CN115821854A - Pile pressing moving guide equipment for severe conditions of bridge construction slope - Google Patents

Pile pressing moving guide equipment for severe conditions of bridge construction slope Download PDF

Info

Publication number
CN115821854A
CN115821854A CN202310006646.XA CN202310006646A CN115821854A CN 115821854 A CN115821854 A CN 115821854A CN 202310006646 A CN202310006646 A CN 202310006646A CN 115821854 A CN115821854 A CN 115821854A
Authority
CN
China
Prior art keywords
frame
pile
pressing
fixed
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310006646.XA
Other languages
Chinese (zh)
Inventor
饶春华
胡志刚
刘杨青
钟毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Communications Design Institute Co Ltd Of Jiangxi Prov
Original Assignee
Communications Design Institute Co Ltd Of Jiangxi Prov
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Communications Design Institute Co Ltd Of Jiangxi Prov filed Critical Communications Design Institute Co Ltd Of Jiangxi Prov
Priority to CN202310006646.XA priority Critical patent/CN115821854A/en
Publication of CN115821854A publication Critical patent/CN115821854A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a pile-pressing moving guide device for severe conditions of a bridge construction side slope, which comprises a frame, inner track wheels, double parallel C-shaped tracks and stable clamping mechanisms, wherein a bracket is fixed on a frame base, the middle parts of the inner sides of four side walls of the bracket are respectively fixed with the stable clamping mechanisms, two ends of an upper connecting plate and two ends of a lower connecting plate of each stable clamping mechanism are respectively hinged to the upper end of a fixed seat and the lower end of an inner pressing plate, the height of the inner pressing plate is always higher than that of the fixed seat, four inner pressing plates of four groups of stable clamping mechanisms are combined into four side surfaces of a quadrangular prism, and a downward pressing driving mechanism for driving the four inner pressing plates to move downward is arranged. The invention adopts the pile pressing moving guide equipment for the bridge construction under the severe slope condition, so that the construction machinery can adapt to running and transfer construction on a narrow slope span or a carriageway through a narrow body shape during the pile sinking construction of the slope, and the construction machinery can be constructed by self or by being dragged and moved in the construction process.

Description

Pile pressing moving guide equipment for severe conditions of bridge construction slope
Technical Field
The invention belongs to the technical field of bridge construction equipment, and particularly relates to pile pressing moving guide equipment for a bridge construction slope under severe conditions.
Background
With the development of urbanization construction and railway traffic, bridges are increasingly constructed, obstacles can be crossed through the bridges, smooth passing of vehicles is guaranteed, and in the bridge construction process, the stability of bridge columns is of great importance, and the bridge columns cannot be horizontally displaced, inclined or settled. Sometimes, river side slopes need to be protected to a certain extent to improve the stability of the river side slopes, but the existing side slope protection device has some defects when in use, for example, the existing side slope protection device generally directly drives positioning piles into soil to fix a protective net, the engagement capacity of the positioning piles and the soil is poor, the overall stability of a subsequent protective net is low, and the practicability of the device is reduced; when current side slope protector is making up the use, lack certain connection between the adjacent protector, lead to can not be convenient when follow-up concatenation fix a position the device, reduced the wholeness of device simultaneously.
The bridge is built on the foundation, the bridge is easy to build when the foundation is stable, and the foundation is unstable, namely a weak foundation, so that the foundation must be treated in advance before the bridge is built, and the stability of the bridge is improved. The weak foundation is characterized by loose soil, high water content and poor bearing capacity, and is characterized by easy settlement and slippage, and if the foundation is positioned on a side slope, the settlement and slippage are more serious, thus providing greater challenge for building a bridge. The construction method is characterized in that a weak foundation on a side slope is typically a road bridge constructed in a valley, and a large number of construction scenes exist in southern areas of China. In the river course side slope pile driving construction process, the anti-landslide treatment of the river course side slope should be considered while the bridge pile foundation is constructed. The existing slide-resistant piles are common reinforcing structures in slope reinforcing engineering, are arranged at different positions and depths of a slope and are generally vertically driven. The anti-slide pile penetrates through the landslide body to be deeply embedded and fixed in the slide bed, landslide thrust borne by the upper portion is transmitted to soil or rock mass of the slide bed on the lower portion of the pile through the pile body, and the landslide thrust of the loaded section of the pile body is balanced by means of lateral resistance of the pile body embedded and fixed in the rock mass of the slide bed, so that the effect that the reinforced slope body is in a stable state is achieved. Pile pressing construction depends on large machinery, and the existing large pile foundation equipment is mainly applied to bridge pile foundation construction, but when landslide pile construction is considered, embarrassment exists in the existing pile pressing construction due to the fact that the construction range is enlarged.
Disclosure of Invention
For the problem that large machinery cannot go deep into the side slope for construction of the riverway side slope with local inclination, the invention provides the pile pressing moving guide equipment for the bridge construction side slope under severe conditions.
The scheme adopted by the invention for solving the technical problem is as follows: the utility model provides a severe condition of bridge construction side slope pile pressing removes guiding equipment, which comprises a vehicle rack, the interior rail wheel, two parallel C shape tracks and stable fixture, two parallel C shape tracks are fixed in on the ground basis, the interior rail wheel that is located the frame bottom is respectively suit in corresponding C shape track, be fixed with the support on the base of frame, be fixed with stable fixture respectively at the inboard middle part of four lateral walls of support, every stable fixture includes the fixing base, the interior clamp plate, go up even board and lower even board, the both ends of going up even board and lower even board articulate respectively in the upper end of fixing base and the lower extreme of interior clamp plate, keep the height that the interior clamp plate is higher than the height of fixing base all the time, four interior clamp plates of four groups stable fixture combine into four sides of four prismatic, be provided with the push down actuating mechanism that drives four interior clamp plates and move down.
The method comprises the following steps of firstly, using an end fixing frame as a basic guide frame, respectively pressing two end fixing piles into fixing channels on two sides of the end fixing frame to fix the end fixing frame, respectively and fixedly connecting two C-shaped rails on two sides of the end fixing frame to fix the near ends of the two rails, and respectively fixing connecting plates at the middle parts and the tail ends of the two C-shaped rails.
The upper end pin shaft position of the lower connecting plate and the lower end pin shaft position of the upper connecting plate are connected with tension springs.
The C-shaped track comprises a base and a C-shaped track groove at the upper part, the C-shaped track groove comprises two side walls and a notch at the top, and shoulder plates are arranged at two sides of the notch; the rail wheels are double parallel wheels, the middle part of each rail wheel is provided with a rotating shaft, the middle rotating shaft is provided with a shaft bracket, and the shaft brackets are fixed at the bottom of the frame; the shaft bracket is led out from the groove of the C-shaped track, and the double parallel wheels are respectively positioned at the lower sides of the two shoulder plates.
The lower pressing driving mechanism comprises a movable inner frame and a swing frame assembly, the movable inner frame comprises an inner frame upper transverse frame and an inner frame lower transverse frame, a stand column is connected between the upper transverse frame and the lower transverse frame, the middle parts of the upper transverse frame and the lower transverse frame are connected with parallel limiting plates, an upper connecting plate and a lower connecting plate of each stable clamping mechanism are respectively sleeved in the corresponding parallel limiting plates, the upper transverse frame of the inner frame is located above the upper connecting plate of each stable clamping mechanism, the lower transverse frame of the inner frame is located below the lower connecting plate of each stable clamping mechanism, a balance weight ring body is fixed below the lower transverse frame, and the swing frame assembly is used for driving the balance weight ring body to ascend or descend.
The invention has the beneficial effects that: the pile pressing moving guide equipment for the bridge construction slope under the severe condition is adopted, so that the construction machinery can be adapted to running and transferring construction on a narrow slope span or a carriageway through a narrow body type during slope pile sinking construction, and the construction machinery can be automatically or dragged to move for construction in the construction process.
Four inner pressure plates of the four groups of stable clamping mechanisms in the device are combined into four side surfaces of a quadrangular prism, and when the lower end of the sinking pile is inserted into the inner sides of the four inner pressure plates, the inner pressure plates are respectively pressed against the four side surfaces of the sinking pile by using a pressing driving mechanism. The side walls around the sunk pile generate downward friction force to each inner pressure plate, the clamping force is stronger when each inner pressure plate moves downwards, and the gravity of the sunk pile and the movable electric hammer at the upper end of the sunk pile form a supporting relation by combining the pressure of each inner pressure plate and cannot slide downwards. After the frame moves in place, the pressing driving mechanism releases the pressure on each inner pressing plate, and each inner pressing plate moves upwards and outwards under the action of the corresponding tension spring, so that the sunk pile falls to the ground. When four interior clamp plates outwards expand less distance, although release the support to the pile sinking, still can constitute vertical passageway, have to pile sinking direction function, take place the slope when preventing that the pile sinking from being strikeed by electric hammer high frequency.
Drawings
Fig. 1 is a perspective view of the movement guide apparatus of the present invention;
FIG. 2 is one of the internal structural views of FIG. 1;
FIG. 3 is a second internal block diagram of FIG. 1;
FIG. 4 is a side view of FIG. 2;
FIG. 5 is a perspective view of a movement guide apparatus incorporating a hydraulic locking mechanism;
FIG. 6 is a top view of FIG. 5;
FIG. 7 is a view showing the construction of the suspension clasp and the movable electric hammer;
FIG. 8 is a side view of the stabilizing fixture;
fig. 9 is a view showing a structure of fixing end pile rails.
Reference numbers in the figures: the device comprises a frame 1, a base 2, an inner rail wheel 3, a support 4, a stable clamping mechanism 5, a fixed seat 6, an inner pressing plate 7, an upper connecting plate 8, a lower connecting plate 9, a tension spring 10, a movable inner frame 11, an inner frame upper transverse frame 12, an inner frame lower transverse frame 13, an inner frame parallel limiting plate 14, a counterweight ring body 15, a support 16, a swing rod 17, a push rod 18, a C-shaped rail 19, a perforation 20, a locking mechanism 21, a right-angle frame 22, an auxiliary frame 23, a sliding shaft 24, a hydraulic cylinder 25, an end fixing frame 26, an end fixing pile 27, a connecting plate 28, a suspension buckle 29, a movable electric hammer 30, a clamp 31, a first fixing clamp plate 32, a spacing adjusting plate 33, a second fixing clamp plate 34, an adaptive adjusting plate 35, an electric control pulling mechanism 36, a pull rope 37, a handle 38, a ground lock 39, a top lock 40, a sliding chute 41, a free sliding block 42, a limiting top column 43, a top wire 44, an inner pressing plate 45, a bottom sleeve 46, a sleeper 47, an auxiliary hanger 48, an electric hoist 49, an auxiliary lifting ring 50, a shell 51, a sinking pile or a positioning pile.
Detailed Description
The invention is further illustrated with reference to the following figures and examples.
Example 1: a pile pressing moving guide device for severe conditions of a bridge construction side slope as shown in figure 1 is designed for solving the problem that large machinery cannot go deep into the side slope construction for a river side slope with a certain inclination, and mainly comprises a frame 1, inner track wheels 3, a C-shaped track 19, a stabilizing and clamping mechanism 5 and the like. The pile pressing moving guide equipment is matched with a crane for construction, a foundation is leveled along a river slope by taking the crane as a center, or an original berm is used as a foundation, double parallel C-shaped rails 19 are laid on the foundation, and the vehicle frame 1 carries with working units on the upper portion of the vehicle frame to be located on the upper sides of the C-shaped rails 19 and move along the rails. After the movable electric hammer 30 (shown in fig. 7) is hoisted by a crane, the clamp at the lower end of the movable electric hammer 30 clamps the end of the sunk pile, the movable electric hammer 30 and the sunk pile are hoisted together to be vertical, then the lower end of the sunk pile is inserted into the inner side of each stable clamping mechanism 5 in fig. 2, each clamping mechanism is controlled to clamp and fix the sunk pile, and the sunk pile is transferred to a lower pile position for press-fitting construction.
Fig. 2 shows the internal structure of the pile-pressing moving guide equipment, the middle part of the frame 1 is a main working unit, the front side and the rear side of the frame 1 along the walking direction are lengthened with auxiliary frames, track wheels 3 are respectively installed below the frame 1 and the auxiliary frames, and each track wheel is respectively installed in a corresponding C-shaped track 19 in a matching way. As shown in fig. 9, at a position close to the crane, the end fixing frame 26 is first fixed by lifting the movable electric hammer 30 with the end fixing piles 27 carried by the end fixing frame 26 as a basic guide frame and pressing the two end fixing piles into fixing passages on both sides of the end fixing frame 26, respectively. Two C-shaped rails 19 are fixedly connected to both sides of the end fixing frame 26, respectively, so that the proximal ends of the two rails are fixed. The two C-shaped rails 19 are fixed at their middle and end with tie plates 28 respectively to ensure that they are always parallel and fixed. The bottom of the far-end track is provided with a convex fixed seat which is fixed with the bottom layer through an anchor rod. It is further contemplated that a tie 47 of a certain height may be laid on the bottom of the two C-shaped rails 19 as shown in fig. 4. The sleeper can be used for improving the height of the track, and the sleeper with the corresponding height is paved according to the height of the top end of the sunk pile exposed out of the ground, so that the sunk pile for reinforcing the river bed and preventing landslide basically does not need to consider paving the sleeper.
As can be seen in fig. 2, a bracket 4 is fixed on the base 2 of the frame 1, and the bracket 4 is integrally of a cubic structure and comprises four upright posts, and a cross beam and a connecting rod are fixed between the adjacent upright posts. And the middle parts of the inner sides of the four side walls of the bracket 4 are respectively fixed with a stable clamping mechanism 5.
Fig. 2 is combined with fig. 8, each stable clamping mechanism 5 comprises a fixed seat 6, an inner pressing plate 7, an upper connecting plate 8 and a lower connecting plate 9, two ends of the upper connecting plate 8 and the lower connecting plate 9 are respectively hinged to the upper end of the fixed seat 6 and the lower end of the inner pressing plate 7, if the height of the inner pressing plate 7 is always higher than that of the fixed seat 6 in fig. 8, a tension spring 10 is preferably connected to the upper end pin shaft position of the lower connecting plate and the lower end pin shaft position of the upper connecting plate. The tension spring can hold the inner pressing plate 7 to move upwards and outwards in a translation mode, namely the inner pressing plate 7 is unfolded outwards in a natural state.
The four inner press plates 7 of the four groups of stable clamping mechanisms 5 are combined into four side surfaces of a quadrangular prism, and a pressing driving mechanism for driving the four inner press plates 7 to move downwards is arranged. When the lower end of the pile is inserted into the inner sides of the four inner press plates 7, the inner press plates are respectively pressed against the four side surfaces of the pile by the pressing-down driving mechanism. The side walls around the sunk pile generate downward friction force to each inner pressure plate, the clamping force is stronger when each inner pressure plate moves downwards, and the gravity of the sunk pile and the movable electric hammer at the upper end of the sunk pile form a supporting relation by combining the pressure of each inner pressure plate and cannot slide downwards. After the frame moves in place, the pressing driving mechanism releases the pressure on each inner pressing plate, and each inner pressing plate moves upwards and outwards under the action of the corresponding tension spring, so that the sunk pile falls to the ground. When four interior clamp plates outwards expand less distance, although release the support to the pile sinking, still can constitute vertical passageway, have to pile sinking direction function, take place the slope when preventing that the pile sinking from being strikeed by electric hammer high frequency.
As shown in fig. 1 and 9, a C-shaped rail 19 is used which includes a base and an upper C-shaped rail groove including both side walls and a notch at the top and having shoulder plates at both sides of the notch. The rail wheels are double parallel wheels, the middle part of each rail wheel is provided with a rotating shaft, the rotating shaft at the middle part is provided with a shaft bracket, and the shaft bracket is fixed at the bottom of the frame. The shaft bracket is led out from the groove of the C-shaped track, but the double parallel wheels of the track wheels are respectively positioned at the lower sides of the two shoulder plates, and the track structure can effectively restrain the frame to keep the frame stable, and particularly can prevent the frame from turning laterally.
This embodiment at first utilizes the crane advantage when the construction, removes the electric hammer and carries pile sinking construction nearby through the lifting hook hoist and mount near, utilizes the electric hammer to carry the tip spud pile simultaneously to the vertical passageway spud pile in tip mount both sides of track initial position department, utilizes the tip spud pile to fix the tip mount, utilizes the tip mount to the end fixing of both sides C shape track, utilizes the stock fixed to orbital middle part of C shape and distal end.
As shown in fig. 7, the suspension clasp 29 is separated from the hook connecting arc of the crane, the lower end of the suspension clasp is fixed on the movable electric hammer 30, the power cord of the movable electric hammer is from the crane or an external power source, the bottom of the suspension clasp is connected to a clamp 31, the clamp 31 comprises a first fixed clamp plate 32 and a second fixed clamp plate 34 (the two clamp plates are controlled to be respectively positioned at the left side and the right side during hoisting), the inner side of the first fixed clamp plate 32 is sleeved on a spacing adjusting plate 33 (the first fixed clamp plate 32 is provided with double parallel screw holes and respectively installed on a bolt, the outer end of the bolt is provided with an adjusting nut, the inner side of the bolt is provided with the spacing adjusting plate 33), the inner side of the second fixed clamp plate 34 is provided with an adaptive adjusting plate 35, the upper end and the lower end of the adaptive adjusting plate are respectively hinged with the second fixed clamp plate through a swing rod to form a parallelogram, a pull rope 37 is connected to the upper side of the adaptive adjusting plate 35, an electronic control pulling mechanism 36 is installed on the main body of the clamp 31, the electronic control pulling mechanism 36 drives the pull rope 37 to move upwards or release, when the pull rope moves upwards, the adaptive adjusting plate is lifted upwards to be close to the fixed clamping plate II, when the clamp is clamped with the upper end part of the sinking pile, the electronic control pulling mechanism releases the pull rope, the adaptive adjusting plate 35 moves inwards to push the upper end part of the sinking pile, when the suspension clasp moves upwards, the upper end part of the sinking pile presses the adaptive adjusting plate to be carried with the adaptive adjusting plate to move downwards, and the adaptive adjusting plate can push the upper end part of the sinking pile inwards while moving downwards, namely the upper end part of the sinking pile is pushed downwards more and more downwards, and the adaptive adjusting plate is ensured not to fall off during hoisting.
When the frame is moved to the initial position of the track, namely the position close to the auxiliary frame of the crane, the crane is used for carrying the movable electric hammer and clamping the sinking pile, the sinking pile is conveyed to the central positions of the four inner pressure plates above the frame after being lifted, and then the pressing driving mechanism is controlled to press and attach the inner pressure plates to the lower end of the sinking pile and fix the inner pressure plates. The hook is released but the power cord of the mobile hammer is ensured to move distally along with the carriage, and the pile sinking construction is conducted and guided by the equipment at any target position. After pile pressing construction is finished, the electric hoist 49 is moved to the position above the electric hammer through the auxiliary lifting appliance 48, the auxiliary lifting ring 50 is lifted upwards for a short distance through the lifting hook, the clamp is led out from the bottom plate through hole 20, and then the frame is moved to return to the auxiliary frame of the crane to wait for construction to the next construction point. The auxiliary lifting appliance is preferably fixed on the upper side of the frame, and other auxiliary lifting appliances moving along with the vehicle body can be adopted.
Example 2: a push-down driving mechanism based on embodiment 1, as shown in fig. 2 and fig. 4, the push-down driving mechanism includes a movable inner frame 11 and a swing frame assembly, the movable inner frame 11 includes an inner frame upper horizontal frame 12 composed of four upper frames fixed end to end, and an inner frame lower horizontal frame 13 composed of four lower flat holes fixed end to end, and a column is connected between the upper horizontal frame and the lower horizontal frame. Parallel limiting plates 14 are connected to the middle portions of the upper transverse frame and the lower transverse frame, and an upper connecting plate and a lower connecting plate of each stable clamping mechanism are respectively sleeved in the corresponding parallel limiting plates 14.
The upper transverse frame 12 of the inner frame is positioned above the upper connecting plate 8 of each stable clamping mechanism 5, and the lower transverse frame 13 of the inner frame is positioned below the lower connecting plate 9 of each stable clamping mechanism 5.
A counterweight ring body 15 is fixed below the lower transverse frame 13, supports 16 are respectively fixed on two sides of the base 2, an L-shaped swing frame is hinged in the supports 16 on the two sides, the L-shaped swing frame comprises double parallel swing rods 17 and double parallel ejector rods 18, the two swing rods 17 are fixed into a whole through connecting rods and handles 38, and the two ejector rods 18 are respectively supported below two side edges of the counterweight ring body 15. As shown in fig. 4, when the handle 38 is pressed downward, the two side swing levers 17 move downward, so that the two side rods 18 move upward, thereby driving the weight ring body 15 to move upward, and when the handle 38 is lifted upward, the two side rods 18 move downward, thereby moving the weight ring body 15 downward.
Since the upper frame upper side frame 12 is located above each upper connecting plate 8, when the handle 38 is lifted upwards, the counterweight ring body 15 moves downwards, so that the inner frame upper side frame 12 presses each upper connecting rod 8 to move downwards, and further each inner pressing plate 7 contracts downwards and inwards. Because the inner frame lower transverse frame 13 is positioned below the lower connecting plates 9, when the handle 38 is pressed downwards, the counterweight ring body 15 moves upwards to enable the inner diameter upper transverse frame 12 to lose the pressing force on the upper connecting plates 8, and at the moment, each inner pressing plate 7 is unfolded upwards and outwards under the action of the tension spring 10, or is unfolded upwards and outwards under the action of the inner frame lower transverse frame 13 lifting the lower connecting plates 9.
Based on the above structure, the bottom sleeve 46 can be further sleeved under each upright, and the lock wires are installed, the bottom sleeve 46 and each upright of the bracket are fixed into a whole by the lock wires, when the lifting appliance needs to be lifted integrally, each lock wire is loosened, each stable clamping mechanism 5 is locked by the locking mechanism, and in this state, the handle is swung downwards to lift the whole bracket upwards.
Example 3: on the basis of embodiment 2, the swing frame assembly further comprises a ground lock 39 positioned on the vehicle frame and a top lock 40 positioned on the top of the support. The ground lock 39 as shown in fig. 2 comprises a base fixed on the frame, a vertical rotating shaft is arranged on the base, a rotating plate is arranged on the rotating shaft, when the handle 38 moves downwards to the limit position, the rotating plate is rotated by 90 degrees, so that the rotating plate is pressed on the upper side of the handle, and the handle is prevented from automatically moving upwards. The top lock 40 is shown in fig. 2, and comprises a sliding sleeve sleeved on a top cross beam of the support, two stages of clamping grooves are arranged outside the sliding sleeve, and when the handle moves upwards to an upper position, the sliding sleeve is slid to clamp the first clamping groove or the second clamping groove and the handle together. First draw-in groove is the limit draw-in groove, and when the handle was located first draw-in groove, each interior clamp plate was to the lock of pile sinking, and when the handle was located the second draw-in groove, each interior clamp plate outwards expanded slightly and formed guide way, nevertheless each interior clamp plate still can prevent effectively empting the effect to the pile sinking.
Example 4: on the basis of the above embodiments 1 to 3, as shown in fig. 8, an absolute locking mechanism for the stable clamping mechanism 5 is adopted, and by this mechanism, when the stable clamping mechanism 5 is locked, the function of locking each inner pressing plate is achieved. In fig. 8, a vertical sliding groove 41 is provided on the fixed seat 6, a free sliding block 42 is sleeved in the vertical sliding groove, the inner end of the free sliding block is provided with a convex limit top post 43, the outer end of the free sliding block is provided with a closed cavity, a pressing plate 45 is sleeved in the closed cavity, a top screw 44 is installed on the side wall of the closed sliding block, the inner pressing plate loses the pressing effect on the fixed seat 6 by screwing the top screw outwards, the free sliding block 42 can freely lift and slide, but after screwing the top screw inwards, the inner pressing plate 45 is locked with the fixed seat 6 together, so that the limit top post is supported on the upper side of the lower connecting plate 9, the lower connecting plate 9 cannot move upwards, and even the inner pressing plate cannot be unfolded outwards. The mechanism of the embodiment is mainly applied to further locking after pile sinking is fixed. Compared with the embodiments 1-3, the embodiments 1-3 utilize the counterweight ring body to act on each internal pressure plate, and the embodiment can realize the absolute locking of the internal pressure plate through the locking mechanism on the basis.
Example 5: on the basis of the above embodiments 1-3, the absolute locking function is realized by adopting a hydraulic driving mode. As shown in fig. 5 and 6, locking mechanisms 21 are respectively installed on the inner sides of the columns at the diagonal positions of the support 4, each locking mechanism comprises a right-angle frame 22 located at the top, an auxiliary frame 23 located on the outer side of the right-angle frame 22, a sliding shaft 24 is vertically connected to the lower portion of the middle portion of the right-angle frame 22, a sliding groove is fixed on the inner side of each support column, and the sliding shaft is sleeved in the sliding groove and can slide up and down. The root of the bracket frame 22 and the lower part of the upright post of the bracket 4 are connected with hydraulic cylinders 25, the hydraulic cylinders are controlled to lift, so that each bracket frame 22 can be driven to move up and down, each bracket frame 22 can press the upper connecting plate 8 below the bracket frame, and when the pile sinking is positioned on the inner side of each inner pressing plate, each bracket frame presses each upper connecting plate downwards so that each inner pressing plate is absolutely supported on the side surface of the pile sinking. Compared with embodiment 4, embodiment 4 is passive locking, and this embodiment is active compression locking, and has a further compression effect on the inner compression plate.
Example 6: on the basis of the above embodiments 1 to 3, the jackscrews are vertically installed in the middle of each upper frame of the movable inner frame 11, and the depth of each jackscrew is adjusted to drive the upper connecting plate to contract inwards successively, so that the adaptive adjustment of rectangular section pile sinking or square section pile sinking can be realized, and the characteristics of multiple pile sinking alternative use are realized.
Example 7: on the basis of the above embodiments, each inner pressing plate 7 may be V-shaped or arc-shaped, or a V-shaped or arc-shaped component is installed on the surface thereof, so as to adapt to the cylindrical pile sinking construction.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides a severe condition pile pressing of bridge construction side slope removes guiding equipment, a serial communication port, including frame (1), interior rail wheel (3), two parallel C shape track (19) and stable fixture (5), two parallel C shape track (19) are fixed in on the ground basis, interior rail wheel (3) that are located frame (1) bottom are respectively suit in corresponding C shape track (19), be fixed with support (4) on base (2) of frame (1), be fixed with stable fixture (5) respectively at the inboard middle part of four lateral walls of support (4), every stable fixture (5) include fixing base (6), interior clamp plate (7), go up even board (8) and lower even board (9), the both ends of going up even board (8) and lower even board (9) articulate respectively in the upper end of fixing base (6) and the lower extreme of interior clamp plate (7), keep the height that interior clamp plate (7) is higher than fixing base (6) throughout, four interior clamp plate (7) of four groups stable fixture (5) make up the combination and be four prismatic actuating mechanism's (7) that move down, the side is provided with four interior clamp plate (7) drive mechanism.
2. The apparatus for guiding the movement of the pile pressing in the severe condition of the construction slope of the bridge according to claim 1, wherein the end fixing frame (26) is used as a basic guide frame, the two end fixing piles are respectively pressed into the fixing channels at the two sides of the end fixing frame (26) to fix the end fixing frame (26), the two C-shaped rails (19) are respectively and fixedly connected at the two sides of the end fixing frame (26) to fix the proximal ends of the two rails, and the connecting plates (28) are respectively fixed at the middle parts and the tail ends of the two C-shaped rails (19).
3. The pile-pressing moving guide equipment for the bridge construction slope under the severe condition as claimed in claim 1, wherein a tension spring (10) is connected to the upper end pin shaft position of the lower connecting plate and the lower end pin shaft position of the upper connecting plate.
4. The apparatus for guiding movement of piles in severe conditions of construction slopes for bridges according to claim 1, wherein the C-shaped rail (19) comprises a base and an upper C-shaped rail groove comprising notches at both side walls and a top, and having shoulder plates at both sides of the notch; the rail wheels are double parallel wheels, the middle part of each rail wheel is provided with a rotating shaft, the middle rotating shaft is provided with a shaft bracket, and the shaft brackets are fixed at the bottom of the frame; the shaft bracket is led out from the groove of the C-shaped track, and the double parallel wheels are respectively positioned at the lower sides of the two shoulder plates.
5. The pile-pressing moving guide equipment for the severe conditions of the construction slopes of the bridges as claimed in claim 1, wherein the downward pressing driving mechanism comprises a movable inner frame (11) and a swing frame assembly, the movable inner frame (11) comprises an upper transverse frame (12) and a lower transverse frame (13) of the inner frame, a vertical column is connected between the upper transverse frame and the lower transverse frame, parallel limiting plates (14) are connected to the middle parts of the upper transverse frame and the lower transverse frame, an upper connecting plate and a lower connecting plate of each stable clamping mechanism are respectively sleeved in the corresponding parallel limiting plates (14), the upper transverse frame (12) of the inner frame is located above an upper connecting plate (8) of each stable clamping mechanism (5), the lower transverse frame (13) of the inner frame is located below a lower connecting plate (9) of each stable clamping mechanism (5), a balance weight (15) is fixed below the lower transverse frame (13), and the swing frame assembly is used for driving the balance weight (15) to ascend or descend.
6. The pile-pressing moving guide device for the severe conditions of the bridge construction slopes as claimed in claim 5, wherein the swing frame assembly is characterized in that supports (16) are respectively fixed on two sides of the base (2), L-shaped swing frames are hinged in the supports (16) on the two sides, each L-shaped swing frame comprises double parallel swing rods (17) and double parallel ejector rods (18), the two swing rods (17) are fixed into a whole through connecting rods and handles (38), and the two ejector rods (18) are respectively supported below two side edges of the counterweight ring body (15).
7. The pile pressing movement guiding device for severe conditions of bridge construction slopes according to claim 6, further comprising a ground lock (39) located on the frame and a top lock (40) located at the top of the support, wherein the ground lock (39) comprises a base fixed on the frame, a vertical rotating shaft is arranged on the base, a rotating plate is mounted on the rotating shaft, and when the handle (38) moves downwards to a limit position, the rotating plate (90) is rotated to enable the rotating plate to be pressed on the upper side of the handle, so that the handle is prevented from automatically moving upwards; the top lock (40) comprises a sliding sleeve sleeved on a beam at the top of the support, two stages of clamping grooves are arranged outside the sliding sleeve, and when the handle moves upwards to the upper position, the sliding sleeve is slid to enable the first clamping groove or the second clamping groove to be clamped with the handle.
8. The pile pressing movement guiding device under the severe conditions of the bridge construction slope according to claim 1, further comprising an absolute locking mechanism for the stable clamping mechanism (5), wherein a vertical sliding groove (41) is arranged on the fixed seat (6), a free sliding block (42) is sleeved in the vertical sliding groove, the inner end of the free sliding block is provided with a convex limit top column (43), the outer end of the free sliding block is provided with a closed cavity, a pressing plate (45) is sleeved in the closed cavity, and a top thread (44) is installed on the side wall of the free sliding block.
9. The pile-pressing moving guide equipment for severe conditions of bridge construction slopes according to claim 1, wherein jackscrews are vertically installed in the middle of each upper frame of the movable inner frame (11), and rectangular-section pile sinking or square-section pile sinking is adapted and adjusted by adjusting the depth of each jackscrew.
CN202310006646.XA 2023-01-04 2023-01-04 Pile pressing moving guide equipment for severe conditions of bridge construction slope Pending CN115821854A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310006646.XA CN115821854A (en) 2023-01-04 2023-01-04 Pile pressing moving guide equipment for severe conditions of bridge construction slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310006646.XA CN115821854A (en) 2023-01-04 2023-01-04 Pile pressing moving guide equipment for severe conditions of bridge construction slope

Publications (1)

Publication Number Publication Date
CN115821854A true CN115821854A (en) 2023-03-21

Family

ID=85520068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310006646.XA Pending CN115821854A (en) 2023-01-04 2023-01-04 Pile pressing moving guide equipment for severe conditions of bridge construction slope

Country Status (1)

Country Link
CN (1) CN115821854A (en)

Similar Documents

Publication Publication Date Title
CN110578476B (en) Slope drilling construction platform
CN106284333B (en) A kind of fast positioning pile extension platform and pile extension method
CN106115555A (en) A kind of Geotechnical Engineering stone masonry lifting carrying machine
CN112302534B (en) Slope anchor rod construction device and rapid construction method
CN220521324U (en) Gate-type pile machine
CN115821854A (en) Pile pressing moving guide equipment for severe conditions of bridge construction slope
CN211202005U (en) Equipment is assembled to prefabricated inverted arch piece
CN110552359B (en) Support hanging basket type high and steep slope anchoring construction method
CN205677344U (en) Electric pole centering guide machine
CN109403707B (en) V-shaped framework hoisting construction auxiliary equipment and construction method
CN110552358B (en) Construction equipment for anchoring tower crane type high and steep slope
CN206722829U (en) Hanging scaffold stabilizer is built in a kind of vertical shaft for mine pick
CN110552357B (en) Tower crane type high and steep slope anchoring construction method
CN210031521U (en) Self-climbing steel beam-tying crane capable of changing amplitude
CN208136632U (en) A kind of raising adjustment mechanism and system for administering subgrade settlement
CN113250090A (en) Climbing device of light hydraulic climbing formwork
CN217942432U (en) Integral standard festival shaping frock of tower machine fishplate
CN110552627A (en) Support hanging basket type high and steep slope anchor and use construction equipment
RU2036270C1 (en) Device to ram down foundation pit
CN219032969U (en) Lifting type balancing device for guy rope hanging basket walking
CN221297944U (en) Deviation rectifying structure for open caisson construction
CN218880823U (en) High construction pile foundation structure of intensity stability
CN218206696U (en) Lifting arm of supporting platform
CN210829068U (en) Pile driver for civil engineering
CN214938859U (en) Portable railway engineering steel rail line crossing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination