JP2019143305A - Stanchion for folded-plate roofing work - Google Patents

Stanchion for folded-plate roofing work Download PDF

Info

Publication number
JP2019143305A
JP2019143305A JP2018026118A JP2018026118A JP2019143305A JP 2019143305 A JP2019143305 A JP 2019143305A JP 2018026118 A JP2018026118 A JP 2018026118A JP 2018026118 A JP2018026118 A JP 2018026118A JP 2019143305 A JP2019143305 A JP 2019143305A
Authority
JP
Japan
Prior art keywords
folded
stanchion
support member
support
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018026118A
Other languages
Japanese (ja)
Other versions
JP7038359B2 (en
Inventor
古川 徹
Toru Furukawa
徹 古川
泰弘 竹口
Yasuhiro Takeguchi
泰弘 竹口
高志 角田
Takashi Tsunoda
高志 角田
寛人 高波
Hiroto Takanami
寛人 高波
敏章 村上
Toshiaki Murakami
敏章 村上
町田 健一
Kenichi Machida
健一 町田
治雄 斉藤
Haruo Saito
治雄 斉藤
秀明 岡田
Hideaki Okada
秀明 岡田
星児 赤尾
Seiji Akao
星児 赤尾
久一 出口
Kyuichi Deguchi
久一 出口
知史 出口
Tomoshi Deguchi
知史 出口
俊 出口
Takashi Deguchi
俊 出口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hisacyu Co Ltd
Takenaka Komuten Co Ltd
Original Assignee
Hisacyu Co Ltd
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hisacyu Co Ltd, Takenaka Komuten Co Ltd filed Critical Hisacyu Co Ltd
Priority to JP2018026118A priority Critical patent/JP7038359B2/en
Publication of JP2019143305A publication Critical patent/JP2019143305A/en
Application granted granted Critical
Publication of JP7038359B2 publication Critical patent/JP7038359B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Emergency Lowering Means (AREA)

Abstract

To improve construction efficiency in a folded-plate roofing work by easily and quickly replacing a stanchion corresponding to the progress of a folded-plate roofing work without using a tool.SOLUTION: In a stanchion for folding plate roofing work that includes a column 11 for mounting a safety tool and a support member 10 that supports the column 11, and the support member 10 is stretched over an adjacent seam 2B of a folded plate roof 2, a pair of fixing tools 13 for detachably fixing both end parts 10A of the support member 10 to the seam 2B are provided; in the fixing tool 13, a lever operating type toggle clamping mechanism 13 is adopted, which is capable of switching a lever operation to a state in which a seam 2B is sandwiched between an end part 10A of the supporting member 10 and the state in which the holding is released.SELECTED DRAWING: Figure 3

Description

本発明は、折板屋根葺き作業時に、折板屋根に盛り替え可能に取り付けられる折板屋根葺き作業用のスタンションに関し、詳しくは、安全用具取り付け用の支柱と、前記支柱を支持する支持部材とを備えて、前記支持部材が、折板屋根の隣接するハゼに掛け渡される折板屋根葺き作業用のスタンションに関する。   The present invention relates to a stanchion for folding plate roofing work that is removably attached to the folded plate roof at the time of folding plate roofing work, and in particular, a support column for mounting safety equipment, and a support member that supports the support column. The support member is related to a stanchion for folding plate roofing work that spans a goby adjacent to the folded plate roof.

上記のような折板屋根葺き作業用のスタンションは、折板屋根葺き作業の進捗に応じて、折板屋根に対するスタンションの取り付け位置を変更する盛り替えを頻繁に行う必要がある。そのため、上記のような折板屋根葺き作業用のスタンションとしては、支持部材(基台)の底部に、折板屋根の山部に沿って形成されたハゼ(突条)を把持する4つの固定部材を備え、各固定部材は、上部フランジと下部フランジとを有する略コ字形の2枚の把持片と、これらの把持片の上部フランジを支持部材に締め付け固定するボルト・ナットとを有し、2枚の把持片の下部フランジが、ボルトに対するナットの締め付け調節で上部フランジを支点にして開閉することで、2枚の把持片が折板屋根のハゼを把持して支持部材を折板屋根に固定する状態と、2枚の把持片が折板屋根のハゼに対する把持を解除して折板屋根に対する支持部材の固定を解除する状態とに切り替え可能に構成されたものがある(例えば特許文献1参照)。   The stanchions for folded plate roofing work as described above need to be frequently changed to change the attachment position of the stanchions with respect to the folded plate roof in accordance with the progress of the folded plate roofing work. Therefore, as a stanchion for the folded plate roofing work as described above, four fixings for gripping a gob (ridge) formed along the mountain portion of the folded plate roof at the bottom of the support member (base). Each fixing member has two substantially U-shaped gripping pieces each having an upper flange and a lower flange, and bolts and nuts for fastening and fixing the upper flanges of these gripping pieces to the support member, The lower flange of the two gripping pieces opens and closes with the upper flange as a fulcrum by adjusting the tightening of the nut against the bolt, so that the two gripping pieces grip the goby of the folded plate roof and the support member becomes the folded plate roof There is one configured to be able to be switched between a fixing state and a state in which the two gripping pieces release the grip of the folded plate roof against the goby and release the fixing of the support member to the folded plate roof (for example, Patent Document 1). reference).

特開2009−215736号公報JP 2009-215736 A

特許文献1に記載の構成では、スタンションの盛り替えを行うたびに、4つの固定部材において、インパクトレンチやスパナなどの工具を使用して2枚の把持片の開閉操作を行う必要がある。そのため、スタンションの盛り替えに手間がかかるようになっており、施工効率の向上を図る上において改善の余地がある。又、盛り替え作業中にボルト・ナットや工具などを滑落させて紛失することによる作業の停滞を招く虞があり、この点からも施工効率の向上を図る上において改善の余地がある。   In the configuration described in Patent Document 1, it is necessary to open and close two gripping pieces using four tools, such as an impact wrench and a spanner, every time the stanchions are rearranged. Therefore, it takes time to change the stanchions, and there is room for improvement in improving construction efficiency. In addition, there is a risk of stagnation of work due to slipping and losing bolts, nuts, tools, etc. during reordering work, and there is room for improvement in this respect from the standpoint of improving construction efficiency.

この実情に鑑み、本発明の主たる課題は、折板屋根葺き作業の進捗に応じたスタンションの盛り替えを、工具を使用することなく簡単かつ迅速に行えるようにして、折板屋根葺き作業における施工効率の向上を図れるようにする点にある。   In view of this situation, the main problem of the present invention is that the replacement of the stanchions according to the progress of the folded plate roofing work can be performed easily and quickly without using a tool, and the construction in the folded plate roofing work is performed. This is to improve efficiency.

本発明の第1特徴構成は、
安全用具取り付け用の支柱と、前記支柱を支持する支持部材とを備えて、前記支持部材が、折板屋根の隣接するハゼに掛け渡される折板屋根葺き作業用のスタンションにおいて、
前記支持部材の両端部を前記ハゼに着脱可能に固定する一対の固定具を備え、
前記固定具には、レバー操作にて前記ハゼを前記支持部材の端部との間に挟持する状態と、その挟持を解除する状態とに簡易切り替え可能なレバー操作式のトグルクランプ機構が採用されている点にある。
The first characteristic configuration of the present invention is:
In a stanchion for folding plate roofing work comprising a support column for mounting safety equipment and a support member that supports the column, and the support member is stretched over adjacent goby of the folded plate roof.
A pair of fixtures that removably fix both ends of the support member to the goby;
The fixing tool employs a lever-operated toggle clamp mechanism that can be easily switched between a state where the gob is held between the ends of the support member and a state where the holding is released by lever operation. There is in point.

本構成によれば、作業者がスタンションを折板屋根に取り付ける場合は、スタンションの支持部材を折板屋根の隣接するハゼに掛け渡した後、各トグルクランプ機構のレバー操作を行って、支持部材の各端部と各トグルクランプ機構との間に各ハゼを挟持することにより、スタンションを折板屋根に簡単に取り付けることができる。
又、作業者がスタンションを折板屋根から取り外す場合は、各トグルクランプ機構のレバー操作を行って、支持部材の各端部と各トグルクランプ機構による各ハゼの挟持を解除することにより、スタンションを折板屋根から簡単に取り外すことができる。
これにより、作業者は、折板屋根葺き作業の進捗に応じたスタンションの盛り替えを、インパクトレンチやスパナなどの工具を使用することなく、又、ボルト・ナットや工具などを滑落させて紛失することによる作業の停滞を招くことなく、簡単かつ迅速に行うことができる。
その結果、折板屋根葺き作業において、スタンションを使用することによる安全性の確保を行いながら、施工効率の向上を図ることができる。
According to this configuration, when the worker attaches the stanchion to the folded plate roof, the support member of the toggle clamp mechanism is operated by operating the lever of each toggle clamp mechanism after the stanchion support member is passed over the adjacent goby of the folded plate roof. The stanchions can be easily attached to the folded plate roof by sandwiching each gob between each end portion of the slab and each toggle clamp mechanism.
In addition, when the worker removes the stanchion from the folded plate roof, the lever operation of each toggle clamp mechanism is performed, and the end of the support member and each goblet clamped by each toggle clamp mechanism are released, so that the stanchion is removed. It can be easily removed from the folded roof.
As a result, the worker can change the stanchion according to the progress of the folding roofing work without using tools such as impact wrench and wrench, or by sliding down bolts, nuts, tools, etc. This can be done easily and quickly without causing a stagnation of work.
As a result, it is possible to improve the construction efficiency while ensuring safety by using a stanchion in the folded-plate roofing operation.

本発明の第2特徴構成は、
前記支柱は、前記支持部材の一端部に支持され、一対の前記トグルクランプ機構は、前記支持部材における支柱支持用の前記一端部と、該一端部とは反対側の他端部との間に配備されている点にある。
The second characteristic configuration of the present invention is:
The support column is supported by one end portion of the support member, and the pair of toggle clamp mechanisms are provided between the one end portion of the support member for supporting the support column and the other end portion opposite to the one end portion. It is in the point where it is deployed.

本構成によれば、例えば、支柱が支持部材の中央部に支持され、一対のトグルクランプ機構が、支柱を挟んで支持部材の両端側に振り分け配備されている場合には、作業者は、支柱の右側に位置するトグルクランプ機構のレバー操作を行うときは、左手で支柱を把持しながら右手で右側のトグルクランプ機構のレバー操作を行うことになる。又、支柱の左側に位置するトグルクランプ機構のレバー操作を行うときは、右手で支柱を把持しながら左手で左側のトグルクランプ機構のレバー操作を行うことになる。つまり、各トグルクランプ機構のレバー操作を行うときに、操作する手をトグルクランプ機構の位置に応じて変更する手間が生じることになる。
これに対し、本発明の第2特徴構成では、支柱が支持部材の一端部に支持され、一対のトグルクランプ機構が支持部材の中央側に隣接して配備されることから、作業者は、一方の手で支柱を把持したまま、他方の手で各トグルクランプ機構のレバー操作を無理なく行うことができる。つまり、各トグルクランプ機構のレバー操作を行うときに、操作する手をトグルクランプ機構の位置に応じて変更する手間がなくなる。
その結果、折板屋根葺き作業の進捗に応じてスタンションの盛り替えを行うときの各トグルクランプ機構の操作性を向上させることができ、これにより、折板屋根葺き作業における施工効率の向上を更に図ることができる。
According to this configuration, for example, when the support column is supported by the central portion of the support member and the pair of toggle clamp mechanisms are arranged and arranged on both end sides of the support member with the support column interposed therebetween, the operator can When the lever of the toggle clamp mechanism located on the right side is operated, the lever of the right toggle clamp mechanism is operated with the right hand while holding the column with the left hand. When the lever of the toggle clamp mechanism located on the left side of the column is operated, the lever of the left toggle clamp mechanism is operated with the left hand while holding the column with the right hand. That is, when performing lever operation of each toggle clamp mechanism, the effort which changes the hand to operate according to the position of a toggle clamp mechanism will arise.
On the other hand, in the second characteristic configuration of the present invention, the support column is supported by one end portion of the support member, and the pair of toggle clamp mechanisms are arranged adjacent to the center side of the support member. The lever operation of each toggle clamp mechanism can be easily performed with the other hand while holding the column with the other hand. That is, when the lever of each toggle clamp mechanism is operated, there is no need to change the operating hand according to the position of the toggle clamp mechanism.
As a result, it is possible to improve the operability of each toggle clamp mechanism when rearranging the stanchions according to the progress of the folded plate roofing work, thereby further improving the construction efficiency in the folded plate roofing work. Can be planned.

本発明の第3特徴構成は、
前記支柱の上部と前記支持部材の端部とにわたる斜材を備えている点にある。
The third characteristic configuration of the present invention is:
It is in the point provided with the diagonal which covers the upper part of the said support | pillar, and the edge part of the said supporting member.

本構成によれば、親綱を介して安全帯が取り付けられる支柱の支持強度を高めることができ、これにより、安全帯を使用して行う折板屋根葺き作業での作業者の安全性を向上させることができる。
特に、スタンションの構成として、支柱が支持部材の一端部に支持され、単一の斜材が支柱の上部と支持部材の他端部とに架設される構成を採用した場合は、折板屋根に対するスタンションの取り付け姿勢を、屋根葺き作業時に作業者が折板屋根から落下する危険性のある領域に対して支柱を挟んだ反対側の位置に斜材が位置するように設定すれば、万が一、作業者が折板屋根から落下しそうになったときには、そのときの荷重を斜材に対して引張力として作用させることができる。これにより、作業者が折板屋根から落下しそうになったときの荷重が斜材に圧縮力として作用する場合に比較して、斜材が持つ強度を支柱の補強に有効に活用することができる。つまり、複数の斜材を設ける場合に比較して、スタンションの軽量化による持ち運びの容易化を図りながら、支柱の支持強度を効果的に高めることができる。その結果、支柱に親綱を介して取り付けられる安全帯を使用して行う折板屋根葺き作業での作業者の安全性を向上させることができる。
According to this configuration, it is possible to increase the support strength of the support column to which the safety belt is attached via the master rope, thereby improving the safety of the operator in the folding plate roofing work performed using the safety belt. Can be made.
In particular, as a structure of the stanchion, when a structure in which the support column is supported by one end portion of the support member and a single diagonal member is installed on the upper portion of the support column and the other end portion of the support member is adopted, If the stanchion mounting position is set so that the diagonal material is positioned at the opposite side of the column with respect to the area where the operator may fall from the folded plate roof during roofing work, work should be done When a person is about to fall from the folded plate roof, the load at that time can be applied to the diagonal as a tensile force. Thereby, compared with the case where the load when an operator is about to fall from the folded-plate roof acts as a compressive force on the diagonal material, the strength of the diagonal material can be effectively utilized for reinforcing the column. . That is, as compared with the case where a plurality of diagonal members are provided, it is possible to effectively increase the support strength of the support column while facilitating carrying by reducing the weight of the stanchion. As a result, it is possible to improve the safety of the operator in the folded plate roofing work performed using the safety belt attached to the support via the master rope.

本発明の第4特徴構成は、
前記支持部材は、前記両端部が前記ハゼに載置されるとともに、前記両端部の横幅が該両端部にわたる中間部の横幅よりも幅広になるH型に形成されている点にある。
The fourth characteristic configuration of the present invention is:
The support member is formed in an H shape in which the both end portions are placed on the gob and the lateral width of the both end portions is wider than the lateral width of the intermediate portion across the both end portions.

本構成によれば、スタンションが折板屋根に取り付けられた状態では、幅広に形成された支持部材の両端部が折板屋根のハゼに載置されていることから、支持部材の横幅方向での折板屋根に対するスタンションのガタツキをより効果的に抑制することができる。
その結果、折板屋根葺き作業の進捗に応じたスタンションの盛り替えを簡単かつ迅速に行えるようにしながら、折板屋根に取り付けたスタンションの安定性を向上させることができる。
According to this configuration, in a state where the stanchion is attached to the folded plate roof, both end portions of the support member formed wide are placed on the goby of the folded plate roof. The backlash of the stanchion with respect to a folded-plate roof can be suppressed more effectively.
As a result, it is possible to improve the stability of the stanchions attached to the folded-plate roof while making it possible to easily and quickly change the stanches according to the progress of the folded-plate roofing operation.

本発明の第5特徴構成は、
前記支柱は、その上端の高さ位置が、台車を利用して折板屋根上を運搬される屋根材と干渉しない低い高さ位置に設定されている点にある。
The fifth characteristic configuration of the present invention is:
The said support | pillar exists in the point which the height position of the upper end is set to the low height position which does not interfere with the roof material conveyed on a folded-plate roof using a trolley | bogie.

本構成によれば、折板屋根葺き作業中に、作業者が複数の折板などの屋根材を折板屋根上にて台車を利用して運搬する場合には、スタンションの盛り替えを行わなくても、その運搬が折板屋根に取り付けられたスタンションによって阻害される虞を回避することができる。
これにより、折板屋根上での屋根材の運搬を円滑に行うことができ、結果、折板屋根葺き作業における施工効率の向上を更に図ることができる。
According to this configuration, when the operator transports a roof material such as a plurality of folded plates on the folded plate roof using a carriage during the folded plate roofing work, the stanchion is not re-ordered. However, it is possible to avoid a possibility that the transportation is hindered by a stanchion attached to the folded roof.
Thereby, conveyance of the roofing material on a folded-plate roof can be performed smoothly, and as a result, the improvement of the construction efficiency in folded-plate roofing work can further be aimed at.

折板屋根葺き作業において折板屋根上の複数のスタンションに親綱を渡し掛けた状態を示す折板屋根上部の斜視図Perspective view of the upper part of the folded-plate roof showing a state in which the master rope is passed over a plurality of stanchions on the folded-plate roof in the folded-plate roofing operation 折板屋根葺き作業において折板屋根上のスタンションに安全ブロックを介して安全帯を取り付けた状態を示す折板屋根上部の斜視図The perspective view of the upper part of the folded-plate roof showing the state where the safety belt is attached to the stanchion on the folded-plate roof in the folded-sheet roofing work through the safety block 折板屋根に対するスタンションの着脱操作を示す要部の縦断正面図Longitudinal front view of main part showing stanchion attachment / detachment operation for folded plate roof スタンションが折板屋根に取り付けられた状態を示す要部の縦断側面図Longitudinal side view of the main part showing the stanchion attached to the folded-plate roof スタンションが折板屋根に取り付けられた状態を示す要部の横断平面図Cross-sectional plan view of the main part showing the state where the stanchion is attached to the folded-plate roof スタンションが折板屋根に取り付けられた状態を示す要部の拡大縦断側面図Enlarged longitudinal side view of the main part showing the stanchion attached to the folded-plate roof 折板屋根のハゼを支持部材の端部と挟持片とで挟持した状態を示す要部の拡大縦断正面図Enlarged longitudinal front view of the main part showing a state in which the goby of the folded plate roof is sandwiched between the end of the support member and the sandwiching piece スタンションが折板屋根に取り付けられた折板屋根葺き作業時での台車を利用した折板の運搬状態を示す要部の縦断側面図Longitudinal side view of the main part showing the state of transport of folded plates using a cart when the stanchions are attached to the folded plate roof.

以下、本発明の実施形態を図面に基づいて説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1〜2に示すように、本発明にかかる折板屋根葺き作業用のスタンション1は、折板屋根2に盛り替え可能に取り付けることができる。そして、例えば、図1に示すように、折板屋根2に取り付けられた複数のスタンション1に、安全用具3の一例である親綱3Bが渡し掛けられ、この親綱3Bに、安全用具3の一例である安全ブロック3A(図2参照)を介して、作業者が装着した安全帯4(図2参照)が取り付けられることにより、又は、図2に示すように、折板屋根2に取り付けられた単一のスタンション1に、安全ブロック3Aを介して作業者の安全帯4が取り付けられることにより、折板屋根葺き作業時における作業者の安全性を確保することができる。   As shown in FIGS. 1 and 2, the stanchion 1 for folding plate roofing according to the present invention can be attached to the folded plate roof 2 so as to be refillable. For example, as shown in FIG. 1, a master rope 3B as an example of a safety tool 3 is passed over a plurality of stanches 1 attached to the folded-plate roof 2, and the safety rope 3 is connected to the master rope 3B. The safety belt 4 (see FIG. 2) worn by the operator is attached via the safety block 3A (see FIG. 2) as an example, or as shown in FIG. In addition, by attaching the worker's safety belt 4 to the single stanchion 1 via the safety block 3A, it is possible to ensure the safety of the worker at the time of folding plate roofing work.

図1〜7に示すように、折板屋根2は、平行に並ぶ複数の梁20の各上面に溶接されたタイトフレーム21に、複数のタイトフレーム21にわたる姿勢でタイトフレーム21が延びる方向に連続して並べられる複数の折板(屋根材)22などを取り付けることで形成されている。各タイトフレーム21は、梁20に支持される谷部21Aと折板22を支持する山部21Bとが交互に位置する波状に形成されている。そして、各山部21Bから上方に延び出るハゼ締め用の吊子21Cを有している。各折板22は、タイトフレーム21の谷部21Aに入り込む谷部22Aと、ハゼ締め用の下ハゼ22Bを有する第1山部22Cと、ハゼ締め用の上ハゼ22Dを有する第2山部22Eとを備える形状に形成されている。
これにより、折板屋根葺き作業時には、各折板22の下ハゼ22Bが各タイトフレーム21の対応する吊子21Cに被さり、かつ、各折板22の上ハゼ22Dが隣接する折板22の下ハゼ22Bに被さるように、複数のタイトフレーム21に対して複数の折板22を屋根葺き方向の下手側から順に載置した後、重なる吊子21Cと下ハゼ22Bと上ハゼ22Dとを、図外の締め機を使用してハゼ締めすることにより、折板屋根2を形成することができる。そして、折板屋根2の山部2Aには、前述したハゼ締めによって折板屋根2の長手方向に延びるハゼ2Bが形成されている。
尚、図1においては、梁20と交差する梁や、タイトフレーム21などの図示が省略されている。
As shown in FIGS. 1 to 7, the folded plate roof 2 is continuous with a tight frame 21 welded to each upper surface of a plurality of parallel beams 20 in a direction in which the tight frame 21 extends in a posture extending over the multiple tight frames 21. It is formed by attaching a plurality of folded plates (roofing material) 22 and the like arranged side by side. Each tight frame 21 is formed in a wave shape in which trough portions 21A supported by the beams 20 and crest portions 21B supporting the folded plate 22 are alternately positioned. And it has the hanging element 21C for the gouge fastening extended upward from each peak part 21B. Each folded plate 22 includes a trough portion 22A that enters the trough portion 21A of the tight frame 21, a first crest portion 22C having a lower goby 22B for fastening a gob, and a second crest portion 22E having an upper goby 22D for fastening a goat. It is formed in the shape provided with.
Thereby, at the time of folding plate roofing, the lower gob 22B of each folded plate 22 covers the corresponding hanging element 21C of each tight frame 21, and the upper gob 22D of each folded plate 22 is below the adjacent folded plate 22 After placing the plurality of folded plates 22 on the plurality of tight frames 21 in order from the lower side in the roofing direction so as to cover the goby 22B, the overlapping hanger 21C, lower goby 22B and upper goby 22D are The folded-plate roof 2 can be formed by using an external fastening machine to tighten the gouge. And the goby 2B extended in the longitudinal direction of the folded-plate roof 2 is formed in the mountain part 2A of the folded-plate roof 2 by the above-mentioned goze fastening.
In FIG. 1, illustration of a beam intersecting with the beam 20, a tight frame 21, and the like is omitted.

図2〜7に示すように、各スタンション1は、折板屋根2の隣接するハゼ2Bに掛け渡される支持部材10、支持部材10に支持された安全用具取り付け用の支柱11、支柱11を補強する単一の斜材12、及び、支持部材10を折板屋根2に着脱可能に固定する一対の固定具13、などを備えている。これにより、各スタンション1は、折板屋根葺き作業時に、折板屋根葺き作業の進捗に応じた折板屋根2に対する盛り替えが可能に構成されている。   As shown in FIGS. 2 to 7, each stanchion 1 reinforces the support member 10 spanned on the adjacent goby 2 </ b> B of the folded plate roof 2, the support 11 for supporting the safety equipment supported by the support member 10, and the support 11. And a pair of fixtures 13 for detachably fixing the support member 10 to the folded plate roof 2. Thereby, each stanchion 1 is comprised so that the change with respect to the folded-plate roof 2 according to progress of the folded-plate roofing operation | work is possible at the time of folded-plate roofing operation | work.

支持部材10は、平行に配置される一対の第1部材14と、各第1部材14の中央部にわたる第2部材15とを有している。これにより、支持部材10は、その両端部10Aの横幅が該両端部10Aにわたる中間部10Bの横幅よりも幅広になるH型に形成されている。各第1部材14は、折板屋根2の隣接するハゼ2Bに載置される天板部14Aと、隣接するハゼ2Bにおける頭部2Baの外側縁に接触する縦壁部14Bとを有するように、その断面形状がL字状に形成されている。第2部材15は、一対の第1部材14にわたる溝部15Aを有するように、その断面形状がU字状に形成されている。又、第2部材15は、折板屋根2の隣接する山部2Aにわたるとともに、折板屋根2の隣接するハゼ2Bの間に収まる長さを有している。第2部材15における長手方向の両端には、補強用の平板部材16が溶接され、溝部15Aの底面と平板部材16との間に、固定具13に備えられた挟持片17の出退移動を許容する開口18が形成されている。そして、第2部材15における長手方向の両端と平板部材16の外面とに、第1部材14における天板部14Aの端縁が溶接されている。   The support member 10 includes a pair of first members 14 arranged in parallel, and a second member 15 extending over the center of each first member 14. Thus, the support member 10 is formed in an H shape in which the lateral width of both end portions 10A is wider than the lateral width of the intermediate portion 10B across the both end portions 10A. Each first member 14 has a top plate portion 14A placed on the adjacent goby 2B of the folded plate roof 2, and a vertical wall portion 14B that contacts the outer edge of the head 2Ba in the adjacent goby 2B. The cross-sectional shape is formed in an L shape. The second member 15 has a U-shaped cross section so as to have a groove 15 </ b> A extending over the pair of first members 14. Further, the second member 15 extends over the adjacent mountain portion 2 </ b> A of the folded plate roof 2 and has a length that fits between the adjacent goby 2 </ b> B of the folded plate roof 2. Reinforcing flat plate members 16 are welded to both ends of the second member 15 in the longitudinal direction, and the holding pieces 17 provided in the fixture 13 are moved back and forth between the bottom surface of the groove 15A and the flat plate member 16. A permissible opening 18 is formed. The edges of the top plate portion 14 </ b> A of the first member 14 are welded to both ends of the second member 15 in the longitudinal direction and the outer surface of the flat plate member 16.

支柱11は、その下端部に備えられた下向きU字状の連結部11Aが、支持部材10における第2部材15の一端部に支持されている。支柱11の上端部には、安全用具取り付け用のリング部11Bが備えられている。   The support 11 has a downward U-shaped connecting portion 11 </ b> A provided at the lower end thereof supported by one end of the second member 15 in the support member 10. A ring portion 11B for attaching a safety tool is provided at the upper end portion of the column 11.

斜材12は、その一端部が支柱11の上部に溶接されている。斜材12の他端部は、支持部材10における第2部材15の支柱連結側とは反対側に位置する平板部材16に溶接されている。これにより、斜材12は、支柱11の上部と、支持部材10における支柱支持側とは反対側の端部とにわたっている。   One end of the diagonal member 12 is welded to the upper portion of the column 11. The other end portion of the diagonal member 12 is welded to the flat plate member 16 located on the opposite side of the support member 10 from the support member 10 on the column connecting side. Accordingly, the diagonal member 12 extends over the upper portion of the support column 11 and the end of the support member 10 on the side opposite to the support column support side.

各固定具13には、レバー操作式のトグルクランプ機構13が採用されている。各トグルクランプ機構13は、第2部材15にネジ止めされた固定部材13A、固定部材13Aに揺動可能に支持された操作レバー13B、固定部材13Aに摺動可能に支持された摺動ロッド13C、及び、操作レバー13Bと摺動ロッド13Cとを連係するリンク部材13D、などを有している。そして、摺動ロッド13Cの先端に、前述した挟持片17がボルト連結されている。
これにより、各トグルクランプ機構13は、操作レバー13Bの揺動操作が行われると、この操作に連動して、摺動ロッド13Cとともに挟持片17を摺動させて、挟持片17を支持部材10の開口18から出退させるように構成されている。そして、この構成により、各トグルクランプ機構13は、スタンション1の支持部材10が折板屋根2の隣接する所定のハゼ2Bに掛け渡された状態では、操作レバー13Bの揺動操作によって、所定の各ハゼ2Bを支持部材10の各第1部材14と各挟持片17とで挟持する状態と、その挟持を解除する状態とに簡易に切り替えることができる。
Each fixture 13 employs a lever-operated toggle clamp mechanism 13. Each toggle clamp mechanism 13 includes a fixing member 13A screwed to the second member 15, an operation lever 13B supported slidably by the fixing member 13A, and a sliding rod 13C slidably supported by the fixing member 13A. And a link member 13D for linking the operation lever 13B and the sliding rod 13C. And the clamping piece 17 mentioned above is bolt-connected by the front-end | tip of the sliding rod 13C.
Thus, when the operation lever 13B is swung, each toggle clamp mechanism 13 slides the sandwiching piece 17 together with the sliding rod 13C in conjunction with this operation, so that the sandwiching piece 17 is supported by the support member 10. It is comprised so that it may withdraw from the opening 18 of this. With this configuration, each toggle clamp mechanism 13 has a predetermined operation by swinging the operation lever 13B in a state where the support member 10 of the stanchion 1 is stretched over a predetermined goby 2B adjacent to the folded plate roof 2. Each goby 2B can be easily switched between a state in which each first member 14 of the support member 10 and each holding piece 17 are held and a state in which the holding is released.

各挟持片17は、それらの横幅が第2部材15の溝部15Aに内接する幅広に形成されている。そして、折板屋根2のハゼ2Bを第1部材14との間に挟持した状態では、幅広に形成された挟持片17の先端部が、ハゼ2Bにおける頭部2Baよりも幅狭で頭部2Baの真下に位置する起立部2Bbに作用するようになっている。   Each sandwiching piece 17 is formed so that its lateral width is inscribed in the groove portion 15 </ b> A of the second member 15. In the state where the goby 2B of the folded-plate roof 2 is held between the first member 14, the tip end portion of the holding piece 17 formed wider is narrower than the head 2Ba of the goby 2B, and the head 2Ba. It acts on the upright portion 2Bb located directly below the head.

上記の構成により、作業者がスタンション1を折板屋根2に取り付ける場合は、先ず、スタンション1における支持部材10の各第1部材14が、折板屋根2の隣接する所定のハゼ2Bにおけるタイトフレーム上の吊子共締め箇所に載置されるように、支持部材10を隣接するハゼ2Bに掛け渡す。次に、各トグルクランプ機構13の操作レバー13Bを操作して、各挟持片17を支持部材10の各開口18から各ハゼ2Bに向けて突出させて、所定の各ハゼ2Bを支持部材10の各第1部材14と各挟持片17とで挟持する。これにより、スタンション1を折板屋根2に簡単に取り付けることができる。
又、作業者がスタンション1を折板屋根2から取り外す場合は、各トグルクランプ機構13の操作レバー13Bを操作して、各挟持片17を第2部材15の溝内に退避させて、支持部材10の各第1部材14と各挟持片17による所定の各ハゼ2Bの挟持を解除する。これにより、スタンション1を折板屋根2から簡単に取り外すことができる。
つまり、作業者は、折板屋根葺き作業の進捗に応じたスタンション1の盛り替えを、インパクトレンチやスパナなどの工具を使用することなく、又、ボルト・ナットや工具などを滑落させて紛失することによる作業の停滞を招くことなく、簡単かつ迅速に行うことができる。
その結果、折板屋根葺き作業における施工効率の向上を図ることができる。
With the above configuration, when the worker attaches the stanchion 1 to the folded plate roof 2, first, each first member 14 of the support member 10 in the stanchion 1 is a tight frame in a predetermined goby 2B adjacent to the folded plate roof 2. The support member 10 is hung on the adjacent goby 2B so as to be placed on the upper suspension joint tightening portion. Next, the operation lever 13B of each toggle clamp mechanism 13 is operated so that each holding piece 17 protrudes from each opening 18 of the support member 10 toward each gob 2B. It clamps with each 1st member 14 and each clamping piece 17. FIG. Thereby, the stanchion 1 can be easily attached to the folded-plate roof 2.
When the operator removes the stanchion 1 from the folded roof 2, the operation lever 13 </ b> B of each toggle clamp mechanism 13 is operated to retract each holding piece 17 into the groove of the second member 15, thereby supporting the member. The holding of each predetermined goby 2B by the 10 first members 14 and the holding pieces 17 is released. Thereby, the stanchion 1 can be easily removed from the folded roof 2.
In other words, the worker loses the replacement of stanchion 1 according to the progress of the folded-plate roofing work without using tools such as impact wrench and spanner, or by sliding down bolts, nuts, tools, etc. This can be done easily and quickly without causing a stagnation of work.
As a result, it is possible to improve the construction efficiency in the folded plate roofing operation.

又、このスタンション1においては、支柱11の上部と支持部材10における支柱支持用の一端部10Aaとは反対側の他端部10Abとにわたる単一の斜材12を備えることから、安全ブロック3Aや親綱3Bを介して安全帯4が取り付けられる支柱11の支持強度を高めることができ、これにより、安全帯4を使用して行う折板屋根葺き作業での作業者の安全性を向上させることができる。
特に、スタンション1を折板屋根2に取り付ける場合の取り付け姿勢を、屋根葺き作業時に作業者が折板屋根2から落下する危険性のある領域Aに対して支柱11を挟んだ反対側の位置に斜材12が位置するように設定すれば、万が一、作業者が折板屋根2から落下しそうになったときには、そのときの荷重を斜材12に対して引張力として作用させることができる。これにより、作業者が折板屋根2から落下しそうになったときの荷重が斜材12に圧縮力として作用する場合に比較して、斜材12が持つ強度を支柱11の補強に有効に活用することができる。つまり、複数の斜材12を設ける場合に比較して、スタンション1の軽量化による持ち運びの容易化を図りながら、支柱11の支持強度を効果的に高めることができる。その結果、支柱11に安全ブロック3Aや親綱3Bを介して取り付けられる安全帯4を使用して行う折板屋根葺き作業での作業者の安全性を向上させることができる。
In addition, the stanchion 1 includes a single diagonal member 12 that extends from the upper portion of the support column 11 and the other end portion 10Ab on the opposite side of the support member 10 to the one end portion 10Aa for supporting the support column. The support strength of the support | pillar 11 to which the safety belt | band | zone 4 is attached via the master rope 3B can be raised, and, thereby, improving the operator's safety in the folded-plate roofing work performed using the safety belt | band | zone 4 Can do.
In particular, when the stanchion 1 is attached to the folded-plate roof 2, the mounting posture is set to the position on the opposite side of the column 11 with respect to the region A where the operator may fall from the folded-plate roof 2 during roofing work. If the diagonal member 12 is set so as to be positioned, if an operator is about to fall from the folded plate roof 2, the load at that time can be applied to the diagonal member 12 as a tensile force. As a result, the strength of the diagonal member 12 can be effectively used for reinforcing the column 11 compared to the case where the load when the operator is about to fall from the folded plate roof 2 acts as a compressive force on the diagonal member 12. can do. That is, as compared with the case where a plurality of diagonal members 12 are provided, the support strength of the column 11 can be effectively increased while facilitating carrying by reducing the weight of the stanchion 1. As a result, it is possible to improve the operator's safety in the folded-plate roofing work performed using the safety belt 4 attached to the support 11 via the safety block 3A or the master rope 3B.

ちなみに、作業者は、自身の安全帯4を単一のスタンション1に安全ブロック3Aのみを介して取り付けるようにすれば(図2参照)、複数のスタンション1に渡し掛ける親綱3Bを使用する場合(図1参照)よりも、折板屋根葺き作業の進捗に応じた折板屋根2に対するスタンション1の盛り替えが行い易くなる。その結果、折板屋根葺き作業において、スタンション1などを使用することによる安全性の確保を行いながら、施工効率の向上を図ることができる。   By the way, if the worker attaches his / her own safety belt 4 to the single stanchion 1 via only the safety block 3A (see FIG. 2), the worker uses the master rope 3B that passes over the plurality of stanchions 1. Rather than (see FIG. 1), it becomes easier to change the stanchions 1 with respect to the folded-plate roof 2 according to the progress of the folded-plate roofing operation. As a result, it is possible to improve the construction efficiency while ensuring safety by using the stanchion 1 or the like in the folded-plate roofing operation.

更に、このスタンション1においては、一対のトグルクランプ機構13が支持部材10における支柱11と斜材12との間の中間部10Bに隣接して配備されていることから、作業者は、一方の手で支柱11又は斜材12を把持したまま、他方の手で各トグルクランプ機構13の操作レバー13Bを無理なく操作することができる。
そして、一対のトグルクランプ機構13が配備される支持部材10の中間部10Bは、折板屋根2の隣接するハゼ2Bに掛け渡される長さを有する支持部材10と、支持部材10の一端部10Aaに支持された支柱11と、支柱11の上部と支持部材10の他端部10Abとにわたる斜材12との間に形成された広い三角空間の底辺を形成するものであることから、作業者が各トグルクランプ機構13の操作レバー13Bを操作する際に、各操作レバー13Bが斜材12に干渉して操作レバー13Bの操作が阻害される虞を回避することができる。
その結果、折板屋根葺き作業の進捗に応じてスタンション1の盛り替えを行うときの各トグルクランプ機構13の操作性を向上させることができ、これにより、折板屋根葺き作業における施工効率の向上を更に図ることができる。
Further, in this stanchion 1, since the pair of toggle clamp mechanisms 13 are disposed adjacent to the intermediate portion 10B between the support column 11 and the diagonal member 12 in the support member 10, the operator can use one hand. With the other hand, the operation lever 13B of each toggle clamp mechanism 13 can be operated without difficulty while holding the column 11 or the diagonal member 12.
And the intermediate part 10B of the support member 10 by which a pair of toggle clamp mechanism 13 is arrange | positioned is the support member 10 which has the length spanned over the adjacent goby 2B of the folded-plate roof 2, and one end part 10Aa of the support member 10 Since the bottom of a wide triangular space formed between the support 11 supported by the support member 10 and the diagonal member 12 extending between the upper portion of the support 11 and the other end 10Ab of the support member 10 is formed. When operating the operation lever 13B of each toggle clamp mechanism 13, it is possible to avoid the possibility that the operation lever 13B interferes with the diagonal member 12 and the operation of the operation lever 13B is hindered.
As a result, it is possible to improve the operability of each toggle clamp mechanism 13 when changing the stanchion 1 according to the progress of the folded-plate roofing work, thereby improving the construction efficiency in the folded-plate roofing work. Can be further achieved.

又、このスタンション1においては、支持部材10の形状が、折板屋根2の隣接するハゼ2Bに載置される両端部10Aの横幅が該両端部10Aにわたる中間部10Bの横幅よりも幅広になるH型であることから、スタンション1が折板屋根2に取り付けられた状態では、幅広に形成された支持部材10の両端部10Aが折板屋根2のハゼ2Bに載置された状態になる。これにより、支持部材10の横幅方向での折板屋根2に対するスタンション1のガタツキをより効果的に抑制することができる。
その結果、折板屋根葺き作業の進捗に応じたスタンション1の盛り替えを簡単かつ迅速に行えるようにしながら、折板屋根2に取り付けたスタンション1の安定性を向上させることができる。
Further, in this stanchion 1, the shape of the support member 10 is such that the lateral width of both end portions 10A placed on the adjacent goby 2B of the folded roof 2 is wider than the lateral width of the intermediate portion 10B across the both end portions 10A. Since the stanchion 1 is attached to the folded plate roof 2 because it is H-shaped, both end portions 10A of the support member 10 formed to be wide are placed on the goby 2B of the folded plate roof 2. Thereby, the rattling of the stance 1 with respect to the folded-plate roof 2 in the width direction of the support member 10 can be suppressed more effectively.
As a result, the stability of the stanchion 1 attached to the folded plate roof 2 can be improved while allowing the stanchions 1 to be rearranged easily and quickly according to the progress of the folded plate roofing operation.

更に、このスタンション1においては、支持部材10の形状が前述したH型であることにより、スタンション1が折板屋根2に取り付けられた場合に各ハゼ2Bの頭部外側縁に接触する各第1部材14の縦壁部14Bも、それらの横幅が幅広になっている。これにより、折板屋根2に対するスタンション1の縦軸回りのガタツキを効果的に抑制することができ、折板屋根2に取り付けたスタンション1の安定性を向上させることができる。
そして、各第1部材14との間で折板屋根2のハゼ2Bを挟持する各挟持片17も、前述したように、それらの横幅が幅広に形成されていることから、折板屋根2のハゼ2Bを第1部材14と挟持片17とで挟持したときの挟持範囲を広くすることができる。これにより、スタンション1を折板屋根2に対してより安定的に強固に取る付けることができる。
しかも、折板屋根2のハゼ2Bを第1部材14と挟持片17とで挟持した状態では、前述したように、各挟持片17の先端部がハゼ2Bの起立部2Bbに作用することから、万が一、作業者が折板屋根2から落下しそうになることでスタンション1の上部に引張力が作用した場合には、挟持片17の先端部がハゼ2Bの頭部2Baに引っ掛かってその引張力に抗することになる。そして、ハゼ2Bの頭部2Baに引っ掛かる挟持片17が幅広に形成されていることから、その引っ掛かりに起因したハゼ2Bの変形を抑制することができる。
その結果、スタンション1を折板屋根2に対してより好適に強固に取る付けることができ、これにより、万が一、作業者が折板屋根2から落下しそうになっても、スタンション1が折板屋根2から外れて作業者が地上に落下する虞を回避することができる。
Furthermore, in this stanchion 1, when the shape of the supporting member 10 is the above-mentioned H type, when the stanchion 1 is attached to the folded-plate roof 2, each 1st which contacts the head outer edge of each goby 2B. The vertical wall portions 14B of the members 14 are also wide in width. Thereby, rattling around the vertical axis of the stanchion 1 with respect to the folded plate roof 2 can be effectively suppressed, and the stability of the stanchion 1 attached to the folded plate roof 2 can be improved.
And each clamping piece 17 which clamps the goby 2B of the folded-plate roof 2 between each 1st member 14 is also formed in the width | variety wide as mentioned above, Therefore The clamping range when the goby 2B is clamped between the first member 14 and the clamping piece 17 can be widened. Thereby, the stanchion 1 can be attached to the folded roof 2 more stably and firmly.
Moreover, in the state where the goby 2B of the folded plate roof 2 is held between the first member 14 and the holding piece 17, as described above, the front end portion of each holding piece 17 acts on the standing part 2Bb of the goby 2B. In the unlikely event that a tensile force acts on the upper portion of the stanchion 1 because the operator is likely to fall from the folded roof 2, the tip of the sandwiching piece 17 is caught on the head 2Ba of the goby 2B and the tensile force is applied. I will resist. And since the clamping piece 17 caught on the head 2Ba of the goby 2B is formed wide, the deformation of the goby 2B due to the catch can be suppressed.
As a result, the stanchion 1 can be attached to the folded-plate roof 2 more preferably and firmly. As a result, even if an operator is likely to fall from the folded-plate roof 2, the stanchion 1 is folded into the folded-plate roof. It is possible to avoid the possibility that the operator falls off the ground 2 and falls to the ground.

ちなみに、本実施形態で例示した構成のスタンション1は、折板屋根2に取り付けた状態で、支柱11のリング部11Bに安全ブロック3A及び安全帯4を介して取り付けられた85kgの錘を折板屋根2から落下させる強度確認試験を行ったところ、折板屋根2に取り付けた状態が維持されることを確認することができた。   Incidentally, the stanchion 1 having the configuration exemplified in the present embodiment is a folded plate in which 85 kg weight attached to the ring portion 11B of the support column 11 via the safety block 3A and the safety belt 4 is attached to the folded plate roof 2. When a strength confirmation test for dropping from the roof 2 was performed, it was confirmed that the state attached to the folded-plate roof 2 was maintained.

図8に示すように、折板屋根2には、折板屋根上での複数の台車5を利用した折板22の運搬を可能にするために、台車案内用の複数のガイドレール6が着脱可能に敷設されている。そして、支柱11は、その上端の高さ位置が、各ガイドレール6で案内される複数の台車5を利用して折板屋根上を運搬される折板22と干渉しない低い高さ位置に設定されている。
これにより、折板屋根葺き作業中に、作業者が複数の折板22を折板屋根上にて台車5を利用して運搬する場合には、スタンション1の盛り替えを行わなくても、その運搬が折板屋根2に取り付けられたスタンション1によって阻害される虞を回避することができる。
その結果、折板屋根上での折板22の運搬を円滑に行うことができ、結果、折板屋根葺き作業における施工効率の向上を更に図ることができる。
As shown in FIG. 8, a plurality of guide rails 6 for guiding the carriage are attached to and detached from the folded-plate roof 2 in order to enable conveyance of the folded board 22 using the plurality of carriages 5 on the folded-plate roof. It is laid as possible. And the support | pillar 11 sets the height position of the upper end to the low height position which does not interfere with the folded plate 22 conveyed on the folded plate roof using the several trolley | bogie 5 guided with each guide rail 6. FIG. Has been.
Thus, when the operator carries a plurality of folded plates 22 using the carriage 5 on the folded plate roof during the folded plate roofing work, the refilling of the stanchion 1 is not necessary. It is possible to avoid the possibility that the transportation is hindered by the stanchion 1 attached to the folded plate roof 2.
As a result, the folded plate 22 can be smoothly transported on the folded plate roof, and as a result, the construction efficiency in the folded plate roofing operation can be further improved.

〔別実施形態〕
本発明の他の実施形態について説明する。
尚、以下に説明する各実施形態の構成は、それぞれ単独で適用することに限らず、他の実施形態の構成と組み合わせて適用することも可能である。
[Another embodiment]
Another embodiment of the present invention will be described.
Note that the configuration of each embodiment described below is not limited to being applied alone, but may be applied in combination with the configuration of another embodiment.

(1)スタンション1は、支柱11が支持部材10の中間部10Bに支持され、一対のトグルクランプ機構13が、支柱11を挟んで支持部材10の両端側に分散配備された構成であってもよい。 (1) The stanchion 1 may have a configuration in which the support column 11 is supported by the intermediate portion 10B of the support member 10 and the pair of toggle clamp mechanisms 13 are distributed on both ends of the support member 10 with the support column 11 interposed therebetween. Good.

(2)スタンション1は、支柱11を支持部材10に連結することで、支柱11の支持強度として、作業者の安全性を確保することができる高い強度が得られる場合には、支柱11の上部と支持部材10の端部10Aとにわたる斜材12を備えない構成であってもよい。 (2) The stanchion 1 is an upper portion of the support 11 when the support 11 is connected to the support member 10 so that the support 11 has a high strength capable of ensuring the safety of the operator. The diagonal member 12 extending over the end 10 </ b> A of the support member 10 may not be provided.

(3)スタンション1は、支柱11が支持部材10の中間部10Bに支持され、支柱11の上部と支持部材10の一端部10Aaとにわたる斜材12と、支柱11の上部と支持部材10の他端部10Abとにわたる斜材12とを備えることで、支柱11の支持強度として、作業者の安全性を確保することができる高い強度が得られるように構成されていてもよい。 (3) In the stanchion 1, the support 11 is supported by the intermediate portion 10 </ b> B of the support member 10, the diagonal member 12 extending between the upper portion of the support 11 and the one end 10 </ b> Aa of the support member 10, the upper portion of the support 11, and the other support members 10. By providing the diagonal member 12 extending over the end portion 10Ab, the support strength of the support column 11 may be configured to obtain a high strength that can ensure the safety of the operator.

(4)スタンション1は、支柱11の下部と支持部材10とにわたるリブを備えることで、支柱11の支持強度として、作業者の安全性を確保することができる高い強度が得られるように構成されていてもよい。 (4) The stanchion 1 is configured to have a rib extending over the lower portion of the support column 11 and the support member 10 so that the support strength of the support column 11 is high enough to ensure the safety of the operator. It may be.

(5)スタンション1は、前述した強度確認試験において折板屋根2に取り付けた状態が維持されるのであれば、支持部材10における両端部10Aの横幅が中間部10Bの横幅と同じになるように支持部材10が形成されていてもよい。 (5) If the stanchion 1 is kept attached to the folded-plate roof 2 in the above-described strength confirmation test, the lateral width of both end portions 10A of the support member 10 is the same as the lateral width of the intermediate portion 10B. Support member 10 may be formed.

2 折板屋根
2B ハゼ
5 台車
10 支持部材
10A 支持部材の端部
10Aa 支持部材の一端部
10Ab 支持部材の他端部
10B 支持部材の中間部
11 支柱
12 斜材
13 固定具(トグルクランプ機構)
22 屋根材
2 folded plate roof 2B goby 5 carriage 10 support member 10A support member end 10Aa support member one end 10Ab support member other end 10B support member intermediate part 11 support column 12 diagonal member 13 fixing tool (toggle clamp mechanism)
22 Roofing material

Claims (5)

安全用具取り付け用の支柱と、前記支柱を支持する支持部材とを備えて、前記支持部材が、折板屋根の隣接するハゼに掛け渡される折板屋根葺き作業用のスタンションにおいて、
前記支持部材の両端部を前記ハゼに着脱可能に固定する一対の固定具を備え、
前記固定具には、レバー操作にて前記ハゼを前記支持部材の端部との間に挟持する状態と、その挟持を解除する状態とに簡易切り替え可能なレバー操作式のトグルクランプ機構が採用されている折板屋根葺き作業用のスタンション。
In a stanchion for folding plate roofing work comprising a support column for mounting safety equipment and a support member that supports the column, and the support member is stretched over adjacent goby of the folded plate roof.
A pair of fixtures that removably fix both ends of the support member to the goby;
The fixing tool employs a lever-operated toggle clamp mechanism that can be easily switched between a state where the gob is held between the ends of the support member and a state where the holding is released by lever operation. A stanchion for folding roofing.
前記支柱は、前記支持部材の一端部に支持され、一対の前記トグルクランプ機構は、前記支持部材における支柱支持用の前記一端部と、該一端部とは反対側の他端部との間に配備されている請求項1に記載の折板屋根葺き作業用のスタンション。   The support column is supported by one end portion of the support member, and the pair of toggle clamp mechanisms are provided between the one end portion of the support member for supporting the support column and the other end portion opposite to the one end portion. The stanchion for folding-plate roofing work of Claim 1 currently deployed. 前記支柱の上部と前記支持部材の端部とにわたる斜材を備えている請求項1又は2に記載の折板屋根葺き作業用のスタンション。   The stanchion for folding-plate roofing work of Claim 1 or 2 provided with the diagonal material covering the upper part of the said support | pillar, and the edge part of the said supporting member. 前記支持部材は、前記両端部が前記ハゼに載置されるとともに、前記両端部の横幅が該両端部にわたる中間部の横幅よりも幅広になるH型に形成されている請求項1〜3のいずれか一項に記載の折板屋根葺き作業用のスタンション。   The said supporting member is formed in the H type | mold from which the said both ends are mounted in the said goby, and the width of the said both ends becomes wider than the width of the intermediate part over this both ends. The stanchion for folding-plate roofing work as described in any one of Claims. 前記支柱は、その上端の高さ位置が、台車を利用して折板屋根上を運搬される屋根材と干渉しない低い高さ位置に設定されている請求項1〜4のいずれか一項に記載の折板屋根葺き作業用のスタンション。   The said support | pillar is set to the low height position in which the height position of the upper end does not interfere with the roof material conveyed on a folded-plate roof using a trolley | bogie. The stanchion for the folded roofing work described.
JP2018026118A 2018-02-16 2018-02-16 Stance for folded plate roofing work Active JP7038359B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018026118A JP7038359B2 (en) 2018-02-16 2018-02-16 Stance for folded plate roofing work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018026118A JP7038359B2 (en) 2018-02-16 2018-02-16 Stance for folded plate roofing work

Publications (2)

Publication Number Publication Date
JP2019143305A true JP2019143305A (en) 2019-08-29
JP7038359B2 JP7038359B2 (en) 2022-03-18

Family

ID=67773630

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018026118A Active JP7038359B2 (en) 2018-02-16 2018-02-16 Stance for folded plate roofing work

Country Status (1)

Country Link
JP (1) JP7038359B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116856634A (en) * 2023-09-04 2023-10-10 山西六建集团有限公司 Foam ceramic insulation board roof installation auxiliary device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05209451A (en) * 1992-01-30 1993-08-20 Nakajima Kinzoku Kogyo Kk Roofing method for large building, and roof sheathing conveyor to be used for the method
JP2003129629A (en) * 2001-10-22 2003-05-08 Shigekichi Mukoyama Slipping down prevention system for work on roof
JP2006207339A (en) * 2005-01-31 2006-08-10 Aigo Kogyo Kk Folded-plate punch
JP2009215736A (en) * 2008-03-07 2009-09-24 Toshiteru Kawachi Main rope stretching implement
JP2012158868A (en) * 2011-01-31 2012-08-23 Jfe Steel Corp Roof surface mounting jig for main-rope support
JP2015197024A (en) * 2014-04-03 2015-11-09 株式会社竹中工務店 Construction method of roof and transport device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05209451A (en) * 1992-01-30 1993-08-20 Nakajima Kinzoku Kogyo Kk Roofing method for large building, and roof sheathing conveyor to be used for the method
JP2003129629A (en) * 2001-10-22 2003-05-08 Shigekichi Mukoyama Slipping down prevention system for work on roof
JP2006207339A (en) * 2005-01-31 2006-08-10 Aigo Kogyo Kk Folded-plate punch
JP2009215736A (en) * 2008-03-07 2009-09-24 Toshiteru Kawachi Main rope stretching implement
JP2012158868A (en) * 2011-01-31 2012-08-23 Jfe Steel Corp Roof surface mounting jig for main-rope support
JP2015197024A (en) * 2014-04-03 2015-11-09 株式会社竹中工務店 Construction method of roof and transport device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116856634A (en) * 2023-09-04 2023-10-10 山西六建集团有限公司 Foam ceramic insulation board roof installation auxiliary device
CN116856634B (en) * 2023-09-04 2023-11-21 山西六建集团有限公司 Foam ceramic insulation board roof installation auxiliary device

Also Published As

Publication number Publication date
JP7038359B2 (en) 2022-03-18

Similar Documents

Publication Publication Date Title
US20170174270A1 (en) Modular truck bed rack system and portions thereof
JP5898231B2 (en) Lifting device with adjustable carriage
CN104853959A (en) A load carrier foot and a roof rack
US20090159540A1 (en) Apparatus and method for supporting an object such as a rifle
US20120235371A1 (en) Multiposition mechanic&#39;s creeper
JP2019143305A (en) Stanchion for folded-plate roofing work
JP6307726B1 (en) Fall prevention device and freight vehicle equipped with the same
JP3751708B2 (en) Curing scaffold plate support assembly
US20100024621A1 (en) Saw Table and Power Saw Combination
WO2007035085A1 (en) Clamping mechanism for securing at least one object to a rail, as well as an assembly
JP4415658B2 (en) Rail cradle during bridge construction
JP4314441B1 (en) Cloth with floor
JP4518960B2 (en) Exterior wall panel position adjustment structure and exterior wall panel mounting method
JP7348148B2 (en) Handrail frame for stair openings in temporary scaffolding
KR100227165B1 (en) The suspension beam of movable scaffolding system in bridge construction
KR200411015Y1 (en) Large support prepoutfitting fit jig
KR200190418Y1 (en) A carriage for transporting plate glass
JP4027855B2 (en) Structural reinforcement equipment
US11731223B1 (en) Lifting and transporting device
JPH0372165A (en) Lifting fixture
KR20140002822U (en) Bilt up stiffening member welded plate support for vessel
JP7213273B2 (en) rail workbench
JP2002167958A (en) Stepladder
JP4434403B2 (en) Man conveyor railing panel support device
JP2001115654A (en) Main pope strut

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201029

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210922

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210929

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220225

R150 Certificate of patent or registration of utility model

Ref document number: 7038359

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150