CN116104538B - Goaf rapid stabilization method based on mining area stratum stability investigation - Google Patents

Goaf rapid stabilization method based on mining area stratum stability investigation Download PDF

Info

Publication number
CN116104538B
CN116104538B CN202310251051.0A CN202310251051A CN116104538B CN 116104538 B CN116104538 B CN 116104538B CN 202310251051 A CN202310251051 A CN 202310251051A CN 116104538 B CN116104538 B CN 116104538B
Authority
CN
China
Prior art keywords
stratum
goaf
zone
grouting
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310251051.0A
Other languages
Chinese (zh)
Other versions
CN116104538A (en
Inventor
孙晓卫
陶二永
徐玉
王鑫
董云奇
刘晓祺
杨磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Design Group Co Ltd
Fifth Geological Brigade of Shandong Provincial Bureua of Geology and Mineral Resources of Fifth Geological and Mineral Exploration Institute of Shandong Province
Original Assignee
China Design Group Co Ltd
Fifth Geological Brigade of Shandong Provincial Bureua of Geology and Mineral Resources of Fifth Geological and Mineral Exploration Institute of Shandong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Design Group Co Ltd, Fifth Geological Brigade of Shandong Provincial Bureua of Geology and Mineral Resources of Fifth Geological and Mineral Exploration Institute of Shandong Province filed Critical China Design Group Co Ltd
Priority to CN202310251051.0A priority Critical patent/CN116104538B/en
Publication of CN116104538A publication Critical patent/CN116104538A/en
Application granted granted Critical
Publication of CN116104538B publication Critical patent/CN116104538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Remote Sensing (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to the field of coal mining, in particular to a goaf rapid stabilization method based on mining area stratum stability investigation. Disconnecting the rock stratum in the goaf from the rock stratum outside the boundary of the goaf through construction cutting and drilling, so that the masonry beam structure among the rock masses in the same rock stratum in the fracture zone is instable, and the gaps of the rock stratum in the fracture zone are eliminated; after the brickwork Liang Shiwen, all gravity of the fracture zone can act on the caving zone, so that compression of the rock mass of the caving zone is accelerated. On the basis, the two developed strata after the mining are combined with the traditional tamping construction to be stable as soon as possible. For the three-zone development stratum after mining, the asynchronous sinking time of the grouting key layer and the stratum below the key layer is captured through the separation layer grouting, so that the grouting pressure is facilitated to compress broken rock blocks in the goaf as soon as possible, and the broken rock blocks are stabilized as soon as possible. The invention provides a treatment means based on the mechanism of residual subsidence in the goaf, so that the goaf can quickly reach the stability requirement, and almost no subsequent residual subsidence exists.

Description

Goaf rapid stabilization method based on mining area stratum stability investigation
Technical Field
The invention relates to the field of coal mining, in particular to a goaf rapid stabilization method based on mining area stratum stability investigation.
Background
The coal energy always occupies more than 60% of the energy consumption of China, is an important rear shield of various industries in China, the annual coal mining amount of China occupies half of the total world coal mining amount, the adopted mining mode mainly comprises underground mining and surface mining, wherein the underground mining occupies about 90% of the yield, the underground mining colloquially constructs a plurality of large-diameter shafts from the ground to directly reach the coal seam, then a long-wall working surface is arranged, and the coal seam is transported to the ground through the shafts after being mined by adopting the comprehensive mechanical coal mining technology. The overlying strata can be damaged and sunk after the coal seam is mined, a collapse zone, a fracture zone and a bending sinking zone are generally generated, wherein the collapse zone and the fracture zone are close to the coal seam, and when the coal seam is shallow in burial depth or large in mining height, only the collapse zone and the fracture zone are generally generated. The collapse zone refers to a rock zone in which rock blocks are randomly piled after roof rock layers in the goaf collapse, and the rock blocks are crushed; the rock stratum in the fracture zone basically maintains the original layered distribution state, but longitudinal fractures exist, the rock stratum is broken, a masonry beam structure can be formed by key layers in the rock stratum, a certain gap is formed in the rock stratum in the fracture zone under the influence of the masonry beam structure, and the rock stratum beyond the fracture interface of the rock stratum is not broken, so that all gravity of the overlying rock stratum is not beneficial to acting on the collapse zone and the fracture zone, and the goaf remains to sink for a long time; the strata of the bending sink zone remains substantially in its original layered distribution and remains intact, except for the deflection sink.
The damage generated by coal mining reaches the ground surface, and when the ground surface is greatly submerged, the damage is mostly abandoned into a subsidence area, and when the ground surface is relatively small in subsidence degree, the damage can be restored by some reclamation means to be reused. The existing treatment mode for the coal mine goaf mainly comprises two modes, namely, only backfilling the earth surface and transmitting the residual subsidence of the underground rock stratum to the earth surface without consideration, wherein the condition is suitable for reclamation of farmlands, the goaf exists for a long time, and the residual subsidence is small. Secondly, grouting cement and other slurry are injected into the goaf through a grouting drilling hole to strengthen and fill the goaf, but the grouting drilling hole is large in construction quantity due to small grouting diffusion radius of the grouting drilling hole, and the problem of drilling fluid leakage easily occurs when the grouting drilling hole is constructed to a fracture zone, the grouting drilling hole is difficult to construct to a collapse zone, the grouting slurry is unfavorable for entering the collapse zone, the collapse zone is the largest root cause of residual subsidence, and the scheme for grouting the goaf is generally used for the situation of building construction of a ground surface.
The existing goaf treatment method is not considered on the stability during treatment, the treatment mode is single, the reason that the goaf is left to sink is not considered, and therefore not all treatment effects can be expected.
Disclosure of Invention
Aiming at the problem that the stability condition of the existing goaf treatment method is not considered in treatment, the stability condition of the goaf is firstly judged through the stratum exploration of the mining area, and then the goaf rapid stabilization is achieved according to the three-zone/two-zone characteristics of overlying strata and the targeted treatment measures of the goaf residual subsidence mechanism, in particular, the invention provides a goaf rapid stabilization method based on the stratum stability investigation of the mining area, which comprises the following steps:
a. determining the plane range of the goaf and the stratum development condition of the mining area;
b. constructing a first exploration drilling hole to obtain a stratum column of a mining area, and obtaining a position of a key layer based on a key layer theory;
preferably, in the step b, the mining area stratum column comprises the position, thickness and lithology characteristics of each stratum, and the mechanical parameters of each stratum are obtained through a mechanical experiment.
c. Constructing a second exploration drilling hole above the goaf to obtain the range of a collapse zone, a fracture zone and a bending sinking zone, selecting a grouting key layer in the bending sinking zone, and taking the contact surface between the grouting key layer and a rock stratum below the key layer as a subsequent grouting layer;
preferably, in the step c, an isolating layer with a certain thickness is reserved between the grouting key layer and the fracture zone.
d. Calculating the original elevation of the rock stratum under the grouting key layer according to the development condition of the stratum in the mining area and the column shape of the stratum in the mining area, and obtaining the actual elevation of the rock stratum under the grouting key layer through a second exploration drilling hole, wherein the difference value between the original elevation and the actual elevation is a first difference value; observing the sinking speed of the rock stratum below the grouting key layer by a rock stratum movement observation means;
e. determining the residual crushing expansion coefficient of the stratum of the collapse zone, calculating the final height of the collapse zone, and obtaining a second difference value by subtracting the final height of the collapse zone from the height of the original stratum of the collapse zone; if the difference value of the first difference value and the second difference value is in the set threshold range, and the observed sinking speed of the rock stratum is in the set threshold range, the goaf stability is good, otherwise, the follow-up steps are executed;
f. constructing a plurality of cutting holes to the goaf at intervals above the goaf inclined boundary along the goaf trend, and sequentially and vertically cutting off the rock stratum in the fracture zone and the collapse zone through the cutting holes along the goaf trend;
preferably, in the step f, two rows of cutting holes can be constructed on each side of the inclined boundary, and the two rows of cutting holes are staggered.
g. Grouting holes are constructed at intervals along the goaf trend, the grouting holes are constructed to grouting horizons, and the cutting work of the delayed cutting holes is grouting into the separation layer through the grouting holes so as to cover the rock blocks in the lower caving zone and the fracture zone.
Preferably, in step g, the grouting holes are arranged in groups, and each group is respectively arranged at two sides of the goaf inclined to the middle and is positioned in the range of the fracture interface of the rock stratum.
Preferably, after grouting filling is finished, determining whether the subsidence zone rock mass reaches the residual expansion coefficient by testing the elevation of the rock stratum below the grouting key layer.
Preferably, for the two-zone development mining area stratum, the step c is that a second exploration drilling hole is constructed above the goaf to obtain a collapse zone, a fracture zone and a bending sinking zone range; step d, calculating the original elevation of a certain key layer in the fracture zone according to the development condition of the stratum in the mining area and the stratum column of the mining area, and obtaining the actual elevation of the key layer through a second exploration drilling hole, wherein the difference value between the original elevation and the actual elevation is a first difference value; observing the sinking speed of the key layer by a rock stratum movement observation means; and g, tamping construction is carried out on the ground by adopting a tamping method and/or a compacting method.
Further, after the compaction construction is finished, whether the crushed rock mass of the subsided zone reaches the residual crushing expansion coefficient is determined by measuring the elevation of the observed key layer.
The invention has the following advantages: 1. according to the invention, rock strata in the goaf and rock strata outside the boundary of the goaf are disconnected through construction cutting and drilling, so that a masonry beam structure between rock strata in the same rock stratum in a fracture zone is unstably dropped, the rock strata in the same rock stratum are uniformly sunk, and gaps/fractures of the rock strata in the fracture zone are eliminated; after the brickwork Liang Shiwen, all gravity of the fracture zone can act on the caving zone, so that compression of the rock mass of the caving zone is accelerated.
2. On the basis of the invention point 1, the crushed rock in the goaf is compressed as soon as possible by combining the traditional tamping construction for the two developed strata after mining so as to reach the residual crushing expansion coefficient as soon as possible and reach stability as soon as possible. For the three-zone development stratum after the mining, the space generated after the brickwork Liang Shiwen is transferred to the lower part of the grouting key layer, the asynchronous sinking of the grouting key layer and the stratum below the grouting key layer is generated, the time of capturing through grouting drilling and grouting is realized, and separation layer grouting is realized, so that the grouting pressure is beneficial to compressing broken rock blocks in a goaf as soon as possible to enable the broken rock blocks to reach the residual expansion coefficient as soon as possible, and the broken rock blocks are as fast as possible stable.
3. The invention also provides a mining area stratum stability investigation method, the underground rock stratum is explored by constructing a first exploration drilling hole and a second exploration drilling hole, the subsidence of the goaf is determined by combining the stratum development condition, and the problem that the actual subsidence amount cannot be determined through earth surface subsidence observation after mining (the earth surface is greatly influenced by external environment) is solved.
Drawings
The invention, together with a further understanding of the many of its attendant advantages, will be more fully appreciated by reference to the following detailed description, when considered in connection with the accompanying drawings, which are included to provide a further understanding of the invention, and the accompanying illustrative embodiments of the invention and description thereof serve to explain and do not constitute a limitation of the invention, wherein:
FIG. 1 is a schematic cross-sectional view of an embodiment of the present invention in an exploration borehole arrangement;
FIG. 2 is a schematic cross-sectional view of a goaf rapid stabilization method according to an embodiment of the present invention;
FIG. 3 is a schematic cross-sectional view of a second illustrative survey borehole arrangement;
FIG. 4 is a schematic cross-sectional view of a method for rapidly stabilizing goaf in accordance with an embodiment of the present invention;
description of the drawings: 1-coal seam; 2-goaf/caving zone; 3-a fracture zone; 4-bending the sinkage belt; 5-loosening layer; 6-a first survey borehole; 7-a second survey borehole; 8-cutting and drilling holes; 9-grouting and drilling; 10-grouting a key layer; 11-delamination/grouting layer; 12-isolating layer; 13-formation fracture interface.
Detailed Description
For a better understanding of the technical content of the present invention, specific examples are set forth below, along with the accompanying drawings. Aspects of the invention are described herein with reference to the drawings, in which there are shown many illustrative embodiments. The embodiments of the present invention are not limited to the embodiments described in the drawings. It is to be understood that this invention is capable of being carried out by any of the various concepts and embodiments described above and as such described in detail below, since the disclosed concepts and embodiments are not limited to any implementation. Additionally, some aspects of the disclosure may be used alone or in any suitable combination with other aspects of the disclosure.
Example 1
Aiming at the condition that rock stratum is broken until the ground surface after coal seam exploitation, namely the condition that the stratum after exploitation only comprises a collapse zone and a fracture zone but does not comprise a bending sinking zone, as shown in figures 1-2, the goaf rapid stabilization method based on mining area stratum stability investigation comprises the following steps:
determining the plane range of the goaf 2, namely the exploitation range of the original working surface, including the width and the stoping length, through original geological data and/or by adopting a geophysical prospecting method (including but not limited to a controllable source audio magnetotelluric method and a micro-motion detection method); simultaneously acquiring stratum development conditions such as extension, inclination and the like of stratum in mining area;
constructing a first exploration drilling 6 at an unaerated position (the coal seam 1 right below the goaf 2 is not mined and maintains an original elastic state) away from the goaf 2, and obtaining a mining area stratum column, wherein the mining area stratum column at least comprises the position, thickness and lithology characteristics of each rock stratum and the range of a loose layer 5, mechanical parameters of each rock stratum are obtained through a mechanical experiment, and the position of a key layer is obtained based on a key layer theory;
constructing a second exploration drilling 7 above the goaf through theoretical calculation or simulation means (physical simulation and numerical simulation) to obtain the ranges of the collapse zone 2 and the fracture zone 3;
according to stratum development conditions such as the extension and the inclination of stratum in a mining area, based on stratum columns acquired by a first exploration drilling hole 6, the original elevation of a certain key layer in a fracture zone (preferably the uppermost key layer in the fracture zone, namely a main key layer) is calculated, the actual elevation of the key layer is acquired by a second exploration drilling hole 7, and the difference value between the original elevation and the actual elevation is a first difference value; observing the sinking speed of the key layer by a rock stratum movement observation means;
determining a residual crushing expansion coefficient of the stratum of the collapse zone based on the characteristics of the stratum corresponding to the collapse zone 2, calculating the final height of the collapse zone (when the residual crushing expansion coefficient is reached), and subtracting the final height of the collapse zone from the original stratum of the collapse zone to obtain a second difference value; when the breaking expansion of the fracture zone is zero, namely the total thickness of the corresponding rock stratum of the fracture zone before and after the coal seam 1 is mined is unchanged, the whole mined stratum is stable when the sinking amount of the rock stratum in the fracture zone after the mining is the second difference value; if the difference value of the first difference value and the second difference value is in a set threshold range (30 cm is generally selected), and meanwhile, the observed sinking speed of the rock stratum is in the set threshold range (1 mm/d can be generally selected), the goaf has good stability, achieves an ideal stability level, and can be directly utilized on the ground; otherwise, executing the subsequent steps;
constructing a plurality of cutting holes 8 to the goaf 2 at intervals above the goaf inclined boundary along the goaf trend; two rows of cutting drilling holes 8 can be constructed on each side of the inclined boundary, and the two rows of cutting drilling holes 8 are staggered; sequentially and vertically cutting off rock strata in the collapse zone 2 and the fracture zone 3 along the trend through a cutting drilling hole 8 (by adopting hydraulic fracturing or blasting means), so that the rock strata in the goaf are disconnected from the rock strata outside the boundary of the goaf, and meanwhile, the masonry beam structure among the rock strata in the same rock stratum in the fracture zone is instable and falls, and the rock strata in the same rock stratum are uniformly sunk;
the cutting work of the delayed cutting drilling hole 8 is about the distance of a direct bursting period breaking step distance, and tamping construction is carried out on the ground by adopting a tamping method and/or a compaction method, so that the rock blocks in the lower collapse zone 2 and the fracture zone 3 are pressed to enable the rock blocks in the collapse zone to reach the residual crushing expansion coefficient as soon as possible, the height direction of the rock blocks in the fracture zone is enabled to be free from crushing expansion as much as possible, and all rock layers are evenly sunk, namely, the goaf is enabled to be fast and stable.
After the compaction construction is finished, whether the crushed rock mass of the subsidence zone reaches the residual crushing expansion coefficient can be determined by measuring the elevation of the observed key layer.
According to the embodiment of the invention, the rock stratum in the goaf and the rock stratum outside the boundary of the goaf are disconnected by cutting off the rock stratum in the fracture zone and the rock stratum in the subsidence zone, so that the masonry beam structure among the rock masses in the same rock stratum in the fracture zone is instable and falls down, the rock masses in the same rock stratum are uniformly sunk, all gravity of the fracture zone can act on the subsidence zone after the masonry Liang Shiwen is conducted, compression of the rock masses in the subsidence zone is accelerated, meanwhile, the generated space can be transferred to the ground surface as soon as possible, the part of the space is prevented from being slowly transferred to the ground surface, and at the moment, the broken rock masses in the goaf can be compressed as soon as possible in combination with the traditional tamping construction so as to achieve residual expansion coefficients as soon as possible, and be stabilized as soon as possible, so that the ground utilization is conducted.
Example two
Aiming at the situation that rock stratum fracture does not reach the earth surface after coal seam exploitation, namely the situation that the stratum after exploitation comprises a collapse zone, a fracture zone and a bending subsidence zone, as shown in figures 3-4, the goaf rapid stabilization method based on mining area stratum stability investigation comprises the following steps:
determining the plane range of the goaf 2, namely the exploitation range of the original working surface, including the width and the stoping length of the original working surface, through original geological data and/or by adopting a geophysical prospecting method (including but not limited to a controllable source audio magnetotelluric method and a micro-motion detection method); simultaneously acquiring stratum development conditions such as extension, inclination and the like of stratum in mining area;
constructing a first exploration drilling 6 at an unaerated position (the coal seam 1 right below the goaf 2 is not mined and maintains an original elastic state) away from the goaf 2, and obtaining a mining area stratum column, wherein the mining area stratum column at least comprises the position, thickness and lithology characteristics of each rock stratum and the range of a loose layer 5, mechanical parameters of each rock stratum are obtained through a mechanical experiment, and a key layer position is obtained based on a key layer theory;
constructing a second exploration drilling 7 through theoretical calculation or simulation means (physical simulation and numerical simulation) or above a goaf, obtaining the ranges of a collapse zone 2, a fracture zone 3 and a bending subsidence zone 4, selecting a proper grouting key layer 10 in the bending subsidence zone 4, taking the contact surface between the grouting key layer 10 and a rock stratum below the grouting key layer as a subsequent grouting layer 11 (separation layer is generated after the contact surface is separated), and keeping an isolation layer 12 with a certain thickness between the grouting key layer 10 and the fracture zone;
according to stratum development conditions such as extension and inclination of stratum in a mining area, based on stratum columns acquired by a first exploration drilling hole 6, calculating an original elevation of the stratum under the grouting key layer 10, and acquiring an actual elevation of the stratum under the grouting key layer 10 through a second exploration drilling hole 7, wherein the difference value between the original elevation and the actual elevation is a first difference value; observing the sinking speed of the rock stratum under the grouting key layer 10 by a rock stratum movement observing means;
determining a residual crushing expansion coefficient of the stratum of the collapse zone based on the characteristics of the stratum corresponding to the collapse zone 2, calculating the final height of the collapse zone (when the residual crushing expansion coefficient is reached), and subtracting the final height of the collapse zone from the original stratum of the collapse zone to obtain a second difference value; when the broken expansion of the fracture zone and the bending subsidence zone is zero, namely the total thickness of the corresponding rock stratum of the fracture zone and the bending subsidence zone is unchanged before and after the coal seam 1 is mined, the whole mined stratum is stable when the rock stratum subsidence in the fracture zone and the bending subsidence zone after the mining is the second difference value; if the difference value of the first difference value and the second difference value is in a set threshold range (30 cm is generally selected), and meanwhile, the observed sinking speed of the rock stratum is in the set threshold range (1 mm/d is generally selected), the goaf has good stability, achieves an ideal stable level, and can be directly utilized on the ground; otherwise, executing the subsequent steps;
constructing a plurality of cutting holes 8 to the goaf 2 at intervals above the goaf inclined boundary along the goaf trend; two rows of cutting drilling holes 8 can be constructed on each side of the inclined boundary, and the two rows of cutting drilling holes 8 are staggered; sequentially and vertically cutting off rock strata in the collapse zone 2 and the fracture zone 3 along the trend through a cutting drilling hole 8 (by adopting hydraulic fracturing or blasting means), so that the rock strata in the goaf are disconnected from the rock strata outside the boundary of the goaf, and meanwhile, the masonry beam structure among the rock strata in the same rock stratum in the fracture zone 2 is instable and falls, and the rock strata in the same rock stratum are uniformly sunk;
constructing a plurality of groups of grouting drilling holes 9 along the trend of the goaf at intervals, wherein each group of grouting drilling holes 9 comprises two grouting drilling holes which are respectively arranged on two sides of the inclined middle part of the goaf and are positioned in the range of a rock stratum breaking interface 13, and the grouting drilling holes 9 are constructed to a grouting layer 11; the cutting work of the delayed cutting drilling holes 8 is about the distance of a direct bursting period breaking step distance, grouting is sequentially carried out in the separation layers 11 through each group of grouting drilling holes 9 along the trend, and the rock blocks in the lower caving zone 2 and the fracture zone 3 can be pressed and covered by grouting and filling so that the residual crushing expansion coefficient of the caving zone rock blocks is reached as soon as possible, the crushing expansion of the fracture zone rock blocks is avoided as much as possible in the height direction, and each rock layer is uniformly sunk, namely, the goaf is enabled to be fast and stable; and simultaneously, the grouting key layer 10 and the upper rock stratum thereof can be lifted by grouting filling.
After grouting filling is finished, whether the broken and expanded coefficients of the crushed zone rock blocks reach can be determined by testing the elevation of the rock stratum below the grouting key layer 10.
The separation layer grouting filling is generally suitable for the condition that the working face is filled while stoping, namely, filling is carried out while stoping. For old goaf conditions, goaf grouting is generally performed directly, because no delamination occurs, especially for a long time, unless extremely thick and hard rock formations are present in the formation. According to the embodiment of the invention, the rock stratum in the goaf and the rock stratum outside the boundary of the goaf are disconnected by cutting off the fracture zone and the rock stratum in the caving zone, so that the masonry beam structure between the rock masses in the same rock stratum in the fracture zone is instable and falls, the rock masses in the same rock stratum are uniformly sunk, a space (which can be regarded as exploitation of an extremely thin coal seam) generated after the masonry Liang Shiwen is transferred to the lower part of the grouting key layer, asynchronous sinking of the grouting key layer and the rock stratum below the grouting key layer is generated, grouting is realized by capturing the time of grouting through grouting drilling, and then the crushed rock masses in the goaf are compressed as soon as possible by grouting pressure to reach residual expansion coefficients as soon as possible, so that ground utilization is realized as soon as possible.
The foregoing description is, of course, merely illustrative of preferred embodiments of the present invention, and it should be understood that the present invention is not limited to the above-described embodiments, but is intended to cover all modifications, equivalents and obvious modifications falling within the spirit and scope of the present invention as defined by the appended claims.

Claims (2)

1. The goaf rapid stabilization method based on mining area stratum stability investigation is characterized by comprising the following steps of:
a. determining the plane range of the goaf and the stratum development condition of the mining area;
b. constructing a first exploration drilling hole at an unaerated position far away from a goaf to obtain a mining area stratum column, wherein the mining area stratum column comprises the position, thickness and lithology characteristics of each rock stratum, mechanical parameters of each rock stratum are obtained through a mechanical experiment, and the position of a key layer is obtained based on a key layer theory;
c. constructing a second exploration drilling hole above the goaf to obtain the range of a collapse zone, a fracture zone and a bending sinking zone, selecting a grouting key layer in the bending sinking zone, taking the contact surface between the grouting key layer and a rock stratum below the grouting key layer as a subsequent grouting layer, and reserving an isolation layer with a certain thickness between the grouting key layer and the fracture zone;
d. calculating the original elevation of the rock stratum under the grouting key layer according to the development condition of the stratum in the mining area and the column shape of the stratum in the mining area, and obtaining the actual elevation of the rock stratum under the grouting key layer through a second exploration drilling hole, wherein the difference value between the original elevation and the actual elevation is a first difference value; observing the sinking speed of the rock stratum below the grouting key layer by a rock stratum movement observation means;
e. determining the residual crushing expansion coefficient of the stratum of the collapse zone based on the characteristics of the stratum corresponding to the collapse zone, calculating the final height of the collapse zone, and subtracting the final height of the collapse zone from the original stratum of the collapse zone to obtain a second difference value; if the difference value of the first difference value and the second difference value is in the set threshold range, and the observed sinking speed of the rock stratum is in the set threshold range, the goaf stability is good, otherwise, the follow-up steps are executed;
f. constructing two rows of cutting holes to the goaf at intervals above the inclined boundary of the goaf along the trend of the goaf, wherein the two rows of cutting holes are staggered, and sequentially and vertically cutting off rock strata in the collapse zone and the fracture zone through the cutting holes along the trend;
g. constructing a plurality of groups of grouting drilling holes at intervals along the trend of the goaf, wherein each group of grouting drilling holes are respectively arranged on two sides of the inclined middle part of the goaf and are positioned in the range of a rock stratum breaking interface, the grouting drilling holes are constructed to a grouting layer, and the cutting work of the lag cutting drilling holes is grouting into a release layer through the grouting drilling holes so as to cover rock blocks in a lower caving zone and a fracture zone;
and after grouting filling is finished, determining whether the crushed rock blocks of the subsidence zone reach the residual expansion coefficient by testing the elevation of the rock layer below the grouting key layer.
2. The goaf rapid stabilization method of claim 1, wherein: for the stratum of the two zones of development mining areas, the step c is that a second exploration drilling hole is constructed above the goaf to obtain a collapse zone, a fracture zone and a bending sinking zone range; step d, calculating the original elevation of a certain key layer in the fracture zone according to the development condition of the stratum in the mining area and the stratum column of the mining area, and obtaining the actual elevation of the key layer through a second exploration drilling hole, wherein the difference value between the original elevation and the actual elevation is a first difference value; observing the sinking speed of the key layer by a rock stratum movement observation means; step g, tamping construction is carried out on the ground by adopting a tamping method and/or a compaction method; and after the compaction construction is finished, determining whether the crushed rock mass of the subsidence zone reaches the residual crushing expansion coefficient or not by measuring the elevation of the observed key layer.
CN202310251051.0A 2023-03-16 2023-03-16 Goaf rapid stabilization method based on mining area stratum stability investigation Active CN116104538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310251051.0A CN116104538B (en) 2023-03-16 2023-03-16 Goaf rapid stabilization method based on mining area stratum stability investigation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310251051.0A CN116104538B (en) 2023-03-16 2023-03-16 Goaf rapid stabilization method based on mining area stratum stability investigation

Publications (2)

Publication Number Publication Date
CN116104538A CN116104538A (en) 2023-05-12
CN116104538B true CN116104538B (en) 2023-10-10

Family

ID=86256307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310251051.0A Active CN116104538B (en) 2023-03-16 2023-03-16 Goaf rapid stabilization method based on mining area stratum stability investigation

Country Status (1)

Country Link
CN (1) CN116104538B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2167299C2 (en) * 1999-06-29 2001-05-20 Открытое акционерное общество по добыче угля "Воркутауголь" Method of mine working construction (versions)
CN101509395A (en) * 2009-03-16 2009-08-19 太原理工大学 The roof caving and tunnel protecting method
KR20090106257A (en) * 2008-04-04 2009-10-08 한국시설안전공단 The method to estimate realtime-quantitative stability of the tunnel under construction and it's system
CN101806054A (en) * 2010-04-02 2010-08-18 中铁二局股份有限公司 Method for estimating stability of house pillar type goaf under highway
CN102678118A (en) * 2011-12-09 2012-09-19 王志强 Method for determining height of caving zone of stope
CN104532818A (en) * 2014-12-02 2015-04-22 辽宁工程技术大学 Treatment method for strip mine goaf
KR101518471B1 (en) * 2014-10-31 2015-05-15 권대륙 Mining method for stratigraphic ore in soft rock
CN108194132A (en) * 2017-12-27 2018-06-22 山东科技大学 A kind of pier formula multi-arch type Mined-out Area control method
WO2018121106A1 (en) * 2016-12-28 2018-07-05 中国矿业大学 Coal mine goaf area hurricane disaster warning method based on goaf area pressure monitoring
CN109488363A (en) * 2018-11-13 2019-03-19 辽宁工程技术大学 A kind of suction road adopts dynamic circuit connector reason method for determining position and device
CN110671145A (en) * 2019-10-24 2020-01-10 中国煤炭地质总局勘查研究总院 Large-mining-width thick coal seam mining composite grouting method
AU2020103698A4 (en) * 2020-11-01 2021-02-04 Anhui University of Science and Technology Monitoring method for dynamic height of overburden failure during underground coal seam mining
CN114370300A (en) * 2022-01-12 2022-04-19 山东省煤田地质局第三勘探队 Detection and efficient treatment integrated method for coal mine goaf
WO2022247176A1 (en) * 2021-05-28 2022-12-01 鞍钢集团矿业有限公司 Filling caving mining method
WO2023029617A1 (en) * 2021-08-30 2023-03-09 中国矿业大学 Isolated overburden grouting filling method for coal gangue underground emission reduction

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894787B (en) * 2018-05-31 2019-08-27 中国矿业大学 Leave the pressure break release method of ore pillar stress concentration in Overburden gob area

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2167299C2 (en) * 1999-06-29 2001-05-20 Открытое акционерное общество по добыче угля "Воркутауголь" Method of mine working construction (versions)
KR20090106257A (en) * 2008-04-04 2009-10-08 한국시설안전공단 The method to estimate realtime-quantitative stability of the tunnel under construction and it's system
CN101509395A (en) * 2009-03-16 2009-08-19 太原理工大学 The roof caving and tunnel protecting method
CN101806054A (en) * 2010-04-02 2010-08-18 中铁二局股份有限公司 Method for estimating stability of house pillar type goaf under highway
CN102678118A (en) * 2011-12-09 2012-09-19 王志强 Method for determining height of caving zone of stope
KR101518471B1 (en) * 2014-10-31 2015-05-15 권대륙 Mining method for stratigraphic ore in soft rock
CN104532818A (en) * 2014-12-02 2015-04-22 辽宁工程技术大学 Treatment method for strip mine goaf
WO2018121106A1 (en) * 2016-12-28 2018-07-05 中国矿业大学 Coal mine goaf area hurricane disaster warning method based on goaf area pressure monitoring
CN108194132A (en) * 2017-12-27 2018-06-22 山东科技大学 A kind of pier formula multi-arch type Mined-out Area control method
CN109488363A (en) * 2018-11-13 2019-03-19 辽宁工程技术大学 A kind of suction road adopts dynamic circuit connector reason method for determining position and device
CN110671145A (en) * 2019-10-24 2020-01-10 中国煤炭地质总局勘查研究总院 Large-mining-width thick coal seam mining composite grouting method
AU2020103698A4 (en) * 2020-11-01 2021-02-04 Anhui University of Science and Technology Monitoring method for dynamic height of overburden failure during underground coal seam mining
WO2022247176A1 (en) * 2021-05-28 2022-12-01 鞍钢集团矿业有限公司 Filling caving mining method
WO2023029617A1 (en) * 2021-08-30 2023-03-09 中国矿业大学 Isolated overburden grouting filling method for coal gangue underground emission reduction
CN114370300A (en) * 2022-01-12 2022-04-19 山东省煤田地质局第三勘探队 Detection and efficient treatment integrated method for coal mine goaf

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
基于采动覆岩离层注浆技术的采煤塌陷控制方法;骆祥均;;矿山测量(第02期);第56-58页 *
极破碎厚大矿体采场稳定性分析及结构参数优化研究;宋宇峰;中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑;全文 *
渑栾高速采空区路段建设场地稳定性评价研究;杨锋;金属矿山(第第11期期);第198-207页 *
骆祥均 ; .基于采动覆岩离层注浆技术的采煤塌陷控制方法.矿山测量.2018,(第02期),第56-58页. *

Also Published As

Publication number Publication date
CN116104538A (en) 2023-05-12

Similar Documents

Publication Publication Date Title
CN104763432B (en) A kind of method that high stress tunnel country rock release controls large deformation
Han et al. Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining
RU2763266C2 (en) Method for determining internal stresses of solid excavation and laying material
CN112446143B (en) Strip filling mining parameter design method under thick unconsolidated formation and thin bedrock
Wei et al. Formation and height of the interconnected fractures zone after extraction of thick coal seams with weak overburden in Western China
CN103924976B (en) A kind of method in outdoor second mining Guo Canmei district
CN110671145A (en) Large-mining-width thick coal seam mining composite grouting method
Tajduś et al. Seismicity and rock burst hazard assessment in fault zones: a case study
CN106555607A (en) A kind of old goaf grouting filling control earth's surface residual settlement method
CN110344831A (en) Top release is cut without coal column along the sky lane self-contained Xiang Liu method
CN108049870B (en) The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
CN114370300B (en) Detection and efficient treatment integrated method for coal mine goaf
CN113530545A (en) Isolated grouting and filling mining method for overlying rock of island working face
CN115199273A (en) Coal mining-filling working face layout method based on ground subsidence control requirement
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process
Eremenko et al. Finding zones of stress concentrations and seismic events in deep ore mining affected by high horizontal stresses
CN116104538B (en) Goaf rapid stabilization method based on mining area stratum stability investigation
CN112861068A (en) Method for determining mining overburden rock damage height
CN116398137A (en) Method for reinforcing coal mine overburden combined rock stratum by reducing sedimentation grouting
CN115030719B (en) Impact mine pressure prevention and control method combining hydraulic fracturing of thick and hard rock stratum and coal seam pressure relief
CN116163798A (en) Overlying strata separation grouting method for goaf lower long wall working face mining
Liang et al. Controlling the effect of a distant extremely thick igneous rock in overlying strata on coal mine disasters
CN113153418B (en) Three-dimensional space filling effect evaluation method based on comprehensive index method
CN114370250A (en) Goaf disaster management method based on stratum exploration
CN114607379A (en) Overburden rock compaction grouting filling continuous mining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230914

Address after: 271000 No.3, Changcheng Road, Daiyue district, Tai'an City, Shandong Province

Applicant after: SHANDONG PROVINCIAL BUREUA OF GEOLOGY & MINERAL RESOURCES FIFTH GEOLOGICAL BRIGADE (SHANDONG FIFTH GEOLOGICAL AND MINERAL EXPLORATION ACADEMY)

Applicant after: China Design Group Co.,Ltd.

Address before: 271000 No.3, Changcheng Road, Daiyue district, Tai'an City, Shandong Province

Applicant before: SHANDONG PROVINCIAL BUREUA OF GEOLOGY & MINERAL RESOURCES FIFTH GEOLOGICAL BRIGADE (SHANDONG FIFTH GEOLOGICAL AND MINERAL EXPLORATION ACADEMY)

GR01 Patent grant
GR01 Patent grant