CN109403707B - A kind of V-shaped frame hoisting construction auxiliary equipment and construction method - Google Patents

A kind of V-shaped frame hoisting construction auxiliary equipment and construction method Download PDF

Info

Publication number
CN109403707B
CN109403707B CN201811191471.XA CN201811191471A CN109403707B CN 109403707 B CN109403707 B CN 109403707B CN 201811191471 A CN201811191471 A CN 201811191471A CN 109403707 B CN109403707 B CN 109403707B
Authority
CN
China
Prior art keywords
shaped frame
rod
plate
vehicle body
auxiliary equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201811191471.XA
Other languages
Chinese (zh)
Other versions
CN109403707A (en
Inventor
蒋军
蒋立
莫昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Southwest Xinke Electric Power Co ltd
Original Assignee
Sichuan Southwest Xinke Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Southwest Xinke Electric Power Co ltd filed Critical Sichuan Southwest Xinke Electric Power Co ltd
Priority to CN201811191471.XA priority Critical patent/CN109403707B/en
Publication of CN109403707A publication Critical patent/CN109403707A/en
Application granted granted Critical
Publication of CN109403707B publication Critical patent/CN109403707B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/345Arrangements for tilting up whole structures or sections thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种V形构架吊装施工辅助设备,属于变电站构架施工技术领域,包括车体以及用于驱动车体行走的驱动装置,车体上固定设置有安装横梁,安装横梁上设置有两平行设置的支杆,每根支杆远离车体的一端设置有用于夹持V形构架的杆体的夹持组件。当V形构架被吊车吊起后,工人通过夹持组件夹持V形构架的杆体,然后通过驱动装置驱动车体行走,车体带动安装横梁运动以及支杆运动,支杆上的夹持组件以及吊车共同作用带动V形构架移动,当V形构架的杆体运动到安装杯口的正上方时,停下车体,以使杆体位置保持不变,再下放V形构架即可;避免人工手动扶持杆体,提高了施工的安全性,且可使V形构架被快速吊运至安装杯口处,提高施工效率。

Figure 201811191471

The invention relates to a V-shaped frame hoisting construction auxiliary equipment, belonging to the technical field of substation frame construction, comprising a vehicle body and a driving device for driving the vehicle body to travel. The supporting rods are provided, and one end of each supporting rod away from the vehicle body is provided with a clamping assembly for clamping the rod body of the V-shaped frame. When the V-shaped frame is lifted by the crane, the worker clamps the rod body of the V-shaped frame through the clamping assembly, and then drives the car body to walk through the driving device. The car body drives the movement of the installation beam and the movement of the support rod. And the crane works together to drive the V-shaped frame to move. When the rod body of the V-shaped frame moves to the top of the installation cup, stop the car body to keep the position of the rod body unchanged, and then lower the V-shaped frame; avoid manual manual operation. Supporting the rod body improves the safety of construction, and enables the V-shaped frame to be quickly hoisted to the mouth of the installation cup to improve construction efficiency.

Figure 201811191471

Description

一种V形构架吊装施工辅助设备及施工方法A kind of V-shaped frame hoisting construction auxiliary equipment and construction method

技术领域technical field

本发明涉及变电站构架施工技术领域,特别涉及一种V形构架吊装施工辅助设备及施工方法。The invention relates to the technical field of substation frame construction, in particular to a V-shaped frame hoisting construction auxiliary equipment and a construction method.

背景技术Background technique

变电站中构架是指挂母线、引线用的钢管或砼电杆组成的承力结构,在变电站构架吊装施工中,需对构架构件进行三方面校正: 既水平位置、标高及垂直度,否则构架梁无法进行安装。杯底的校正在杯形基础杯底抄平时已经完成,而柱的平面位置的校正在就位时完成。在柱临时固定后,则需进行垂直度校正。V形构架包括左右两个杆体,左右两个杆体的一端固定连接形成V形。The frame in the substation refers to the load-bearing structure composed of steel pipes or concrete poles for hanging busbars and lead wires. During the hoisting construction of the substation frame, the frame members need to be corrected in three aspects: the horizontal position, the elevation and the verticality, otherwise the frame beam Unable to install. The calibration of the bottom of the cup has been completed when the base of the cup is copied, and the calibration of the plane position of the column is completed when it is in place. After the column is temporarily fixed, verticality correction is required. The V-shaped frame includes two left and right rod bodies, and one ends of the left and right rod bodies are fixedly connected to form a V shape.

目前,V形构架吊装施工时,先在地面上开挖好用于安装V形构架的安装杯口,然后采用吊车直接将V形构架吊起,并吊运至安装杯口的正上方,然后缓慢地下放,直到V形构架的两个支脚落入到两个安装杯口内,最后再进行校正。At present, when the V-shaped frame is hoisted and constructed, the installation cup opening for installing the V-shaped frame is first excavated on the ground, and then the V-shaped frame is directly hoisted by a crane and transported to the top of the installation cup opening, and then Slowly lower until the two legs of the V-frame fall into the two mounting cups, and then make the final adjustment.

但是,在吊运V形构架至安装杯口的正上方的过程中,需要多名工人手扶V形构架的支脚,以防止V形构架发生晃动而影响定位。而V形构架自重大,吊起高度高,在移动校正过程中,安全风险较大,为了保证工人的安全以及便于V形构架的定位,吊运的速度非常缓慢,影响施工效率,存在一定的局限性。However, in the process of hoisting the V-shaped frame to just above the installation cup opening, multiple workers are required to hold the legs of the V-shaped frame to prevent the V-shaped frame from shaking and affecting the positioning. However, the V-shaped frame has a heavy weight and a high hoisting height. During the process of movement and correction, the safety risk is relatively large. In order to ensure the safety of workers and facilitate the positioning of the V-shaped frame, the speed of hoisting is very slow, which affects the construction efficiency. There are certain limitation.

发明内容SUMMARY OF THE INVENTION

本发明的目的之一在于提供一种V形构架吊装施工辅助设备,具有夹持V形构架,防止V形构架晃动,提高施工效率的优点。One of the objectives of the present invention is to provide a construction auxiliary equipment for hoisting a V-shaped frame, which has the advantages of clamping the V-shaped frame, preventing the V-shaped frame from shaking, and improving the construction efficiency.

本发明的上述技术目的是通过以下技术方案得以实现的:The above-mentioned technical purpose of the present invention is achieved through the following technical solutions:

一种V形构架吊装施工辅助设备,包括车体以及用于驱动车体行走的驱动装置,所述车体上固定设置有安装横梁,所述安装横梁上设置有两平行设置的支杆,每根所述支杆远离车体的一端设置有用于夹持V形构架的杆体的夹持组件。A V-shaped frame hoisting construction auxiliary equipment includes a vehicle body and a driving device for driving the vehicle body to walk, a mounting beam is fixedly arranged on the vehicle body, and two parallel supporting rods are arranged on the mounting beam. A clamping assembly for clamping the rod body of the V-shaped frame is arranged at one end of the strut away from the vehicle body.

实施上述技术方案,当V形构架被吊车吊起后,工人通过夹持组件夹持V形构架的杆体,然后通过驱动装置驱动车体行走,车体带动安装横梁运动以及支杆运动,支杆上的夹持组件以及吊车共同作用带动V形构架移动,当V形构架的杆体运动到安装杯口的正上方时,停下车体,以使杆体位置保持不变,再下放V形构架即可;避免人工手动扶持杆体,提高了施工的安全性,且可使V形构架被快速吊运至安装杯口处,提高施工效率。Implementing the above technical solution, when the V-shaped frame is lifted by the crane, the worker clamps the rod body of the V-shaped frame through the clamping assembly, and then drives the vehicle body to walk through the driving device, and the vehicle body drives the movement of the installation beam and the movement of the support rod. The clamping components on the upper part and the crane work together to drive the V-shaped frame to move. When the rod body of the V-shaped frame moves to just above the installation cup mouth, stop the car body to keep the position of the rod body unchanged, and then lower the V-shaped frame. Can; avoid manual support of the rod body, improve the safety of construction, and can make the V-shaped frame be quickly hoisted to the installation cup mouth, improve the construction efficiency.

进一步,所述夹持组件包括固定板、安装板、抵接板和气压缸,所述固定板固定设置于支杆上,所述安装板固定设置于固定板的两端,固定板和安装板形成П形结构,且П形结构的开口朝向车体的前进方向,所述抵接板滑动设置于安装板上,所述气压缸固定设置于安装板上以用于驱使两抵接板相互靠近或远离,气压缸的活塞杆与抵接板固定连接。Further, the clamping assembly includes a fixing plate, a mounting plate, an abutting plate and a pneumatic cylinder, the fixing plate is fixedly arranged on the support rod, the mounting plate is fixedly arranged at both ends of the fixing plate, the fixing plate and the mounting plate A П-shaped structure is formed, and the opening of the П-shaped structure faces the forward direction of the vehicle body, the abutting plate is slidably arranged on the mounting plate, and the pneumatic cylinder is fixedly arranged on the mounting plate to drive the two abutting plates to approach each other Or away, the piston rod of the pneumatic cylinder is fixedly connected with the abutment plate.

实施上述技术方案,待V形构架的杆体处于П形结构内后,启动气压缸,气压缸带动抵接板运动,并驱使抵接板与杆体抵紧,在V形构架运动的过程中,起到防止杆体晃动的目的。Implementing the above technical scheme, after the rod body of the V-shaped frame is in the П-shaped structure, the pneumatic cylinder is activated, and the pneumatic cylinder drives the abutment plate to move, and drives the abutment plate and the rod body to abut tightly. During the movement of the V-shaped frame, the To prevent the rod body from shaking.

进一步,所述安装板上滑动穿设有贯穿安装板的导向杆,导向杆垂直支杆设置,导向杆的一端与抵接板固定连接。Further, a guide rod penetrating through the mounting plate is slidably passed through the mounting plate, the guide rod is arranged perpendicular to the support rod, and one end of the guide rod is fixedly connected with the abutting plate.

实施上述技术方案,在抵接板运动的过程中,导向杆的设置,起到对抵接板导向的作用,防止抵接板转动,使抵接板保持正对杆体的状态,提高夹持效果。In the implementation of the above technical solution, during the movement of the abutting plate, the setting of the guide rod plays a role of guiding the abutting plate, preventing the abutting plate from rotating, keeping the abutting plate facing the rod body, and improving the clamping effect. .

进一步,所述抵接板为与V形构架的杆体贴合的弧形板。Further, the abutting plate is an arc-shaped plate that fits with the rod body of the V-shaped frame.

实施上述技术方案,弧形板增加了与杆体的接触面积,提高夹持效果。By implementing the above technical scheme, the arc-shaped plate increases the contact area with the rod body and improves the clamping effect.

进一步,两所述抵接板正对的侧壁上设置有若干的与抵接板滚动连接的滚珠。Further, a number of balls that are in rolling connection with the abutting plates are provided on the opposite side walls of the two abutting plates.

实施上述技术方案,滚珠的设置起到减小杆体下放时受到的摩擦力,同时减小抵接板受到的冲击力,防止抵接板损坏,提高抵接板的使用寿命。Implementing the above technical solution, the balls are arranged to reduce the friction force received when the rod body is lowered, and at the same time reduce the impact force received by the abutment plate, prevent the abutment plate from being damaged, and improve the service life of the abutment plate.

进一步,所述安装横梁靠近支杆的侧壁沿自身长度方向开设有滑槽,所述支杆上固定设置有与滑槽滑移连接的滑块,所述安装横梁上设置有用于驱使支杆滑动的驱动组件。Further, the side wall of the mounting beam close to the support rod is provided with a chute along its own length direction, the support rod is fixedly provided with a sliding block slidingly connected with the chute, and the mounting beam is provided with a support rod for driving the support rod. Sliding drive assembly.

实施上述技术方案,当安装两杆体之间的距离较大的V形构架时,通过驱动组件驱动滑块沿滑槽滑动,滑块带动两支杆向相互远离的方向运动,从而实现增加两夹持组件之间的间距的目的,以适应尺寸较大的V形构架。Implementing the above technical scheme, when installing a V-shaped frame with a large distance between the two rod bodies, the sliding block is driven by the driving assembly to slide along the chute, and the sliding block drives the two rods to move in a direction away from each other, thereby increasing the number of two clamps. The purpose of maintaining the spacing between components to accommodate the larger size of the V-shaped frame.

进一步,所述滑槽设置为燕尾槽,所述滑块设置为与燕尾槽相适配的燕尾块,所述驱动组件包括双向丝杆和电机,所述双向丝杆转动设置于滑槽内并与滑块螺纹连接,所述电机固定设置于安装横梁上用于驱动双向丝杆转动以使两支杆向相互靠近或远离的方向运动。Further, the chute is set as a dovetail slot, the slider is set as a dovetail block adapted to the dovetail slot, the drive assembly includes a bidirectional screw rod and a motor, and the bidirectional screw rod is rotatably arranged in the chute and In screw connection with the slider, the motor is fixedly arranged on the installation beam to drive the two-way screw to rotate so that the two support rods move toward or away from each other.

实施上述技术方案,启动电机,电机带动双向丝杆转动,双向丝杆带动滑块沿滑槽滑动,从而实现带动支杆向相互靠近或远离的方向运动的目的,同时燕尾块与燕尾槽配合,起到防止支杆脱离滑槽的目的,安装更稳定。Implement the above technical scheme, start the motor, the motor drives the two-way screw to rotate, and the two-way screw drives the slider to slide along the chute, so as to achieve the purpose of driving the support rod to move in the direction of approaching or away from each other, and at the same time, the dovetail block is matched with the dovetail groove, The purpose is to prevent the support rod from being separated from the chute, and the installation is more stable.

进一步,所述车体设置有链板式底盘。Further, the vehicle body is provided with a chain plate type chassis.

实施上述技术方案,链板式底盘的设置,起到减小地面受到的压强,使车体运动更平稳。Implementing the above technical solution, the setting of the chain plate type chassis can reduce the pressure on the ground and make the movement of the vehicle body more stable.

本发明的另一目的在于提供一种V形构架吊装施工方法,防止V形构架晃动,提高施工效率的优点。Another object of the present invention is to provide a V-shaped frame hoisting construction method, which has the advantages of preventing the V-shaped frame from shaking and improving construction efficiency.

本发明的上述技术目的是通过以下技术方案得以实现的:The above-mentioned technical purpose of the present invention is achieved through the following technical solutions:

一种V形构架吊装施工方法,包括以下步骤:A construction method for hoisting a V-shaped frame, comprising the following steps:

步骤一:采用混凝土浇筑成型形成混凝土基座,并在混凝土基座上开设安装杯口,安装杯口每两个为一组,共两组,四个安装杯口按照两行两列排布,所有安装杯口的杯底面进行找平处理;Step 1: The concrete base is formed by pouring concrete, and the installation cup openings are set on the concrete base. Every two installation cup openings are grouped into two groups, and the four installation cup openings are arranged in two rows and two columns. The bottom surface of all cups where the cup mouth is installed shall be leveled;

步骤二:通过吊车将V形构架吊起,并使V形构架的支脚高于地面;Step 2: Lift the V-shaped frame by a crane, and make the legs of the V-shaped frame higher than the ground;

步骤三:通过权利要求1-8任意一项所述的一种V形构架吊装施工辅助设备对V形构架进行夹持定位,并与吊车共同作用下将V形构架移动到安装杯口的正上方;Step 3: The V-shaped frame is clamped and positioned by a V-shaped frame hoisting construction auxiliary equipment described in any one of claims 1-8, and the V-shaped frame is moved to the positive position of the installation cup under the joint action of the crane. above;

步骤四:通过吊车下放V形构架,保持V形构架处于竖直状态,向安装杯口内灌注混凝土填实。Step 4: Lower the V-shaped frame through the crane, keep the V-shaped frame in a vertical state, and pour concrete into the installation cup opening.

实施上述技术方案,采用混凝土浇筑成型形成混凝土基座,并在混凝土基座上开设安装杯口,安装杯口每两个为一组,共两组,四个安装杯口按照两行两列排布,所有安装杯口的杯底面进行找平处理;通过吊车将V形构架吊起,并使V形构架的支脚高于地面;通过夹持组件对V形构架进行夹持定位,并与吊车共同作用下将V形构架移动到安装杯口的正上方,保持车体行进速度与吊车运动速度一致;通过吊车下放V形构架,保持V形构架处于竖直状态,向安装杯口内灌注混凝土填实,避免人工手动扶持杆体,提高了施工的安全性,且可使V形构架被快速吊运至安装杯口处,提高施工效率。To implement the above technical scheme, the concrete base is formed by pouring concrete, and the installation cup openings are opened on the concrete base. Every two installation cup openings are grouped into two groups, and the four installation cup openings are arranged in two rows and two columns. The bottom surface of all cups where the cup mouth is installed shall be leveled; the V-shaped frame shall be hoisted by a crane, and the legs of the V-shaped frame shall be higher than the ground; Under the action, move the V-shaped frame to the top of the installation cup to keep the traveling speed of the car body consistent with the speed of the crane; lower the V-shaped frame through the crane, keep the V-shaped frame in a vertical state, and pour concrete into the installation cup to fill it. , to avoid manual support of the rod body, improve the safety of construction, and can make the V-shaped frame be quickly hoisted to the installation cup mouth, and improve the construction efficiency.

综上所述,本发明对比于现有技术的有益效果为:当V形构架被吊车吊起后,工人通过夹持组件夹持V形构架的杆体,然后通过驱动装置驱动车体行走,车体带动安装横梁运动以及支杆运动,支杆上的夹持组件以及吊车共同作用带动V形构架移动,当V形构架的杆体运动到安装杯口的正上方时,停下车体,以使杆体位置保持不变,再下放V形构架即可;避免人工手动扶持杆体,提高了施工的安全性,且可使V形构架被快速吊运至安装杯口处,提高施工效率。To sum up, the beneficial effects of the present invention compared with the prior art are: after the V-shaped frame is lifted by the crane, the worker clamps the rod body of the V-shaped frame through the clamping component, and then drives the vehicle body to walk through the driving device, and the vehicle The body drives the movement of the installation beam and the movement of the support rod. The clamping components on the support rod and the crane work together to drive the V-shaped frame to move. The position of the rod body remains unchanged, and then the V-shaped frame can be lowered; the manual support of the rod body is avoided, the safety of construction is improved, and the V-shaped frame can be quickly hoisted to the installation cup opening to improve the construction efficiency.

附图说明Description of drawings

图1是本发明实施例的整体的结构示意图;Fig. 1 is the overall structural schematic diagram of the embodiment of the present invention;

图2是图1中的A部放大图;Fig. 2 is the enlarged view of A part in Fig. 1;

图3是本发明实施例的施工示意图。FIG. 3 is a schematic view of the construction of the embodiment of the present invention.

附图标记:1、车体;11、链板式底盘;2、安装横梁;21、支杆;211、滑块;22、滑槽;31、固定板;32、安装板;321、导向杆;33、抵接板;331、滚珠;34、气压缸;4、驱动组件;41、双向丝杆;42、电机;5、V形构架;51、杆体;6、安装杯口。Reference numerals: 1. Vehicle body; 11. Chain plate type chassis; 2. Mounting beam; 21. Support rod; 211. Slider; 22. Chute; 31. Fixed plate; 33, abutment plate; 331, ball; 34, pneumatic cylinder; 4, drive assembly; 41, two-way screw; 42, motor; 5, V-shaped frame; 51, rod body; 6, installation cup mouth.

具体实施方式Detailed ways

以下结合附图对本发明作进一步详细说明。The present invention will be further described in detail below with reference to the accompanying drawings.

实施例一:Example 1:

如图1、3所示,一种V形构架吊装施工辅助设备,包括车体1以及用于驱动车体1行走的驱动装置,驱动装置与挖掘机或吊车的驱动装置相同,车体1设置有链板式底盘11,以减小地面受到的压强,使车体1运动更平稳。车体1上固定设置有安装横梁2,安装横梁2上设置有两平行设置的支杆21,每根支杆21远离车体1的一端设置有用于夹持V形构架5的杆体51的夹持组件。As shown in Figures 1 and 3, a V-shaped frame hoisting construction auxiliary equipment includes a vehicle body 1 and a driving device for driving the vehicle body 1 to walk. The driving device is the same as the driving device of an excavator or a crane, and the vehicle body 1 is provided with There is a chain plate type chassis 11 to reduce the pressure on the ground and make the movement of the vehicle body 1 more stable. The vehicle body 1 is fixedly provided with a mounting beam 2, and the mounting beam 2 is provided with two struts 21 arranged in parallel, and one end of each strut 21 away from the vehicle body 1 is provided with a clamp for clamping the rod body 51 of the V-shaped frame 5. holding components.

如图1所示,安装横梁2靠近支杆21的侧壁沿自身长度方向开设有滑槽22,支杆21上固定设置有与滑槽22滑移连接的滑块211,滑槽22设置为燕尾槽,滑块211设置为与燕尾槽相适配的燕尾块。安装横梁2上设置有用于驱使支杆21滑动的驱动组件4,驱动组件4包括双向丝杆41和电机42,双向丝杆41转动设置于滑槽22内并与滑块211螺纹连接,电机42固定设置于安装横梁2上用于驱动双向丝杆41转动以使两支杆21向相互靠近或远离的方向运动。As shown in FIG. 1 , the side wall of the mounting beam 2 close to the support rod 21 is provided with a chute 22 along its own length direction. In the dovetail groove, the slider 211 is set as a dovetail block adapted to the dovetail groove. The installation beam 2 is provided with a drive assembly 4 for driving the support rod 21 to slide. The drive assembly 4 includes a bidirectional screw rod 41 and a motor 42. The bidirectional screw rod 41 is rotatably arranged in the chute 22 and is threadedly connected with the slider 211. The motor 42 It is fixedly arranged on the mounting beam 2 and is used to drive the bidirectional screw rod 41 to rotate so as to make the two support rods 21 move toward or away from each other.

当安装两杆体51之间的距离较大的V形构架5时,启动电机42,电机42带动双向丝杆41转动,双向丝杆41带动滑块211沿滑槽22滑动,滑块211带动支杆21向相互靠近或远离的方向运动,从而实现增加两夹持组件之间的间距的目的,以适应尺寸较大的V形构架5。When the V-shaped frame 5 with a large distance between the two rod bodies 51 is installed, the motor 42 is activated, the motor 42 drives the bidirectional screw rod 41 to rotate, the bidirectional screw rod 41 drives the slider 211 to slide along the chute 22, and the slider 211 drives the support The rods 21 move toward or away from each other, so as to achieve the purpose of increasing the distance between the two clamping assemblies, so as to adapt to the V-shaped frame 5 with a larger size.

如图1、2所示,夹持组件包括固定板31、安装板32、抵接板33和气压缸34,固定板31固定设置于支杆21上,安装板32固定设置于固定板31的两端,固定板31和安装板32形成П形结构,且П形结构的开口朝向车体1的前进方向,抵接板33滑动设置于安装板32上,参见图3,抵接板33为与V形构架5的杆体51贴合的弧形板,两抵接板33正对的侧壁上设置有若干的与抵接板33滚动连接的滚珠331;弧形板增加了与杆体51的接触面积,提高夹持效果,而滚珠331的设置起到减小杆体51下放时受到的摩擦力,同时减小抵接板33受到的冲击力,防止抵接板33损坏,提高抵接板33的使用寿命。As shown in FIGS. 1 and 2 , the clamping assembly includes a fixing plate 31 , a mounting plate 32 , an abutting plate 33 and a pneumatic cylinder 34 . At both ends, the fixing plate 31 and the mounting plate 32 form a П-shaped structure, and the opening of the П-shaped structure faces the forward direction of the vehicle body 1, and the abutting plate 33 is slidably arranged on the mounting plate 32, referring to FIG. 3, the abutting plate 33 is The arc-shaped plate attached to the rod body 51 of the V-shaped frame 5 has a number of balls 331 rollingly connected to the abutting plate 33 on the opposite side walls of the two abutting plates 33 ; The contact area improves the clamping effect, and the arrangement of the balls 331 reduces the frictional force received when the rod body 51 is lowered, and at the same time reduces the impact force received by the abutment plate 33, prevents the abutment plate 33 from being damaged, and improves the abutment plate 33. service life.

如图1、2所示,气压缸34固定设置于安装板32上以用于驱使两抵接板33相互靠近或远离,气压缸34的活塞杆与抵接板33固定连接。安装板32上滑动穿设有贯穿安装板32的导向杆321,导向杆321垂直支杆21设置,导向杆321的一端与抵接板33固定连接;在抵接板33运动的过程中,导向杆321的设置,起到对抵接板33导向的作用,防止抵接板33转动,使抵接板33保持正对杆体51的状态,提高夹持效果。As shown in FIGS. 1 and 2 , the pneumatic cylinder 34 is fixed on the mounting plate 32 to drive the two abutting plates 33 to approach or move away from each other. The piston rod of the pneumatic cylinder 34 is fixedly connected to the abutting plate 33 . The mounting plate 32 is slidably provided with a guide rod 321 penetrating the mounting plate 32 , the guide rod 321 is arranged perpendicular to the support rod 21 , and one end of the guide rod 321 is fixedly connected with the abutment plate 33 ; during the movement of the abutment plate 33 , the guiding The provision of the rod 321 plays a role of guiding the abutting plate 33, preventing the abutting plate 33 from rotating, keeping the abutting plate 33 facing the rod body 51, and improving the clamping effect.

待V形构架5的杆体51处于П形结构内后,启动气压缸34,气压缸34带动抵接板33运动,并驱使抵接板33与杆体51抵紧,在V形构架5运动的过程中,起到防止杆体51晃动的目的。After the rod body 51 of the V-shaped frame 5 is in the П-shaped structure, the pneumatic cylinder 34 is activated, and the pneumatic cylinder 34 drives the abutment plate 33 to move, and drives the abutment plate 33 to abut against the rod body 51. During the movement of the V-shaped frame 5 , to prevent the rod body 51 from shaking.

具体工作过程:当V形构架5被吊车吊起后,工人开动车体1,调节车体1位置,以使V形构架5的杆体51处于П形结构内,然后启动气压缸34,气压缸34带动抵接板33运动,并驱使抵接板33与杆体51抵紧;然后通过驱动装置驱动车体1行走,车体1带动安装横梁2运动以及支杆21运动,支杆21上的夹持组件以及吊车共同作用带动V形构架5移动,当V形构架5的杆体51运动到安装杯口6的正上方时,停下车体1,以使杆体51位置保持不变,再下放V形构架5即可;避免人工手动扶持杆体51,提高了施工的安全性,且可使V形构架5被快速吊运至安装杯口6处,提高施工效率。The specific working process: when the V-shaped frame 5 is lifted by the crane, the worker starts the car body 1, adjusts the position of the car body 1, so that the rod body 51 of the V-shaped frame 5 is in the П-shaped structure, and then starts the pneumatic cylinder 34, the pneumatic cylinder 34 drives the abutment plate 33 to move, and drives the abutment plate 33 to abut against the rod body 51; then drive the car body 1 to walk through the driving device, and the car body 1 drives the movement of the installation beam 2 and the movement of the support rod 21, and the clamp on the support rod 21 The holding assembly and the crane work together to drive the V-shaped frame 5 to move. When the rod body 51 of the V-shaped frame 5 moves directly above the installation cup 6, stop the car body 1 to keep the position of the rod body 51 unchanged, and then lower the V-shaped frame 5. The V-shaped frame 5 is enough; the manual support of the rod body 51 is avoided, the safety of construction is improved, and the V-shaped frame 5 can be quickly hoisted to the installation cup 6 to improve the construction efficiency.

实施例二:Embodiment 2:

如图3所示,一种V形构架吊装施工方法,包括以下步骤:As shown in Figure 3, a V-shaped frame hoisting construction method includes the following steps:

步骤一:采用混凝土浇筑成型形成混凝土基座,并在混凝土基座上开设安装杯口6,安装杯口6每两个为一组,共两组,四个安装杯口6按照两行两列排布,所有安装杯口6的杯底面进行找平处理;Step 1: The concrete base is formed by pouring concrete, and the installation cup openings 6 are set on the concrete base. The installation cup openings 6 form a group of two, a total of two groups, and the four installation cup openings 6 are arranged in two rows and two columns. Arrangement, all the cup bottoms where the cup mouth 6 is installed are leveled;

步骤二:通过吊车将V形构架5吊起,并使V形构架5的支脚高于地面;Step 2: hoist the V-shaped frame 5 by a crane, and make the legs of the V-shaped frame 5 higher than the ground;

步骤三:通过权利要求1-8任意一项的一种V形构架5吊装施工辅助设备对V形构架5进行夹持定位,并与吊车共同作用下将V形构架5移动到安装杯口6的正上方;Step 3: The V-shaped frame 5 is clamped and positioned by a construction auxiliary equipment for hoisting the V-shaped frame 5 according to any one of claims 1-8, and the V-shaped frame 5 is moved to the installation cup 6 under the joint action of the crane. directly above;

步骤四:通过吊车下放V形构架5,保持V形构架5处于竖直状态,向安装杯口6内灌注混凝土填实。Step 4: Lower the V-shaped frame 5 by a crane, keep the V-shaped frame 5 in a vertical state, and pour concrete into the installation cup 6 to fill it.

采用混凝土浇筑成型形成混凝土基座,并在混凝土基座上开设安装杯口6,安装杯口6每两个为一组,共两组,四个安装杯口6按照两行两列排布,所有安装杯口6的杯底面进行找平处理;通过吊车将V形构架5吊起,并使V形构架5的支脚高于地面;通过夹持组件对V形构架5进行夹持定位,并与吊车共同作用下将V形构架5移动到安装杯口6的正上方,保持车体1行进速度与吊车运动速度一致;通过吊车下放V形构架5,保持V形构架5处于竖直状态,向安装杯口6内灌注混凝土填实,避免人工手动扶持杆体51,提高了施工的安全性,且可使V形构架5被快速吊运至安装杯口6处,提高施工效率。A concrete base is formed by pouring concrete, and installation cup openings 6 are set on the concrete base. Every two installation cup openings 6 are grouped into two groups, and the four installation cup openings 6 are arranged in two rows and two columns. All the cup bottom surfaces where the cup mouths 6 are installed are leveled; the V-shaped frame 5 is hoisted by a crane, and the feet of the V-shaped frame 5 are higher than the ground; the V-shaped frame 5 is clamped and positioned by the clamping assembly, and is Under the combined action of the crane, the V-shaped frame 5 is moved to just above the installation cup 6 to keep the traveling speed of the car body 1 consistent with the movement speed of the crane; The installation cup opening 6 is filled with concrete to avoid manual support of the rod body 51, which improves the safety of construction, and enables the V-shaped frame 5 to be quickly hoisted to the installation cup opening 6 to improve construction efficiency.

本具体实施方式的实施例均为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention should be covered in within the protection scope of the present invention.

Claims (5)

1.一种V形构架吊装施工辅助设备,其特征在于:包括车体(1)以及用于驱动车体(1)行走的驱动装置,所述车体(1)上固定设置有安装横梁(2),所述安装横梁(2)上设置有两平行设置的支杆(21),每根所述支杆(21)远离车体(1)的一端设置有用于夹持V形构架(5)的杆体(51)的夹持组件;所述夹持组件包括固定板(31)、安装板(32)、抵接板(33)和气压缸(34),所述固定板(31)固定设置于支杆(21)上,所述安装板(32)固定设置于固定板(31)的两端,固定板(31)和安装板(32)形成П形结构,且П形结构的开口朝向车体(1)的前进方向,所述抵接板(33)滑动设置于安装板(32)上,所述气压缸(34)固定设置于安装板(32)上以用于驱使两抵接板(33)相互靠近或远离,气压缸(34)的活塞杆与抵接板(33)固定连接;所述车体(1)设置有链板式底盘(11);所述安装横梁(2)靠近支杆(21)的侧壁沿自身长度方向开设有滑槽(22),所述支杆(21)上固定设置有与滑槽(22)滑移连接的滑块(211),所述安装横梁(2)上设置有用于驱使支杆(21)滑动的驱动组件(4);所述驱动组件(4)包括双向丝杆(41)和电机(42),所述双向丝杆(41)转动设置于滑槽(22)内并与滑块(211)螺纹连接,所述电机(42)固定设置于安装横梁(2)上用于驱动双向丝杆(41)转动以使两支杆(21)向相互靠近或远离的方向运动。1. A V-shaped frame hoisting construction auxiliary equipment is characterized in that: comprising a vehicle body (1) and a drive device for driving the vehicle body (1) to walk, and the vehicle body (1) is fixedly provided with a mounting beam ( 2), the mounting beam (2) is provided with two support rods (21) arranged in parallel, and one end of each of the support rods (21) away from the vehicle body (1) is provided with a V-shaped frame (5) for clamping; ) clamping assembly for the rod body (51); the clamping assembly includes a fixing plate (31), a mounting plate (32), an abutting plate (33) and a pneumatic cylinder (34), the fixing plate (31) is fixed be arranged on the support rod (21), the mounting plate (32) is fixedly arranged on both ends of the fixing plate (31), the fixing plate (31) and the mounting plate (32) form a П-shaped structure, and the opening of the П-shaped structure Towards the forward direction of the vehicle body (1), the abutting plate (33) is slidably arranged on the mounting plate (32), and the pneumatic cylinder (34) is fixedly arranged on the mounting plate (32) for driving the two abutting plates (32). The connecting plates (33) are close to or away from each other, and the piston rod of the pneumatic cylinder (34) is fixedly connected with the abutting plate (33); the vehicle body (1) is provided with a chain plate type chassis (11); the mounting beam (2) ) A chute (22) is opened along the side wall of the support rod (21) along its own length direction, and a slider (211) slidingly connected with the chute (22) is fixed on the support rod (21), so The mounting beam (2) is provided with a drive assembly (4) for driving the support rod (21) to slide; the drive assembly (4) includes a bidirectional screw rod (41) and a motor (42), and the bidirectional screw rod ( 41) The motor (42) is rotatably arranged in the chute (22) and is threadedly connected with the slider (211). The rods (21) move toward or away from each other. 2.根据权利要求1所述的一种V形构架吊装施工辅助设备,其特征在于:所述安装板(32)上滑动穿设有贯穿安装板(32)的导向杆(321),导向杆(321)垂直支杆(21)设置,导向杆(321)的一端与抵接板(33)固定连接。2. A V-shaped frame hoisting construction auxiliary equipment according to claim 1, characterized in that: the mounting plate (32) is slidably provided with a guide rod (321) penetrating the mounting plate (32), and the guide rod (321) A vertical support rod (21) is arranged, and one end of the guide rod (321) is fixedly connected with the abutment plate (33). 3.根据权利要求2所述的一种V形构架吊装施工辅助设备,其特征在于:所述抵接板(33)为与V形构架(5)的杆体(51)贴合的弧形板。3. A V-shaped frame hoisting construction auxiliary equipment according to claim 2, characterized in that: the abutting plate (33) is an arc-shaped plate that fits with the rod body (51) of the V-shaped frame (5). . 4.根据权利要求3所述的一种V形构架吊装施工辅助设备,其特征在于:两所述抵接板(33)正对的侧壁上设置有若干的与抵接板(33)滚动连接的滚珠(331)。4. A V-shaped frame hoisting construction auxiliary equipment according to claim 3, characterized in that: the opposite side walls of the two abutting plates (33) are provided with a number of rollers that roll with the abutting plates (33). Attached balls (331). 5.根据权利要求4所述的一种V形构架吊装施工辅助设备,其特征在于:所述滑槽(22)设置为燕尾槽,所述滑块(211)设置为与燕尾槽相适配的燕尾块。5. A V-shaped frame hoisting construction auxiliary equipment according to claim 4, characterized in that: the chute (22) is configured as a dovetail groove, and the sliding block (211) is configured to be adapted to the dovetail groove dovetail block.
CN201811191471.XA 2018-10-12 2018-10-12 A kind of V-shaped frame hoisting construction auxiliary equipment and construction method Expired - Fee Related CN109403707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811191471.XA CN109403707B (en) 2018-10-12 2018-10-12 A kind of V-shaped frame hoisting construction auxiliary equipment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811191471.XA CN109403707B (en) 2018-10-12 2018-10-12 A kind of V-shaped frame hoisting construction auxiliary equipment and construction method

Publications (2)

Publication Number Publication Date
CN109403707A CN109403707A (en) 2019-03-01
CN109403707B true CN109403707B (en) 2020-12-08

Family

ID=65467134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811191471.XA Expired - Fee Related CN109403707B (en) 2018-10-12 2018-10-12 A kind of V-shaped frame hoisting construction auxiliary equipment and construction method

Country Status (1)

Country Link
CN (1) CN109403707B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279621A (en) * 2021-05-20 2021-08-20 北京博大恒生送变电工程有限公司 Electric pole correcting device for electric power construction
CN117449615B (en) * 2023-10-24 2025-12-12 国家电网有限公司华中分部 A platform for installing and commissioning the structure of a new energy power station booster station and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669957A (en) * 2013-12-10 2014-03-26 国家电网公司 V-shaped framework hoisting construction method
CN205637815U (en) * 2016-05-24 2016-10-12 黎浩 Quick righting device of electric power pole
CN108312162A (en) * 2018-02-08 2018-07-24 海宁市盛祥线业有限公司 A kind of clamping device of rubber processing

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE419852B (en) * 1979-10-05 1981-08-31 Hiab Foco Ab Grippers to be fitted on crane jibs for handling and pulling up poles
SE439173B (en) * 1980-10-02 1985-06-03 Pejo Sekerhetsdetaljer Ab Device for gripping and erection of posts mounted on buckets
CN203141494U (en) * 2012-12-11 2013-08-21 王子豪 Maintenance robot for chemical pipe network
CN104858854B (en) * 2015-05-21 2017-05-10 北京信息科技大学 A light object handling manipulator
CN106088788B (en) * 2016-07-12 2018-08-21 浙江邮电职业技术学院 A kind of electric pole mounting robot
CN106938787A (en) * 2017-04-21 2017-07-11 广州雍远溯智能装备科技有限公司 A kind of multi-functional Zhua Ping robots
CN207260611U (en) * 2017-10-04 2018-04-20 陈燕霞 Lightweight wall plate rotation holds riser machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669957A (en) * 2013-12-10 2014-03-26 国家电网公司 V-shaped framework hoisting construction method
CN205637815U (en) * 2016-05-24 2016-10-12 黎浩 Quick righting device of electric power pole
CN108312162A (en) * 2018-02-08 2018-07-24 海宁市盛祥线业有限公司 A kind of clamping device of rubber processing

Also Published As

Publication number Publication date
CN109403707A (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN205708412U (en) A kind of wind-powered electricity generation crab-bolt stretch-draw automatic loading and unloading mechanism
CN103790154B (en) Reinforcing cage pushing tow system and pushing method
CN110723677B (en) Precast Beam Assisted Lifting Trolley
CN110127530A (en) For hanging apparatus and its application method in restricted clearance workshop
CN109403707B (en) A kind of V-shaped frame hoisting construction auxiliary equipment and construction method
CN107663859B (en) pile driver
CN109112963B (en) Bridge hoisting equipment
CN206509679U (en) The mounting and positioning device of cast pipe union
CN205660667U (en) Overturning device
CN210001467U (en) For hoisting devices in confined space workshops
CN110725707B (en) Integral arch frame installation method and integral arch frame installation trolley
CN109898375B (en) Hydraulic rail replacing machine
CN210002915U (en) Mobile mounting device for steel beam sliding support bracket
CN204057853U (en) The special erector of a kind of large size valve
CN103395613A (en) Assembly conveyor line for drive bodies of construction hoists
CN218365715U (en) Quick drilling device
CN207129916U (en) It is a kind of to remove brick machine with self-locking clamping jaw
CN216914331U (en) Precast beam jack adjustment and stretch-draw protector
CN215516375U (en) Manhole hoisting device for foundation reinforcement cage
DE112014000114T5 (en) Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same
CN116517301A (en) Anti-side-tilting jacking device for large-span steel structure net rack and using method
CN209990133U (en) Reinforced concrete wall sliding formwork device
CN102500997B (en) Method for installing lower cross beam of fast forging machine
CN114803973A (en) Trench cover plate installation device and method
CN201221373Y (en) Beam lifting apparatus for coal mine laneway hydraulic support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208

Termination date: 20211012

CF01 Termination of patent right due to non-payment of annual fee