit can look at the electronic drawings of similar engineering projects by mistake when looking up the electronic drawings.
In one of the application scenarios of the scheme, the electronic drawing stored in the database or the modified electronic drawing is released to the corresponding engineering project for the related personnel with the reference authority to refer. According to the consulting authorities of different personnel, the consulting range is limited, wherein personnel entering the system can give initial authorities, the drawing level that initial authorities can check is the opening level of the whole person, and if the drawing outside the authority of the personnel is to be checked, the authority of the personnel can be temporarily promoted by submitting and checking.
In one preferred embodiment of the present invention, the method further includes limiting the reference range, specifically including:
when receiving a reference request, acquiring reference authority corresponding to the reference request;
opening engineering projects and electronic drawings corresponding to the consulting authority;
returning information corresponding to the reference request from the opened engineering projects and the electronic drawings;
and/or, the method further comprises the step of submitting temporary consulting permission, and specifically comprises the following steps:
receiving a temporary permission request application based on the auditing template and outputting feedback information;
and when the feedback information contains temporary permission information, opening temporary reference rights corresponding to the temporary rights request application based on the request time of the temporary rights request application.
In the scheme, when the consulting request is received, the project and the electronic drawing corresponding to the consulting authority are opened to the terminal sending the consulting request in a mode of acquiring the consulting authority corresponding to the consulting request, and the information corresponding to the consulting request is returned, so that the aim of limiting the consulting range according to the consulting authorities of different people is fulfilled.
In one preferable embodiment of the present invention, when the feedback information includes permission information, updating the electronic drawing according to the modification request includes:
marking the electronic drawing corresponding to the modification request in a database as a second state;
and marking the electronic drawing contained in the feedback information as a first state and storing the first state into a database.
In the scheme, the first state and the second state are used for distinguishing the modification state of the drawing, and the first state is the latest electronic drawing or the modified electronic drawing; the second state is a history drawing or an electronic drawing before modification; when the feedback information contains permission information and the electronic drawing in the database needs to be updated, the original electronic drawing in the first state in the database is marked as the second state, and then the electronic drawing contained in the feedback information is marked as the first state and is stored in the database as the electronic drawing, so that the electronic drawing in the first state in the database is ensured to be the latest version, and the electronic drawing which is referred to can be ensured to be the latest version only by pushing the electronic drawing when the electronic drawing is referred to and the drawing is pushed, and engineering problems caused by reasons such as disordered version of the electronic drawing, untimely updating of the electronic drawing information and the like are avoided.
In one preferable scheme of the invention, the pushing the electronic drawing marked as the first state includes:
updating the electronic drawing marked as the first state to the cloud;
receiving a comparison result of the version number of the currently displayed electronic drawing sent by the consulting terminal and the version number of the cloud electronic drawing;
and when the comparison results are inconsistent, sending an update prompt to the reference terminal for displaying update prompt information at the reference terminal.
In the process of looking up the electronic drawing in the scheme, drawing information can be updated in real time through the cloud, so that all the people can be ensured to look up the latest version of the drawing; and comparing the version numbers to ensure whether the drawing is up to date, even if browsing old version drawings, the reference terminal can compare the version numbers of the drawing at each preset time interval, and when the comparison is not established, the reference terminal can remind the user that the drawing browsed by the user is not up to date and send out an update prompt to ensure that the drawing is up to date when the user browses.
In one preferred embodiment of the present invention, there is also provided an electronic drawing monorail management apparatus, including:
the drawing acquisition module is used for acquiring an electronic drawing and storing the electronic drawing into the local database;
the management module is used for identifying project information in the electronic drawing and configuring an audit template;
the auditing module is used for receiving the modification application based on the auditing template and outputting feedback information;
the updating pushing module is used for updating the electronic drawing and pushing the updated electronic drawing;
and the archiving module is used for integrating archiving information according to the archiving request and storing the archiving information in an archive system.
The electronic drawing management device with the electronic drawing monorail system management device can effectively solve the problems existing in the traditional drawing management mode. The drawing acquisition module uniformly acquires the electronic drawing and stores the electronic drawing into the database after marking the electronic drawing as the first state; after the auditing template is matched through the management module, the auditing and modifying control of the electronic drawing are performed in a mode of auditing and modifying the electronic drawing by receiving the modifying application based on the auditing template and outputting feedback information, so that the accuracy of the drawing is ensured, the engineering quality problem caused by drawing errors is reduced, and meanwhile, the auditing flow is optimized to accelerate the auditing speed. And pushing the electronic drawing related to the operation content or the project by updating the pushing module, and after uploading the electronic drawing or modifying the electronic drawing in the project implementation process, related personnel can quickly review the electronic drawing of the latest version, so that the working efficiency is improved. Meanwhile, by auditing and modifying the electronic drawing, the drawing quality is ensured, and the engineering quality problem caused by drawing errors is reduced. Thereby ensuring that the engineering project is successfully completed and enabling the quality and the progress to reach the expected targets.
In one preferred embodiment of the present invention, a storage medium is further indicated, where the storage medium stores a control program of the electronic drawing monorail management method, where the control program of the electronic drawing monorail management method, when executed by a processor, implements the steps of the electronic drawing monorail management method according to any one of the above embodiments.
In one preferred aspect of the present invention, there is also provided an electronic drawing monorail management apparatus comprising:
at least one processor; the method comprises the steps of,
a memory communicatively coupled to the at least one processor; the memory stores a computer program executable by at least one processor, and the computer program is executed by the at least one processor, so that the at least one processor can implement the electronic drawing monorail management method according to any one of the schemes.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings may be obtained according to the structures shown in these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic flow chart of a single-rail management method of an electronic drawing according to an embodiment of the invention;
FIG. 2 is a flow chart of a method for storing electronic drawings according to an embodiment of the invention;
FIG. 3 is a flow chart of a method for receiving a modified application according to an embodiment of the present invention;
FIG. 4 is a flowchart of an embodiment of the present invention for updating an electronic drawing;
FIG. 5 is a schematic flow chart of pushing an electronic drawing according to an embodiment of the invention;
FIG. 6 is a schematic diagram of an electronic drawing monorail management device according to an embodiment of the present invention;
fig. 7 is a block diagram of an electronic drawing monorail management apparatus according to an embodiment of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that, if a directional indication (such as up, down, left, right, front, and rear … …) is involved in the embodiment of the present invention, the directional indication is merely used to explain the relative positional relationship, movement condition, etc. between the components in a specific posture, and if the specific posture is changed, the directional indication is correspondingly changed.
In addition, if there is a description of "first", "second", etc. in the embodiments of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In addition, if "and/or" and/or "are used throughout, the meaning includes three parallel schemes, for example," a and/or B "including a scheme, or B scheme, or a scheme where a and B are satisfied simultaneously. In addition, the technical solutions of the embodiments may be combined with each other, but it is necessary to base that the technical solutions can be realized by those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should be considered to be absent and not within the scope of protection claimed in the present invention.
Referring to fig. 1, an embodiment of the present invention provides a method for managing an electronic drawing monorail, including:
s10, acquiring an electronic drawing and storing the electronic drawing in a local database;
s20, identifying project information in the electronic drawing and configuring an audit template;
s30, receiving a modification application based on the auditing template and outputting feedback information;
s40, when the feedback information contains permission information, updating the electronic drawing according to the modification request, and pushing the updated electronic drawing;
s50, receiving an archiving request, integrating all electronic drawings corresponding to the archiving request, the modification application and the feedback information to form archiving information, and storing the archiving information to an archive system.
In the embodiment, a single-rail management mode is adopted to perform unified management on electronic drawings related to engineering projects, and specifically, a database for specially storing the electronic drawings is established to store the electronic drawings of all the engineering projects; when the electronic drawing is uploaded for the first time, an auditing template is configured according to project information and the electronic drawing, and the subsequently uploaded electronic drawing is audited, so that the drawing quality is ensured; receiving a modification application based on the auditing template, and ensuring that each modification is audited in a mode of firstly auditing and then signing, so that drawing errors are reduced; after the drawing is modified, the updated electronic drawing (namely the electronic drawing in the first state) is pushed in time, so that the engineering quality problem caused by the hysteresis of drawing updating is avoided; and finally, after receiving the archiving request, integrating the electronic file to be archived and the corresponding metadata into an archiving information package, and realizing information exchange by communication with an electronic archive system to finish the archiving action.
By adopting the embodiment to manage the electronic drawings, the problems existing in the traditional drawing management mode can be effectively solved. In the project implementation process, related personnel can quickly review the latest version of electronic drawing, so that the working efficiency is improved. Meanwhile, by auditing and modifying the electronic drawing, the drawing quality is ensured, and the engineering quality problem caused by drawing errors is reduced. The smooth completion of the engineering project is ensured, and the quality and the progress reach the expected targets. After the project is finished, receiving a completion drawing and an archiving request, archiving all the electronic drawings, the modification application, the feedback information and related auditing templates into an archiving information package, and storing the archiving information package into an archive system through an archiving interface, so that the later-stage consulting and maintenance are facilitated.
In one of the application scenarios of this embodiment, the monorail is not a management manner, but rather, the document is free from the inherent traditional manual and physical modes, and the whole process of electronically running and storing the electronic document includes generating, handling, archiving management, handing over, storing and utilizing, etc. business activities, i.e. the document and the whole process of the document are paperless, and the paper document is not generated, handled and stored at the same time.
Referring to fig. 2, in one preferred embodiment of the present invention, the storing the electronic drawing in the database includes:
s101, identifying a drawing catalog and an engineering project number of the electronic drawing;
s102, creating a storage space corresponding to a target segment in the engineering project based on the engineering project number;
s103, splitting the electronic drawing into an album corresponding to the project label segment based on the drawing catalog;
s104, storing the album into a storage space corresponding to the project number according to the project label.
In this embodiment, by identifying the drawing catalog and the project number of the electronic drawing, then creating a storage space corresponding to the target segment in the project based on the project number, and finally storing the album obtained by splitting the electronic drawing based on the drawing catalog into the storage space corresponding to the project number, the electronic drawings of all the project are stored, and meanwhile, the subsequent calling of the electronic drawings or albums of a certain contract segment or target segment in the project is facilitated, so that the corresponding calling or inquiring speed is improved.
In one of the application scenarios of the embodiment, the original image of the electronic drawing is uploaded to the system by the designer, and an original image drawing catalog is provided, so that the owner unit or the construction unit can conveniently audit the original image of the electronic drawing.
In one preferred embodiment of the present invention, the identifying the item information in the electronic drawing and configuring the audit template includes:
acquiring the project information, and matching a reference template consistent with the project information as an auditing template;
and/or acquiring the project information, matching a reference template with the highest overlapping degree with the project information, and adjusting auditing node information of the reference template based on the project information to obtain an auditing template.
In this embodiment, the reference template is obtained by desensitizing an audit template according to a history engineering project, and the reference template has a plurality of reference templates. When a new engineering project is created, the auditing template with the highest overlap ratio with the engineering project can be obtained by matching according to basic information of multiple dimensions such as responsible person information, auditor information, project specification, construction unit number and construction unit number of the engineering project, and can be used after the auditing template is selected and an auditing flow is configured, and the auditing template can be reused under the condition that the auditor is not changed, and a user only needs to select a corresponding auditing flow when requesting auditing, so that the auditing flow is simpler and more standard.
In one application scenario of the embodiment, when the audit template of the project sub-project is configured based on the current project, if the basic information of the project sub-project information in the audit dimension is consistent with the basic information of the current project, the audit template of the current project can be used as a reference template of the project sub-project, thereby reducing the time required for configuring the audit template and improving the working efficiency
Referring to fig. 3, in one preferred embodiment of the present invention, the receiving a modification application based on the audit template and outputting feedback information includes:
s301, receiving a modification application, creating an auditing flow based on the auditing template, and sending auditing requests to at least two auditing nodes;
s302, if audit feedback is not received within a first preset time, a first audit prompt is sent to the audit node;
s303, if the first audit prompt is sent and audit feedback is not received within a second preset time, sending a second audit prompt to the audit node;
s304, receiving audit feedback of any one audit node, outputting feedback information and ending the audit flow;
the modification application comprises a change order and designed service function information, and the modification mode of the modification application at least comprises one of the following steps: the method comprises the steps of replacing a drawing, modifying a drawing name and drawing number, adding a drawing, modifying the state of the drawing and canceling the state of the drawing.
In the embodiment, the same node is supported to send an auditing request to at least two auditing nodes in an auditing flow, and any one auditing node passes the auditing, so that the auditing time is greatly shortened compared with the traditional auditing; meanwhile, the quality of the drawing can be ensured by adopting a mode of checking before signing.
In one of the application scenarios of the embodiment, the basis needs to be provided for modifying the electronic drawing, for example, corresponding change orders and post-design service functions need to be provided; when a user submits to audit, only a corresponding audit template is selected to create an audit flow, and audit requests can be sent out, if the audit person of the current audit node does not conduct audit operation within a first preset time (such as 10 minutes), first audit reminding can be conducted, and if the audit person of the current audit node does not conduct audit within a second preset time (such as 30 minutes) after the first audit reminding is sent out, second audit reminding can be conducted. The second preset time is longer than the first preset time, and in the single auditing process, the single auditing node is sent with two auditing reminders at most.
In another application scenario of the embodiment, any one of a short message prompt, a system popup prompt, a telephone voice prompt and a mail prompt can be adopted to prompt an auditor corresponding to the auditing node when the first auditing prompt and the second auditing prompt are carried out, and the short message prompt is taken as an example, and comprises the steps of inputting the mobile phone number of the auditor, sending an auditing request notice to the auditor according to the input mobile phone number, so that the auditor corresponding to the auditing node can obtain the auditing request notice at the first time, and the time spent on the auditing process is reduced.
In one preferred embodiment of the present invention, the method further comprises constructing a reference authority, the reference authority including at least one of: a full member disclosure level, a project disclosure level, a punctuation disclosure level, a job level disclosure level, and a custom disclosure level.
The embodiment can realize unified management on the electronic drawings, thereby avoiding drawing leakage and avoiding that a construction unit can look at the electronic drawings of similar engineering projects by mistake when looking up the electronic drawings.
In one of the application scenarios of the embodiment, the electronic drawing stored in the database or the modified electronic drawing will be released to the corresponding engineering project for the relevant personnel with the reference authority to refer. According to the consulting authorities of different personnel, the consulting range is limited, wherein personnel entering the system can give initial authorities, the drawing level that initial authorities can check is the opening level of the whole person, and if the drawing outside the authority of the personnel is to be checked, the authority of the personnel can be temporarily promoted by submitting and checking.
In another application scenario of the present embodiment, a reference procedure in the reference terminal through the reference authority includes: entering a corresponding item, selecting a corresponding contract section/standard section, finding an album to be checked, and referring to the management of a historical electronic drawing by referring to the authority, wherein the historical electronic drawing comprises information such as time for generating/uploading, personnel for generating/uploading and the like.
In one preferred embodiment of the present invention, the method further includes limiting the reference range, specifically including:
when receiving a reference request, acquiring reference authority corresponding to the reference request;
opening engineering projects and electronic drawings corresponding to the consulting authority;
returning information corresponding to the reference request from the opened engineering projects and the electronic drawings;
in one preferred embodiment of the present invention, the method further includes submitting a temporary reference authority, specifically including:
receiving a temporary permission request application based on the auditing template and outputting feedback information;
and when the feedback information contains temporary permission information, opening temporary reference rights corresponding to the temporary rights request application based on the request time of the temporary rights request application.
In this embodiment, when a review request is received, by acquiring the review authority corresponding to the review request, an engineering project and an electronic drawing corresponding to the review authority are opened to a terminal sending the review request, and information corresponding to the review request is returned, so that the purpose of limiting the review range according to the review authority of different people is achieved.
Further, when different project items corresponding to the reference requests have different reference rights, the corresponding project items and electronic drawings are opened based on the reference rights with the highest level.
In another application scenario of the embodiment, when there is a need to refer to an electronic drawing outside the self-reference authority, the electronic drawing outside the self-reference authority can be referred to in the temporary reference authority after the temporary permission information is obtained by submitting the temporary reference authority, so that the operation flow of referring to the electronic drawing is more standard and is suitable for different application scenarios.
Referring to fig. 4, in a preferred embodiment of the present invention, when the feedback information includes permission information, updating the electronic drawing according to the modification request includes:
s401, marking the electronic drawing corresponding to the modification request in a database as a second state;
s402, marking the electronic drawing contained in the feedback information as a first state and storing the first state in a database.
In this embodiment, the first state and the second state are used to distinguish the modification state of the drawing, where the first state is the latest electronic drawing or the modified electronic drawing; the second state is a history drawing or an electronic drawing before modification; when the feedback information contains permission information and the electronic drawing in the database needs to be updated, the original electronic drawing in the first state in the database is marked as a second state, and then the electronic drawing contained in the feedback information is marked as the first state and is stored in the database, so that the electronic drawing in the first state in the database is ensured to be the latest version, and when the electronic drawing in the first state is searched and the drawing is pushed, the searched electronic drawing can be ensured to be the latest version only by pushing the electronic drawing in the first state, and engineering problems caused by reasons such as disordered electronic drawing version, untimely electronic drawing information updating and the like are avoided.
Referring to fig. 5, in one preferred embodiment of the present invention, the pushing the electronic drawing labeled as the first state includes:
s403, updating the electronic drawing marked as the first state to the cloud;
s404, receiving a comparison result of the version number of the currently displayed electronic drawing sent by the consulting terminal and the version number of the cloud electronic drawing;
and S405, when the comparison results are inconsistent, sending an update prompt to the reference terminal for displaying update prompt information at the reference terminal.
In the process of looking up the electronic drawing in the embodiment, the information of the electronic drawing can be updated in real time through the cloud, so that all the drawings looked up by all the staff are guaranteed to be the latest version; and comparing the version numbers to ensure whether the drawing is up to date, even if browsing old version drawings, the reference terminal can compare the version numbers of the drawing every preset time (such as 15 minutes), and when the comparison is not established, the reference terminal can remind the user that the drawing browsed by the reference terminal is not up to date, and issue an update prompt to ensure that the drawing is up to date when browsing by the user.
In one of the application scenarios of this embodiment, any one of a popup window prompt, an icon prompt and a voice prompt may be used to update the prompt, taking the icon prompt as an example, when a drawing related to a project is referred to by a reference terminal, after the drawing is updated, a prompt of a "new" character icon is displayed in the upper right corner of the corresponding electronic drawing, so as to clearly distinguish the latest electronic drawing after modification from the electronic drawing before modification, and meanwhile, guide a user to click on the electronic drawing with the prompt icon, and when the drawing is clicked for the first time, the icon disappears.
In another application scenario of the embodiment, when the drawing version number comparison result is not established, based on update reminding, the consulting terminal pops up an update reminding popup window on an operation page, and is used for reminding a user of operating or old version electronic drawings and suggesting that the user refreshes drawing information.
Referring to fig. 6, one preferred embodiment of the present invention further provides an electronic drawing monorail management device, including:
the drawing acquisition module 100 is used for acquiring an electronic drawing and storing the electronic drawing into a local database;
the management module 200 is used for identifying project information in the electronic drawing and configuring an audit template;
the auditing module 300 is used for receiving the modification application based on the auditing template and outputting feedback information;
the updating pushing module 400 is configured to update the electronic drawing and push the updated electronic drawing;
the archiving module 500 is configured to integrate and store archiving information to the archive system according to the archiving request.
The electronic drawing management device for the electronic drawing monorail system can effectively solve the problems existing in the traditional drawing management mode. The drawing acquisition module 100 uniformly acquires the electronic drawings and stores the electronic drawings into a database after marking the electronic drawings as a first state; after the auditing template is matched through the management module 200, the auditing and modifying control of the electronic drawing are performed in a mode of auditing and modifying the electronic drawing by receiving the modifying application based on the auditing template and outputting feedback information, so that the accuracy of the drawing is ensured, the engineering quality problem caused by drawing errors is reduced, and meanwhile, the auditing flow is optimized to accelerate the auditing speed. And by updating the pushing module 400, the electronic drawing related to the operation content or the project is pushed and marked, and after uploading the electronic drawing or modifying the electronic drawing in the project implementation process, related personnel can quickly review the electronic drawing of the latest version, so that the working efficiency is improved. Meanwhile, by auditing and modifying the electronic drawing, the drawing quality is ensured, and the engineering quality problem caused by drawing errors is reduced.
Finally, after the project is finished, the archiving module 500 receives the completion drawings and the archiving request, archives all the electronic drawings, the modification application, the feedback information and the related auditing templates into an archiving information package, and stores the archiving information package into the archive system through an archiving interface (WebService) so as to facilitate later consulting and maintenance.
In one preferred embodiment of the present invention, a storage medium is further indicated, where a control program of the electronic drawing monorail management method is stored, and when the control program of the electronic drawing monorail management method is executed by a processor, the steps of the electronic drawing monorail management method according to any one of the above embodiments are implemented.
There is also pointed out in one of the preferred embodiments of the present invention an electronic drawing monorail management apparatus 200 comprising:
at least one processor 210; and a memory 220 communicatively connected to the at least one processor 210, the processor 210 and the memory 220 being connected by a communication bus 230, the memory 220 having stored thereon a computer program 240 executable by the at least one processor 210, the computer program 240 being executable by the at least one processor 210 to enable the at least one processor 210, when executed, to implement the electronic monorail management method as described in any of the above embodiments. In this embodiment.
The foregoing description is only of the preferred embodiments of the present invention and is not intended to limit the scope of the invention, and all equivalent structural changes made by the description of the present invention and the accompanying drawings or direct/indirect application in other related technical fields are included in the scope of the invention.

Claims (10)

1. The single-rail management method for the electronic drawing is characterized by comprising the following steps of:
acquiring an electronic drawing and storing the electronic drawing in a local database;
identifying project information in the electronic drawing and configuring an audit template;
receiving a modification application based on the auditing template and outputting feedback information;
when the feedback information contains permission information, updating the electronic drawing according to the modification request, and pushing the updated electronic drawing;
and receiving an archiving request, integrating all electronic drawings corresponding to the archiving request, the modification application and the feedback information to form archiving information, and storing the archiving information to an archive system.
2. The method for monorail management of electronic drawings according to claim 1, wherein the step of obtaining the electronic drawings and storing the electronic drawings in a local database comprises:
identifying a drawing catalog and an engineering project number of the electronic drawing;
creating a storage space corresponding to a target segment in the engineering project based on the engineering project number;
splitting the electronic drawing into an album corresponding to the project label segments based on the drawing catalog;
and storing the album into a storage space corresponding to the project number according to the project standard section.
3. The method for monorail management of an electronic drawing according to claim 1, wherein the identifying project information in the electronic drawing and configuring an audit template comprises:
acquiring the project information, and matching a reference template consistent with the project information as an auditing template;
and/or acquiring the project information, matching a reference template with the highest overlapping degree with the project information, and adjusting auditing node information of the reference template based on the project information to obtain an auditing template.
4. The method of claim 1, wherein receiving a modification application based on the audit template and outputting feedback information comprises:
receiving a modification application, creating an auditing flow based on the auditing template, and sending auditing requests to at least two auditing nodes;
if the auditing feedback is not received within the first preset time, a first auditing prompt is sent to the auditing node;
if the first audit prompt is sent and audit feedback is not received within a second preset time, sending a second audit prompt to the audit node;
receiving audit feedback of any one audit node, outputting feedback information and ending the audit flow;
the modification application comprises a change order and designed service function information, and the modification mode of the modification application at least comprises one of the following steps: the method comprises the steps of replacing a drawing, modifying a drawing name and drawing number, adding a drawing, modifying the state of the drawing and canceling the state of the drawing.
5. The electronic drawing monorail management method of any one of claims 1-4, further comprising constructing a reference authority, the reference authority comprising at least one of: a full member disclosure level, a project disclosure level, a punctuation disclosure level, a job level disclosure level, and a custom disclosure level.
6. The method for monorail management of electronic drawings of claim 5, further comprising limiting a reference range, specifically comprising:
when receiving a reference request, acquiring reference authority corresponding to the reference request;
opening engineering projects and electronic drawings corresponding to the consulting authority;
returning information corresponding to the reference request from the opened engineering projects and the electronic drawings;
and/or, the method further comprises the step of submitting temporary consulting permission, and specifically comprises the following steps:
receiving a temporary permission request application based on the auditing template and outputting feedback information;
and when the feedback information contains temporary permission information, opening temporary reference rights corresponding to the temporary rights request application based on the request time of the temporary rights request application.
7. The method for monorail management of electronic drawings according to claim 6, wherein pushing the electronic drawings marked as the first state comprises:
updating the electronic drawing marked as the first state to the cloud;
receiving a comparison result of the version number of the currently displayed electronic drawing sent by the consulting terminal and the version number of the cloud electronic drawing;
and when the comparison results are inconsistent, sending an update prompt to the reference terminal for displaying update prompt information at the reference terminal.
8. The utility model provides a single track management device of electronic drawing which characterized in that includes:
the drawing acquisition module is used for acquiring an electronic drawing and storing the electronic drawing into the local database;
the management module is used for identifying project information in the electronic drawing and configuring an audit template;
the auditing module is used for receiving the modification application based on the auditing template and outputting feedback information;
the updating pushing module is used for updating the electronic drawing and pushing the updated electronic drawing;
and the archiving module is used for integrating archiving information according to the archiving request and storing the archiving information in an archive system.
9. A storage medium, wherein a control program of an electronic drawing monorail management method is stored on the storage medium, and when the control program of the electronic drawing monorail management method is executed by a processor, the steps of the electronic drawing monorail management method according to claims 1-7 are implemented.
10. An electronic drawing monorail management device, comprising:
at least one processor; the method comprises the steps of,
a memory communicatively coupled to the at least one processor; wherein the memory has stored thereon a computer program executable by at least one processor, the computer program being executable by the at least one processor to enable the at least one processor, when executed, to implement the electronic drawing monorail management method of any one of claims 1-7.
CN202310991000.1A 2023-08-07 2023-08-07 Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing Pending CN117114603A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310991000.1A CN117114603A (en) 2023-08-07 2023-08-07 Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310991000.1A CN117114603A (en) 2023-08-07 2023-08-07 Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing

Publications (1)

Publication Number Publication Date
CN117114603A true CN117114603A (en) 2023-11-24

Family

ID=88795667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310991000.1A Pending CN117114603A (en) 2023-08-07 2023-08-07 Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing

Country Status (1)

Country Link
CN (1) CN117114603A (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01217505A (en) * 1988-02-25 1989-08-31 Fujitsu Ltd System for instructing design change
CN102236842A (en) * 2011-06-30 2011-11-09 内蒙古电力勘测设计院 Method and system for archiving finished products during electric power design
KR20120034383A (en) * 2010-10-01 2012-04-12 엔에이치엔(주) Automatic map update system and method thereof
WO2012137567A1 (en) * 2011-04-08 2012-10-11 株式会社セイコーアイ・インフォテック Drawing management server, drawing management program, and drawing management system
CN104809189A (en) * 2015-04-21 2015-07-29 国家电网公司 System and method for managing versions of electric drawing
CN105045770A (en) * 2015-07-22 2015-11-11 福建福昕软件开发股份有限公司 Automatic document new version prompting method
CN109656931A (en) * 2018-09-28 2019-04-19 平安科技(深圳)有限公司 Verification mechanism, device, equipment and the storage medium of contract dataset consistency
CN109740372A (en) * 2018-12-17 2019-05-10 广州天越电子科技有限公司 Based on the system and method for realizing that conceptual schematic drawing paper is divided in automatic audit room on WEB
CN110276587A (en) * 2019-04-29 2019-09-24 阿里巴巴集团控股有限公司 The method, apparatus of project examination calculates equipment and computer readable storage medium
CN110764851A (en) * 2018-07-27 2020-02-07 Oppo广东移动通信有限公司 Application update reminding method and device, storage medium and electronic equipment
CN110781138A (en) * 2019-10-31 2020-02-11 海南蓄能发电有限公司 Electronic drawing management system and method
CN111080222A (en) * 2018-10-22 2020-04-28 西安企业资本服务中心有限公司 Approval method and approval system
CN112036824A (en) * 2020-08-27 2020-12-04 北京新橙科技有限公司 Business approval method, system, storage medium and electronic equipment
CN113689090A (en) * 2021-08-04 2021-11-23 中国二十冶集团有限公司 Alteration and drawing management method based on engineering management and control platform
CN114005135A (en) * 2021-10-29 2022-02-01 平安国际智慧城市科技股份有限公司 Intelligent construction project drawing verification method, system and device and readable storage medium
CN114282883A (en) * 2021-12-01 2022-04-05 浪潮软件股份有限公司 Construction drawing examination method and system based on multi-drawing joint examination
WO2022105135A1 (en) * 2020-11-23 2022-05-27 平安普惠企业管理有限公司 Information verification method and apparatus, and electronic device and storage medium
CN115934637A (en) * 2022-12-15 2023-04-07 北京数码大方科技股份有限公司 Drawing file management method and device, storage medium and electronic equipment

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01217505A (en) * 1988-02-25 1989-08-31 Fujitsu Ltd System for instructing design change
KR20120034383A (en) * 2010-10-01 2012-04-12 엔에이치엔(주) Automatic map update system and method thereof
WO2012137567A1 (en) * 2011-04-08 2012-10-11 株式会社セイコーアイ・インフォテック Drawing management server, drawing management program, and drawing management system
CN102236842A (en) * 2011-06-30 2011-11-09 内蒙古电力勘测设计院 Method and system for archiving finished products during electric power design
CN104809189A (en) * 2015-04-21 2015-07-29 国家电网公司 System and method for managing versions of electric drawing
CN105045770A (en) * 2015-07-22 2015-11-11 福建福昕软件开发股份有限公司 Automatic document new version prompting method
CN110764851A (en) * 2018-07-27 2020-02-07 Oppo广东移动通信有限公司 Application update reminding method and device, storage medium and electronic equipment
CN109656931A (en) * 2018-09-28 2019-04-19 平安科技(深圳)有限公司 Verification mechanism, device, equipment and the storage medium of contract dataset consistency
CN111080222A (en) * 2018-10-22 2020-04-28 西安企业资本服务中心有限公司 Approval method and approval system
CN109740372A (en) * 2018-12-17 2019-05-10 广州天越电子科技有限公司 Based on the system and method for realizing that conceptual schematic drawing paper is divided in automatic audit room on WEB
CN110276587A (en) * 2019-04-29 2019-09-24 阿里巴巴集团控股有限公司 The method, apparatus of project examination calculates equipment and computer readable storage medium
CN110781138A (en) * 2019-10-31 2020-02-11 海南蓄能发电有限公司 Electronic drawing management system and method
CN112036824A (en) * 2020-08-27 2020-12-04 北京新橙科技有限公司 Business approval method, system, storage medium and electronic equipment
WO2022105135A1 (en) * 2020-11-23 2022-05-27 平安普惠企业管理有限公司 Information verification method and apparatus, and electronic device and storage medium
CN113689090A (en) * 2021-08-04 2021-11-23 中国二十冶集团有限公司 Alteration and drawing management method based on engineering management and control platform
CN114005135A (en) * 2021-10-29 2022-02-01 平安国际智慧城市科技股份有限公司 Intelligent construction project drawing verification method, system and device and readable storage medium
CN114282883A (en) * 2021-12-01 2022-04-05 浪潮软件股份有限公司 Construction drawing examination method and system based on multi-drawing joint examination
CN115934637A (en) * 2022-12-15 2023-04-07 北京数码大方科技股份有限公司 Drawing file management method and device, storage medium and electronic equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
满庆鹏编: "《面向可持续发展的土建类工程教育丛书 建设工程信息管理》", 30 September 2021, 机械工业出版社, pages: 227 *
袁仁有;罗伟庭;魏明智;: "图纸电子化在广蓄电厂的实施与应用", 水电站机电技术, no. 01, pages 61 - 63 *
赵昕主编: "《中国建筑施工行业信息化发展报告 2014 BIM应用与发展》", 30 September 2014, 中国城市出版社, pages: 231 *

Similar Documents

Publication Publication Date Title
CN107729031B (en) Code administration method, apparatus, computer equipment and computer readable storage medium
US11681685B1 (en) System for uploading information into a metadata repository
CN103516591A (en) Method and device for achieving enterprise address list in instant communication platform
JP2019121285A (en) Configuration change management device, configuration change management method, and program
CN115185967A (en) Data processing method and device, electronic equipment and storage medium
US20150026081A1 (en) Method and system for managing standards
JP6865942B1 (en) Programs, methods, information processing equipment, and systems
RU2635886C2 (en) Systems and methods for managing files through mobile computer devices
CN117114603A (en) Single-rail management method, single-rail management device, storage medium and single-rail management equipment for electronic drawing
CN109815428A (en) A kind of online table caching method and device
CN113377458B (en) Plug-in management method and device, electronic equipment and storage medium
US20230195792A1 (en) Database management methods and associated apparatus
CN103870603A (en) Directory management method and electronic device
US11023830B2 (en) Processing a request in accordance with original rules and configurations
JP2010061200A (en) Document management system and operation history display method
JP2018060272A (en) Budget management system, budget management method and budget management
CN111221817A (en) Service information data storage method and device, computer equipment and storage medium
KR20210051817A (en) System and method for providing an authentication information service based an open api
JP2002063294A (en) Facilities management server, facilities management method and recording medium with facilities management program recorded therein
CN111367553B (en) Method and device for bidirectional updating between template library FMEA and project FMEA
US20230074366A1 (en) Information management device, information management system, information management method, and nontransitory computer-readable medium
US20240037468A1 (en) Method of monitoring project process and outcome
CN116719824A (en) Data management method and related device
JP2000066931A (en) Database system, data changing method and computer readable recording medium recorded with database program
KR20220102896A (en) Method and device for ai image management solution convergence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination