CN117071947A - Three-open movable plate Fang Wei bath space layout system - Google Patents

Three-open movable plate Fang Wei bath space layout system Download PDF

Info

Publication number
CN117071947A
CN117071947A CN202311026068.2A CN202311026068A CN117071947A CN 117071947 A CN117071947 A CN 117071947A CN 202311026068 A CN202311026068 A CN 202311026068A CN 117071947 A CN117071947 A CN 117071947A
Authority
CN
China
Prior art keywords
plate body
bathroom
north
male
south
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311026068.2A
Other languages
Chinese (zh)
Inventor
郜世锋
尹传凯
郭洪波
陈昌君
肖冰冰
徐飞
关志威
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202311026068.2A priority Critical patent/CN117071947A/en
Publication of CN117071947A publication Critical patent/CN117071947A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention relates to the technical field of bathroom boards, in particular to a three-open movable board Fang Wei bath space layout system. The three-open movable plank house is arranged on the ground, the three-open movable plank house comprises a north plank body, an east plank body and a west plank body are respectively connected to two sides of the north plank body, a south plank body is arranged between the east plank body and the west plank body, top plank bodies are jointly arranged on the north plank body, the east plank body, the west plank body and the south plank body, and a bathroom space is jointly enclosed and formed, and a main entrance and exit for entering and exiting the bathroom space is arranged in the middle of the south plank body; a bathroom space is divided into a female bathroom space and a male shower space, a male bathroom space is divided into a right side of the bathroom space, a male bathroom is arranged between the female bathroom space and the male shower space, a public washroom is divided into one side of the male bathroom space, which is close to a main entrance and exit, a hall is arranged between the public washroom and the main entrance and exit, the public washroom and the male bathroom space are arranged at intervals, and an aisle which communicates the male bathroom space with the hall is arranged at the intervals.

Description

Three-open movable plate Fang Wei bath space layout system
Technical Field
The invention relates to the technical field of bathroom boards, in particular to a three-open movable board Fang Wei bath space layout system.
Background
In modern buildings, the prefabricated houses are widely applied to various construction sites with the unique advantages; however, the movable house designed at present is small in use area, most of functions are concentrated on solving the temporary accommodation problem of people, and the requirements of the washing and bathroom of people are rarely considered. When the movable plank house is built, no matched bathroom facilities are usually arranged, or a simple outdoor dry toilet is built, so that the sanitation and comfort level are extremely poor, and the requirements of people on life quality are difficult to meet; even if a bathroom and a bathroom are specially built, the bathroom and the bathroom are designed in a separated mode and are installed in a scattered mode, the bathroom and the bathroom are separated from each other, the distance between the bathroom and the bathroom is long, the use convenience is low, and the occupied area is large; partial bathroom and bathroom all design in a big space, and do not have effectual wall, and inside shower district sets up unreasonably inadequately with the lavatory district, and drainage and ventilation are difficult to design, and use comfort is relatively poor, and space utilization is not high, causes the material extravagant, in order to satisfy many people's operation requirement simultaneously moreover, the condition that the privacy is not high appears.
Therefore, a space layout system of a three-open movable plate Fang Wei bath is needed at present to solve the defects of large occupied area, unreasonable division of functional areas and low use comfort of the existing common worksite bathroom, toilet and washroom, and further to design a space layout system of the bathroom which saves materials, has high use comfort and simultaneously meets the use functions of bathing, toileting, washing and the like under the condition of limiting the area of the site.
Disclosure of Invention
The invention aims to solve the problems, thereby providing a three-open movable plate Fang Wei bath space layout system which has reasonable and compact structure, is convenient to use, occupies smaller space, meets the bathroom requirements of different users of men and women, has complete functions, better sanitation and comfort, and meets the daily washing requirements of project personnel in peak period; solves the defects of large occupied area, unreasonable division of functional areas and low use comfort of the prior common site bathroom.
The invention solves the problems, and adopts the following technical scheme:
the three-open movable plank Fang Wei bath space layout system is characterized in that the three-open movable plank house is arranged on the ground, the three-open movable plank house comprises a north plank body, an east plank body and a west plank body are respectively and vertically connected to two sides of the north plank body, a south plank body parallel to the north plank body is arranged between the east plank body and the west plank body, top plank bodies are jointly arranged on the north plank body, the east plank body, the west plank body and the south plank body, and jointly enclose a bathroom space, and a main entrance and exit for entering and exiting the bathroom space are arranged in the middle of the south plank body; a female bathroom is partitioned at the left side of the bathroom space, a male shower is partitioned at the right side of the bathroom space, a male bathroom is arranged between the female bathroom and the male shower and close to one side of the north plate body, a public washroom is partitioned at one side of the male bathroom close to the main entrance, a hall is arranged between the public washroom and the main entrance, the public washroom is adjacent to the female bathroom, and the public washroom and the male shower are arranged at intervals and are provided with passages for communicating the male bathroom with the hall at intervals; the left side of the hall is provided with a first access opening communicated with the female bathroom, the right side of the hall is provided with a second access opening communicated with the passageway, and the male bathroom and the south side plate body are provided with a third access opening.
Preferably, the invention further adopts the technical scheme that:
further, be provided with first division plate body in bathroom space, between north side plate body and the south side plate body, first division plate body and north side plate body and south side plate body parallel arrangement, the both sides of first division plate body all are the interval setting with east side plate body and west side plate body, be connected with the second division plate body perpendicularly between west side and north side plate body of first division plate body, be connected with the third division plate body perpendicularly between north side plate body and the side that is close to main access & exit on the west side of first division plate body, north side plate body, west side plate body, south side plate body, second division plate body, first division plate body and third division plate body enclose jointly into female bathroom, first access & exit sets up on the third division plate body.
Further, the inside of the female bathroom, one side, close to the west side plate, of the north side plate and the south side plate is provided with a shutter, one side, close to the west side plate, of the north side plate is provided with three squatting compartments in sequence from north to south, one side, close to the south side plate, is provided with two shower compartments in sequence from west to east, one side, close to the first access opening, of the shower compartment is provided with a mop pool, washing machine reserved positions are arranged in the female bathroom, close to the first separation plate and the third separation plate, and the rest of the female bathroom is a public channel.
Further, a fourth separation plate body is vertically connected between the eastern side plate body and the south side plate body of the first separation plate body, a fifth separation plate body is arranged between the fourth separation plate body and the eastern side plate body, the fifth separation plate body and the fourth separation plate body are arranged at intervals, the fifth separation plate body is vertically arranged between the north side plate body and the south side plate body and is parallel to the fourth separation plate body and the eastern side plate body, the north side plate body, the second separation plate body, the first separation plate body, the fourth separation plate body and the fifth separation plate body enclose together to form a male bathroom, a passageway is arranged between the fourth separation plate body and the fifth separation plate body, a second passageway is arranged on the fourth separation plate body, and the rest of the male bathroom is a public passageway.
Further, three shutters are arranged in the men's bathroom, on the north side plate body and on the aisle and the south side plate body, three squatting pan compartments are arranged between the north side plate body and the south side plate body on one side close to the second partition plate body, three squatting pan compartments are sequentially arranged from east to west on one side close to the north side plate body, a mop pool is arranged between the squatting pan compartments and the squatting pan compartments, and three induction urinals are arranged on the north side face of the first partition plate body.
Further, the north side plate body, the east side plate body, the south side plate body and the fifth partition plate body enclose together to form a male shower room, the third access opening is arranged on one side, close to the east side plate body, of the south side plate body, four shower rooms are sequentially arranged from north to south on one side, close to the fifth partition plate body, of the north side plate body, a reserved position of the washing machine is arranged between the shower rooms and the south side plate body, and the rest of the male shower room is a public channel.
Furthermore, the public washing area is arranged between the third separation plate body and the fourth separation plate body and on one side close to the first separation plate body, four circular wash basins are arranged in the public washing area, and each wash basin is correspondingly provided with a water-saving faucet.
Further, the hall is provided between the third partition plate body, the fourth partition plate body and the public washroom, and the first doorway and the second doorway are provided at the western side and the eastern side of the hall and are opposite to each other.
Further, a water supply pipeline communicated with a municipal tap water pipeline is buried in the ground foundation of the bathroom space, and extends to the female bathroom, the male shower and the public washroom, and the water supply pipeline is connected with water equipment arranged in the female bathroom, the male shower and the public washroom.
Furthermore, a septic tank is arranged below the ground foundation of the bathroom space, and sewage pipes communicated with the septic tank are arranged in the bathroom, the male shower room and the public washroom.
Compared with the prior art, the invention adopting the technical scheme has the outstanding characteristics that:
the bathroom has reasonable and compact structure and convenient use, and the bathroom, the male bathroom and the public washroom are arranged in the bathroom by using simple and easy-to-operate technical means, so that the bathroom occupies small space, meets the bathroom requirements of different male and female users, has complete functions, better sanitation and comfort, and meets the daily washing requirements of project personnel in peak period; the male and female users have independent bathroom spaces and sanitary wares, compared with the traditional long-ditch urinal of the building site bathroom, the toilet is cleaner and environment-friendly, has turnover, and reduces comprehensive use cost; the three-open movable house has high design flexibility, can perform internal function design according to actual requirements of projects, reduces waste of space and materials, is convenient and simple in structural composition, is more beneficial to design of ventilation and drainage, and greatly increases use comfort; the defects of large occupied area, unreasonable division of functional areas and low use comfort of the conventional bathroom at the common construction site are overcome; under the condition of limited field area, the utility model can meet the use functions of bath, toilet, washing, etc.
Drawings
FIG. 1 is a schematic diagram of a front view of an embodiment of the present invention;
in the figure: 1. a north plate body; 2. an eastern side plate body; 3. a west plate body; 4. a south plate body; 5. a main entrance; 6. women's bathroom; 7. shower room for men; 8. a male toilet; 9. public washroom areas; 10. a hall; 11. an aisle; 12. a first passageway; 13. a second passageway; 14. a third passageway; 15. a first partition plate body; 16. a second partition plate body; 17. a third partition plate body; 18. a fourth partition plate body; 19. a fifth partition plate body; 20. a shutter; 21. a mop pool; 22. sensing the urinal; 23. reserved positions of the washing machine; 24. a shower compartment; 25. squatting pan compartment; 26. round washbasin; 27. a common channel.
Detailed Description
The present invention will be further understood by the following description of embodiments, but the specific embodiments given by the applicant should not be considered as limiting the technical solution of the present invention, and any modification of the definition of components or technical features and/or the form of the whole structure without substantial change should be considered as the protection scope defined by the technical solution of the present invention.
Referring to fig. 1, the technical scheme of the invention is as follows:
the three-open movable plank Fang Wei bath space layout system comprises a north-side plank body 1, an east-side plank body 2 and a west-side plank body 3 are respectively and vertically connected to two sides of the north-side plank body 1, a south-side plank body 4 parallel to the north-side plank body 1 is arranged between the east-side plank body 2 and the west-side plank body 3, a top plank body is jointly arranged on the north-side plank body 1, the east-side plank body 2, the west-side plank body 3 and the south-side plank body 4 and jointly enclose a bathroom space, the indoor ground in the bathroom space is paved by adopting anti-slip floor tiles, a buckle suspended ceiling for decoration is arranged on the top plank body, and a main entrance 5 for entering and exiting the bathroom space is arranged in the middle of the south-side plank body 4; a female bathroom 6 is partitioned at the left side of the bathroom space, a male shower 7 is partitioned at the right side of the bathroom space, a male bathroom 8 is arranged between the female bathroom 6 and the male shower 7 and near one side of the north plate body 1, a public washroom 9 is partitioned at one side of the male bathroom 8 near the main entrance 5, a hall 10 is arranged between the public washroom 9 and the main entrance 5, the public washroom 9 is adjacent to the female bathroom 6, and a passageway 11 which is formed between the public washroom 9 and the male shower 7 and is used for communicating the male bathroom 8 with the hall 10 is arranged at the interval; by the arrangement, the three-room type movable plank house with the total area of 6K is divided into three partitions of the female bathroom 6, the male bathroom 8 and the male bathroom 7, a public washroom 9 is arranged, a first access opening 12 communicated with the female bathroom 6 is arranged on the left side of a hall 10, a second access opening 13 communicated with a passageway 11 is arranged on the right side of the hall 10, and a third access opening 14 is arranged on the male bathroom 7 and the south side plank body 4.
A first separation plate body 15 is arranged in the bathroom space and between the north plate body 1 and the south plate body 4, the first separation plate body 15 is arranged in parallel with the north plate body 1 and the south plate body 4, two sides of the first separation plate body 15 are arranged at intervals with the east plate body 2 and the west plate body 3, a second separation plate body 16 is vertically connected between the west side of the first separation plate body 15 and the north plate body 1, a third separation plate body 17 is vertically connected between one side surface of the west side of the first separation plate body 15 close to the main entrance 5 and the south plate body 4, the north plate body 1, the west plate body 3, the south plate body 4, the second separation plate body 16, the first separation plate body 15 and the third separation plate body 17 enclose a female bathroom 6 together, the female bathroom 6 is arranged in a 1k movable board room, and the first entrance 12 is arranged on the third separation plate body 17; through above-mentioned north curb plate body 1, west curb plate body 3, south curb plate body 4, second partition plate body 16, first partition plate body 15 and third partition plate body 17 together separate women's bathroom 6 alone in the bathroom space to with women's bathroom and the integrated design of women's bathroom, practiced thrift space, area and construction material when satisfying women's user's bathroom demand, and then the cost is reduced.
The bathroom is characterized in that a shutter 20 is arranged in a female bathroom 6, one side, close to a west side plate body 3, of a north side plate body 1 and a south side plate body 4, each shutter 20 is 1.8m wide to meet ventilation and lighting requirements, three squatting compartments 25 are sequentially arranged from north to south on one side, close to the west side plate body 3, each squatting compartment 25 is 1.2m long and 1.1m wide, a channel with the width of 1.4m is commonly arranged in front of the three squatting compartments 25, two shower compartments 24 are sequentially arranged from west to east on one side, close to the south side plate body 4, each shower compartment 24 is 1.05m wide and 1.5m long, each three squatting compartments 25 and each two shower compartments 24 are formed by three-sided boards, the boards are fixed with screws through hinges, the boards are connected with the west side plate body 3 or the south side plate body 4 through plastic hinges, the boards are convenient to detach and maintain, the longitudinal partition is connected with the additional boards through two plastic rotating mechanisms to ensure normal closing, each plastic rotating lock catch is arranged, the partition boards are simultaneously, the first side of the partition board is provided with a first partition board and the first toilet and the other privacy mop is provided with a partition board 17, the first toilet and the partition board 17 is arranged in the bathroom is close to the first side to the bathroom 6 to the first bathroom 6, and the first toilet is provided with a partition board 17, and a partition board 17 is provided with a first toilet and a partition board 17, which is arranged in the bathroom and a position near the bathroom 6; the three squatting pan compartments 25 are all squatting pans with water tanks, and a drainage ditch is arranged in the two shower compartments 24 together to drain water; through the above-mentioned squatting pan compartment 25, shower compartment 24, mop pond 21 and the structure setting in washing machine reservation position 23, satisfied female user's health and the function of using of shower, also considered the washing demand of user and the washing demand of various burnisher, guaranteed female user's privacy when using lavatory, shower simultaneously.
A fourth partition plate body 18 is vertically connected between the east side and south side plate bodies 4 of the first partition plate body 15, a fifth partition plate body 19 is arranged between the fourth partition plate body 18 and the east side plate body 2, the fifth partition plate body 19 is arranged at intervals from the fourth partition plate body 18 and the east side plate body 2, the fifth partition plate body 19 is vertically arranged between the north side plate body 1 and the south side plate body 4 and is parallel to the fourth partition plate body 18 and the east side plate body 2, the north side plate body 1, the second partition plate body 16, the first partition plate body 15, the fourth partition plate body 18 and the fifth partition plate body 19 jointly enclose a male bathroom 8, a passageway 11 is arranged between the fourth partition plate body 18 and the fifth partition plate body 19, a second passageway 13 is arranged on the fourth partition plate body 18, and the rest of the male bathroom 8 is a public passageway 27; through above-mentioned north curb plate body 1, second division plate body 16, first division plate body 15, fourth division plate body 18 and fifth division plate body 19 jointly separate men's toilet and bathroom space 8 alone, satisfied male user's physiological hygienic demand, can hold many people and use simultaneously.
Three shutters 20 are arranged in the men's toilet 8, on the north side plate body 1 and the passageway 11 and on the south side plate body 4 in total, each shutter 20 is 1.8m wide to meet ventilation and lighting requirements, three squatting pan compartments 25 are arranged between one side of the second partition plate body 16 and the north side plate body 1 and the south side plate body 4, the squatting pan compartments 25 are 1.2m long, 1.05m wide, a water outlet is 0.4m away from a wall, 20cm Gao Kan tables are arranged below each squatting pan to prevent water seepage, three squatting pan compartments 25 are sequentially arranged on one side of the north side plate body 1 from east to west, the squatting pan compartments 25 are 1.2m long, 1.1m wide, the water outlet is 0.4m away from the wall, 20cm Gao Kan tables are arranged below each squatting pan to prevent water seepage, the three squatting pan compartments 25 and the three squatting pan compartments 25 are formed by three wooden boards, the wooden boards are fixed with the water inlet and the water outlet, the mop body 3 or the north side plate body 1 are fixed by screws, the lock catch is convenient to detach, the two plastic compartments are connected with the side plates in a rotary mode, the two partition plates are connected with the side plates through the hinge, and the two partition plates are arranged in turn, the side plates are connected with the side plates in a rotary mode, and the partition plate is convenient mode, and a rotary mode is connected with the partition plate is arranged on the side plate 21 is provided with the side plate and has a partition plate 21; the three squatting pan compartments 25 and the three squatting pan compartments 25 are squatting pans with water tanks; through the arrangement of the squatting pan compartment 25, the induction urinal and the mop pool 21, the requirement that the male user can separate the urine and the feces into the toilet is met, the use efficiency of the male toilet 8 is improved, the washing requirement of various cleaning tools is also met, and meanwhile, the privacy of the male user in the toilet is ensured.
The north side plate body 1, the east side plate body 2, the south side plate body 4 and the fifth partition plate body 19 jointly enclose a male shower room 7, an air energy water heater is arranged beside the male shower room 7 to meet daily hot water requirements of an office area, one of lily windows on the north side plate body 1 and a shutter 20 on the south side plate body 4 of the male shower room 7 and the male bathroom 8 are shared so as to meet ventilation and lighting requirements, a third access 14 is arranged on one side of the south side plate body 4 close to the east side plate body 2, four shower compartments 24 are sequentially arranged on one side of the fifth partition plate body 19 from north to south, each shower compartment 24 is 1.5m long and 1.1m wide, a 0.9m channel is reserved in front, passing requirements are met, each shower compartment 24 is internally provided with a dual-purpose shower head, the four shower compartments 24 are formed by three-sided boards, the boards are fixed with the fifth partition plate body 19 through hinges and screws, the boards are connected through plastic hinges, the disassembly and the maintenance are convenient, the longitudinal partition and the transverse partition are connected through an additional board, the door leaves are connected with the additional board through two plastic rotating mechanisms to ensure normal open and close, each door leaf is provided with a plastic rotating lock catch, the privacy is convenient and fast, a reserved position 23 of the washing machine is arranged between the third access 14, the shower compartment 24 and the south side plate body 4, so that the clothing changing and washing requirements of male users are met, and the rest parts of the male shower compartments 7 are public channels 27; the four shower compartments 24 are provided with drainage ditches for discharging sewage, and the north side plate body 1, the east side plate body 2, the south side plate body 4 and the fifth partition plate body 19 are used for separating the shower compartments 7 of the male in the bathroom space, so that the shower requirements of male users are met, a plurality of users can be accommodated for simultaneous use, and the reserved positions 23 of the washing machine are arranged in the shower compartments, so that the washing requirements of the male users are met.
The public washing area 9 is arranged between the third separation plate body 17 and the fourth separation plate body 18 and on one side close to the first separation plate body 15, the public washing area 9 is 3.6m long, four circular wash basins 26 are arranged in the public washing area 9, and each wash basin is correspondingly provided with a water-saving faucet; by arranging the public washroom 9 between the female bathroom 6 and the male bathroom 8, the comfort and convenience of use of male and female users are improved, and the users do not need to walk for a long distance to clean personal hygiene after using the toilet, so that the time is saved.
The hall 10 is provided between the third partition plate body 17, the fourth partition plate body 18, and the public washroom 9, and the first doorway 12 and the second doorway 13 are provided on the west side and the east side of the hall 10, and are opposed to each other;
a water supply pipeline communicated with a municipal tap water pipeline is buried in a ground foundation of the bathroom space, no water supply pipeline is arranged in the bathroom space so as to ensure the attractiveness, the water supply pipeline extends to a female bathroom 6, a male bathroom 8, a male shower 7 and a public washroom 9, and the water supply pipeline is connected with water equipment arranged in the female bathroom 6, the male bathroom 8, the male shower 7 and the public washroom 9; the main water supply pipe is connected by adopting a ppr pipe with DN50 in a hot-melt manner, and the branch pipe is connected by adopting a ppr pipe with DN20 in a hot-melt manner; domestic water in the bathroom space is supplied from municipal pipelines, and meanwhile, an air energy water heater is adopted to meet the hot water requirements of projects and water equipment in the bathroom space; the water supply device arranged in the bathroom space through the structure provides a water source, so that the normal use, the cleanliness and the comfort of use of the female bathroom 6, the male bathroom 8 and the male shower 7 are guaranteed.
A septic tank is arranged below the ground foundation of the bathroom space, and sewage pipes communicated with the septic tank are arranged in the female bathroom 6, the male bathroom 8, the male shower 7 and the public washroom 9; through the structure, the cleanliness in the bathroom space and the comfort level of use are guaranteed, so that no ponding and no peculiar smell are generated in the bathroom space.
It should be noted that: all partitions in the squatting pan compartment 25 and the shower compartment 24 are separated by using customized wood boards, related connecting parts are all connected by adopting a plastic device with higher strength, so that the squatting pan is prevented from being wetted and rusted in the using process, and each squatting position of the squatting pan compartment 25 adopts independent sanitary ware; the public washroom 9 is provided with an independent drainage pipeline and is regularly overhauled by special persons, so that the probability of pipeline blockage is greatly reduced, and compared with the traditional cement floor, the indoor floor in the bathroom space is paved by using the anti-slip ceramic tile, the damping is reduced in rainy days, meanwhile, the cleaning work is favorably carried out, and the overall use comfort is higher.
All compartments in the bathroom space are three-sided enclosing patterns, each partition is formed by two partitions and a door, the connection between the partition and the wall of the bathroom is realized by means of bolt holes on the partition through which bolts pass, one side of the partition is fixed on the partition, the other side of the partition is fixed on the wall, and each partition and the wall are fixed by means of two fixing pieces; the bottom of the partition is supported by four plastics, the partition plate is inserted into the upper U-shaped groove and is fixed by bolts, so that the partition plate is not directly contacted with the ground, the phenomenon that the wooden partition is soaked due to the fact that the ground is wet is avoided, the use is affected, the top is not sealed, and normal ventilation is ensured; when the wooden partition is particularly used, the wooden partition and the rest parts are transported to the appointed position to start assembly. The screw is fixed with the partition through the screw hole on the partition, the door of the partition is fixed with a section of partition which extends out through the screw hole on the partition, the door leaf is convenient to install, and the door leaf can be guaranteed to rotate on the basis of fixing the door leaf for rotating the hinge; the door leaf is provided with a rotary locking mechanism, and the door can be locked by rotating the knob, so that the privacy is ensured; the baffle is a support at the bottom of the baffle, the baffle is clamped into the support groove, and the baffle is screwed tightly by adopting a screw.
The bathroom has reasonable and compact structure and convenient use, and the bathroom 6, the male bathroom 8, the male bathroom 7 and the public washroom 9 are arranged in the bathroom by using simple and easy-to-operate technical means in a centralized manner through reasonable planning and arrangement of the bathroom space, so that the bathroom not only occupies smaller space, but also meets the bathroom requirements of different male and female users, has complete functions, better sanitation and comfort, and meets the daily washing requirements of project personnel in peak period; the male and female users have independent bathroom spaces and sanitary wares, compared with the traditional long-ditch urinal of the building site bathroom, the toilet is cleaner and environment-friendly, has turnover, and reduces comprehensive use cost; the three-open movable house has high design flexibility, can perform internal function design according to actual requirements of projects, reduces waste of space and materials, is convenient and simple in structural composition, is more beneficial to design of ventilation and drainage, and greatly increases use comfort; the defects of large occupied area, unreasonable division of functional areas and low use comfort of the conventional bathroom at the common construction site are overcome; under the condition of limited field area, the utility model can meet the use functions of bath, toilet, washing, etc.
The foregoing description of the preferred embodiments of the invention is not intended to limit the scope of the claims, but rather to cover all equivalent modifications within the scope of the present invention as defined by the appended claims.

Claims (10)

1. A three-open-cell movable plate Fang Wei bath space layout system, which is characterized in that: the three-open movable house is arranged on the ground, and comprises a north plate body, an east plate body and a west plate body are respectively and vertically connected to two sides of the north plate body, a south plate body parallel to the north plate body is arranged between the east plate body and the west plate body, top plate bodies are jointly arranged on the north plate body, the east plate body, the west plate body and the south plate body, and jointly enclose a bathroom space, and a main entrance and exit for entering and exiting the bathroom space are arranged in the middle position of the south plate body; a female bathroom is partitioned at the left side of the bathroom space, a male shower is partitioned at the right side of the bathroom space, a male bathroom is arranged between the female bathroom and the male shower and close to one side of the north plate body, a public washroom is partitioned at one side of the male bathroom close to the main entrance, a hall is arranged between the public washroom and the main entrance, the public washroom is adjacent to the female bathroom, and the public washroom and the male shower are arranged at intervals and are provided with passages for communicating the male bathroom with the hall at intervals; the left side of the hall is provided with a first access opening communicated with the female bathroom, the right side of the hall is provided with a second access opening communicated with the passageway, and the male bathroom and the south side plate body are provided with a third access opening.
2. The three-compartment flap Fang Wei bath space layout system of claim 1, further comprising: a first separation plate body is arranged in the bathroom space and between the north plate body and the south plate body, the first separation plate body is arranged in parallel with the north plate body and the south plate body, two sides of the first separation plate body are arranged at intervals with the east plate body and the west plate body, a second separation plate body is vertically connected between the west plate body and the north plate body of the first separation plate body, a third separation plate body is vertically connected between the south plate body and one side face of the west side of the first separation plate body, which is close to the main entrance, of the first separation plate body, the north plate body, the west plate body, the south plate body, the second separation plate body, the first separation plate body and the third separation plate body enclose together to form a female bathroom, and the first entrance is arranged on the third separation plate body.
3. The three-compartment flap Fang Wei bath space layout system of claim 2, further comprising: the bathroom comprises a bathroom body, wherein a side, close to a side plate body, of a north side plate body and a south side plate body, of the bathroom body is provided with shutters, three squatting compartments are sequentially arranged from north to south on the side, close to the south side plate body, of the bathroom body, two shower compartments are sequentially arranged from west to east on the side, close to a first access opening, of the shower compartments is provided with a mop pool, washing machine reserved positions are arranged in the bathroom body, close to the first partition plate body and the third partition plate body, and the rest parts of the bathroom are public channels.
4. The three-compartment flap Fang Wei bath space layout system of claim 2, further comprising: a fourth separation plate body is vertically connected between the eastern side plate body and the south side plate body of the first separation plate body, a fifth separation plate body is arranged between the fourth separation plate body and the eastern side plate body, the fifth separation plate body is arranged between the north side plate body and the south side plate body at intervals, the fifth separation plate body is vertically arranged between the fourth separation plate body and the east side plate body and is parallel to the fourth separation plate body, the north side plate body, the second separation plate body, the first separation plate body, the fourth separation plate body and the fifth separation plate body are enclosed together to form a male bathroom, a passageway is arranged between the fourth separation plate body and the fifth separation plate body, a second passageway is arranged on the fourth separation plate body, and the rest of the male bathroom is a public passageway.
5. The three-compartment flap Fang Wei bath space layout system of claim 4, further comprising: three shutters are arranged in the male toilet, on the north side plate body and the aisle and on the south side plate body, three squatting and defecating compartments are arranged between one side of the second partition plate body, the north side plate body and the south side plate body, three squatting and defecating compartments are sequentially arranged from east to west on one side of the north side plate body, a mop pool is arranged between the squatting and defecating compartments, and three sensing urinals are arranged on the north side surface of the first partition plate body.
6. The three-compartment flap Fang Wei bath space layout system of claim 4, further comprising: the north side plate body, the east side plate body, the south side plate body and the fifth partition plate body enclose together to form a male shower room, the third access opening is arranged on one side, close to the east side plate body, of the south side plate body, four shower rooms are sequentially arranged from north to south on one side, close to the fifth partition plate body, a washing machine reserved position is arranged between the shower rooms and the south side plate body, and the rest of the male shower room is a public channel.
7. The three-compartment flap Fang Wei bath space layout system of claim 6, further comprising: the public washing area is arranged between the third separation plate body and the fourth separation plate body and on one side close to the first separation plate body, four circular wash basins are arranged in the public washing area, and each wash basin is correspondingly provided with a water-saving faucet.
8. The three-compartment flap Fang Wei bath space layout system of claim 7, further comprising: the hall is arranged among the third division plate body, the fourth division plate body and the public washroom, and the first access opening and the second access opening are arranged on the west side and the east side of the hall and are opposite to each other.
9. The three-compartment deck Fang Wei bath space layout system according to any one of claims 1-7, wherein: the ground foundation of the bathroom space is embedded with a water supply pipeline communicated with a municipal tap water pipeline, the water supply pipeline extends to the female bathroom, the male shower and the public washroom, and the water supply pipeline is connected with water equipment arranged in the female bathroom, the male shower and the public washroom.
10. The three-compartment deck Fang Wei bath space layout system according to any one of claims 1-7, wherein: a septic tank is arranged below the ground foundation of the bathroom space, and sewage pipes communicated with the septic tank are arranged in the female bathroom, the male shower and the public washroom.
CN202311026068.2A 2023-08-15 2023-08-15 Three-open movable plate Fang Wei bath space layout system Pending CN117071947A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311026068.2A CN117071947A (en) 2023-08-15 2023-08-15 Three-open movable plate Fang Wei bath space layout system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311026068.2A CN117071947A (en) 2023-08-15 2023-08-15 Three-open movable plate Fang Wei bath space layout system

Publications (1)

Publication Number Publication Date
CN117071947A true CN117071947A (en) 2023-11-17

Family

ID=88709044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311026068.2A Pending CN117071947A (en) 2023-08-15 2023-08-15 Three-open movable plate Fang Wei bath space layout system

Country Status (1)

Country Link
CN (1) CN117071947A (en)

Similar Documents

Publication Publication Date Title
US3221454A (en) Pre-fabricated utility building assembly
US20030140571A1 (en) ADA-compliant portable bathroom modules
US6820375B2 (en) Precut utility core for small building structures
US4574533A (en) Portable home
JP2011047261A (en) Multifunctional furniture with sanitary equipment
EP3759286B1 (en) Prefabricated sanitary modular kit
CN101871228B (en) Drainage pipeline system in building wall
CN117071947A (en) Three-open movable plate Fang Wei bath space layout system
CN201801942U (en) Urinal with hand washing basin
CN101881039B (en) Water-saving indoor drainage system
CN209837779U (en) Assembled public lavatory with normal water processing system
CN117071948A (en) Six-open movable plate Fang Wei bath space layout system
CN111379442A (en) Assembled public lavatory with normal water processing system
RU2459046C9 (en) Water closet and method of its operation
CN219931336U (en) Water supply and drainage pipeline integrated building wall
CN210530414U (en) Wash and defend integral type device and bathroom thereof
CN100497850C (en) Kitchen-toilet modularized same floor side water draining device
Haas-Arndt Basics water cycles
CN101012660B (en) Civil architecture sinking type toilet area and wastewater recycle saving device
RU2675981C1 (en) Stationary drain implementation method in the bathroom and / or the kitchen of multilevel house with separate bathrooms arrangement
CN201386303Y (en) Water-saving interior pumping system
JP2702500B2 (en) Equipment quantity adjustment method
CN113775002B (en) Water supply and drainage system for hotel toilet
CN216810149U (en) Sewage discharge structure with squatting type defecation ceramic device
CN210342783U (en) Box combination formula removes lavatory

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination