CN116596451A - Supervision system for urban construction - Google Patents
Supervision system for urban construction Download PDFInfo
- Publication number
- CN116596451A CN116596451A CN202211597581.2A CN202211597581A CN116596451A CN 116596451 A CN116596451 A CN 116596451A CN 202211597581 A CN202211597581 A CN 202211597581A CN 116596451 A CN116596451 A CN 116596451A
- Authority
- CN
- China
- Prior art keywords
- module
- project
- planning
- supervision
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 68
- 238000007689 inspection Methods 0.000 claims description 52
- 238000007726 management method Methods 0.000 claims description 17
- 238000013500 data storage Methods 0.000 claims description 14
- 238000000034 method Methods 0.000 description 8
- 230000009471 action Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/62—Protecting access to data via a platform, e.g. using keys or access control rules
- G06F21/6218—Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Marketing (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Databases & Information Systems (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Bioethics (AREA)
- Computer Hardware Design (AREA)
- Computer Security & Cryptography (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a supervision system for urban construction, which comprises a project electronic archive platform for establishing a construction project electronic archive; the planning platform is used for inputting planning data information of the construction project; the patrol platform is used for inputting real-time patrol data information of the construction project; the supervision platform is used for supervising the construction project electronic files. The invention collects the information of each project of urban construction in a classified way and establishes a project electronic file, the project planning personnel, the patrol personnel, the constructors, the supervisory personnel and the public related data information of the project are recorded in the electronic file, and the personnel of each party can limit the editing and revising of each component module and unit in the project electronic file through the management authority and the login key set by the supervisory personnel, and the editing and revising in the project electronic file is checked by the supervisory personnel and then registered, and meanwhile, the supervisory personnel can manage the project conveniently.
Description
Technical Field
The invention relates to the technical field of urban construction supervision, in particular to a supervision system for urban construction.
Background
With the acceleration of urban construction pace, smart urban construction has achieved significant success. In the construction and operation of a smart city, a large amount of data is generated, and the data are used as basic stones for supporting the city construction and are key to influence the city construction and management decision by the informatization system in each field of the data components.
The procedures of small scattered engineering and sporadic operation and the recording of data are completed manually, and the informatization means is lacking, so that the effective management cannot be performed.
The prior art CN112381494A discloses an intelligent city construction supervision system and method, wherein the intelligent city construction supervision system comprises a management center layer, and is used for comprehensively managing all construction projects in a jurisdiction area by supervision departments at all levels; the object processing layer is used for providing object processing functions for engineering owners and staff; the system management layer is used for comprehensively managing the user group, the data source interface and the columns; the data resource library layer is used for providing storage service for system operation; and the data exchange layer is used for establishing a basic data interface for information exchange. The invention perfects the collaborative operation among the businesses of project record, inspection, safety inspection, law enforcement joint debugging and the like, establishes on-line channels of each supervision department and project owners, ensures that data run more and people run less, and comprehensively and effectively manages various scattered projects and sporadic operations in the jurisdiction by taking an informatization system as a means.
The scheme solves the defects that the existing scattered engineering and the sporadic operation all business handling processes and data recording are completed manually, an informatization means is lacked, and effective management cannot be performed.
Disclosure of Invention
The present invention is directed to a supervision system for urban construction, which solves the problems set forth in the background art.
In order to solve the technical problems, the invention provides the following technical scheme: the supervision system for urban construction comprises a planning platform, a patrol platform and a supervision platform which are in data connection with project electronic archive platforms;
the project electronic archive platform is used for establishing a construction project electronic archive;
the planning platform is used for inputting planning data information of a construction project;
the patrol platform is used for inputting real-time patrol data information of the construction project;
and the supervision platform is used for supervising the construction project electronic files.
According to the technical scheme, the project electronic archive platform comprises a project planning name module, a project planning address module, a planning memorandum module, a project inspection time module and a project inspection material module which are connected with the data storage module in a data mode;
according to the technical scheme, the planning platform comprises a project planning login module, a project planning key module and a project planning editing module which are sequentially connected with each other through data, and the project planning editing module is respectively connected with the project planning name module, the project planning address module and the planning memorandum module through data.
According to the technical scheme, the inspection platform comprises an item inspection login module, an item inspection key module and an item inspection editing module which are sequentially connected with each other through data, wherein the item inspection editing module is respectively connected with the data between the item inspection time module and the item inspection material module;
the project inspection material module comprises a constructor information registering unit, an inspection condition text creating unit, an inspection condition audio/video recording unit and an inspection condition file uploading unit.
According to the technical scheme, the supervision platform comprises an item supervision login module, an item supervision editing module, an item supervision reading module and a right management module which are connected with the item supervision key module in data, wherein the item supervision reading module and the right management module are respectively connected with the item planning name module, the item planning address module, the planning memo module, the item inspection time module, the item inspection material module and the data storage module in data;
the project electronic archive platform also comprises a supervision memo module which is connected with the project supervision editing module in a data mode.
According to the technical scheme, the supervision system further comprises a public platform, wherein the public platform comprises a public login module, a public reading module and a public editing module, which are sequentially connected with each other through data;
the public reading module is in data connection with the authority management module;
the project electronic archive platform also comprises a public opinion module which is connected with the public editing module data;
the public opinion module comprises a public opinion text creation unit, a public opinion audio/video recording unit and a public opinion file uploading unit.
According to the technical scheme, the supervision system further comprises a cloud database which is in data connection with the data storage modules.
Compared with the prior art, the invention has the following beneficial effects: the invention collects the information of each project of urban construction in a classified way and establishes a project electronic file, the project planning personnel, the patrol personnel, the constructors, the supervisory personnel and the public related data information of the project are recorded in the electronic file, and the personnel of each party can limit the editing and revising of each component module and unit in the project electronic file through the management authority and the login key set by the supervisory personnel, and the editing and revising in the project electronic file is checked by the supervisory personnel and then registered, and meanwhile, the supervisory personnel can manage the project conveniently.
Drawings
The accompanying drawings are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate the invention and together with the embodiments of the invention, serve to explain the invention. In the drawings:
FIG. 1 is a block diagram of a supervisory system for urban construction of the present invention;
FIG. 2 is a block diagram of a project inspection materials module in a supervisory system for urban construction according to the present invention;
fig. 3 is a block diagram of a public opinion module in a supervision system for urban construction according to the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the supervision system comprises a planning platform, a patrol platform and a supervision platform which are in data connection with project electronic archive platforms, wherein the project electronic archive platforms are used for establishing project electronic archives, a comprehensive platform is provided for personnel of each party, each city project corresponds to one project electronic archive, relevant information such as project names, project addresses, project planning, patrol, supervision and the like is recorded in a set mode, the planning platform is used for inputting planning data information of the project, the planning platform is used for project planners, and the project planners carry out filling input on specified information in the project electronic archives through the planning platform; the inspection platform is used for inputting real-time inspection data information of the construction project, inspection staff performs filling input on appointed information in the construction project electronic file through the inspection platform, the supervision platform is used for supervising the construction project electronic file, and supervision staff manages the construction project electronic file through the supervision platform.
The project electronic archive platform comprises a project planning name module, a project planning address module, a planning memo module, a project inspection time module and a project inspection material module which are connected with the data storage module in a data mode, wherein the project planning name module records the name of the construction project, the project planning name module and the project planning address module are respectively used for registering the name and the area address of the construction project, project construction name and area address information are recorded and registered by a planning person, the planning memo module is used for recording notes of the project planning person on specific information of the construction project, and the project inspection time module and the project inspection material module are respectively used for recording specific information such as inspection time of the construction project, progress of the construction project and the like of the inspection person, and the project inspection person is responsible for recording related information. Finally, the data information recorded in each module is stored in a data storage module;
the project planning platform comprises a project planning login module, a project planning key module and a project planning editing module which are sequentially connected through data, wherein the project planning editing module is respectively connected with the project planning name module, the project planning address module and the planning memorandum module through data, project planning personnel enter the project planning key module through the project planning login module to input keys of corresponding construction projects to enter the project planning editing module, and the project planning editing module is used for importing, filling and editing contents in the project planning name module, the project planning address module and the planning memorandum module.
The project patrol platform comprises a project patrol login module, a project patrol key module and a project patrol editing module which are sequentially connected with each other through data, wherein the project patrol editing module is respectively connected with the project patrol time module and the project patrol material module through data, project patrol personnel enter the project patrol key module through the project patrol login module to input keys of corresponding construction projects to enter the project patrol editing module, and the project patrol editing module is used for importing, filling and editing contents in the project patrol time module and the project patrol material module. The project inspection material module comprises a constructor information registering unit, an inspection condition text creating unit, an inspection condition audio/video recording unit and an inspection condition file uploading unit, wherein project inspection personnel can inspect on site to obtain construction project implementation personnel information, the construction project implementation personnel information is registered in the constructor information registering unit, the project inspection personnel edit text form materials obtained by inspecting the construction project on site in the inspection condition text creating unit, the project inspection personnel can record the condition of the construction site of the construction project in real time through a mobile terminal and record the condition in the inspection condition audio/video recording unit, and other information obtained by the project inspection personnel can scan to form electronic information and record the electronic information in the inspection condition file uploading unit.
The supervision platform comprises an item supervision login module, an item supervision editing module, an item supervision reading module and a right management module which are connected with the item supervision key module in data, wherein the item supervision reading module and the right management module are respectively connected with the item planning name module, the item planning address module, the planning memo module, the item patrol time module, the item patrol material module and the data storage module in data; the project electronic archive platform further comprises a supervision memo module which is connected with the project supervision editing module in data, wherein project supervision personnel enter the project supervision editing module, the project supervision reading module and the permission management module through the project supervision login module, the project supervision personnel can import, fill and edit the content in the supervision memo module through the project supervision editing module, the project supervision reading module obtains the data stored in the project planning name module, the project planning address module, the project planning memo module, the project patrol time module, the project patrol material module and the data storage module, and the permission management module can control the project planning name module, the project planning address module, the project planning memo module, the project patrol time module and the project patrol material module to open and close the content editing, control the project planning personnel and the project patrol personnel to edit the content in the corresponding modules in a specified time, and subsequently revise the content in each module to apply permission, so that the content in each module is prevented from being tampered randomly.
The supervision system also comprises a public platform, wherein the public platform comprises a public login module, a public reading module and a public editing module, the data of which are sequentially connected, and the public can acquire the content in each module through the public reading module; the public reading module is in data connection with the permission management module, and the permission management module can control the public reading module to acquire the open closing time and the permission of the development and closing of each reading module in the project planning name module, the project planning address module, the planning memo module, the project inspection time module, the project inspection material module and the data storage module; the project electronic archive platform also comprises a public opinion module which is connected with the public editing module through data; the public opinion module comprises a public opinion text creation unit, a public opinion audio/video recording unit and a public opinion file uploading unit, the public edits literal opinions of construction projects in the public opinion text creation unit, the public opinion audio/video recording unit can record audio/video, other forms of opinions are uploaded to the public opinion file uploading unit and stored in the data storage module, and project supervision personnel can read the contents in the public opinion module through the project management reading module.
The supervision system further comprises a cloud database connected with the data storage modules in a data mode, construction project electronic archive information stored by the data storage modules is synchronized in the cloud database in real time, unified collection of the construction project electronic archive information data is achieved, and safe storage of the data is facilitated.
In the monitoring method, a project supervisor opens a project planning name module, a project planning address module and a planning memorandum module at first, edits contents in the project planning name module, the project planning address module and the planning memorandum module through a project planning editing unit within a set time, fills information such as names, addresses and other parameters of construction projects, closes editing rights of the project planning editing unit to the project planning name module, the project planning address module and the planning memorandum module after the project supervisor passes the content auditing of the project planning name module, the project planning address module and the planning memorandum module, and applies editing rights to the project supervisor first if the project programmer needs to modify the contents in the project planning name module, the project planning address module or the planning memorandum module after the project supervisor closes the editing rights, and modifies and edits the contents under the supervision of the project supervisor. After construction of a construction project, project supervision personnel open a project patrol time module, a project patrol material module and a public opinion module, project patrol personnel register patrol time in the project patrol time module, record patrol obtained information in the project patrol material module, meanwhile, public record comments on the construction project in the public opinion module, after the construction project is completed, the project supervision personnel close editing authorities of the project patrol time module and the project patrol material module, if the project patrol personnel need to modify contents in the project patrol time module and the project patrol material module after the authorities are closed, the project supervision personnel need to apply editing authorities first, and modify and edit under supervision of the project supervision personnel. The public opinion module keeps an open state continuously, and acquires public opinion after construction projects are built in real time.
And after construction of the construction project is completed, the supervision memorandum module, the project planning name module, the project planning address module, the planning memorandum module, the project inspection time module and the project inspection material module are locked, and the contents in the public opinion module are combined together to form the construction project electronic file.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present invention, and the present invention is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present invention has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. A supervisory system for urban construction, characterized by: the supervision system comprises a planning platform, a patrol platform and a supervision platform which are in data connection with the project electronic archive platform;
the project electronic archive platform is used for establishing a construction project electronic archive;
the planning platform is used for inputting planning data information of a construction project;
the patrol platform is used for inputting real-time patrol data information of the construction project;
and the supervision platform is used for supervising the construction project electronic files.
2. A supervision system for urban construction according to claim 1, wherein: the project electronic archive platform comprises a project planning name module, a project planning address module, a planning memorandum module, a project inspection time module and a project inspection material module which are connected with the data storage module in a data mode.
3. A supervision system for urban construction according to claim 2, wherein: the planning platform comprises a project planning login module, a project planning key module and a project planning editing module which are sequentially connected with each other through data, and the project planning editing module is respectively connected with the project planning name module, the project planning address module and the planning memorandum module through data.
4. A supervision system for urban construction according to claim 3, wherein: the project patrol editing module is respectively connected with the project patrol time module and the project patrol material module in data;
the project inspection material module comprises a constructor information registering unit, an inspection condition text creating unit, an inspection condition audio/video recording unit and an inspection condition file uploading unit.
5. A supervision system for urban construction according to claim 4, wherein: the supervision platform comprises an item supervision login module, an item supervision editing module, an item supervision reading module and a right management module which are connected with the item supervision key module in data, wherein the item supervision reading module and the right management module are respectively connected with the item planning name module, the item planning address module, the planning memo module, the item inspection time module, the item inspection material module and the data storage module in data;
the project electronic archive platform also comprises a supervision memo module which is connected with the project supervision editing module in a data mode.
6. A supervision system for urban construction according to claim 5, wherein: the supervision system also comprises a public platform, wherein the public platform comprises a public login module, a public reading module and a public editing module which are sequentially connected with each other through data;
the public reading module is in data connection with the authority management module;
the project electronic archive platform also comprises a public opinion module which is connected with the public editing module data;
the public opinion module comprises a public opinion text creation unit, a public opinion audio/video recording unit and a public opinion file uploading unit.
7. A supervision system for urban construction according to claim 6, wherein: the supervisory system further includes a cloud database in data communication with the data storage modules.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211597581.2A CN116596451A (en) | 2022-12-12 | 2022-12-12 | Supervision system for urban construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211597581.2A CN116596451A (en) | 2022-12-12 | 2022-12-12 | Supervision system for urban construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116596451A true CN116596451A (en) | 2023-08-15 |
Family
ID=87610433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211597581.2A Pending CN116596451A (en) | 2022-12-12 | 2022-12-12 | Supervision system for urban construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116596451A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117371955A (en) * | 2023-10-27 | 2024-01-09 | 深圳瑞捷工程咨询股份有限公司 | Supervision method and system for small powder engineering |
-
2022
- 2022-12-12 CN CN202211597581.2A patent/CN116596451A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117371955A (en) * | 2023-10-27 | 2024-01-09 | 深圳瑞捷工程咨询股份有限公司 | Supervision method and system for small powder engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111598379B (en) | Project management method, platform, device, computer equipment and storage medium | |
Ho et al. | Enhancing knowledge sharing management using BIM technology in construction | |
Lee et al. | BIM‐Based Construction Information Management Framework for Site Information Management | |
US20060195334A1 (en) | Integrated environmental emission reduction data management system and method | |
CN115375146B (en) | Digital construction integrated platform | |
CN106056268A (en) | Engineering project management cloud platform system based on material tracking | |
CN111666464A (en) | Project document cooperation management system and method based on cloud service | |
CN114443923A (en) | Electronic archiving method and system for power grid operation and inspection project archives | |
Salzano et al. | Existing assets maintenance management: Optimizing maintenance procedures and costs through BIM tools | |
Lee et al. | Sensor-integrated hybrid blockchain system for supply chain coordination in volumetric modular construction | |
CN116596451A (en) | Supervision system for urban construction | |
CN113870047A (en) | Power engineering management and control system | |
Boonpheng et al. | Bringing blockchain technology to construction engineering management | |
CN107693997B (en) | Fire fighting equipment detection and maintenance management system and management method | |
CN117670623A (en) | Industrial carbon chain analysis tracking system and method based on identification analysis | |
Tavakoli et al. | Blockchain-based digital twin data provenance for predictive asset management in building facilities | |
Walravens et al. | Data ownership and open data: The potential for data-driven policy making | |
CN113642975A (en) | Hydrogen energy supervision method and system based on block chain | |
CN207070219U (en) | Projects supervision system based on video monitoring | |
CN111860895A (en) | BIM-based bridge auxiliary facility operation maintenance management system | |
Vieth et al. | Data-driven intelligence oversight. Recommendations for a system update | |
CN112232760A (en) | Infrastructure management system and method | |
CN112241892A (en) | Insurance traceability platform and method based on block chain | |
CN116663848A (en) | Multi-terminal full-flow engineering resource interaction management system and method | |
Park et al. | Blockchain based concept model for construction quality management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |