CN117071948A - Six-open movable plate Fang Wei bath space layout system - Google Patents

Six-open movable plate Fang Wei bath space layout system Download PDF

Info

Publication number
CN117071948A
CN117071948A CN202311026086.0A CN202311026086A CN117071948A CN 117071948 A CN117071948 A CN 117071948A CN 202311026086 A CN202311026086 A CN 202311026086A CN 117071948 A CN117071948 A CN 117071948A
Authority
CN
China
Prior art keywords
plate body
bathroom
side plate
south
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311026086.0A
Other languages
Chinese (zh)
Inventor
郜世锋
尹传凯
陈浩
陈昌君
肖冰冰
徐飞
关志威
郭洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202311026086.0A priority Critical patent/CN117071948A/en
Publication of CN117071948A publication Critical patent/CN117071948A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention relates to the technical field of bathroom boards, in particular to a six-open movable board Fang Wei bath space layout system. The six-open movable plank house is arranged on the ground, and comprises a north plank body, wherein the two sides of the north plank body are respectively and vertically connected with an east plank body and a west plank body, a south plank body parallel to the north plank body is arranged between the east plank body and the west plank body, and a top plank body is arranged on the north plank body, the east plank body, the west plank body and the south plank body together and encloses a bathroom space together; the bathroom space is sequentially divided into a male shower room, a female bathroom, a male bathroom, a storage room and a boiled water room from left to right, the south side plate body is provided with inlets and outlets for the male shower room, the female bathroom, the storage room and the boiled water room, and the south side plate body positioned in the male bathroom is provided with a left inlet and outlet and a right inlet and outlet. Under the condition of limited field area, the utility model can meet the use functions of bath, toilet, drinking water, etc.

Description

Six-open movable plate Fang Wei bath space layout system
Technical Field
The invention relates to the technical field of bathroom boards, in particular to a six-open-space movable board Fang Wei bath space layout system.
Background
In modern buildings, the prefabricated houses are widely applied to various construction sites with the unique advantages; however, the movable house designed at present is small in use area, most of functions are concentrated on solving the temporary accommodation problem of people, and the requirements of the washing and bathroom of people are rarely considered. When the movable plank house is built, no matched bathroom facilities are usually arranged, or a simple outdoor dry toilet is built, so that the sanitation and comfort level are extremely poor, and the requirements of people on life quality are difficult to meet; even if a bathroom and a bathroom are specially built, the bathroom and the bathroom are designed in a separated mode and are installed in a scattered mode, the bathroom and the bathroom are separated, the distance between the bathroom and the bathroom is long, the use convenience is low, and the occupied area is large; part of the bathroom and the bathroom are designed in a large space, no effective partition exists, the arrangement of the internal shower area and the toilet area is unreasonable, the design of drainage and ventilation is difficult, the use comfort is poor, the space utilization rate is low, the material waste is caused, and in order to meet the use requirements of multiple people at the same time, the situation of low privacy exists; moreover, the requirement of project workers on using hot water is rarely considered in design, a water boiling room is not independently provided in many cases, and only the project workers are provided with small household appliances such as a hot water kettle and the like, and safety accidents are easy to occur in the use process.
Therefore, a space layout system of a three-open movable plate Fang Wei bath is needed at present to solve the defects of large occupied area, unreasonable division of functional areas and low use comfort of the existing common worksite bathroom, bathroom and boiled water room, and further to design a space layout system of the bathroom which saves materials, has high use comfort and simultaneously meets the use functions of bathing, toilet, drinking water and the like under the condition of limiting the area of the site.
Disclosure of Invention
The invention aims to solve the problems, thereby providing a six-open movable plate Fang Wei bath space layout system which has reasonable and compact structure, convenient use, small occupied space, complete functions, sanitation and comfort, and meets the bathroom requirements of different users of men and women; solves the defects of large occupied area, unreasonable division of functional areas and low use comfort of the prior common site bathroom.
The invention solves the problems, and adopts the following technical scheme:
the six-open movable plank Fang Wei bath space layout system is characterized in that the six-open movable plank house is arranged on the ground, the six-open movable plank house comprises a north plank body, an east plank body and a west plank body are respectively and vertically connected to two sides of the north plank body, a south plank body parallel to the north plank body is arranged between the east plank body and the west plank body, and top plank bodies are jointly arranged on the north plank body, the east plank body, the west plank body and the south plank body and jointly enclose a bathroom space; the bathroom space is internally and sequentially divided into a male shower room, a female bathroom, a male bathroom, a storage room and a boiled water room from left to right, the south side plate body is provided with inlets and outlets for the male shower room, the female bathroom, the storage room and the boiled water room, the south side plate body positioned in the male bathroom is provided with a left inlet and outlet and a right inlet and outlet for the male bathroom, and the left inlet and outlet and the right inlet and outlet are arranged in bilateral symmetry.
Preferably, the invention further adopts the technical scheme that:
further, a first partition plate body is arranged in the bathroom space and between the male shower room and the female shower room in a separating way, the first partition plate body is arranged between the north plate body and the south plate body, the first partition plate body comprises a long vertical part which is vertical to the north plate body, a transverse part is vertically connected to the left side of the long vertical part, a short vertical part is vertically connected to the side surface of the transverse part, which is close to the south plate body, and the short vertical part is vertical to the south plate body; a retaining wall plate opposite to the entrance and exit of the male shower room is arranged in the male shower room, the retaining wall plate is in a right angle shape, one right-angle edge of the retaining wall plate is perpendicular to the western side plate body and is parallel to the southern side plate body, a first passage is arranged between the right-angle edge of the retaining wall plate perpendicular to the western side plate body and the southern side plate body, and the other right-angle edge of the retaining wall plate is parallel to the western side plate body and is arranged at intervals with the western side plate body and the northern side plate body.
Further, the north plate body and the south plate body of the shower room are respectively provided with a shutter, a first flow channel with a type structure is arranged in the shower room and on the indoor ground, a shower area is arranged along the first flow channel in the shower room, an opening of the first flow channel type faces the south plate body, the first flow channel comprises a left vertical part, a middle transverse part and a right vertical part, the flow directions of the left vertical part and the right vertical part flow from one side of the north plate body to one side of the north plate body, and the flow directions of the middle transverse part flow from left to right.
Further, a second partition plate body is arranged in the bathroom space and between the female shower room and the female bathroom in a separating way, the second partition plate body is vertically arranged between the north side plate body and the south side plate body, the transverse part and the south side plate body of the first partition plate body are parallel and are opposite to the inlet and outlet of the female shower room, and a second passageway is arranged between the transverse part and the south side plate body; the north side plate body and the south side plate body of the female shower room are respectively provided with a shutter, one side, close to the second partition plate body, of the indoor ground of the female shower room is provided with a second water flowing channel, the water flowing direction of the second water flowing channel flows from the south side plate body to the north side plate body, and a shower area is arranged in the female shower room along the second water flowing channel.
Further, a third partition plate body is arranged in the bathroom space, between the female bathroom and the male bathroom, the third partition plate body is vertically arranged between the north side plate body and the south side plate body, a first partition is arranged in the female bathroom, between the south side plate body and the north side plate body and close to the south side plate body, a secondary entrance is arranged in the middle of the first partition, the first partition is vertically arranged between the second partition plate body and the third partition plate body, the first partition is parallel to the south side plate body, a third passageway is arranged between the first partition and the south side plate body, a washing area is arranged on one side, close to the third partition plate body, of the third passageway, and the entrance of the female bathroom is communicated with the secondary entrance on the first partition through the third passageway.
Further, the south side plate body and the north side plate body of the female toilet are respectively provided with a shutter, the left side and the right side of the indoor ground of the female toilet are respectively provided with a third water flowing channel, the water flowing direction of each third water flowing channel flows from the south side plate body to the north side plate body, and three squatting pans are arranged in the female toilet along the length direction of each third water flowing channel.
Further, a fourth partition plate body is arranged in the bathroom space, between the male bathroom and the storage room in a separated mode, the fourth partition plate body is vertically arranged between the north side plate body and the south side plate body, a second partition is arranged in the male bathroom, between the south side plate body and the north side plate body and close to the south side plate body, secondary inlets and outlets are formed in the left side and the right side of the second partition, the second partition is vertically arranged between the third partition plate body and the fourth partition plate body, the second partition is parallel to the south side plate body, a fourth passageway is arranged between the second partition and the south side plate body, and the left inlet and the right inlet of the male bathroom are communicated with the left secondary inlet and the right secondary inlet and outlet on the second partition through the fourth passageway.
Further, the south side plate body and the north side plate body of the men's bathroom are respectively provided with a shutter, four fourth water flowing channels are arranged on the indoor ground of the men's bathroom, the water flowing directions of the four fourth water flowing channels are respectively distributed from the south side plate body to the north side plate body, the four water flowing channels comprise a first fourth water flowing channel, a second fourth water flowing channel, a third fourth water flowing channel and a fourth water flowing channel which are sequentially arranged from left to right, four squatting pans are arranged in the men's bathroom along the length direction of each fourth water flowing channel, the second fourth water flowing channel and the third fourth water flowing channel are adjacent, the first fourth water flowing channel and the second fourth water flowing channel are arranged at intervals, and the third fourth water flowing channel and the fourth water flowing channel are arranged at intervals; a fifth water flowing channel which is in a shape of a Chinese character 'nan' is arranged on the ground in the fourth passageway and near the south side plate body, the fifth water flowing channel is communicated with the third fourth water flowing channel, and a urine groove is arranged in the male bathroom along the length direction of the fifth water flowing channel.
Further, a fifth partition plate body is arranged in the bathroom space, between the storage room and the boiled water room in a separating way, and a fourth partition plate is vertically arranged between the north side plate body and the south side plate body and is parallel to the fourth partition plate body and the east side plate body; a shutter is arranged on the north side plate body of the boiled water room.
Further, a water supply pipeline communicated with a municipal tap water pipeline is buried in the ground foundation of the bathroom space, and extends to a male shower room, a female toilet room, a male toilet room and a boiled water room, and the water supply pipeline is connected with water equipment arranged in the male shower room, the female toilet room, the male toilet room and the boiled water room; a septic tank is arranged below the ground foundation of the bathroom space, and sewage pipes communicated with the septic tank are arranged on the first flow channel, the second flow channel, the third flow channel and the four fourth flow channels.
Compared with the prior art, the invention adopting the technical scheme has the outstanding characteristics that:
the bathroom has reasonable and compact structure and convenient use, and by reasonably planning and arranging the bathroom space, the male shower room, the female toilet room, the male toilet room, the storage room and the boiled water room are arranged in the bathroom space in a concentrated manner by using a simple and easy-to-operate technical means, so that the bathroom has small occupied space, meets the bathroom requirements of different male and female users, has complete functions, is good in sanitation and comfort, and meets the daily washing requirements of project personnel; the male and female users have independent bathroom spaces and sanitary wares, compared with the traditional long-ditch urinal of the building site bathroom, the toilet is cleaner and environment-friendly, has turnover, and reduces comprehensive use cost; the independent storage room and the boiled water room are provided, so that the storage requirement of cleaning tools in the bathroom space is met, the requirement of project workers on hot water is met, and the potential safety hazard caused by the use of small household appliances by the project workers is reduced; the six-open movable plank house has high design flexibility, can perform internal function design according to actual requirements of projects, reduces waste of space and materials, is convenient and simple in structural composition, is more beneficial to design of ventilation and drainage, and greatly increases use comfort; the defects of large occupied area, unreasonable division of functional areas and low use comfort of the conventional bathroom at the common construction site are overcome; under the condition of limited field area, the utility model can meet the use functions of bath, toilet, drinking water, etc.
Drawings
FIG. 1 is a schematic diagram of a front view of the present invention;
in the figure: 1. a north plate body; 2. an eastern side plate body; 3. a west plate body; 4. a south plate body; 5. shower room for men; 6. a female shower stall; 7. women's toilet; 8. a male toilet; 9. a storage compartment; 10. a water boiling room; 11. an access opening; 12. a first partition plate body; 13. a first aisle; 14. a shutter; 15. a first flow channel; 16. a shower area; 17. a second partition plate body; 18. a second aisle; 19. a second water flow path; 20. a third partition plate body; 21. a first partition; 22. a third aisle; 23. a fourth partition plate body; 24. a second partition; 25. a fourth aisle; 26. a washroom; 27. a fourth flow channel; 28. a fifth water flow passage; 29. urinate ditch; 30. a fifth partition plate body; 31. a wall baffle plate; 32. and a third water flow channel.
Detailed Description
The present invention will be further understood by the following description of embodiments, but the specific embodiments given by the applicant should not be considered as limiting the technical solution of the present invention, and any modification of the definition of components or technical features and/or the form of the whole structure without substantial change should be considered as the protection scope defined by the technical solution of the present invention.
Referring to fig. 1, the technical scheme of the invention is as follows:
the six-open movable plate Fang Wei bath space layout system is characterized in that the six-open movable plate house is arranged on the ground, the six-open movable plate house is designed to be 12K from west to east, takes up 117.5 square meters, the six-open movable plate house comprises a north plate body 1, an east plate body 2 and a west plate body 3 are respectively and vertically connected to two sides of the north plate body 1, a south plate body 4 parallel to the north plate body 1 is arranged between the east plate body 2 and the west plate body 3, and a top plate body is jointly arranged on the north plate body 1, the east plate body 2, the west plate body 3 and the south plate body 4, and jointly encloses a bathroom space; the bathroom space is internally provided with an indoor floor which is paved by anti-slip floor tiles, the top of the bathroom space is provided with a buckle suspended ceiling, a male shower room 5, a female shower room 6, a female bathroom room 7, a male bathroom room 8, a storage room 9 and a boiled water room 10 are sequentially separated from left to right in the bathroom space, the south side plate body 4 is provided with inlets and outlets 11 for entering and exiting the male shower room 5, the female shower room 6, the female bathroom room 7, the storage room 9 and the boiled water room 10, the south side plate body 4 positioned in the male bathroom room 8 is provided with a left inlet and outlet 11 and a right inlet and outlet 11 for entering and exiting the male bathroom room 8, and the left inlet and outlet 11 and the right inlet and outlet 11 are symmetrically arranged left and right.
A first partition plate body 12 is arranged in the bathroom space and between the male shower 5 and the female shower 6 in a separating way, the first partition plate body 12 is arranged between the north plate body 1 and the south plate body 4, the first partition plate body 12 comprises a long vertical part which is vertically arranged on the north plate body 1, a transverse part is vertically connected to the left side of the long vertical part, a short vertical part is vertically connected to the side surface of the transverse part, which is close to the south plate body 4, and the short vertical part is vertically arranged on the south plate body 4; a retaining wall plate 31 opposite to the entrance 11 of the male shower 5 is arranged in the male shower 5, the retaining wall plate 31 is in a right angle shape, one right-angle edge of the retaining wall plate 31 is perpendicular to the western side plate body 3 and the south side plate body 4 and parallel to each other, a first passageway 13 is arranged between the right-angle edge of the retaining wall plate 31 perpendicular to the western side plate body 3 and the south side plate body 4, and the other right-angle edge of the retaining wall plate 31 is parallel to the western side plate body 3 and is arranged with the western side plate body 3 and the north side plate body 1 at intervals.
The shower room 5 is internally provided with a first water flowing channel 15 with a structure along the first water flowing channel 15, the shower room 5 is internally provided with a shower area 16 along the first water flowing channel 15, the opening of the first water flowing channel 15 faces the south side plate body 4, the first water flowing channel 15 comprises a left vertical part, a middle transverse part and a right vertical part, the water flowing directions of the left vertical part and the right vertical part flow from one side of the south side plate body 4 to one side of the north side plate body 1, and the water flowing direction of the middle transverse part flows from left to right; the whole shower room 5 of the male is 5.4m in depth and 5.4m in depth, the shower area 16 is arranged in a surrounding mode, and a plurality of wooden board baffles are arranged in the shower area 16 in an adjacent mode at intervals so as to protect privacy of a user in the shower process.
A second partition plate 17 is arranged in the bathroom space and between the female shower 6 and the female bathroom 7 in a separating way, the second partition plate is vertically arranged between the north plate body 1 and the south plate body 4, the transverse part of the first partition plate 12 is parallel to the south plate body 4 and is opposite to the inlet and outlet 11 of the female shower 6, and a second passageway 18 is arranged between the transverse part and the south plate body 4; the north plate body 1 and the south plate body 4 of the female shower room 6 are both provided with shutters 14, one side of the indoor floor of the female shower room 6, which is close to the second partition plate body 17, is provided with a second water flow channel 19, the water flow direction of the second water flow channel 19 flows from the south plate body 4 to the north plate body 1, and a shower area 16 is arranged in the female shower room 6 along the second water flow channel 19.
A third partition plate body 20 is arranged in the bathroom space in a separation manner between the female bathroom 7 and the male bathroom 8, the third partition plate body is vertically arranged between the north side plate body 1 and the south side plate body 4, a first partition 21 is arranged in the bathroom 7 and on one side, close to the south side plate body 4, between the south side plate body 4 and the north side plate body 1, a secondary entrance 11 is arranged in the middle of the first partition 21, the first partition 21 is vertically arranged between the second partition plate body 17 and the third partition plate body 20, the first partition 21 is parallel to the south side plate body 4, a third passageway 22 is arranged between the first partition 21 and the south side plate body 4, a washroom 26 is arranged on one side, close to the third partition plate body 20, of the third passageway 22, a washroom with the width of 0.6m is arranged at the washroom 26, and the entrance 11 of the bathroom 7 is communicated with the secondary entrance 11 on the first partition 21 through the third passageway 22.
The south side plate body 4 and the north side plate body 1 of the female bathroom 7 are respectively provided with a shutter 14, the left side and the right side of the indoor ground of the female bathroom 7 are respectively provided with a third water flowing channel 32, the flowing water of the third water flowing channels 32 flows from the south side plate body 4 to the north side plate body 1, and three squatting pans are arranged in the female bathroom 7 along the length direction of each third water flowing channel 32. Squatting pans on the left side and the right side are both provided with squatting pan compartments, the interval between the squatting pan compartments on the left side and the squatting pan compartments on the right side is 1.2 meters, each squatting pan compartment is a compartment which is 1.2m long and 1.4m wide, a water outlet is 0.3m away from a wall, and 20cm Gao Kan water seepage prevention tables are arranged below each squatting pan.
A fourth partition plate body 23 is arranged in the bathroom space in a separation manner between the male bathroom 8 and the storage room 9, the fourth partition plate body is vertically arranged between the north side plate body 1 and the south side plate body 4, a second partition 24 is arranged in the male bathroom 8 and on one side, close to the south side plate body 4, between the south side plate body 4 and the north side plate body 1, secondary inlets and outlets 11 are respectively arranged on the left side and the right side of the second partition 24, the second partition 24 is vertically arranged between the third partition plate body 20 and the fourth partition plate body 23, the second partition 24 is parallel to the south side plate body 4, a fourth passageway 25 is arranged between the second partition 24 and the south side plate body 4, and the left inlet and outlet 11 and the right inlet and outlet 11 of the male bathroom 8 are respectively communicated with the left secondary inlet and outlet 11 and the right secondary inlet and outlet 11 on the second partition 24 through the fourth passageway 25.
The four water channels comprise a first fourth water channel 27, a second fourth water channel 27, a third fourth water channel 27 and a fourth water channel 27 which are sequentially arranged from left to right, four squatting pans are arranged in the male toilet 8 along the length direction of each fourth water channel 27, 16 squatting pans are arranged in total, squatting pan compartments are arranged on the indoor ground of the male toilet 8, the length of each squatting pan compartment close to the second partition 24 is 1.2m, the width of each squatting pan compartment is 1.2m, the rest of each squatting pan compartment is 1.2m, the width of each water outlet is 0.3m from a wall, 20cm Gao Kan water prevention tables are arranged below each squatting pan, the distance between each squatting pan and the fourth water channel 27 is 1.2m, the distance between each squatting pan and the adjacent squatting pan 27 is 1.2m, and the distance between each squatting pan and the fourth water channel 27 is 1.2m, and the distance between each squatting pan and each squatting pan is 1.27 is 1.2 m; a fifth water flowing channel 28 which is shaped like a Chinese character 'zhi' is arranged on the indoor ground of the fourth passageway 25 and near the south side plate body 4, the fifth water flowing channel 28 is communicated with the third fourth water flowing channel 27, a urine groove 29 is arranged in the male toilet 8 along the length direction of the fifth water flowing channel 28, and the length of the urine groove 29 is 3.3 meters.
A fifth separation plate body 30 is arranged in the bathroom space and between the storage room 9 and the boiled water room in a separation way, and a fourth separation plate is vertically arranged between the north side plate body 1 and the south side plate body 4 and is parallel to the fourth separation plate body 23 and the east side plate body 2; a louver 14 is arranged on the north plate body 1 of the boiled water room 10.
The ground foundation of the bathroom space is embedded with a water supply pipeline communicated with a municipal tap water pipeline, the water supply pipeline extends to a male shower room 5, a female shower room 6, a female bathroom 7, a male bathroom 8 and a boiled water room 10, the water supply pipeline is connected with water equipment arranged in the male shower room 5, the female shower room 6, the female bathroom 7, the male bathroom 8 and the boiled water room 10, a water supply main pipe is in hot melting connection by adopting ppr pipes of DN50, and branch pipes are in hot melting connection by adopting ppr pipes of DN 20; a septic tank is arranged below the ground foundation of the bathroom space, and sewage pipes communicated with the septic tank are arranged on the first water flowing channel 15, the second water flowing channel 19, the third water flowing channel 32 and the four fourth water flowing channels 27.
It should be noted that: all squatting compartments are formed by three-sided boards, the boards are fixed with the wall surfaces of the boards through hinges and screws, the boards are connected through plastic hinges, the disassembly and the maintenance are convenient, the longitudinal partition and the transverse partition are connected through a section of additional boards, the door leaves are connected with the additional boards through two plastic rotating mechanisms to ensure normal opening and closing, and each door leaf is provided with a plastic rotating lock catch, so that the privacy is also met while the convenience is realized; domestic water in the male and female shower bath 6 and the male and female toilet 7 is supplied from municipal pipelines, the water pipelines are buried along the enclosing wall, no open water pipeline exists, the attractiveness is ensured, and meanwhile, the air energy water heater is adopted to meet the hot water requirements of projects and bathrooms; in order to meet ventilation and lighting requirements, a blind 14 with a width of 1.8m is arranged at the top of the board house along the bathroom 7, the bathroom 8, and two blinds 14 are arranged at the bathroom 8 due to the large area of the bathroom 8. The squatting pan with the water tank is adopted for all toilets, the shower bath 5 for men discharges water through the first flowing water channel 15, the shower bath 6 for women discharges water through the second flowing water channel 19, the bathroom 7 for women discharges water through the third flowing water channel 32, the bathroom 8 for men discharges water through the fourth flowing water channel 27 and the fifth flowing water channel 28, and all sewage is regularly pumped and discharged by sanitation departments after being treated by the septic tank, so that no water accumulation and no peculiar smell in the bathroom are realized.
The bathroom has reasonable and compact structure and convenient use, and the bathroom 5, the female bathroom 6, the female bathroom 7, the male bathroom 8, the storage room 9 and the boiled water room 10 are arranged in the bathroom in a concentrated way by using a simple and easy-to-operate technical means through reasonable planning and arrangement of the bathroom space, so that the bathroom occupies small space, meets the bathroom requirements of different users of men and women, has complete functions, better sanitation and comfort, and meets the daily washing requirements of project personnel; the male and female users have independent bathroom spaces and sanitary wares, compared with the traditional long-ditch urinal of the building site bathroom, the toilet is cleaner and environment-friendly, has turnover, and reduces comprehensive use cost; the independent storage room 9 and the boiled water room 10 are arranged, so that the storage requirement of cleaning tools in a bathroom space is met, the requirement of project workers on hot water is met, and the potential safety hazard caused by the use of small household appliances by the project workers is reduced; the six-open movable plank house has high design flexibility, can perform internal function design according to actual requirements of projects, reduces waste of space and materials, is convenient and simple in structural composition, is more beneficial to design of ventilation and drainage, and greatly increases use comfort; the defects of large occupied area, unreasonable division of functional areas and low use comfort of the conventional bathroom at the common construction site are overcome; under the condition of limited field area, the utility model can meet the use functions of bath, toilet, drinking water, etc.
The foregoing description of the preferred embodiments of the invention is not intended to limit the scope of the claims, but rather to cover all equivalent modifications within the scope of the present invention as defined by the appended claims.

Claims (10)

1. A six-open-cell movable plate Fang Wei bath space layout system, which is characterized in that: the six-open movable plank house is arranged on the ground, and comprises a north plank body, wherein the two sides of the north plank body are respectively and vertically connected with an east plank body and a west plank body, a south plank body parallel to the north plank body is arranged between the east plank body and the west plank body, and a top plank body is arranged on the north plank body, the east plank body, the west plank body and the south plank body together and encloses a bathroom space together; the bathroom space is internally and sequentially divided into a male shower room, a female bathroom, a male bathroom, a storage room and a boiled water room from left to right, the south side plate body is provided with inlets and outlets for the male shower room, the female bathroom, the storage room and the boiled water room, the south side plate body positioned in the male bathroom is provided with a left inlet and outlet and a right inlet and outlet for the male bathroom, and the left inlet and outlet and the right inlet and outlet are arranged in bilateral symmetry.
2. The six open-cell flap Fang Wei bath space layout system of claim 1, wherein: a first partition plate body is arranged in the bathroom space and between the male shower room and the female shower room in a separating way, the first partition plate body is arranged between the north plate body and the south plate body, the first partition plate body comprises a long vertical part which is vertical to the north plate body, a transverse part is vertically connected to the left side of the long vertical part, a short vertical part is vertically connected to the side surface of the transverse part, which is close to the south plate body, and the short vertical part is vertical to the south plate body; a retaining wall plate opposite to the entrance and exit of the male shower room is arranged in the male shower room, the retaining wall plate is in a right angle shape, one right-angle edge of the retaining wall plate is perpendicular to the western side plate body and is parallel to the southern side plate body, a first passage is arranged between the right-angle edge of the retaining wall plate perpendicular to the western side plate body and the southern side plate body, and the other right-angle edge of the retaining wall plate is parallel to the western side plate body and is arranged at intervals with the western side plate body and the northern side plate body.
3. The six-compartment flap Fang Wei bath space layout system of claim 2 wherein: the shower room comprises a north plate body and a south plate body, wherein shutters are arranged on the north plate body and the south plate body of the shower room, a first water flowing channel with a type structure is arranged in the shower room and on the indoor ground, a shower area is arranged in the shower room along the first water flowing channel, an opening of the first water flowing channel type faces the south plate body, the first water flowing channel comprises a left vertical part, a middle transverse part and a right vertical part, the water flowing directions of the left vertical part and the right vertical part flow from one side of the south plate body to one side of the north plate body, and the water flowing direction of the middle transverse part flows from left to right.
4. The six open-cell deck Fang Wei bath space layout system of claim 3, further comprising: a second partition plate body is arranged in the bathroom space, between the female shower room and the female bathroom in a separating way, the second partition plate body is vertically arranged between the north side plate body and the south side plate body, the transverse part of the first partition plate body is parallel to the south side plate body and is opposite to the entrance of the female shower room, and a second passageway is arranged between the transverse part and the south side plate body; the north side plate body and the south side plate body of the female shower room are respectively provided with a shutter, one side, close to the second partition plate body, of the indoor ground of the female shower room is provided with a second water flowing channel, the water flowing direction of the second water flowing channel flows from the south side plate body to the north side plate body, and a shower area is arranged in the female shower room along the second water flowing channel.
5. The six open-cell flap Fang Wei bath space layout system of claim 4, further comprising: a third partition plate body is arranged in the bathroom space in a separation mode between the female bathroom and the male bathroom, the third partition plate body is vertically arranged between the north side plate body and the south side plate body, a first partition is arranged in the bathroom, between the south side plate body and the north side plate body and close to the south side plate body, a secondary entrance is arranged in the middle of the first partition, the first partition is vertically arranged between the second partition plate body and the third partition plate body, the first partition is parallel to the south side plate body, a third passageway is arranged between the first partition and the south side plate body, a washing area is arranged on one side, close to the third partition plate body, of the third passageway, and the entrance of the female bathroom is communicated with the secondary entrance on the first partition through the third passageway.
6. The six compartment activity board Fang Wei bath space layout system of claim 5, further comprising: the female toilet comprises a south plate body and a north plate body, wherein the south plate body and the north plate body of the female toilet are respectively provided with a shutter, the left side and the right side of the indoor ground of the female toilet are respectively provided with a third water flowing channel, the water flowing direction of each third water flowing channel flows from the south plate body to the north plate body, and three squatting pans are arranged in the female toilet along the length direction of each third water flowing channel.
7. The six open-cell flap Fang Wei bath space layout system of claim 6, further comprising: a fourth partition plate body is arranged in the bathroom space in a separation mode between the male bathroom and the storage room, the fourth partition plate body is vertically arranged between the north side plate body and the south side plate body, a second partition is arranged on one side, close to the south side plate body, of the male bathroom, between the south side plate body and the north side plate body, secondary inlets and outlets are formed in the left side and the right side of the second partition, the second partition is vertically arranged between the third partition plate body and the fourth partition plate body, the second partition is parallel to the south side plate body, a fourth passageway is arranged between the second partition and the south side plate body, and the left inlet and the right inlet of the male bathroom are communicated with the left secondary inlet and the right secondary inlet and outlet on the second partition through the fourth passageway.
8. The six open-cell flap Fang Wei bath space layout system of claim 7, wherein: the four water channels comprise a first fourth water channel, a second fourth water channel, a third fourth water channel and a fourth water channel which are sequentially arranged from left to right, four squatting pans are arranged in the bathroom along the length direction of each fourth water channel, the second fourth water channel and the third fourth water channel are adjacent, the first fourth water channel and the second fourth water channel are arranged at intervals, and the third fourth water channel and the fourth water channel are arranged at intervals; a fifth water flowing channel which is in a shape of a Chinese character 'nan' is arranged on the ground in the fourth passageway and near the south side plate body, the fifth water flowing channel is communicated with the third fourth water flowing channel, and a urine groove is arranged in the male bathroom along the length direction of the fifth water flowing channel.
9. The six open-cell flap Fang Wei bath space layout system according to claim 8, wherein: a fifth separation plate body is arranged in the bathroom space, between the storage room and the boiled water room in a separation way, and a fourth separation plate is vertically arranged between the north side plate body and the south side plate body and is parallel to the fourth separation plate body and the east side plate body; a shutter is arranged on the north side plate body of the boiled water room.
10. The six open-cell flap Fang Wei bath space layout system of claim 9, wherein: the ground foundation of the bathroom space is embedded with a water supply pipeline communicated with a municipal tap water pipeline, the water supply pipeline extends to a male shower room, a female toilet room, a male toilet room and a boiled water room, and the water supply pipeline is connected with water equipment arranged in the male shower room, the female toilet room, the male toilet room and the boiled water room; a septic tank is arranged below the ground foundation of the bathroom space, and sewage pipes communicated with the septic tank are arranged on the first flow channel, the second flow channel, the third flow channel and the four fourth flow channels.
CN202311026086.0A 2023-08-15 2023-08-15 Six-open movable plate Fang Wei bath space layout system Pending CN117071948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311026086.0A CN117071948A (en) 2023-08-15 2023-08-15 Six-open movable plate Fang Wei bath space layout system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311026086.0A CN117071948A (en) 2023-08-15 2023-08-15 Six-open movable plate Fang Wei bath space layout system

Publications (1)

Publication Number Publication Date
CN117071948A true CN117071948A (en) 2023-11-17

Family

ID=88707274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311026086.0A Pending CN117071948A (en) 2023-08-15 2023-08-15 Six-open movable plate Fang Wei bath space layout system

Country Status (1)

Country Link
CN (1) CN117071948A (en)

Similar Documents

Publication Publication Date Title
Wise et al. Water, sanitary and waste services for buildings
US4574533A (en) Portable home
US20040206011A1 (en) Precut utility core for small building structures
CN117071948A (en) Six-open movable plate Fang Wei bath space layout system
CN205134986U (en) Notch set nature residential architecture in terraced many families
CN213391362U (en) Sanitary and efficient kitchen and bathroom drainage system
CN210459414U (en) Flat pipe leading floor drain type non-falling plate same-layer drainage system
CN117071947A (en) Three-open movable plate Fang Wei bath space layout system
CN112538988A (en) Assembled integrated toilet without lowering plate
CN201908338U (en) Descending floor-type drainage on the same layered floor and drainage collector system
CN204876482U (en) Building drainage pipe well
Haas-Arndt Basics water cycles
CN215564760U (en) Assembled integrated toilet without lowering plate
CN215406339U (en) Same-floor water supply and drainage structure for toilet
CN218952320U (en) Interference-free independent drainage structure for kitchen and toilet of residential building
CN210530414U (en) Wash and defend integral type device and bathroom thereof
Zimmerman et al. Plumbing System Models for a Set of Reference Buildings
CN213062247U (en) Bathroom is not fallen board and is had layer drainage system
CN219509076U (en) SI system four-way integrated drainage system
RU10406U1 (en) SYSTEM OF THE SANITARY TECHNICAL DEVICE OF THE BUILDING
RU15486U1 (en) RESIDENTIAL ROOM (OPTIONS), SEPARATE RESIDENTIAL PREMISES (OPTIONS), SEPARATE RESIDENTIAL PREMISES, SEPARATE APARTMENT (OPTIONS), RESIDENTIAL HOUSE SECTION (OPTIONS)
CN113622486B (en) Back checking type toilet water supply and drainage structure
CN220469015U (en) Anti-return water drainage system of different-layer water drainage toilet easy to return water
RU2675981C1 (en) Stationary drain implementation method in the bathroom and / or the kitchen of multilevel house with separate bathrooms arrangement
CN213477766U (en) Sanitary and efficient kitchen and bathroom ventilation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination