CN116856634A - Foam ceramic insulation board roof installation auxiliary device - Google Patents
Foam ceramic insulation board roof installation auxiliary device Download PDFInfo
- Publication number
- CN116856634A CN116856634A CN202311131675.5A CN202311131675A CN116856634A CN 116856634 A CN116856634 A CN 116856634A CN 202311131675 A CN202311131675 A CN 202311131675A CN 116856634 A CN116856634 A CN 116856634A
- Authority
- CN
- China
- Prior art keywords
- foamed ceramic
- driving
- insulation board
- ceramic insulation
- connecting block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000919 ceramic Substances 0.000 title claims abstract description 47
- 238000009413 insulation Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 239000006260 foam Substances 0.000 title description 3
- 230000007246 mechanism Effects 0.000 claims abstract description 18
- 238000005187 foaming Methods 0.000 claims abstract description 9
- 230000001360 synchronised effect Effects 0.000 claims description 14
- 210000001503 joint Anatomy 0.000 claims description 11
- 238000009826 distribution Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000003491 array Methods 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 description 5
- 238000010276 construction Methods 0.000 description 2
- 125000004122 cyclic group Chemical group 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003054 catalyst Substances 0.000 description 1
- 229910010293 ceramic material Inorganic materials 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000013012 foaming technology Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 229920005990 polystyrene resin Polymers 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D15/00—Apparatus or tools for roof working
- E04D15/04—Apparatus or tools for roof working for roof coverings comprising slabs, sheets or flexible material
Abstract
The invention relates to the technical field of installation of heat-insulating boards, in particular to a roof installation auxiliary device for a foamed ceramic heat-insulating board, which solves the problems that when a building roof is installed and paved with the foamed ceramic heat-insulating board, a building worker is required to manually lay the foamed ceramic heat-insulating board on the roof one by one and align the foamed ceramic heat-insulating board, so that the operation is time-consuming and labor-consuming, and the working efficiency is low. The utility model provides a foaming ceramic insulation board roof installation auxiliary device, includes two bears the seat, bear the vertical pile up in top of seat and have a plurality of foaming ceramic insulation board panels, the both sides that bear the seat all are provided with and lay the mechanism, lay the mechanism including side riser, lay circulation push rod, lay vertical track and walking power component, two the outside of side riser is provided with the linking bridge. The invention can rapidly lay the foamed ceramic heat-insulating boards on the roof smoothly and mutually in a fitting way, shortens the laying time, improves the working efficiency, effectively saves labor force and reduces the labor cost.
Description
Technical Field
The invention relates to the technical field of insulation board installation, in particular to an auxiliary device for roof installation of a foamed ceramic insulation board.
Background
The heat-insulating board is a rigid foam plastic board which is formed by taking polystyrene resin as a raw material, adding other raw materials and auxiliary materials and polymer, heating, mixing, simultaneously injecting a catalyst, extruding and molding, has dampproof and waterproof properties, and can reduce the thickness of a peripheral protection structure of a building, thereby increasing the indoor use area, and the heat-insulating board is commonly used in the outer wall of a building and is used for ensuring that the temperature in the building is at a constant temperature;
the foamed ceramic heat insulating board is one kind of heat insulating board, and has the main materials of clay tailings, ceramic fragments, river mud, adulterant, etc. and through advanced production process and foaming technology, high porosity closed pore ceramic material, fireproof and fireproof product, low deformation coefficient, high ageing resistance, stable performance, high ecological environment friendship, high compatibility with wall base and finishing layer, high safety and stability, etc.
When the foamed ceramic heat-insulating plates are installed and paved on the roof of a building, a building worker is required to manually pave the foamed ceramic heat-insulating plates on the roof one by one and align the foamed ceramic heat-insulating plates, so that the operation is time-consuming and labor-consuming, and the working efficiency is low; therefore, the existing requirements are not met, and for this reason we propose a foamed ceramic insulation board roof installation auxiliary device.
Disclosure of Invention
The invention aims to provide a roof installation auxiliary device for a foamed ceramic heat-insulating board, which aims to solve the problems that in the background art, when the foamed ceramic heat-insulating board is installed and paved on a building roof, a construction worker is required to manually lay the foamed ceramic heat-insulating board on the roof one by one and align the foamed ceramic heat-insulating board, so that the operation is time-consuming and labor-consuming, the working efficiency is low and the like.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a foaming ceramic heated board roof installation auxiliary device, includes two bears the seat, bear the top of seat and vertically pile up a plurality of foaming ceramic heated board panels, the both sides that bear the seat all are provided with the mechanism of laying, the mechanism of laying includes side riser, lays circulation push rod, lays vertical track and walking power component, two the outside of side riser is provided with the linking bridge, the both ends and the two side riser of linking bridge are fixed, lay vertical track movable mounting and lay circulation push rod and install between two vertical tracks of laying and with lay vertical track fixed at the inboard surface of side riser;
the walking power assembly drives the bearing seat and the two side vertical plates to move to the other end of the top surface of the house along one end of the top surface of the house, and simultaneously drives the vertical crawler belt to be paved and the circulating push rod to be paved to move, so that the foamed ceramic heat-insulating plate at the bottommost layer is pushed away from the bearing seat;
the walking power assembly further comprises four walking wheels, the four walking wheels are symmetrically arranged at the bottoms of the two side vertical plates in pairs, one of the walking wheels located at the bottoms of the side vertical plates is provided with a driving belt pulley coaxial with the walking wheels, the inner side of the vertical crawler belt is provided with four driving gears which are meshed with the driving gears in a holding mode, the same side of the driving gears is provided with driving pulleys, the outer sides of the driving pulleys are wound with driving ropes, one of the driving pulleys is provided with a synchronous belt pulley, and the synchronous belt pulley is sleeved with the outer side of the driving belt pulley and is connected and driven through the driving belt.
Preferably, the middle of the driving rope is provided with a driving rope tightening module, the driving rope tightening module comprises a center positioning block, the center positioning block is arranged on the inner wall of the side vertical plate through a screw, four tension connecting blocks are arranged on the outer side of the center positioning block, tension springs are arranged between one ends of the tension connecting blocks and the center positioning block, the other ends of the tension connecting blocks are provided with tightening draw hooks, the tightening draw hooks are hooked on the outer side of the driving rope and pull the driving rope towards the direction of the center positioning block, and the outer surface of the tightening draw hooks is smooth and free of burrs or bulges.
Preferably, the middle of the travelling wheel is penetrated and provided with a supporting rotating shaft, the supporting rotating shaft penetrates through the driving belt pulley, and both ends of the supporting rotating shaft are rotationally inserted into the inner wall of the side vertical plate.
Preferably, the axis coincidence and the centre of drive gear and drive pulley run through and are provided with the location axostylus axostyle, the both ends of location axostylus axostyle are all rotatory grafting in the inner wall of side riser, synchronous pulley, drive pulley and drive gear are installed on same location axostylus axostyle, drive gear, drive pulley and synchronous pulley all pass through the fixed pin with the location axostylus axostyle and are connected.
The middle of two side riser is provided with interval adjustment mechanism, interval adjustment mechanism includes the center fixed plate, the inside regulation electric putter that all is provided with two symmetric distributions in the both ends of center fixed plate, the activity tip of adjusting electric putter is located the outside of center fixed plate and the tip is provided with movable lock joint piece, the other end of movable lock joint piece is provided with the regulation connecting block, it is outside being close to the side riser of center fixed plate tip to adjust the connecting block.
Preferably, the surface of adjusting the connecting block towards movable lock joint piece is provided with the butt joint draw-in groove, movable lock joint piece includes fixed connection block, fixed connection block is fixed at the movable end of adjusting electric putter, the other end swivelling joint of fixed connection block has the connection pivot, the other end of connecting the pivot is fixed to be provided with rotatory locking plate and rotatory locking plate is pegged graft in the butt joint draw-in groove, the top both sides of rotatory locking plate are provided with the locking overlap joint hole that runs through, the inside of butt joint draw-in groove is provided with the reference column, the aperture size of locking overlap joint hole is greater than the external diameter size of reference column.
Preferably, a supporting frame is arranged below the central fixing plate, a plurality of spherical grooves distributed in rectangular arrays are formed in the bottom surface of the supporting frame, balls are embedded in the inner sides of the spherical grooves, and the supporting frame is in rolling contact with the ground through the balls.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, the foamed ceramic heat-insulating plates to be installed are stacked and placed on the device, then the space size between the two bearing seats is adjusted, and the bearing seats are pushed to move on the roof, so that the foamed ceramic heat-insulating plates can be quickly and flatly and mutually attached to be paved on the roof in the moving process of the device, the paving time is shortened, the working efficiency is improved, the labor force is effectively saved, and the labor cost is reduced.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the construction of the paving mechanism of the present invention;
FIG. 3 is an enlarged view of the structure of FIG. 2A in accordance with the present invention;
FIG. 4 is a schematic view of a spacing adjustment mechanism according to the present invention;
FIG. 5 is a schematic view of the structure of the movable lock block of the present invention;
FIG. 6 is a schematic view of the structure of the center fixing plate of the present invention;
fig. 7 is a schematic structural view of the support frame of the present invention.
In the figure: 1. a bearing seat; 2. foaming ceramic heat-insulating board; 3. a connecting bracket; 4. a paving mechanism; 401. side vertical plates; 402. paving a circulating push rod; 403. paving a vertical crawler belt; 404. a transmission gear; 405. a transmission pulley; 406. a driving rope; 407. a synchronous pulley; 408. a walking wheel; 409. a drive pulley; 410. a drive belt; 5. a spacing adjustment mechanism; 501. a center fixing plate; 502. adjusting the connecting block; 503. adjusting the electric push rod; 504. a movable locking block; 5041. rotating the locking plate; 5042. the connecting rotating shaft; 5043. fixing the connecting block; 5044. locking the lap hole; 505. a butt joint clamping groove; 506. positioning columns; 507. a support frame; 508. a spherical groove; 509. a ball; 6. a transmission rope tightening module; 601. a center positioning block; 602. a tension connecting block; 603. a tension spring; 604. tightening the draw hook.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1 to 6, an embodiment of the present invention provides: the utility model provides a foaming ceramic heated board roof installation auxiliary device, including two bear seat 1, bear the vertical pile up of top of seat 1 and have a plurality of foaming ceramic heated board boards 2, bear the both sides of seat 1 and all be provided with laying mechanism 4, laying mechanism 4 includes side riser 401, lay circulation push rod 402, lay vertical track 403 and walking power component, the outside of two side riser 401 is provided with linking bridge 3, the both ends and the two side riser 401 of linking bridge 3 are fixed, lay vertical track 403 movable mounting in the inboard of side riser 401, and lay circulation push rod 402 fixed mounting between two and lay vertical track 403;
the walking power assembly drives the bearing seat 1 and the two side vertical plates 401 to move to the other end of the top surface of the house along one end of the top surface of the house, and simultaneously drives the laying vertical crawler 403 and the laying circulating push rod 402 to move so as to push the foamed ceramic insulation board 2 positioned at the bottommost layer away from the bearing seat 1;
by adopting the technical scheme, the laying time can be shortened, the working efficiency can be improved, the labor force can be effectively saved, and the labor cost can be reduced.
The walking power assembly further comprises four walking wheels 408, the four walking wheels 408 are symmetrically arranged at the bottoms of the two side vertical plates 401 in pairs, one side of one walking wheel 408 positioned at the bottom of the side vertical plate 401 is provided with a driving belt pulley 409 coaxial with the walking wheel, the inner side of the paved vertical crawler 403 is provided with four driving gears 404 which are meshed with the walking wheels, the same side of the four driving gears 404 is provided with driving pulleys 405, the outer sides of the four driving pulleys 405 are wound with driving ropes 406, the other end of one driving pulley 405 is provided with a synchronous belt pulley 407, the outer sides of the synchronous belt pulley 407 and the driving belt pulley 409 are sleeved with a driving belt 410, and connection and driving are realized through the driving belt 410;
the middle of two side riser 401 is provided with interval adjustment mechanism 5, interval adjustment mechanism 5 includes central fixed plate 501, the inside regulation electric putter 503 that all is provided with two symmetric distributions in both sides of central fixed plate 501, the movable tip that adjusts electric putter 503 is located the outside of central fixed plate 501 and the tip is provided with movable lock joint piece 504, the other end of movable lock joint piece 504 is provided with adjusts connecting block 502, it is outside at the side riser 401 that is close to central fixed plate 501 tip to adjust connecting block 502.
Wherein, the centre of walking wheel 408 runs through and is provided with the support pivot, the support pivot runs through drive pulley 409 and both ends all rotate and peg graft in the inner wall of side riser 401, the axis coincidence of drive gear 404 and drive pulley 405 and centre run through and are provided with the location axostylus axostyle, the both ends of location axostylus axostyle all rotate and peg graft in the inner wall of side riser 401, synchronizing pulley 407, drive pulley 405 and drive gear 404 are installed on same location axostylus axostyle, drive gear 404, drive pulley 405 and synchronizing pulley 407 all pass through the fixed pin with the location axostylus axostyle and are connected.
Through adopting above-mentioned technical scheme, connect walking wheel 408 and drive pulley 409 through supporting the pivot, the locating shaft pole is connected coaxial drive gear 404, drive pulley 405, synchronizing pulley 407 for four drive gear 404 can synchronous rotation and drive and lay vertical track 403 and drive and lay circulation push rod 402 and operate when being promoted by side riser 401.
The middle of the driving rope 406 is provided with a driving rope tightening module 6, the driving rope tightening module 6 comprises a center positioning block 601, the center positioning block 601 is mounted on the inner wall of the side vertical plate 401 through screws, four tension connecting blocks 602 are arranged on the periphery of the center positioning block 601, a tension spring 603 is arranged between one end of each tension connecting block 602 and the center positioning block 601, a tightening draw hook 604 is arranged at the other end of each tension connecting block 602, the tightening draw hook 604 is hooked on the driving rope 406, the driving rope 406 is pulled towards the direction of the center positioning block 601, and the surface of the tightening draw hook 604 is smooth and free of burrs or bulges.
Through adopting above-mentioned technical scheme, exert the pulling force that points to central locating piece 601 to pulling force connecting block 602 and tightening drag hook 604 through four extension springs 603 for the driving rope 406 of winding on driving pulley 405 is in the state of tightening, guarantees that driving rope 406 can not appear slackening and driving pulley 405 separates.
Wherein, adjust connecting block 502 towards the surface of movable lock block 504 and be provided with butt joint draw-in groove 505, movable lock block 504 includes fixed connecting block 5043, fixed connecting block 5043 fixes the movable end at adjusting electric putter 503, fixed connecting block 5043's the other end swivelling joint has connection pivot 5042, the other end of connection pivot 5042 is fixed to be provided with rotatory locking plate 5041, and rotatory locking plate 5041 peg graft in butt joint draw-in groove 505, rotatory locking plate 5041's top is provided with the locking overlap joint hole 5044 that runs through, the inside of butt joint draw-in groove 505 is provided with reference column 506, the aperture size of locking overlap joint hole 5044 is greater than the external diameter size of reference column 506.
Through adopting above-mentioned technical scheme, peg graft rotatory locking plate 5041 in butt joint draw-in groove 505 and rotate, can be quick will adjust electric putter 503 and adjust connecting block 502 and connect for adjust electric putter 503 and can realize pushing or pulling to adjust connecting block 502, thereby change the interval size between two carrier seats 1, adjust the device according to the interval of laying of foaming ceramic heated board panel 2.
Wherein, the below of center fixed plate 501 is provided with support frame 507, and the bottom surface of support frame 507 is provided with a plurality of spherical grooves 508 that rectangular array distributes, and ball 509 is inlayed to the inboard in spherical groove 508, and support frame 507 passes through ball 509 rolling contact with ground.
Through adopting above-mentioned technical scheme, support frame 507 supports central fixed plate 501 to be located the ball 509 of support frame 507 bottom surface can effectually reduce the frictional resistance between support frame 507 and the ground, make the device can be light by promotion or removal.
Working principle: firstly, foamed ceramic heat-insulating board plates 2 to be laid are sequentially stacked on bearing seats 1, the distance between the two bearing seats 1 is adjusted, after the foamed ceramic heat-insulating board plates 2 are filled and the distance between the two bearing seats 1 is adjusted, a pushing device integrally moves, a travelling wheel 408 rolls on the surface of a roof when the device moves, at the moment, the travelling wheel 408 drives a driving belt pulley 409 to rotate so that a driving belt 410 drives a synchronous belt pulley 407 to synchronously rotate, at the moment, the synchronous belt pulley 407 drives a driving pulley 405 and a driving gear 404 which are arranged on the same positioning shaft rod to synchronously rotate, and the driving pulley 405 drives other three driving pulleys 405 to synchronously rotate through a driving rope 406 wound on the outer side of the driving pulley 405 when rotating, the three transmission gears 404 simultaneously run in the same direction, at this time, the four transmission gears 404 can drive the vertical track 403 to be paved to run anticlockwise when rotating synchronously, at this time, the vertical track 403 can drive the cyclic push rod 402 to run synchronously, the cyclic push rod 402 paved in running can push out the foamed ceramic insulation board boards 2 positioned at the bottommost layer from the foamed ceramic insulation boards 2 and slide on the roof along the inclined plane of the front end of the bearing seat 1, in the continuous moving process of the device, the plurality of foamed ceramic insulation boards 2 stacked on the bearing seat 1 can be sequentially paved on the roof in a mutually fitting way, the paving time is effectively shortened, the working efficiency is improved, and the labor force and the labor cost are effectively saved.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (10)
1. The utility model provides a foaming ceramic heated board roof installation auxiliary device, includes two bearer (1), its characterized in that: a plurality of foamed ceramic insulation board plates (2) are vertically stacked above the bearing seat (1), paving mechanisms (4) are arranged on two sides of the bearing seat (1), each paving mechanism (4) comprises a side vertical plate (401), a paving circulating push rod (402), a paving vertical crawler (403) and a walking power assembly, connecting brackets (3) are arranged on the outer sides of the two side vertical plates (401), two ends of each connecting bracket (3) are fixedly connected with the two side vertical plates (401), each paving vertical crawler (403) is movably mounted on the inner side surface of each side vertical plate (401), each paving circulating push rod (402) is fixedly mounted between the two paving vertical crawler (403), and each walking power assembly is mounted inside each side vertical plate (401);
the walking power assembly drives the bearing seat (1) and the two side vertical plates (401) to move to the other end of the top surface of the house along one end of the top surface of the house, and simultaneously drives the laying vertical crawler belt (403) and the laying circulating push rod (402) to move, so that the foamed ceramic insulation board (2) positioned at the bottommost layer is pushed away from the bearing seat (1).
2. A foamed ceramic insulation board roofing installation aid according to claim 1, wherein: the walking power assembly further comprises four walking wheels (408), the four walking wheels (408) are symmetrically arranged at the bottoms of the two side vertical plates (401) in pairs, one side of one walking wheel (408) is provided with a driving belt wheel (409) coaxial with the walking wheel, the inner side of the vertical track (403) is provided with four driving gears (404) which are meshed with the driving gears, the same side of each driving gear (404) is provided with a driving pulley (405), the outer sides of the driving pulleys (405) are wound with driving ropes (406), one driving pulley (405) is provided with a synchronous belt wheel (407), and a driving belt (410) is sleeved between the synchronous belt wheel (407) and the driving belt wheel (409) and connected and driven through the driving belt (410).
3. A foamed ceramic insulation board roofing installation aid according to claim 2, wherein: the middle of walking wheel (408) runs through and is provided with the support pivot, the support pivot runs through drive pulley (409) and both ends are rotatory grafting in the inner wall of side riser (401).
4. A foamed ceramic insulation board roofing installation aid according to claim 2, wherein: the axis coincidence and the centre of drive gear (404) and drive pulley (405) run through and are provided with the location axostylus axostyle, the both ends of location axostylus axostyle are all rotatory grafting in the inner wall of side riser (401), synchronous pulley (407), drive pulley (405) and drive gear (404) are installed on same location axostylus axostyle, drive gear (404), drive pulley (405) and synchronous pulley (407) are all connected through the fixed pin with the location axostylus axostyle.
5. A foamed ceramic insulation board roofing installation aid according to claim 1, wherein: two the centre of side riser (401) is provided with interval adjustment mechanism (5), interval adjustment mechanism (5) are including central fixed plate (501), the inside regulation electric putter (503) that all are provided with two symmetric distributions in both sides of central fixed plate (501), the expansion end that adjusts electric putter (503) is located the outside of central fixed plate (501) and tip is provided with movable lock catch (504), the other end of movable lock catch (504) is provided with adjusts connecting block (502), it is outside in side riser (401) near central fixed plate (501) tip to adjust connecting block (502).
6. The foamed ceramic insulation board roof installation auxiliary device according to claim 5, wherein: the utility model discloses a butt joint draw-in groove (505) is provided with to the surface of adjusting connecting block (502) orientation activity lock block (504), activity lock block (504) are including fixed connecting block (5043), fixed connecting block (5043) are fixed in the movable end of adjusting electric putter (503), the other end swivelling joint of fixed connecting block (5043) has connection pivot (5042), the other end of connection pivot (5042) is fixed to be provided with rotatory locking plate (5041), and rotatory locking plate (5041) are pegged graft in butt joint draw-in groove (505).
7. The foamed ceramic insulation board roof installation auxiliary device according to claim 6, wherein: the top of rotatory locking plate (5041) is provided with locking overlap joint hole (5044) that runs through, the inside of butt joint draw-in groove (505) is provided with reference column (506), the aperture size of locking overlap joint hole (5044) is greater than the external diameter size of reference column (506).
8. A foamed ceramic insulation board roofing installation aid according to claim 2, wherein: the middle of driving rope (406) is provided with driving rope tensioning module (6), driving rope tensioning module (6) are including central locating piece (601), central locating piece (601) are installed on side riser (401) inner wall through the screw, the periphery of central locating piece (601) is provided with four pulling force connecting block (602), be provided with extension spring (603) between pulling force connecting block (602) one end and central locating piece (601), the other end of pulling force connecting block (602) is provided with tensioning drag hook (604).
9. The foamed ceramic insulation board roof installation auxiliary device according to claim 8, wherein: the tightening draw hook (604) is hooked on the driving rope (406) and pulls the driving rope (406) towards the center positioning block (601), and the surface of the tightening draw hook (604) is smooth and free of burrs or bulges.
10. The foamed ceramic insulation board roof installation auxiliary device according to claim 5, wherein: the utility model discloses a ground ball bearing device, including central fixed plate (501), support frame (507) are provided with below of central fixed plate (501), the bottom surface of support frame (507) is provided with spherical groove (508) that a plurality of rectangular arrays distribute, ball (509) are inlayed to the inboard of spherical groove (508), support frame (507) pass through ball (509) rolling contact with ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311131675.5A CN116856634B (en) | 2023-09-04 | 2023-09-04 | Foam ceramic insulation board roof installation auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311131675.5A CN116856634B (en) | 2023-09-04 | 2023-09-04 | Foam ceramic insulation board roof installation auxiliary device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116856634A true CN116856634A (en) | 2023-10-10 |
CN116856634B CN116856634B (en) | 2023-11-21 |
Family
ID=88222021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311131675.5A Active CN116856634B (en) | 2023-09-04 | 2023-09-04 | Foam ceramic insulation board roof installation auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116856634B (en) |
Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4656808A (en) * | 1986-04-28 | 1987-04-14 | Mansfield Peter W | Roof shingle laying machine |
DE19940837A1 (en) * | 1998-10-26 | 2000-11-23 | Karl Boeckl | Floor laying system comprises alignment elements and plate elements with cutouts which are dimensioned so that the alignment elements are easily slidable into their respective cutouts |
JP2001140431A (en) * | 1999-11-11 | 2001-05-22 | Watahan Koki Kk | Transportation device for shingle |
AU5193001A (en) * | 2001-05-24 | 2002-11-28 | Hoxin Trading Australia Pty Ltd | A rail device for bricks |
US20060059858A1 (en) * | 2004-09-09 | 2006-03-23 | Layman Terry A | Shingle bundle load tool with hose/cord keeper |
US20080034705A1 (en) * | 2006-08-02 | 2008-02-14 | Andrew Truss | Stacking bar for roofing elements |
JP2010281150A (en) * | 2009-06-05 | 2010-12-16 | Tajima Roofing Inc | Base for facility installation |
JP3170093U (en) * | 2011-06-21 | 2011-09-01 | 株式会社サンリョウ・テック | Rooftop safety device |
JP2012211504A (en) * | 2012-06-07 | 2012-11-01 | Ohbayashi Corp | Re-roofing unit for existent building and re-roofing method |
CN104499659A (en) * | 2014-12-26 | 2015-04-08 | 高凯 | Mobile plate paving equipment and method |
JP2017008569A (en) * | 2015-06-22 | 2017-01-12 | シンコユニ株式会社 | Carrying-in aid of folded plate roofing material |
JP2019143305A (en) * | 2018-02-16 | 2019-08-29 | 株式会社竹中工務店 | Stanchion for folded-plate roofing work |
CN110485690A (en) * | 2019-09-19 | 2019-11-22 | 云和县凯毅德电子设备厂 | A kind of construction stacks laying apparatus with ceramic tile |
CN111305526A (en) * | 2018-12-12 | 2020-06-19 | 江苏锡沂高新区科技发展有限公司 | Indoor ceramic tile laying device for building |
CN112942729A (en) * | 2021-02-04 | 2021-06-11 | 东莞市颐和园林建设工程有限公司 | Method for laying horizontal floor tiles for house construction |
CN113323342A (en) * | 2021-06-10 | 2021-08-31 | 浙江广厦建设职业技术大学 | Equipment for paving and pasting ceramic tiles in building room |
CN113629582A (en) * | 2021-07-12 | 2021-11-09 | 山西六建集团有限公司 | Outdoor pre-buried cable laying device |
CN215291250U (en) * | 2021-06-07 | 2021-12-24 | 徐州康仕居建筑科技有限公司 | Auxiliary device for tile pasting for building |
CN114278023A (en) * | 2021-12-21 | 2022-04-05 | 上海豫宏建筑防水工程有限公司 | Automatic change equipment of laying of waterproof insulation intergral template that degree is high |
CN114319747A (en) * | 2021-12-14 | 2022-04-12 | 谢荣才 | Waterproof glass fiber tile mounting device |
CN216446372U (en) * | 2021-01-25 | 2022-05-06 | 巨鑫建设集团有限公司 | Auxiliary device for roof waterproof heat-preservation construction |
CN114635555A (en) * | 2022-03-22 | 2022-06-17 | 山西六建集团有限公司 | Based on construction is with quantitative feed mechanism |
-
2023
- 2023-09-04 CN CN202311131675.5A patent/CN116856634B/en active Active
Patent Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4656808A (en) * | 1986-04-28 | 1987-04-14 | Mansfield Peter W | Roof shingle laying machine |
DE19940837A1 (en) * | 1998-10-26 | 2000-11-23 | Karl Boeckl | Floor laying system comprises alignment elements and plate elements with cutouts which are dimensioned so that the alignment elements are easily slidable into their respective cutouts |
JP2001140431A (en) * | 1999-11-11 | 2001-05-22 | Watahan Koki Kk | Transportation device for shingle |
AU5193001A (en) * | 2001-05-24 | 2002-11-28 | Hoxin Trading Australia Pty Ltd | A rail device for bricks |
US20060059858A1 (en) * | 2004-09-09 | 2006-03-23 | Layman Terry A | Shingle bundle load tool with hose/cord keeper |
US20080034705A1 (en) * | 2006-08-02 | 2008-02-14 | Andrew Truss | Stacking bar for roofing elements |
JP2010281150A (en) * | 2009-06-05 | 2010-12-16 | Tajima Roofing Inc | Base for facility installation |
JP3170093U (en) * | 2011-06-21 | 2011-09-01 | 株式会社サンリョウ・テック | Rooftop safety device |
JP2012211504A (en) * | 2012-06-07 | 2012-11-01 | Ohbayashi Corp | Re-roofing unit for existent building and re-roofing method |
CN104499659A (en) * | 2014-12-26 | 2015-04-08 | 高凯 | Mobile plate paving equipment and method |
JP2017008569A (en) * | 2015-06-22 | 2017-01-12 | シンコユニ株式会社 | Carrying-in aid of folded plate roofing material |
JP2019143305A (en) * | 2018-02-16 | 2019-08-29 | 株式会社竹中工務店 | Stanchion for folded-plate roofing work |
CN111305526A (en) * | 2018-12-12 | 2020-06-19 | 江苏锡沂高新区科技发展有限公司 | Indoor ceramic tile laying device for building |
CN110485690A (en) * | 2019-09-19 | 2019-11-22 | 云和县凯毅德电子设备厂 | A kind of construction stacks laying apparatus with ceramic tile |
CN216446372U (en) * | 2021-01-25 | 2022-05-06 | 巨鑫建设集团有限公司 | Auxiliary device for roof waterproof heat-preservation construction |
CN112942729A (en) * | 2021-02-04 | 2021-06-11 | 东莞市颐和园林建设工程有限公司 | Method for laying horizontal floor tiles for house construction |
CN215291250U (en) * | 2021-06-07 | 2021-12-24 | 徐州康仕居建筑科技有限公司 | Auxiliary device for tile pasting for building |
CN113323342A (en) * | 2021-06-10 | 2021-08-31 | 浙江广厦建设职业技术大学 | Equipment for paving and pasting ceramic tiles in building room |
CN113629582A (en) * | 2021-07-12 | 2021-11-09 | 山西六建集团有限公司 | Outdoor pre-buried cable laying device |
CN114319747A (en) * | 2021-12-14 | 2022-04-12 | 谢荣才 | Waterproof glass fiber tile mounting device |
CN114278023A (en) * | 2021-12-21 | 2022-04-05 | 上海豫宏建筑防水工程有限公司 | Automatic change equipment of laying of waterproof insulation intergral template that degree is high |
CN114635555A (en) * | 2022-03-22 | 2022-06-17 | 山西六建集团有限公司 | Based on construction is with quantitative feed mechanism |
Also Published As
Publication number | Publication date |
---|---|
CN116856634B (en) | 2023-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN116856634B (en) | Foam ceramic insulation board roof installation auxiliary device | |
CN114102803A (en) | Mortar scraping device for processing fireproof insulation boards of buildings | |
CN201336602Y (en) | Position-adjustable motor fixing device | |
CN114941267A (en) | Ground deformation joint connection structure | |
CN2921088Y (en) | Concrete ultrawide paving machine | |
CN111600253A (en) | Bridge structure and assembling method thereof | |
CN111706218A (en) | External formwork structure of building construction window frame and construction method | |
CN209492191U (en) | A kind of interior demolding structure for solidifying electric pole production line | |
CN111255190A (en) | Cladding fossil fragments buckle spare that finishing work used | |
CN216804190U (en) | Adjustable insulation board maintenance support | |
CN220221714U (en) | Energy-saving building material supporting device | |
CN219887479U (en) | Adjustable hanging bar construction device | |
CN218970656U (en) | Template supporting structure for building engineering construction | |
CN219791902U (en) | Waterproofing membrane tensioning force adjusting device | |
CN218324674U (en) | Horizontal garage door track mounting structure | |
CN220225792U (en) | Novel reinforced concrete shear wall structure | |
CN216196447U (en) | Scaffold for architectural decoration engineering | |
CN211646694U (en) | Assembled building supporting seat | |
CN110725484B (en) | Inside-pressing low-tile rapid construction equipment for large-span structure factory building | |
CN218265038U (en) | Prefab micromatic setting | |
CN220334013U (en) | Building insulation board transfer machine | |
CN116101723A (en) | Conveying mechanism for producing steel bar truss floor support plate | |
CN219155255U (en) | Aerated brick rack | |
CN220346210U (en) | Outdoor concrete curing means | |
CN220848644U (en) | Suspension platform device for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |