CN116733235A - Concrete vibrating method for complex structure of reinforced bar embedded part - Google Patents

Concrete vibrating method for complex structure of reinforced bar embedded part Download PDF

Info

Publication number
CN116733235A
CN116733235A CN202310657702.6A CN202310657702A CN116733235A CN 116733235 A CN116733235 A CN 116733235A CN 202310657702 A CN202310657702 A CN 202310657702A CN 116733235 A CN116733235 A CN 116733235A
Authority
CN
China
Prior art keywords
concrete
vibrating
vibration
embedded part
vibrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310657702.6A
Other languages
Chinese (zh)
Inventor
周扬
陈慧乾
董亚伦
邓磊
姬建成
张延东
张建伟
董泉清
孙展鹏
鲁天宇
张凯
马维勤
徐海霖
王胤江
杜雄飞
侯博文
马佩龙
董义功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Development and Construction Co Ltd
Original Assignee
China Construction Eighth Bureau Development and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau Development and Construction Co Ltd filed Critical China Construction Eighth Bureau Development and Construction Co Ltd
Priority to CN202310657702.6A priority Critical patent/CN116733235A/en
Publication of CN116733235A publication Critical patent/CN116733235A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a concrete vibrating method for a more complex structure of a steel bar embedded part, which belongs to the technical field of concrete construction, and comprises the following steps of: establishing a three-dimensional model of a concrete structure, and dividing the three-dimensional model at equal heights to form a plurality of pouring sections; dividing each pouring section into a plurality of vibrating areas, and numbering the vibrating areas; planning embedded parts in each vibration area, and avoiding the position planning vibration points of the embedded parts; laying the embedded part on a construction site by combining the position of the embedded part; pouring each pouring section sequentially from bottom to top, vibrating at the position of the vibrating point by using a vibrator, monitoring the vibrating state in real time, and timely processing if abnormal conditions exist; the invention can solve the problem that the vibrating rod impacts the reinforced embedded part during concrete vibrating, and avoid influencing the structural performance of the concrete.

Description

Concrete vibrating method for complex structure of reinforced bar embedded part
Technical Field
The invention belongs to the technical field of concrete construction, and particularly relates to a concrete vibrating method for a complex structure of a reinforced embedded part.
Background
The Chinese patent (application number: CN 201510900760.2) with publication number of CN105569345B proposes a concrete spot compacting method, which comprises the following steps: the multipoint concrete pouring method has the advantages that multipoint concrete pouring is conducted in the die through the plurality of concrete pouring pipes, compaction is achieved through the micro vibration pipe vibration concrete sleeved on the concrete pouring pipes, compared with the traditional method that compaction is conducted through the external vibration stick, multipoint concrete pouring can be achieved, and the local compaction effect of the concrete is good.
However, in order to ensure the efficient and tight combination of the embedded part and the concrete structure, the strength and stability of the whole structure are improved, the arrangement of the reinforced embedded part inside the concrete structure is complex, the phenomenon that the vibrator impacts the reinforced embedded part is very easy to occur in the vibrating process, and the vibrator is difficult to be found in time after impacting the reinforced embedded part because the concrete is thick and non-transparent, so that the crack is possibly generated inside the concrete, and the structural performance of the concrete is finally affected; and the steel bars are easy to shift and deform after collision, and shearing force can be generated between the deformed steel bar embedded parts and the concrete, so that the anchoring force of the steel bars can be reduced, and the structural performance of the concrete is reduced.
In summary, when the reinforced embedded part in the concrete structure is complex, the existing concrete vibrating method cannot solve the problem that the vibrating rod impacts the reinforced embedded part, and is very easy to influence the structural performance of the concrete.
Disclosure of Invention
In view of the above, the invention provides a concrete vibrating method with a more complex structure of a reinforcing steel bar embedded part, which can solve the problem that a vibrating rod impacts the reinforcing steel bar embedded part during concrete vibrating and avoid influencing the structural performance of the concrete.
The invention is realized in the following way:
the invention provides a concrete vibrating method for a complex structure of a reinforcing steel bar embedded part, which comprises the following steps:
s10: establishing a three-dimensional model of a concrete structure, and dividing the three-dimensional model at equal heights to form a plurality of pouring sections;
s20: dividing each pouring section into a plurality of vibrating areas, and numbering the vibrating areas;
s30: planning embedded parts in each vibration area, and avoiding the position planning vibration points of the embedded parts;
s40: laying the embedded part on a construction site by combining the position of the embedded part;
s50: and pouring each pouring section from bottom to top in sequence, vibrating at the position of the vibrating point by using a vibrator, monitoring the vibrating state in real time, and timely processing if abnormal conditions exist.
The concrete vibrating method for the complex structure of the steel bar embedded part has the technical effects that: according to the concrete vibrating method with the complex structure of the reinforcing steel bar embedded part, the vibrating area is divided, the coordinates of the vibrating points are recorded by establishing a coordinate system, the vibrating position is monitored in real time in the concrete pouring and vibrating process in a vibrating monitoring mode, the contact or interference between the vibrating rod and the reinforcing steel bar embedded part can be timely found, the vibrating rod is prevented from impacting the reinforcing steel bar embedded part in the vibrating process, the reinforcing steel bar is prevented from shifting or deforming, the shearing force is further generated between the reinforcing steel bar and the concrete, the anchoring force of the reinforcing steel bar is reduced, and the structural performance of the concrete is reduced.
On the basis of the technical scheme, the concrete vibrating method for the complex structure of the reinforced embedded part can be improved as follows:
in the step S10, the three-dimensional model is divided into equal height segments, and the steps for forming the plurality of pouring segments specifically include:
and determining the height of each pouring section according to the structural characteristics of the concrete structure and the density of the reinforcing steel bars, wherein the height of each pouring section is 1.25 times of the length of the acting part of the vibrator, and the maximum height is not more than 500mm.
Further, the step S20 specifically includes the following steps:
the method comprises the following steps of firstly, establishing a coordinate system, so that the height direction of the concrete structure coincides with the z-axis of the coordinate system, the length direction coincides with the x-axis, and the width direction coincides with the y-axis;
dividing each pouring section into a plurality of vibrating areas;
and thirdly, recording an x coordinate, a y coordinate and a z coordinate of the central position of each vibrating area as the serial numbers of the vibrating areas.
Further, the rule for planning the vibration point in step S30 is as follows:
(1) Selecting the vibration density by combining the slump of the concrete;
(2) Selecting vibrating time by combining the self-fluidity of the concrete;
(3) Selecting a vibrating mode by combining the construction requirement of the concrete and the shape of the concrete;
(4) Selecting vibration points according to the volume, shape and arrangement condition of the steel bars of the concrete, the type, parameters and application range of the vibrator and the environmental conditions of the poured concrete, such as the temperature, wind speed and humidity of the concrete;
after the vibration points are planned, the coordinates of each vibration point are recorded based on the coordinate system.
The position of the vibrating point is arranged in the center or around the concrete pouring area, and mainly comprises the following situations: plane vibrating: arranging vibrating points in a region with a relatively flat concrete surface, wherein the central position of a concrete construction region is generally adopted; side vibrating: arranging vibrating points at the edge position of concrete, which is generally the edge position of a concrete construction area, and vibrating the area, which is close to the position to be knotted, at the edge position if the beam column steel bars are knotted in the concrete construction process; internal vibrating: the vibrating points are arranged at the middle part of the concrete, and are generally arranged with the center of the concrete as a reference; and (3) composite vibrating: the composite vibration means that plane vibration and side vibration or internal vibration are adopted in the same concrete pouring area at the same time, so that the compactness and the compactness of concrete can be improved more comprehensively. According to the invention, the positions of the vibrating points are comprehensively considered according to various factors such as the construction requirement of the concrete, the shape of the concrete, the arrangement condition of the steel bars and the like, so that the quality and the performance of the concrete can be ensured.
Further, in step S30, rules for planning the embedded part in each vibration area are as follows:
(1) The embedded parts are arranged at intervals, at distances and in distribution so as to avoid overlapping;
(2) The embedded part is arranged to be parallel to the main stress direction of the concrete, so that the structural performance of the embedded part is improved to the greatest extent.
The beneficial effects of adopting above-mentioned improvement scheme are: through following above rule, can make the position, quantity and the direction of built-in fitting reasonable, ensure that built-in fitting and concrete structure's high-efficient closely combine, form the synergism with concrete to improve the intensity and the stability of whole structure.
Further, in the step S50, the step of vibrating with a vibrator at the position of the vibrating point specifically includes:
in the process of continuously pouring concrete, an inserted high-frequency vibrator is used for inserting the lower layer concrete by 50-100 mm, the inserting points are uniformly arranged, the moving is performed sequentially, the moving interval is not more than 1.25 times of the vibrating action radius, the uniform distribution of the vibrating inserting points is ensured, and the positions of column dowel bars are avoided; vibrating until slurry appears on the surface of the concrete, and the concrete is no longer submerged and no bubbles emerge; wherein, the distance between the vibrator inside the vibrator and the template in the vibrating process is not more than 1/2 of the radius of action.
The concrete should be vibrated compactly, but not excessively, and the mortar splashing should be reduced as much as possible in the vibration process, so that the mortar splashed on the inner surface of the template is cleaned in time; the surface of the vibration point is vibrated to form floating slurry and no sinking is caused, so that the concrete column, liang Quejiao and honeycomb pitting surface are prevented from being generated; the position of the column dowel bar is avoided in the vibration process, the dowel bar inclination and displacement caused by ash discharging and vibration can be prevented, and the position of the column dowel bar is rechecked before the concrete is finally set, so that the displacement inclination is found to be corrected in time.
Further, the step of monitoring the vibration state in real time in the step S50 specifically includes:
monitoring and feeding back the vibration state in real time by adopting a concrete vibration monitoring device; and observing whether the template, the steel bar, the reserved hole, the embedded part, the steel bar and the like move, deform or block in the pouring process.
The beneficial effects of adopting above-mentioned improvement scheme are: through real-time supervision state of vibrating, be favorable to in time finding the unusual phenomenon of vibrating in-process, the staff of being convenient for in time makes the processing to construction quality when can improving concrete placement reduces the reworking, improves the efficiency of construction.
Further, the concrete vibration monitoring device includes: the device comprises a sensing detection unit, a controller and a feedback unit;
the sensing detection unit comprises a sensing optical fiber and a receiving terminal, wherein the sensing optical fiber is fixed at the position, closest to the vibration point, of the embedded part and is used for sending an optical signal to the receiving terminal, and the receiving terminal is used for receiving and analyzing the optical signal to obtain vibration position information and vibration data of amplitude information of the sensing optical fiber and sending the vibration data to the controller;
the controller is used for analyzing and processing the vibration data, obtaining the position relation between the vibrator and the sensing optical fiber, judging whether the vibrator coincides with the position where the sensing optical fiber is located or not, and sending the judging result to the feedback unit;
the feedback unit is used for correspondingly displaying the judging result;
the sensing detection unit is electrically connected with the controller, and the controller is electrically connected with the feedback unit.
The beneficial effects of adopting above-mentioned improvement scheme are: the sensing optical fiber is arranged on the embedded part, so that the embedded part has the capability of emitting vibration data outwards, the vibration condition of the embedded part inside the concrete can be captured by utilizing the receiving terminal, the vibration position and the vibration amplitude information of the embedded part are obtained, the controller compares the vibration data with the vibration information of the vibrator after receiving the vibration data, whether the vibration position of the vibrator coincides with the embedded part or not can be judged by comparing the vibration data with the vibration information of the vibrator, and feedback is carried out in time through the feedback unit, so that the whole vibration monitoring device has high operation efficiency and does not need manual intervention, and more accurate concrete vibration effect is realized; the sensing optical fiber is equivalent to the wearable equipment connected with the concrete vibrating embedded part, the optical fiber is used as a sensor to replace the original point type sensor, the networking is flexible, the limitation is small, and the real-time monitoring and feedback of the concrete vibrating embedded part can be realized, so that the efficiency and accuracy of concrete vibrating are improved.
Further, the concrete vibration monitoring device includes: the GPS positioning unit, the controller and the feedback unit;
the GPS positioning unit is arranged at the vibrating head of the vibrator and used for positioning the position of the vibrating head;
the controller is used for acquiring the GPS position of the GPS positioning unit, mapping the GPS position in the coordinate system, comparing and matching the GPS position with the coordinate of the vibration point preset in the inside, judging whether the current position of the vibration head is positioned at the preset position or not, and feeding back the judgment result to the feedback unit;
the feedback unit is used for correspondingly displaying the judging result;
the GPS positioning unit is electrically connected with the controller, and the controller is electrically connected with the feedback unit.
The beneficial effects of adopting above-mentioned improvement scheme are: through setting up GPS positioning unit in the vibrating head department of vibrator, the controller will gather GPS positioning unit's GPS coordinate and send to mobile terminal through wireless transmission module, can be convenient for the staff to look over the position that concrete vibrates at any time to match the position information of vibrator and the position information of the vibration point of predetermineeing through the controller, can in time discover whether the position of vibrator deviates from the vibration point, the staff of being convenient for handles in time, avoids unnecessary error and loss.
Further, the concrete vibration monitoring device includes: the device comprises a wireless signal transmitting unit, a wireless signal receiving unit, a controller and a feedback unit;
the wireless signal transmitting unit is arranged on the vibrator and is used for transmitting ultra-wideband active signals;
the wireless signal receiving unit is arranged in the concrete pouring construction area and is used for receiving the ultra-wideband active signal and sending the ultra-wideband active signal to the controller;
the controller is used for acquiring real-time coordinates of the vibrator, comparing and matching the real-time coordinates with the coordinates of the vibration points preset in the vibrator, judging whether the current position of the vibration head is located at the preset position or not, and feeding back the judgment result to the feedback unit;
the feedback unit is used for correspondingly displaying the judging result;
the wireless signal transmitting unit and the wireless signal receiving unit are electrically connected with the controller, and the controller is electrically connected with the feedback unit.
The beneficial effects of adopting above-mentioned improvement scheme are: the wireless signal transmitting unit and the wireless signal receiving unit are utilized to establish communication between the vibrator and the controller, so that real-time monitoring of the vibrating position of the vibrator is realized, the position information of the vibrator is matched with the position information of a preset vibrating point through the controller, whether the position of the vibrator deviates from the vibrating point or not can be timely found, real-time feedback in the concrete vibrating process is realized, and the phenomenon that the vibrator collides with a reinforcing steel bar embedded part after deviating to cause dislocation of the reinforcing steel bar is avoided.
Compared with the prior art, the concrete vibrating method for the complex structure of the reinforced embedded part has the beneficial effects that: according to the concrete vibrating method with the complex structure of the reinforcing steel bar embedded part, the vibrating position can be monitored in real time in the concrete pouring and vibrating process by utilizing the vibrating monitoring mode, so that the contact or interference between the vibrating rod and the reinforcing steel bar embedded part can be found in time, the vibrating rod is prevented from impacting the reinforcing steel bar embedded part in the vibrating process, the reinforcing steel bar is prevented from shifting or deforming, the shearing force generated between the reinforcing steel bar and the concrete due to the impact deformation is avoided, the anchoring force of the reinforcing steel bar is reduced, and the structural performance of the concrete is reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are needed in the description of the embodiments of the present invention will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a flow chart of a method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part;
fig. 2 is an electrical connection diagram of a first embodiment of a concrete vibration monitoring device in a concrete vibration method with a more complex structure of a reinforcing steel bar embedded part;
FIG. 3 is an electrical connection diagram of a second embodiment of a concrete vibration monitoring device in a method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part;
fig. 4 is an electrical connection diagram of a third embodiment of a concrete vibration monitoring device in a concrete vibration method with a more complex structure of a reinforcing steel bar embedded part;
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments. All other embodiments, based on the embodiments of the invention, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the invention.
Thus, the following detailed description of the embodiments of the invention, as presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, based on the embodiments of the invention, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the invention.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the apparatus or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present invention, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
As shown in fig. 1, the invention provides a flow chart of a concrete vibrating method with a more complex structure for a reinforced embedded part, which specifically comprises the following steps:
s10: establishing a three-dimensional model of the concrete structure, and dividing the three-dimensional model at equal heights to form a plurality of pouring sections;
s20: dividing each pouring section into a plurality of vibrating areas, and numbering the vibrating areas;
s30: planning embedded parts in each vibrating area, and avoiding position planning vibrating points of the embedded parts;
s40: laying the embedded part on a construction site by combining the position of the embedded part;
s50: and pouring each pouring section from bottom to top in sequence, vibrating at the position of a vibrating point by using a vibrator, and monitoring the vibrating state in real time, and if abnormal conditions exist, timely processing.
It should be noted that, the pouring of column concrete adopts the car pump to pour, and every 6 posts are a set of, circulation unloading. When the column top is used for discharging, the free falling height is not more than 2m, for example, more than 2m, a string cylinder is additionally arranged, and ash is uniformly discharged. And (3) casting the column concrete once, finishing casting height exceeding the beam bottom by 2cm, and removing the column concrete when the beam is constructed. And (3) after the concrete strength reaches 1.2Mpa, performing construction joint treatment, removing the floating slurry layer until stones are exposed, and washing the concrete with water. Before the concrete is poured, cement mortar with the thickness of 5-10 cm and the same mixing proportion of the concrete and the stone is deducted, so that the cement mortar is combined with the lower concrete tightly. When the concrete is poured in layers, the layering thickness is controlled within 500mm. When the concrete is poured, the pouring speed of the pumped concrete is high, and the column part template needs to be corrected for the second time, namely, the correction is performed again after the concrete is poured. The casting layering thickness is as follows: the thickness of the pouring layer is less than or equal to 1.25 times of the length of the action part of the vibrating rod. In the invention, 50 vibrating bars are adopted in the concrete pouring process of the middle column, the length of an acting part is 38.5cm, and the layering thickness of the concrete is 450mm. And (3) manufacturing a concrete pouring thickness control rod on site, detecting at any time, and adjusting the concrete pouring thickness. When concrete is dusted, the flashlight is used for lighting and reading data on the thickness control rod, so that the casting thickness is controlled. The vibration time of concrete vibration is determined by observing that the surface of the concrete is flooded with slurry, no obvious sinking occurs, no bubbles occur any more, and the concrete vibration is required to be compact.
When the beam and plate concrete is poured, a scaffold board is paved on the special steel bar split heads to serve as a pouring horse way so as to prevent the steel bars from being stepped on and deformed. The beam and the slab are poured simultaneously, the pouring method starts to make the cement from one end, the vibrating hands are closely matched, the concrete is kept to advance along the bottom of the beam by a slurry-driving method, the beam is poured in layers according to the height of the beam, and the beam and the slab are poured together after reaching the bottom of the slab. The vibrator and the flat vibrator are matched for vibration, the vibrator is inserted and pulled slowly, and the insertion points are even. The face adopts the flat vibrator, and with the laser leveling machine flattening along with vibrating, the artifical cooperation flattening in local corner, smears the benefit and prohibits the person to trample. The beam column joint steel bars are dense, small vibrating bars with phi 30 are used for vibrating, and small steel bars are prepared for manual auxiliary vibrating.
In the above technical solution, in step S10, the step of dividing the three-dimensional model into equal heights to form a plurality of pouring segments specifically includes:
the height of each pouring section is determined according to the structural characteristics of the concrete structure and the density of the reinforcing steel bars, and the height of each pouring section is 1.25 times of the length of the acting part of the vibrator, and the maximum height is not more than 500mm.
Further, in the above technical solution, step S20 specifically includes the following steps:
the method comprises the steps of firstly, establishing a coordinate system so that the height direction of the concrete structure coincides with the z-axis of the coordinate system, the length direction coincides with the x-axis, and the width direction coincides with the y-axis;
dividing each pouring section into a plurality of vibrating areas;
and thirdly, recording an x coordinate, a y coordinate and a z coordinate at the central position of each vibrating area as the serial numbers of the vibrating areas.
Further, in the above technical solution, the rule for planning the vibration point in step S30 is as follows:
(1) Selecting the vibration density by combining the slump of the concrete;
(2) Selecting vibrating time by combining the self-fluidity of the concrete;
(3) Selecting a vibrating mode by combining the construction requirement of the concrete and the shape of the concrete;
(4) Selecting vibration points according to the volume, shape and arrangement condition of the steel bars of the concrete, the type, parameters and application range of the vibrator and the environmental conditions of the poured concrete, such as the temperature, wind speed and humidity of the concrete;
after the vibration points are planned, the coordinates of each vibration point are recorded based on a coordinate system.
The vibration density refers to the number of vibrations to be applied to the concrete per unit time. The size of the vibration density reflects the full degree of vibration, and has great influence on the compactness, strength and performance of concrete. In general, the vibration density is closely related to the slump of concrete, and concrete having a large slump requires a large number of vibration times. In the construction process of different concretes, proper vibrating density should be selected to realize the best compacting effect.
Proper vibrating time is selected, so that the fluidity of the concrete can be utilized to the greatest extent, and the compaction of the concrete is promoted. Before vibrating, the concrete should be properly waited for self-flowing, and the vibrating is started after the self-flowing reaches a preset height, so that the concrete can be vibrated in the optimal fluidity state, and the cavities and defects in the concrete are effectively reduced.
The vibration mode is usually edge vibration, comprehensive vibration, internal vibration and the like.
Further, in the above technical solution, the rule of planning the embedded part in each vibration area in step S30 is as follows:
(1) The embedded parts are arranged at intervals, at intervals and in distribution so as to avoid overlapping;
(2) The embedded part is arranged to be parallel to the main stress direction of the concrete, so that the structural performance of the embedded part is improved to the greatest extent.
Further, in the above technical solution, the step of vibrating at the position of the vibrating point using the vibrator in step S50 specifically includes:
in the process of continuously pouring concrete, an inserted high-frequency vibrator is used for inserting the lower layer concrete by 50-100 mm, the inserting points are uniformly arranged, the moving is performed sequentially, the moving interval is not more than 1.25 times of the vibrating action radius, the uniform distribution of the vibrating inserting points is ensured, and the positions of column dowel bars are avoided; vibrating until slurry appears on the surface of the concrete, and the concrete is no longer submerged and no bubbles emerge; wherein, the distance between the vibrator inside the vibrator and the template in the vibrating process is not more than 1/2 of the radius of action.
When the shear wall is concreted, a shovel or a concrete conveying pump pipe is used for evenly filling the shear wall into a mould when concreting the wall, and the shear wall is directly filled into the mould without a bucket; the concrete pouring of the wall body adopts the cooperation of a ground pump and a distributing rod, and when the height of the wall body is more than 2m, ash is discharged by an ash groove; the concrete pouring is carried out from one end of the wall body, the ash discharging thickness and the concrete vibrating time are strictly controlled, the pouring thickness of each layer is not more than 500mm, the time for the front and back two times is that the concrete stops flowing, but the next pouring is carried out before final setting; the concrete vibration adopts a slurry-driving method to ensure that the joint parts of new and old concrete are well bonded, the top stay wire is trowelled and has no loose concrete, and cement paste adhered to the steel bars and the templates is cleaned up in time, so that the concrete pouring quality is ensured; the casting thickness of each layer of concrete is controlled to be about 500mm and vibrated; the concrete discharging points of each layer should be distributed; pouring the wall body continuously, wherein the interval time is not more than 2 hours; the construction joint of the wall concrete is arranged in 1/3 section of the bridge span of the door opening.
Further, in the above technical solution, the step of monitoring the vibration state in real time in step S50 specifically includes:
monitoring and feeding back the vibration state in real time by adopting a concrete vibration monitoring device; and observing whether the template, the steel bar, the reserved hole, the embedded part, the steel bar and the like move, deform or block in the pouring process.
As shown in fig. 2, in the above technical solution, the concrete vibration monitoring device further includes: the device comprises a sensing detection unit, a controller and a feedback unit;
the sensing detection unit comprises a sensing optical fiber and a receiving terminal, wherein the sensing optical fiber is fixed at the position, closest to the vibration point, of the embedded part and is used for sending an optical signal to the receiving terminal, and the receiving terminal is used for receiving and analyzing the optical signal to obtain vibration data of vibration position information and amplitude information of the sensing optical fiber and sending the vibration data to the controller;
the controller is used for analyzing and processing the vibration data, obtaining the position relation between the vibrator and the sensing optical fiber, judging whether the vibrator coincides with the position of the sensing optical fiber or not, and sending the judging result to the feedback unit;
the feedback unit is used for correspondingly displaying the combination of the judgment result;
the sensing detection unit is electrically connected with the controller, and the controller is electrically connected with the feedback unit.
When the optical fiber sensor is used, when external vibration acts on the sensing optical fiber, the refractive index and the length of the optical fiber can be slightly changed, so that the phase of a transmission signal in the optical fiber is changed, and the light intensity is changed. The detection and positioning of the optical fiber vibration can be realized by detecting the intensity change of the optical signal before and after vibration through the receiving terminal. The receiving terminal collects vibration data of different positions on the optical fiber, the vibration data are transmitted to the controller analysis processing unit for processing and analysis, when the vibration data of a certain optical fiber position is consistent with the vibration information of the vibrator or only has small difference, the vibrator is judged to be in mutual contact interference with an embedded part where the sensing optical fiber is located, resonance occurs to cause the vibration data to be consistent, and at the moment, the controller sends a judging result to the feedback unit for displaying, and warning prompt is sent to staff.
As shown in fig. 3, the second embodiment of the concrete vibrating method with a more complex structure for a reinforcing steel bar embedded part provided by the invention is that in the present embodiment, the concrete vibrating monitoring device includes: the GPS positioning unit, the controller and the feedback unit;
the GPS positioning unit is arranged at the vibrating head of the vibrator and used for positioning the position of the vibrating head;
the controller is used for acquiring the GPS position of the GPS positioning unit, mapping the GPS position in a coordinate system, comparing and matching the GPS position with the coordinates of the internal preset vibrating point, judging whether the current position of the vibrating head is positioned at the preset position or not, and feeding back the judging result to the feedback unit;
the feedback unit is used for correspondingly displaying the combination of the judgment result;
the GPS positioning unit is electrically connected with the controller, and the controller is electrically connected with the feedback unit.
When the vibration device is used, the GPS positioning unit acquires the GPS coordinates of the vibration head of the vibrator in real time, the controller compares the GPS coordinates of the vibration head with the position information of the preset vibration point in the vibration head, judges whether the current vibration head is in the specified vibration point or not, sends a judgment result to the feedback unit for display, and sends a warning prompt to staff.
As shown in fig. 4, the third embodiment of the concrete vibrating method with a more complex structure for a reinforcing steel bar embedded part provided by the invention is that in the present embodiment, the concrete vibrating monitoring device includes: the device comprises a wireless signal transmitting unit, a wireless signal receiving unit, a controller and a feedback unit;
the wireless signal transmitting unit is arranged on the vibrator and is used for transmitting the ultra-wideband active signal;
the wireless signal receiving unit is arranged in the concrete pouring construction area and is used for receiving the ultra-wideband active signal and sending the ultra-wideband active signal to the controller;
the controller is used for acquiring real-time coordinates of the vibrator, comparing and matching the real-time coordinates with coordinates of internal preset vibrating points, judging whether the current position of the vibrating head is located at the preset position or not, and feeding back a judging result to the feedback unit;
the feedback unit is used for correspondingly displaying the combination of the judgment result;
the wireless signal transmitting unit and the wireless signal receiving unit are electrically connected with the controller, and the controller is electrically connected with the feedback unit.
When the wireless signal transmitting unit is used, the wireless signal transmitting unit is arranged on the vibrating head of the vibrator, the plurality of wireless signal receiving units are arranged in the concrete pouring construction area, each wireless signal receiving unit completely covers the construction area in the received signal transmitting controller with the ultra-wideband active signal tag, the positions of the vibrating head are transmitted to the controller through the plurality of wireless signal receiving units for analysis, and finally the coordinates of the vibrating head in a coordinate system are determined; the controller analyzes real-time coordinate information of the vibrating head and judges whether the position state of the vibrating head deviates.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any person skilled in the art will readily recognize that variations or substitutions are within the scope of the present invention. Therefore, the protection scope of the invention is subject to the protection scope of the claims.

Claims (10)

1. The concrete vibrating method for the complex structure of the reinforced embedded part is characterized by comprising the following steps of:
s10: establishing a three-dimensional model of a concrete structure, and dividing the three-dimensional model at equal heights to form a plurality of pouring sections;
s20: dividing each pouring section into a plurality of vibrating areas, and numbering the vibrating areas;
s30: planning embedded parts in each vibration area, and avoiding the position planning vibration points of the embedded parts;
s40: laying the embedded part on a construction site by combining the position of the embedded part;
s50: and pouring each pouring section from bottom to top in sequence, vibrating at the position of the vibrating point by using a vibrator, monitoring the vibrating state in real time, and timely processing if abnormal conditions exist.
2. The method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 1, wherein in the step S10, the three-dimensional model is divided into equal heights, and the steps for forming a plurality of pouring sections are specifically as follows:
and determining the height of each pouring section according to the structural characteristics of the concrete structure and the density of the reinforcing steel bars, wherein the height of each pouring section is 1.25 times of the length of the acting part of the vibrator, and the maximum height is not more than 500mm.
3. The method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 2, wherein the step S20 specifically comprises the following steps:
the method comprises the following steps of firstly, establishing a coordinate system, so that the height direction of the concrete structure coincides with the z-axis of the coordinate system, the length direction coincides with the x-axis, and the width direction coincides with the y-axis;
dividing each pouring section into a plurality of vibrating areas;
and thirdly, recording an x coordinate, a y coordinate and a z coordinate of the central position of each vibrating area as the serial numbers of the vibrating areas.
4. A method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 3, wherein the rule for planning the vibrating points in the step S30 is as follows:
(1) Selecting the vibration density by combining the slump of the concrete;
(2) Selecting vibrating time by combining the self-fluidity of the concrete;
(3) Selecting a vibrating mode by combining the construction requirement of the concrete and the shape of the concrete;
(4) Selecting vibration points according to the volume, shape and arrangement condition of the steel bars of the concrete, the type, parameters and application range of the vibrator and the environmental conditions of the poured concrete, such as the temperature, wind speed and humidity of the concrete;
after the vibration points are planned, the coordinates of each vibration point are recorded based on the coordinate system.
5. The method for vibrating concrete with a more complex structure of a reinforced concrete embedded part according to claim 4, wherein the rule of planning the embedded part in each vibrating area in the step S30 is as follows:
(1) The embedded parts are arranged at intervals, at distances and in distribution so as to avoid overlapping;
(2) The embedded part is arranged to be parallel to the main stress direction of the concrete, so that the structural performance of the embedded part is improved to the greatest extent.
6. The method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 5, wherein the step of vibrating the reinforcing steel bar embedded part at the position of the vibrating point by using a vibrator in the step S50 is specifically as follows:
in the process of continuously pouring concrete, an inserted high-frequency vibrator is used for inserting the lower layer concrete by 50-100 mm, the inserting points are uniformly arranged, the moving is performed sequentially, the moving interval is not more than 1.25 times of the vibrating action radius, the uniform distribution of the vibrating inserting points is ensured, and the positions of column dowel bars are avoided; vibrating until slurry appears on the surface of the concrete, and the concrete is no longer submerged and no bubbles emerge; wherein, the distance between the vibrator inside the vibrator and the template in the vibrating process is not more than 1/2 of the radius of action.
7. The method for vibrating concrete with a more complex structure of a reinforced embedded part according to claim 6, wherein the step of monitoring the vibrating state in real time in the step S50 is specifically:
monitoring and feeding back the vibration state in real time by adopting a concrete vibration monitoring device; and observing whether the template, the steel bar, the reserved hole, the embedded part, the steel bar and the like move, deform or block in the pouring process.
8. The method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 7, wherein the concrete vibration monitoring device comprises: the device comprises a sensing detection unit, a controller and a feedback unit;
the sensing detection unit comprises a sensing optical fiber and a receiving terminal, wherein the sensing optical fiber is fixed at the position, closest to the vibration point, of the embedded part and is used for sending an optical signal to the receiving terminal, and the receiving terminal is used for receiving and analyzing the optical signal to obtain vibration position information and vibration data of amplitude information of the sensing optical fiber and sending the vibration data to the controller;
the controller is used for analyzing and processing the vibration data, obtaining the position relation between the vibrator and the sensing optical fiber, judging whether the vibrator coincides with the position where the sensing optical fiber is located or not, and sending the judging result to the feedback unit;
the feedback unit is used for correspondingly displaying the judging result;
the sensing detection unit is electrically connected with the controller, and the controller is electrically connected with the feedback unit.
9. The method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 7, wherein the concrete vibration monitoring device comprises: the GPS positioning unit, the controller and the feedback unit;
the GPS positioning unit is arranged at the vibrating head of the vibrator and used for positioning the position of the vibrating head;
the controller is used for acquiring the GPS position of the GPS positioning unit, mapping the GPS position in the coordinate system, comparing and matching the GPS position with the coordinate of the vibration point preset in the inside, judging whether the current position of the vibration head is positioned at the preset position or not, and feeding back the judgment result to the feedback unit;
the feedback unit is used for correspondingly displaying the judging result;
the GPS positioning unit is electrically connected with the controller, and the controller is electrically connected with the feedback unit.
10. The method for vibrating concrete with a more complex structure of a reinforcing steel bar embedded part according to claim 7, wherein the concrete vibration monitoring device comprises: the device comprises a wireless signal transmitting unit, a wireless signal receiving unit, a controller and a feedback unit;
the wireless signal transmitting unit is arranged on the vibrator and is used for transmitting ultra-wideband active signals;
the wireless signal receiving unit is arranged in the concrete pouring construction area and is used for receiving the ultra-wideband active signal and sending the ultra-wideband active signal to the controller;
the controller is used for acquiring real-time coordinates of the vibrator, comparing and matching the real-time coordinates with the coordinates of the vibration points preset in the vibrator, judging whether the current position of the vibration head is located at the preset position or not, and feeding back the judgment result to the feedback unit;
the feedback unit is used for correspondingly displaying the judging result;
the wireless signal transmitting unit and the wireless signal receiving unit are electrically connected with the controller, and the controller is electrically connected with the feedback unit.
CN202310657702.6A 2023-06-05 2023-06-05 Concrete vibrating method for complex structure of reinforced bar embedded part Pending CN116733235A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310657702.6A CN116733235A (en) 2023-06-05 2023-06-05 Concrete vibrating method for complex structure of reinforced bar embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310657702.6A CN116733235A (en) 2023-06-05 2023-06-05 Concrete vibrating method for complex structure of reinforced bar embedded part

Publications (1)

Publication Number Publication Date
CN116733235A true CN116733235A (en) 2023-09-12

Family

ID=87907380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310657702.6A Pending CN116733235A (en) 2023-06-05 2023-06-05 Concrete vibrating method for complex structure of reinforced bar embedded part

Country Status (1)

Country Link
CN (1) CN116733235A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117124455A (en) * 2023-10-23 2023-11-28 四川公路桥梁建设集团有限公司 Beam prefabrication control system, control method, device and medium
CN117536363A (en) * 2024-01-10 2024-02-09 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Energy-saving heat-preserving building wall structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117124455A (en) * 2023-10-23 2023-11-28 四川公路桥梁建设集团有限公司 Beam prefabrication control system, control method, device and medium
CN117124455B (en) * 2023-10-23 2024-04-09 四川公路桥梁建设集团有限公司 Beam prefabrication control system, control method, device and medium
CN117536363A (en) * 2024-01-10 2024-02-09 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Energy-saving heat-preserving building wall structure and construction method thereof
CN117536363B (en) * 2024-01-10 2024-03-26 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Energy-saving heat-preserving building wall structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN116733235A (en) Concrete vibrating method for complex structure of reinforced bar embedded part
CN106284080B (en) Continuous rigid frame aqueduct closes up section constructing method
CN106401207B (en) The overlapping connection structure and its construction method on pillar basis are added for existing building
CN103806656A (en) Construction method of cast-in-place concrete flat slab built-in thin-wall hollow box body
CN107310025A (en) The fabricated device and method for prefabricating of a kind of Prefabricated bar boots
CN107476567A (en) It is a kind of to control the pitched roof gradient and the construction method and track-type facilities of thickness
CN110145124A (en) A kind of control shear wall level connects the reinforcement tools and its construction method of batch quality
CN109555027A (en) A kind of beam sections concrete casting system and its construction method
CN106638183A (en) Urban rail transit assembly board type high precision rail base cast-in-place construction method
CN108643217A (en) A kind of high-speed railway subgrade contact net upright post basic construction method
CN108544655A (en) The curved beam prefabricated construction method of curved bridge
CN108331237A (en) A kind of construction method of constructional column building block and building structure column
CN206844389U (en) Building blocks wall structure
CN115538316A (en) Pier column construction method
CN209538047U (en) A kind of beam sections concrete casting system
CN109139108A (en) The construction method of construction trolley and ditch cable trench
CN211285212U (en) Small box girder structure suitable for medium and small span simply supported girder bridge
CN114083641A (en) Vibrator combined structure in precast T-beam concrete pouring process and use method thereof
CN107894721B (en) Control system and method for arch dam transverse seam opening time
CN114165055A (en) Cast-in-place stair concrete pouring and tamping process
CN107419631B (en) A kind of rapid constructing method on brick structure road surface
CN106049288A (en) Graded casting construction method for cast-in-place annular cantilever pier stud
CN110616659A (en) Method for maintaining and reinforcing anti-collision wall of highway
CN109930628A (en) A kind of pre-buried mounting device and method for breathing out fragrant slot
CN110076877A (en) Building site enclosing prefabricated foundation and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination