CN116129605A - Comprehensive control method and comprehensive control device for coal mine intelligent park - Google Patents

Comprehensive control method and comprehensive control device for coal mine intelligent park Download PDF

Info

Publication number
CN116129605A
CN116129605A CN202310408912.1A CN202310408912A CN116129605A CN 116129605 A CN116129605 A CN 116129605A CN 202310408912 A CN202310408912 A CN 202310408912A CN 116129605 A CN116129605 A CN 116129605A
Authority
CN
China
Prior art keywords
information
transmission channel
detection
module
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310408912.1A
Other languages
Chinese (zh)
Other versions
CN116129605B (en
Inventor
应永华
姚志生
黄顺权
黄冠龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Long Wall Fluid Kinetic Sci Tech Co Ltd
Original Assignee
Ningbo Long Wall Fluid Kinetic Sci Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Long Wall Fluid Kinetic Sci Tech Co Ltd filed Critical Ningbo Long Wall Fluid Kinetic Sci Tech Co Ltd
Priority to CN202310408912.1A priority Critical patent/CN116129605B/en
Publication of CN116129605A publication Critical patent/CN116129605A/en
Application granted granted Critical
Publication of CN116129605B publication Critical patent/CN116129605B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/02Preventing, monitoring, or locating loss
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/12Alarms for ensuring the safety of persons responsive to undesired emission of substances, e.g. pollution alarms
    • G08B21/16Combustible gas alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B31/00Predictive alarm systems characterised by extrapolation or other computation using updated historic data
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Emergency Management (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Agronomy & Crop Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Operations Research (AREA)
  • Environmental & Geological Engineering (AREA)
  • Development Economics (AREA)
  • Computing Systems (AREA)
  • Toxicology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Educational Administration (AREA)
  • Animal Husbandry (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Mining & Mineral Resources (AREA)
  • Primary Health Care (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Alarm Systems (AREA)
  • Traffic Control Systems (AREA)

Abstract

The invention provides a comprehensive control method and a comprehensive control device for a coal mine intelligent park, wherein the comprehensive control method comprises the following steps: acquiring state information of the transmission channel through a patrol unit arranged on the inner wall of the transmission channel; judging whether the transmission channel meets a first early warning state according to the state information; if yes, controlling the inspection unit to move to a first position corresponding to the first early warning state, and executing leakage detection action on the first position through a detection part of the inspection unit to acquire detection information; and judging whether the transmission channel is in a leakage state according to the detection information. The invention solves the technical problems that in the actual coal mining process, the control force is insufficient for the specific conditions of other channels under the mine, so that people are difficult to know the conditions at the position in time during the coal mining operation, and the information is delayed, so that emergency action cannot be performed.

Description

Comprehensive control method and comprehensive control device for coal mine intelligent park
Technical Field
The invention relates to the technical field of coal mine control, in particular to a comprehensive control method and a comprehensive control device for a coal mine intelligent park.
Background
Along with the rapid change of traditional industry modes of coal mine enterprises in China, the pace of constructing intelligent coal mines is faster and faster, and the safety monitoring of the coal mines is a key for guaranteeing the safety production of the coal mines and preventing accidents. Therefore, the modern scientific technology is applied to the safety monitoring system of the coal mine, is an essential basic means for safety management of the coal mine, and can effectively ensure the safety production of the coal mine. Along with the wide development and popularization of computer technology and Internet technology in China, more and more coal mine enterprises put forward higher requirements on the intellectualization of the production control of the full production chain.
However, the related art has at least one of the following technical problems: for example, before entering an operation roadway, a user often needs to pass through a transmission channel, and because the transmission channel is only used as a transition channel, people often have difficulty in timely knowing the situation at the position during operation, so that the existence of the delay of a message is known, uncertain factors in the operation process of the user are increased, and the safety is reduced. For example, the number of mines excavated in the same mining area is often more than one, and in the actual coal excavation process, operators tend to concentrate on the working tunnel of the coal mining machine, and the control force is insufficient for the specific conditions of other channels under the mining area, once any one of the two mining areas breaks the transmission channel of the other mining area accidentally due to the excavation process, water seepage or a large amount of gas is easy to occur, so that the danger is increased.
Disclosure of Invention
The invention solves the technical problems that in the actual coal mining process, the control force is insufficient for the specific conditions of other channels under the mine, so that people are difficult to know the conditions at the position in time during the coal mining operation, and the information is delayed, so that emergency action cannot be performed.
In order to solve the problems, the invention provides a comprehensive management and control method for a coal mine intelligent park, which comprises construction modules correspondingly arranged in a coal mine area, wherein the construction modules are used for constructing a mine channel, a middle roadway and an operation roadway which are communicated with each other in the coal mine area; the construction module comprises a patrol unit which is arranged in a transmission channel formed by a mine channel and a middle roadway; the comprehensive control method comprises the following steps: acquiring state information of the transmission channel through a patrol unit arranged on the inner wall of the transmission channel; wherein the status information includes surface breakage information generated from the inner wall; judging whether the transmission channel meets a first early warning state according to the state information; if yes, controlling the inspection unit to move to a first position corresponding to the first early warning state, and executing leakage detection action on the first position through a detection part of the inspection unit to acquire detection information; if not, controlling the inspection unit to keep a first inspection action on the inner wall; judging whether the transmission channel is in a leakage state according to the detection information; if the construction module is in the leakage state, controlling the construction module to execute an emergency command according to the leakage type corresponding to the leakage state; if the first position is not in the leakage state, the inspection unit is controlled to execute periodic second inspection action on the first position; wherein the leakage type comprises gas leakage and/or water seepage; after the construction module executes the emergency command, emergency information corresponding to the emergency command is sent to an administrative management module of the coal mine intelligent park, and the administrative management module calls standard risk avoidance response information matched with the emergency command from a historical database according to the emergency information; the standard risk avoidance response information corresponds to the emergency information one by one.
Compared with the prior art, the technical effect achieved by adopting the technical scheme is as follows: for example, the inspection unit includes, for example, a mobile train unit, and specifically, a monitoring device is disposed on the mobile train unit, so that the mobile train unit can monitor the corresponding position of the inner wall when the mobile train unit is paved to the track motion on the inner wall. Therefore, whether the transmission channel is in a leakage state or not is judged by monitoring the integrity of the corresponding surface of the inner wall, so that the effect of timely monitoring the specific condition of the transmission channel by means of the inspection unit can be realized, an operator can timely make emergency actions according to the information fed back by the inspection unit, and the loss caused by the leakage condition of the transmission channel is reduced. In addition, the periodic second inspection action of the inspection unit is combined, so that the inspection monitoring efficiency is further improved, and early warning reaction can be timely carried out according to the surface damage condition of the inner wall.
In one example of the invention, the coal mine intelligent park comprises a ventilation pipeline, the ventilation pipeline is communicated with an operation tunnel, the coal mine intelligent park further comprises a temporary transfer area arranged on the ground, a coal outlet channel communicated with the operation tunnel is formed on the temporary transfer area, the operation tunnel transfers coal to the temporary transfer area through the coal outlet channel, and the ventilation pipeline forms an air outlet exhausting air from the operation tunnel on the temporary transfer area; judging whether the transmission channel meets the first early warning state according to the state information, including: detecting environmental parameter values formed at the air outlet for multiple times in a first preset time period when the transmission channel is judged to not meet the first early warning state; judging whether fluctuation difference values formed between a plurality of first environment parameter values continuously acquired in the multi-time detection and preset environment parameter values respectively fall into a preset fluctuation difference value interval or not; if yes, judging that the operation environment parameter value of the operation roadway meets the safe operation condition, and sending a carrying instruction to the transfer vehicle parked in the waiting area by the administrative management module; if not, a second early warning signal is sent to the operation roadway; wherein the environmental parameter values include gas concentration parameter values.
In one example of the invention, a preset environmental parameter value is defined as C0, M is a set of { C1, C2, …, ct }, t is a continuous time period in a first preset time period, ci is a first environmental parameter value obtained by detection at the ith moment in t, and t is more than or equal to i and more than or equal to 1;
if the first environmental parameter value obtained by detection in the detection process of the first preset time period meets the following formula 1, judging that the operation environmental parameter value meets the safety operation condition; wherein, formula 1 is:
Figure SMS_1
wherein ,
Figure SMS_2
for the preset lower limit fluctuation difference, +.>
Figure SMS_3
The upper limit fluctuation difference value is preset, k1 and k2 are preset parameters respectively, and k1 is more than 0 and k2 is more than 1.
In one example of the invention, the space in the working roadway is divided into a first range and a second range, the first range is centered on the tunneling working face, and the second range is arranged adjacent to the first range; judging whether the transmission channel meets the first early warning state according to the state information, and further comprising: after a second early warning signal is sent into the operation roadway, detecting a first dust concentration in a first range and a second dust concentration in a second range; the first dust concentration is recorded as P1, the second dust concentration is recorded as P2, and P1 is more than or equal to P2; if P2 is more than or equal to L1, judging that the operation roadway is in a first-stage dangerous state, controlling the development machine in the operation roadway to stop running, and controlling the spraying equipment in the operation roadway to execute first cyclic spraying operation on the first range and the second range successively after the development machine stops running; if P1 is more than or equal to L1 and more than P2, judging that the operation roadway is in a second-level dangerous state, controlling the development machine to stop running, and controlling the spraying equipment to execute second spraying operation on the first range after the development machine stops running; if L1 is more than P1 and more than or equal to P2, controlling the heading machine to keep running, and controlling the spraying equipment to execute second cyclic spraying operation on the first range and the second range successively; wherein L1 is the lower limit of the dust explosion concentration, and the duration of the first cyclic spraying operation and the spraying amount in unit time are longer than those of the second cyclic spraying operation.
In one example of the invention, the coal mine intelligent park further comprises an identity recognition module, wherein the identity recognition module is arranged at the entrance of the waiting area into the temporary transfer area, and is used for recognizing the identity of the transfer vehicle entering the temporary transfer area; after judging that the operation environment parameter value meets the safe operation condition, the administrative management module sends a coal carrying instruction to the transfer vehicle parked in the waiting area, and the method comprises the following steps: when the transfer vehicle receives the coal carrying instruction, controlling the transfer vehicle to move to the entrance; acquiring vehicle identity information of the reloaded vehicle through an identity recognition module; wherein the vehicle identity information comprises license plate number information and vehicle appearance information; inputting the vehicle identity information into a standard carrying database of the identity recognition module to obtain standard carrying volume information matched with the vehicle identity information; the transfer vehicle moves to a preset position in the temporary transfer area according to the standard transfer volume information; the conveying equipment arranged in the temporary conveying area conveys the preset coal quantity to a transfer vehicle positioned at a preset position according to the standard conveying quantity information; wherein the standard movement volume is associated with license plate number information and vehicle profile information.
In one example of the invention, when the leak type is water penetration; controlling the construction module to execute the emergency command according to the leakage type corresponding to the leakage state, including: the inspection unit is controlled to send danger avoiding alarms to the transmission channel and the operation roadway, and the inspection unit sends real-time state information corresponding to the first position to the administrative management module; the administrative management module compares the real-time state information with the historical water seepage information in the historical database, and takes emergency measures matched with the real-time state information according to the comparison result of the real-time state information and the historical water seepage information; the emergency measures comprise performing waterproof treatment on the construction module and/or backing up operation data information of the construction module.
In one example of the present invention, controlling the patrol unit to send the risk avoidance alert to the transmission channel and the operation lane includes: a first number of people who leave from an exit of the mine passageway after the sending of the risk avoidance alert; judging whether the first number of people is equal to the second number of people in the transmission channel and the operation tunnel at the moment before sending the danger avoiding alarm; if not, comparing the work clothes labels of the first person number with the work clothes labels of the second person number to determine the residual identity information in the difference person number; wherein the difference number is matched with the identity information of only one of the first number and the second number; and determining the working position range of the mobile terminal according to the residual identity information.
In one example of the present invention, controlling the patrol unit to perform a periodic second patrol operation on the first location includes: comparing the surface breakage information obtained by the jth detection with the surface breakage information obtained by the jth-1 detection to obtain the surface breakage variation from the jth-1 detection to the jth detection; if the calculated surface breakage variation is larger than the surface breakage variation in the last detection period in at least two continuous detection periods, the period duration of executing the second inspection operation is shortened.
On the other hand, the invention also provides a comprehensive management and control device for the coal mine intelligent park, which comprises a construction module correspondingly arranged in the coal mine area, wherein the construction module is used for constructing a mine channel, a middle tunnel and an operation tunnel which are mutually communicated in the coal mine area, and comprises a patrol unit which is arranged in a transmission channel formed by the mine channel and the middle tunnel; the comprehensive control device comprises: the acquisition module is used for acquiring the state information of the transmission channel through the inspection unit arranged on the inner wall of the transmission channel; wherein the status information includes surface breakage information generated from the inner wall; the first judging module is used for judging whether the transmission channel meets a first early warning state according to the state information; the first control module is used for controlling the inspection unit to move to a first position corresponding to the first early warning state when the judgment result is that the transmission channel meets the first early warning state, and executing leakage detection action on the first position through the detection part of the inspection unit to acquire detection information; the second judging module is used for judging whether the transmission channel is in a leakage state or not according to the detection information; the second control module is used for controlling the construction module to execute an emergency command according to the leakage type corresponding to the leakage state when the transmission channel is in the leakage state as a judgment result; if the transmission channel is not in the leakage state, controlling the inspection unit to execute periodic second inspection action on the first position; wherein the leakage type comprises gas leakage and/or water seepage; the emergency module is used for sending emergency information corresponding to the emergency command to an administrative management module of the coal mine intelligent park after the construction module executes the emergency command, and the administrative management module calls standard risk avoidance response information matched with the emergency information from the historical database according to the emergency information; the standard risk avoidance response information corresponds to the emergency information one by one.
Compared with the prior art, the technical effect achieved by adopting the technical scheme is as follows: the technical effects corresponding to any one of the above technical schemes can be achieved, and will not be repeated here.
After the technical scheme of the invention is adopted, the following technical effects can be achieved:
(1) Whether the transmission channel is in a leakage state or not is judged by monitoring the integrality of the corresponding surface of the inner wall, so that the effect of timely monitoring the specific condition of the transmission channel by means of the inspection unit can be realized, an operator can timely make emergency actions according to the information fed back by the inspection unit, and the loss caused by the leakage condition of the transmission channel is reduced. In addition, the periodic second inspection action of the inspection unit is combined, so that the inspection monitoring efficiency is further improved, and early warning reaction can be timely carried out according to the surface damage condition of the inner wall.
Drawings
FIG. 1 is a schematic flow chart of a comprehensive control method for a smart park in a coal mine according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of module connection of a comprehensive control device for a smart park in a coal mine according to a second embodiment of the present invention;
reference numerals illustrate:
100-comprehensive management and control device; 110-an acquisition module; 120-a first judging module; 130-a first control module; 140-a second judging module; 150-a second control module; 160-emergency module.
Detailed Description
In order that the above objects, features and advantages of the invention will be readily understood, a more particular description of the invention will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings.
Embodiment one:
referring to fig. 1, a flow chart of a comprehensive control method for a coal mine intelligent park according to an embodiment of the invention is shown. The intelligent coal mine park comprises construction modules which are correspondingly arranged in a coal mine area, wherein the construction modules are used for constructing a mine channel, a middle tunnel and an operation tunnel which are communicated with each other in the coal mine area; the construction module comprises a patrol unit which is arranged in a transmission channel formed by a mine channel and a middle roadway; the comprehensive control method specifically comprises the following steps:
step S1, acquiring state information of a transmission channel through a patrol unit arranged on the inner wall of the transmission channel; wherein the status information includes surface breakage information generated from the inner wall.
And S2, judging whether the transmission channel meets a first early warning state according to the state information.
And S21, if yes, controlling the inspection unit to move to a first position corresponding to the first early warning state, and executing a leakage detection action on the first position through a detection part of the inspection unit to acquire detection information.
Step S22, if not, the inspection unit is controlled to keep the first inspection operation on the inner wall.
And step S3, judging whether the transmission channel is in a leakage state or not according to the detection information.
And S31, if the construction module is in the leakage state, controlling the construction module to execute the emergency command according to the leakage type corresponding to the leakage state.
Step S32, if the first position is not in the leakage state, the inspection unit is controlled to execute periodic second inspection operation on the first position. Wherein the leakage type comprises gas leakage and/or water seepage.
Step S4, after the construction module executes the emergency command, emergency information corresponding to the emergency command is sent to an administrative management module of the coal mine intelligent park, and the administrative management module calls standard risk avoidance response information matched with the emergency command from the historical database according to the emergency information; the standard risk avoidance response information corresponds to the emergency information one by one.
For example, the inspection unit includes, for example, a mobile train unit, and specifically, a monitoring device is disposed on the mobile train unit, so that the mobile train unit can monitor the corresponding position of the inner wall when the mobile train unit is paved to the track motion on the inner wall. Therefore, whether the transmission channel is in a leakage state or not is judged by monitoring the integrity of the corresponding surface of the inner wall, so that the effect of timely monitoring the specific condition of the transmission channel by means of the inspection unit can be realized, an operator can timely make emergency actions according to the information fed back by the inspection unit, and the loss caused by the leakage condition of the transmission channel is reduced. In addition, the periodic second inspection action of the inspection unit is combined, so that the inspection monitoring efficiency is further improved, and early warning reaction can be timely carried out according to the surface damage condition of the inner wall.
Specifically, in another specific example, the above-mentioned track can be arranged on the ground in the transmission channel, so that the situation that the part, which is covered by the track laid on the inner wall, is difficult to monitor in the process of monitoring the inner wall of the mobile vehicle set is avoided, and thus, a monitoring leak is formed. On the contrary, the track laid on the ground is arranged in a direction close to the inner wall, and the mobile train unit comprises a body, a mobile wheel set and a detection component for further accurately acquiring the surface condition of the inner wall of the transmission channel. The movable wheel set is connected to the bottom end of the machine body and is used for being in rolling connection with the track; the detection component is arranged at the top end of the machine body, the detection component is rotationally connected with the machine body, the signal light ray emission port of the detection component is arranged towards the direction of the inner wall, and the detection component emits detection signal light rays towards the inner wall through the signal light ray emission port. Then, the detection part rotates to form a detection area projected on the inner wall through the emitted detection signal light, and then whether the part of the inner wall corresponding to the detection area at the moment meets the first early warning state is judged by acquiring the detection information of the inner wall corresponding to the detection area.
Of course, the track laid on the ground extends along the length direction of the transmission channel, so that the mobile train unit rotates and projects detection signal light in the direction of the surface of the inner wall in combination with the detection part to obtain surface damage information on each position of the inner wall in the moving process of the track, the effect of comprehensively detecting the surface of the inner wall is improved, and the risk of missing detection is reduced.
Further, if the inspection unit detects that, for example, a breakage occurs on the inner wall, it indicates that there is a risk of gas leakage and water seepage. It should be noted that, because the transmission channels are channels formed by digging under the ground, and the characteristics of the coal mine are combined, the gas dissociated in the transmission channels is removed, that is, the gas is mainly concentrated in the operation channels, and the residual gas is adsorbed to the surface of the coal mine, for example, a plurality of transmission channels digging in the same mining area, once the plurality of transmission channels are mutually dug in the process of digging and mining, the gas in at least one transmission channel is easily leaked into another transmission channel communicated with the transmission channels, specifically, the gas in one transmission channel is leaked into the middle channel of the other transmission channels, or the two operation channels leaking the gas are communicated; or when the inner wall surface of the transmission channel is seriously damaged, the transmission channel is easily communicated with other undeveloped areas in the coal mine, if the areas are rich in gas, the gas in the areas can leak into the transmission channel, so that the gas content in the transmission channel is increased, and the potential risk of gas explosion is formed.
In addition, the inner wall of the transmission channel is damaged, so that water leakage is likely. In the underground coal mining process, a plurality of coal mines are buried in positions near the river channel, and when the coal mines are performed at the positions, the dynamic flowing flushing of river water of the river is combined, so that the structural stability of the constructed transmission channel is influenced. Then, when the inspection unit detects that the inner wall surface of the transmission channel is damaged, the transmission channel is judged to meet the first early warning state, namely the risk of gas leakage or water leakage exists.
Further, when the transmission channel satisfies the first early warning state, it does not mean that the gas leakage or water leakage is already performed at this time. More specifically, when the damage is not serious, for example, only the surface layer on the smaller area of the inner wall is dropped, the inspection unit is controlled to maintain the second inspection operation, wherein the second inspection operation may specifically be represented as that the inspection unit is stopped at the position of the track, the inspection unit is rotated relative to the machine body to inspect the surface condition of the transverse area along the transmission channel, and then the inspection unit is controlled to move in the track, that is, move along the longitudinal length direction of the transmission channel, and the above-mentioned inspection of the surface condition of the transverse area along the transmission channel is repeated. Of course, when the transmission channel satisfies the first early warning state, the area where the damage occurs on the inner wall is defined as a risk area, so that in the process of executing the second inspection action, the detection duty ratio of the inspection unit to the risk area is increased, for example, the detection times of the detection part rotating reciprocally to sweep the risk area is increased, or the detection duration of the detection part staying in the risk area is increased. And the second inspection action is kept on the inner wall by controlling the inspection unit so as to acquire the surface damage information of the inner wall to the greatest extent in time.
Of course, when a plurality of risk areas appear on the surface of the inner wall, the specific gravity execution such as the detection duration or the detection times of the inspection unit on the plurality of risk areas may be controlled, or the second inspection operation may be executed according to the priority that the surface area of the surface damage in the plurality of risk areas is larger, and the second inspection operation may be executed after the surface area of the surface damage is smaller.
Further, when the transmission channel is judged to be in the leakage state, the detection information may specifically include water seepage information and gas information. In a specific example, the detection component includes a dynamic identification module, where the dynamic identification module is used to identify and detect the water seepage condition of the inner wall corresponding to the first position and convert the water seepage condition into corresponding water seepage information, so that the control construction module according to the water seepage information can specifically include backup construction operation information of the construction module so as to extract the construction operation at the first time to perform the working state when the normal operation is restored next time, and of course, the control construction module can be controlled to take waterproof measures, especially, the power supply equipment in the construction module can be in a waterproof state, so that damage to the power supply equipment when water seepage is serious is avoided, especially, the power supply equipment is not in a waterproof state and runs to cause water contact short circuit, and the internal circuit condition is burnt.
Furthermore, the history database can be understood as a standard risk avoidance response measure corresponding to the standard risk avoidance response information causing the minimum loss, which is adopted by the stored coal mine intelligent park when the leakage condition occurs in the history. It should be noted that the standard risk avoidance response measure indicated herein may also be a standard response measure taken when other coal mine historic periods have a leak. Of course, in order to ensure that the enforceability of taking the standard hedging response actions corresponding to the standard hedging response information is safe enough and the loss which can be caused is minimum, the data stored in the historical database is the standard hedging response information disclosed in the coal mine intelligent park and other coal mine areas. The standard risk avoidance response information is a standard measure accepted in the art, and is not described herein.
Thus, the loss suffered by the coal mine intelligent park can be ensured to be minimum by adopting standard risk avoidance response information matched with the emergency information. Preferably, the coal mine intelligent park comprises a ventilating duct, the ventilating duct is communicated with an operation roadway, the coal mine intelligent park further comprises a temporary transfer area arranged on the ground, a coal outlet channel communicated with the operation roadway is formed in the temporary transfer area, the operation roadway transfers coal to the temporary transfer area through the coal outlet channel, and the ventilating duct forms an air outlet exhausting from the operation roadway in the temporary transfer area. The step S2 specifically comprises the following steps:
And S21, detecting environmental parameter values formed at the air outlet for a plurality of times in a first preset time period when the transmission channel is judged to not meet the first early warning state.
Step S22, judging whether fluctuation difference values formed between a plurality of first environment parameter values continuously acquired in the plurality of detection and preset environment parameter values respectively fall into a preset fluctuation difference value interval.
Step S231, if yes, judging that the operation environment parameter value of the operation roadway meets the safety operation condition, and sending a conveying instruction to the transfer vehicle parked in the waiting area by the administrative management module.
Step S232, if not, a second early warning signal is sent to the operation roadway; wherein the environmental parameter values include gas concentration parameter values.
It should be noted that, the above-mentioned gas concentration corresponding to the gas leakage obtained by the inspection unit corresponds to the first position and the position near the first position, and is not equal to the gas concentration detected by the air outlet. Specifically, when the environmental parameter value is, for example, a gas concentration parameter value, the gas concentration parameter value formed at the air outlet is detected for a plurality of times to further obtain the gas content in the operation roadway. In short, the working roadway needs to mine within the gas safety concentration range to ensure normal mining operation so as to ensure personal safety of constructors. In the process of tunneling and mining, the gas concentration in the operation tunnel can change, and in order to improve the detection accuracy, the gas concentration needs to be detected for multiple times at the air outlet.
Preferably, defining a preset environment parameter value as C0, M as a set of { C1, C2, …, ct }, t as a continuous time period in a first preset time period, and Ci as a first environment parameter value obtained by detection at the ith moment in t, wherein t is more than or equal to i and more than or equal to 1; if the first environmental parameter value obtained by detection in the detection process of the first preset time period meets the following formula 1, judging that the operation environmental parameter value meets the safety operation condition; wherein, formula 1 is:
Figure SMS_4
wherein ,
Figure SMS_5
for the preset lower limit fluctuation difference, +.>
Figure SMS_6
The upper limit fluctuation difference value is preset, k1 and k2 are preset parameters respectively, and k1 is more than 0 and k2 is more than 1. Specifically, the->
Figure SMS_7
For indicating the difference accumulation of the detected first environmental parameter value within t and the preset environmental parameter value, ->
Figure SMS_8
For representing the average of the accumulation of the differences between the detected first environmental parameter value and the preset environmental parameter value within t.
Thus M is a set representing the values of the gas concentration parameter acquired during the first preset time period, M min For the minimum value in the set M, M max Is the maximum value in set M. For example, the gas concentration parameter values may be collected every 5 seconds, and C1 is the gas concentration parameter value collected for the first time within the first preset time period, and C2 is the gas concentration parameter value collected from 5 seconds after the collection of C1 until Ct is collected at time t. Wherein C0 is used for representing a preset environmental parameter value capable of safely operating in the operation roadway, and the environmental parameter value corresponding to the safe operation in the operation roadway is combined with a small fluctuation value around C0, namely k1 and (M) min -C0) as a preset lower limit fluctuation value, more accurately reflects whether the environmental parameter values in the operation lane meet the safety operation requirements, in contrast to k2 and (M) max The same holds true for the product of C0) as the preset offline ripple value, which is not described here again.
Preferably, the space in the working roadway is divided into a first range and a second range, the first range takes the tunneling working face as the center, and the second range is adjacent to the first range; the step S2 specifically further comprises the following steps:
after a second early warning signal is sent into the operation roadway, detecting a first dust concentration in a first range and a second dust concentration in a second range; the first dust concentration is P1, the second dust concentration is P2, and P1 is more than or equal to P2.
If P2 is more than or equal to L1, judging that the operation roadway is in a first-stage dangerous state, controlling the development machine in the operation roadway to stop running, and controlling the spraying equipment in the operation roadway to execute first cyclic spraying operation on the first range and the second range successively after the development machine stops running.
If P1 is more than or equal to L1 and more than P2, judging that the operation roadway is in a second-level dangerous state, controlling the development machine to stop running, and controlling the spraying equipment to execute second spraying operation on the first range after the development machine stops running.
If L1 is more than P1 and more than or equal to P2, the heading machine is controlled to keep running, and the spraying equipment is controlled to execute the second cyclic spraying operation on the first range and the second range successively.
Wherein L1 is the lower limit of the dust explosion concentration, and the duration of the first cyclic spraying operation and the spraying amount in unit time are longer than those of the second cyclic spraying operation.
Preferably, the coal mine intelligent park further comprises an identity recognition module, the identity recognition module is arranged at an entrance of the waiting area into the temporary transfer area, and the identity recognition module is used for recognizing the transfer vehicle entering the temporary transfer area.
Further, after judging that the operation environment parameter value meets the safe operation condition, the administrative management module sends a coal handling instruction to the transfer vehicle parked in the waiting area, and the method comprises the following steps:
and after the transfer vehicle receives the coal carrying instruction, controlling the transfer vehicle to move to the entrance.
Acquiring vehicle identity information of the reloaded vehicle through an identity recognition module; wherein the vehicle identity information includes license plate number information and vehicle exterior information.
And inputting the vehicle identity information into a standard carrying database of the identity recognition module to acquire standard carrying volume information matched with the vehicle identity information.
The transfer vehicle moves to a preset position in the temporary transfer area according to the standard transfer volume information.
The conveying equipment arranged in the temporary conveying area conveys the preset coal quantity to a transfer vehicle positioned at a preset position according to the standard conveying quantity information. Wherein the standard movement volume is associated with license plate number information and vehicle profile information.
In one embodiment, a weight sensing assembly is disposed at a preset position where the transferring vehicle is located, the weight sensing assembly is used for sensing a weight of the transferring vehicle disposed thereon, in particular, a receiving groove for receiving the weight sensing assembly is formed on the ground, so that a top surface of the weight sensing assembly is approximately level with a ground around the top surface of the weight sensing assembly. Therefore, the support plate and the ground are arranged in a flush manner, so that the reversed vehicle can smoothly move onto the support plate, and the weight sensor can read the weight of the reversed vehicle.
Further, in order to better control the amount of coal carried to the transfer vehicle, a display screen and an early warning device matched with the corresponding weight sensor assembly can be arranged at a place corresponding to the preset position, and the display screen is used for displaying the coal loading amount of the transfer vehicle at the corresponding position; when the actual coal load of the reversed vehicle reaches the set required quantity, the early warning device sends out an early warning prompt signal, for example, the early warning prompt signal can be expressed in a form of alarm sound or flash of an early warning lamp.
It can be understood that, in order to obtain the coal load of the transfer vehicle more accurately, the weight calculation of the weight sensor assembly on the transfer vehicle includes an empty weight and a full weight, and specifically, the empty weight is the weight obtained in a state that the transfer vehicle is stopped when the transfer vehicle just enters a preset position, and the full weight is the weight when the transfer vehicle reaches the preset coal amount, at this time, the early warning device sends an early warning prompt signal, and the handling device pauses the coal conveying action on the transfer vehicle. For example, the conveying device may be a conveyor device, and the preset position is set at the output end of the conveyor device, so that the coal on the conveyor device can enter the loading space of the transfer vehicle under the action of self gravity to realize the coal conveying operation.
It is conceivable that the load capacity of the transfer vehicle is effectively managed through cooperation of the weight sensor assembly and the carrying device, so that on one hand, the load capacity of the transfer vehicle is prevented from being too low to reduce the loading efficiency, on the other hand, traffic accidents which are easy to cause due to the fact that the load capacity of the transfer vehicle is too large are avoided, particularly, when the transfer vehicle is operated in sudden braking, sharp turning or large-angle turning, overload coal is easy to cause to pour out of the transfer vehicle or the risk of dumping of a vehicle body is increased under the action of self inertia force of the overload coal, and the transportation safety of the transfer vehicle is improved by combining the technical scheme.
Preferably, when the leakage type is water penetration; the control construction module executing the emergency command according to the leakage type corresponding to the leakage state specifically comprises:
the inspection unit is controlled to send danger avoiding alarms to the transmission channel and the operation roadway, and the inspection unit sends real-time state information corresponding to the first position to the administrative management module.
The administrative management module compares the real-time state information with the historical water seepage information in the historical database, and takes emergency measures matched with the real-time state information according to the comparison result of the real-time state information and the historical water seepage information; the emergency measures comprise performing waterproof treatment on the construction module and/or backing up operation data information of the construction module.
Preferably, the controlling the patrol unit to send the risk avoidance alarm to the transmission channel and the operation roadway specifically includes:
obtained from a first person leaving an exit from the mine shaft after sending the hedge alert.
And judging whether the first number of people is equal to the second number of people in the transmission channel and the operation tunnel at the moment before sending the danger avoiding alarm.
If not, comparing the work clothes labels of the first person number with the work clothes labels of the second person number to determine the residual identity information in the difference person number; wherein the difference number matches the identity information of only one of the first number and the second number.
And determining the working position range of the mobile terminal according to the residual identity information.
Preferably, the controlling the inspection unit to perform the periodic second inspection operation on the first position specifically includes:
and comparing the surface breakage information obtained by the jth detection with the surface breakage information obtained by the jth-1 detection to obtain the surface breakage variation from the jth-1 detection to the jth detection.
If the calculated surface breakage variation is larger than the surface breakage variation in the last detection period in at least two continuous detection periods, the period duration of executing the second inspection operation is shortened.
Embodiment two:
referring to fig. 2, a schematic diagram of module connection of a comprehensive control device 100 for a smart campus of a coal mine according to a second embodiment of the present invention is shown. The intelligent park of the coal mine comprises a construction module which is correspondingly arranged in the coal mine area, wherein the construction module is used for constructing a mine channel, a middle tunnel and an operation tunnel which are mutually communicated in the coal mine area, the construction module comprises a patrol unit, and the patrol unit is arranged in a transmission channel formed by the mine channel and the middle tunnel; the integrated management and control device 100 includes, for example, an acquisition module 110, a first determination module 120, a first control module 130, a second determination module 140, a second control module 150, and an emergency module 160.
Specifically, the acquiring module 110 is configured to acquire status information of the transmission channel through a patrol unit disposed on an inner wall of the transmission channel; wherein the status information includes surface breakage information generated from the inner wall; the first judging module 120 is configured to judge whether the transmission channel meets a first early warning state according to the state information; the first control module 130 is configured to control the inspection unit to move to a first position corresponding to the first early warning state when the transmission channel satisfies the first early warning state as a result of the determination, and perform a leakage detection action on the first position through a detection component of the inspection unit to obtain detection information; the second judging module 140 is configured to judge whether the transmission channel is in a leakage state according to the detection information; the second control module 150 is configured to control the construction module to execute an emergency command according to the leakage type corresponding to the leakage state when the transmission channel is in the leakage state as a result of the determination; if the transmission channel is not in the leakage state, controlling the inspection unit to execute periodic second inspection action on the first position; wherein the leakage type comprises gas leakage and/or water seepage; the emergency module 160 is configured to send emergency information corresponding to the emergency command to an administrative management module of the coal mine intelligent park after the construction module executes the emergency command, and the administrative management module invokes standard risk avoidance response information matched with the emergency command from the history database according to the emergency information; the standard risk avoidance response information corresponds to the emergency information one by one.
Therefore, the technical effects corresponding to any technical scheme in the above embodiment can be achieved in this embodiment, and will not be described herein.
Although the present invention is disclosed above, the present invention is not limited thereto. Various changes and modifications may be made by one skilled in the art without departing from the spirit and scope of the invention, and the scope of the invention should be assessed accordingly to that of the appended claims.

Claims (9)

1. The comprehensive management and control method for the coal mine intelligent park comprises construction modules correspondingly arranged in a coal mine area, wherein the construction modules are used for constructing a mine channel, a middle roadway and an operation roadway which are communicated with each other in the coal mine area; the construction module is characterized by comprising a patrol unit, wherein the patrol unit is arranged in a transmission channel formed by the mine channel and the middle roadway; the comprehensive control method comprises the following steps:
acquiring state information of the transmission channel through the inspection unit arranged on the inner wall of the transmission channel; wherein the status information includes surface breakage information generated from the inner wall;
judging whether the transmission channel meets a first early warning state according to the state information;
If yes, controlling the inspection unit to move to a first position corresponding to the first early warning state, and executing a leakage detection action on the first position through a detection part of the inspection unit to acquire detection information; if not, controlling the inspection unit to keep a first inspection action on the inner wall;
judging whether the transmission channel is in a leakage state or not according to the detection information;
if the construction module is in the leakage state, controlling the construction module to execute an emergency command according to the leakage type corresponding to the leakage state; if the first position is not in the leakage state, controlling the inspection unit to execute periodic second inspection action on the first position; wherein the leakage type comprises gas leakage and/or water seepage;
after the construction module executes the emergency command, emergency information corresponding to the emergency command is sent to an administrative management module of the coal mine intelligent park, and the administrative management module calls standard risk avoidance response information matched with the emergency command from a historical database according to the emergency information; the standard risk avoidance response information corresponds to the emergency information one by one.
2. The comprehensive control method according to claim 1, wherein the smart campus for coal mine comprises a ventilation pipeline which is communicated with the operation roadway, the smart campus for coal mine further comprises a temporary transfer area which is arranged on the ground, a coal outlet channel which is communicated with the operation roadway is formed on the temporary transfer area, coal is transferred to the temporary transfer area through the coal outlet channel by the operation roadway, and an air outlet which is exhausted from the operation roadway is formed on the temporary transfer area by the ventilation pipeline; the judging whether the transmission channel meets the first early warning state according to the state information comprises the following steps:
Detecting environmental parameter values formed at the air outlet for multiple times in a first preset time period when the transmission channel is judged to not meet the first early warning state;
judging whether fluctuation difference values formed between a plurality of first environment parameter values continuously acquired in the plurality of detection and preset environment parameter values respectively fall into a preset fluctuation difference value interval or not;
if yes, judging that the operation environment parameter value of the operation roadway meets the safe operation condition, and sending a carrying instruction to the transfer vehicle parked in the waiting area by the administrative management module;
if not, a second early warning signal is sent to the operation roadway;
wherein the environmental parameter value includes a gas concentration parameter value.
3. The integrated management and control method as defined in claim 2, wherein,
defining preset environment parameter values as C0, M as a set of { C1, C2, …, ct }, t as a continuous time period in the first preset time period, and Ci as a first environment parameter value obtained by detection at the ith moment in t, wherein t is more than or equal to i and more than or equal to 1;
if the first environmental parameter value obtained by detection in the detection process of the first preset time period meets the following formula 1, judging that the operation environmental parameter value meets the safety operation condition;
Wherein, the formula 1 is:
Figure QLYQS_1
wherein ,
Figure QLYQS_2
for the preset lower limit fluctuation difference, +.>
Figure QLYQS_3
The upper limit fluctuation difference value is preset, k1 and k2 are preset parameters respectively, and k1 is more than 0 and k2 is more than 1.
4. The comprehensive control method according to claim 2, wherein the space in the working roadway is divided into a first range and a second range, the first range is centered on a tunneling working face, and the second range is disposed adjacent to the first range; the step of judging whether the transmission channel meets a first early warning state according to the state information further comprises:
after the second early warning signal is sent into the operation roadway, detecting a first dust concentration in the first range and a second dust concentration in the second range; recording the first dust concentration as P1, the second dust concentration as P2, and the P1 is more than or equal to P2;
if P2 is more than or equal to L1, judging that the operation roadway is in a first-stage dangerous state, controlling a development machine in the operation roadway to stop running, and controlling spraying equipment in the operation roadway to execute first cyclic spraying operation on the first range and the second range successively after the development machine stops running;
If P1 is more than or equal to L1 and more than P2, judging that the operation roadway is in a secondary dangerous state, controlling the development machine to stop running, and controlling the spraying equipment to execute second spraying operation on the first range after the development machine stops running;
if L1 is more than P1 and more than or equal to P2, controlling the heading machine to keep running, and controlling the spraying equipment to execute a second circulating spraying operation on the first range and the second range successively;
and L1 is a lower limit of the dust explosion concentration, and the continuous spraying duration and the spraying quantity in unit time of the first cyclic spraying operation are larger than those of the second cyclic spraying operation.
5. The comprehensive control method according to claim 2 or 3, wherein the smart park further comprises an identity recognition module, the identity recognition module is disposed at an entrance from the waiting area into the temporary transfer area, and the identity recognition module is configured to recognize the transfer vehicle entering the temporary transfer area; after judging that the operation environment parameter value meets the safe operation condition, the administrative management module sends a coal carrying instruction to a transfer vehicle parked in a waiting area, and the method comprises the following steps:
When the transfer vehicle receives the coal carrying instruction, controlling the transfer vehicle to move to the entrance;
acquiring vehicle identity information of the reversed vehicle through the identity recognition module; wherein the vehicle identity information comprises license plate number information and vehicle appearance information;
inputting the vehicle identity information into a standard carrying database of the identity recognition module to obtain standard carrying volume information matched with the vehicle identity information;
the transfer vehicle moves to a preset position in the temporary transfer area according to the standard transfer volume information;
the conveying equipment arranged in the temporary transfer area conveys the preset coal quantity to the transfer vehicle at the preset position according to the standard conveying quantity information;
wherein the standard movement volume is associated with the license plate number information and the vehicle exterior shape information.
6. The integrated management and control method of claim 1, wherein when the leak type is water penetration; the step of controlling the construction module to execute the emergency command according to the leakage type corresponding to the leakage state comprises the following steps:
controlling the inspection unit to send an danger avoiding alarm to the transmission channel and the operation roadway, and sending real-time state information corresponding to the first position to the administrative management module;
The administrative management module compares the real-time state information with the historical water seepage information in the historical database, and takes emergency measures matched with the real-time state information according to the comparison result of the real-time state information and the historical water seepage information; the emergency measures comprise performing waterproof treatment on the construction module and/or backing up operation data information of the construction module.
7. The comprehensive control method according to claim 6, wherein the controlling the patrol unit to send the danger-avoiding alarm to the transmission channel and the operation lane comprises:
acquiring a first number of people leaving from an outlet of the mine passageway after sending the risk avoidance alarm;
judging whether the first number of people is equal to a second number of people in the transmission channel and the operation roadway at a moment before sending the risk avoidance alarm;
if not, comparing the work clothes labels of the first number of people with the work clothes labels of the second number of people to determine the residual identity information in the difference number of people; wherein the difference number matches identity information of only one of the first number and the second number;
and determining the working position range of the residual identity information according to the residual identity information.
8. The integrated management and control method of claim 1, wherein the controlling the patrol unit to perform a periodic second patrol action on the first location comprises:
comparing the surface breakage information obtained by the jth detection with the surface breakage information obtained by the jth detection to obtain a surface breakage variation between the jth detection and the jth detection;
and if the calculated surface breakage variation is larger than the surface breakage variation in the last detection period in at least two continuous detection periods, shortening the period duration of executing the second inspection operation.
9. The comprehensive management and control device for the coal mine intelligent park comprises a construction module which is correspondingly arranged in a coal mine area, wherein the construction module is used for constructing a mine channel, a middle roadway and an operation roadway which are mutually communicated in the coal mine area, the construction module comprises a patrol unit, and the patrol unit is arranged in a transmission channel formed by the mine channel and the middle roadway; the comprehensive management and control device is characterized by comprising:
the acquisition module is used for acquiring the state information of the transmission channel through the inspection unit arranged on the inner wall of the transmission channel; wherein the status information includes surface breakage information generated from the inner wall;
The first judging module is used for judging whether the transmission channel meets a first early warning state according to the state information;
the first control module is used for controlling the inspection unit to move to a first position corresponding to the first early warning state when the transmission channel meets the first early warning state as a judgment result, and executing leakage detection action on the first position through a detection part of the inspection unit to obtain detection information;
the second judging module is used for judging whether the transmission channel is in a leakage state or not according to the detection information;
the second control module is used for controlling the construction module to execute an emergency command according to the leakage type corresponding to the leakage state when the transmission channel is in the leakage state as a judgment result; if the transmission channel is not in the leakage state as a result of the judgment, controlling the inspection unit to execute periodic second inspection action on the first position; wherein the leakage type comprises gas leakage and/or water seepage;
the emergency module is used for sending emergency information corresponding to the emergency command to an administrative management module of the coal mine intelligent park after the construction module executes the emergency command, and the administrative management module calls standard risk avoidance response information matched with the emergency command from a historical database according to the emergency information; the standard risk avoidance response information corresponds to the emergency information one by one.
CN202310408912.1A 2023-04-18 2023-04-18 Comprehensive control method and comprehensive control device for coal mine intelligent park Active CN116129605B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310408912.1A CN116129605B (en) 2023-04-18 2023-04-18 Comprehensive control method and comprehensive control device for coal mine intelligent park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310408912.1A CN116129605B (en) 2023-04-18 2023-04-18 Comprehensive control method and comprehensive control device for coal mine intelligent park

Publications (2)

Publication Number Publication Date
CN116129605A true CN116129605A (en) 2023-05-16
CN116129605B CN116129605B (en) 2023-09-01

Family

ID=86306675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310408912.1A Active CN116129605B (en) 2023-04-18 2023-04-18 Comprehensive control method and comprehensive control device for coal mine intelligent park

Country Status (1)

Country Link
CN (1) CN116129605B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117935176A (en) * 2024-03-25 2024-04-26 宁波长壁流体动力科技有限公司 Control method and control system for coal mine park

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120011365A1 (en) * 2009-03-20 2012-01-12 Schmidt Paul E Method and Apparatus for Reliable Communications in Underground and Hazardous Areas
CN108757041A (en) * 2018-06-14 2018-11-06 安徽理工大学 A kind of safety dynamic monitoring management system of mine
CN112377262A (en) * 2020-11-11 2021-02-19 闵苓 Coal mine geology alarm device that leaks
CN213209392U (en) * 2020-09-27 2021-05-14 上海民办张江集团学校 Water leakage alarm disposal system
CN113252004A (en) * 2021-06-09 2021-08-13 成都国铁电气设备有限公司 Tunnel comprehensive detection monitoring system and method
CN113464205A (en) * 2021-07-16 2021-10-01 深圳市森邦照明有限公司 Intelligent positioning system for underground personnel in mine
CN115014439A (en) * 2022-06-07 2022-09-06 多彩贵州印象网络传媒股份有限公司 Industrial park intelligent patrol early warning system based on artificial intelligence
CN115880862A (en) * 2022-11-25 2023-03-31 贵州大学 Mine tunnel collapse real-time early warning method and system based on 5G and big data

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120011365A1 (en) * 2009-03-20 2012-01-12 Schmidt Paul E Method and Apparatus for Reliable Communications in Underground and Hazardous Areas
CN108757041A (en) * 2018-06-14 2018-11-06 安徽理工大学 A kind of safety dynamic monitoring management system of mine
CN213209392U (en) * 2020-09-27 2021-05-14 上海民办张江集团学校 Water leakage alarm disposal system
CN112377262A (en) * 2020-11-11 2021-02-19 闵苓 Coal mine geology alarm device that leaks
CN113252004A (en) * 2021-06-09 2021-08-13 成都国铁电气设备有限公司 Tunnel comprehensive detection monitoring system and method
CN113464205A (en) * 2021-07-16 2021-10-01 深圳市森邦照明有限公司 Intelligent positioning system for underground personnel in mine
CN115014439A (en) * 2022-06-07 2022-09-06 多彩贵州印象网络传媒股份有限公司 Industrial park intelligent patrol early warning system based on artificial intelligence
CN115880862A (en) * 2022-11-25 2023-03-31 贵州大学 Mine tunnel collapse real-time early warning method and system based on 5G and big data

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117935176A (en) * 2024-03-25 2024-04-26 宁波长壁流体动力科技有限公司 Control method and control system for coal mine park

Also Published As

Publication number Publication date
CN116129605B (en) 2023-09-01

Similar Documents

Publication Publication Date Title
CN116129605B (en) Comprehensive control method and comprehensive control device for coal mine intelligent park
CN108267172B (en) Intelligent robot inspection system for mine
CN110262355B (en) Smart mine management system and method based on smart mine management and control platform
WO2017088555A1 (en) Intelligent pipe network system based on orbital robot
CN109278053B (en) Railway tunnel operation state detection and monitoring method
CN105888644B (en) A kind of collision-proof method and system for cantilever crane
CN106121654A (en) The unmanned excavation of a kind of surface mine loads transportation system
CN115937213A (en) Visual defect identification system of automatic inspection robot for mining monorail crane track
CN112282819A (en) Fully mechanized coal mining face personnel target safety monitoring method and system based on vision
CN110359960A (en) A kind of safety alarming method and equipment for the passage of coal mine elevating conveyor
CN113485324A (en) Inspection robot
CN113319861A (en) Inspection method and inspection robot for metro vehicle section comprehensive pipe trench
CN108877216A (en) A kind of engineering site Construction traffic monitoring system and method
CN111980746A (en) Colliery is equipment train scheduling management system in pit
CN116543527A (en) Surface mine unmanned transportation unloading area collapse monitoring method and system
CN112645166B (en) Mining inclined drift elevator integrated control system based on thing networking
CN113401175B (en) Advanced detection early warning system and method for monorail crane
CN111507640B (en) Zero-overrun multi-dimensional dynamic prevention and control method for coal mine gas
KR102404039B1 (en) IoT RELAY WIRELESS REPEATER FOR WIRELESS DATA TRANSMISSION AND RECEPTION IN UNDERGROUND MINES AND CLOSED AREAS
CN115372932A (en) System and method for evaluating driveability of monorail crane and predicting roadway risk
CN114895608A (en) Intelligent brain centralized control strategy and method for tunneling and intelligent control system
LU504093B1 (en) Isotope fluid tracing underground rock geological advanced warning device and warning system
CN207991835U (en) Coalcutter guide slip shoe service life early warning system
CN202694130U (en) Internet of things based remote monitoring system of building machinery
CN112099499A (en) Unmanned transport vehicle, system, control method and readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant