CN115769159A - 作业计划确定程序、作业计划确定方法以及信息处理装置 - Google Patents

作业计划确定程序、作业计划确定方法以及信息处理装置 Download PDF

Info

Publication number
CN115769159A
CN115769159A CN202080102042.XA CN202080102042A CN115769159A CN 115769159 A CN115769159 A CN 115769159A CN 202080102042 A CN202080102042 A CN 202080102042A CN 115769159 A CN115769159 A CN 115769159A
Authority
CN
China
Prior art keywords
cutting device
raw material
objects
switching
conversions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202080102042.XA
Other languages
English (en)
Chinese (zh)
Inventor
谷口淳
山崎贵司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Publication of CN115769159A publication Critical patent/CN115769159A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00—Program-control systems
    • G05B19/02—Program-control systems electric
    • G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form
    • G05B19/182—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form characterised by the machine tool function, e.g. thread cutting, cam making, tool direction control
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00—Administration; Management
    • G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/043—Optimisation of two dimensional placement, e.g. cutting of clothes or wood
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00—Program-control systems
    • G05B19/02—Program-control systems electric
    • G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04—Manufacturing
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/32—Operator till task planning
    • G05B2219/32016—Minimize setup time of machines
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/32—Operator till task planning
    • G05B2219/32253—As a function of, change of machine operation
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/32—Operator till task planning
    • G05B2219/32257—Tool replacement minimization
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/32—Operator till task planning
    • G05B2219/32264—Setup time
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/32—Operator till task planning
    • G05B2219/32301—Simulate production, process stages, determine optimum scheduling rules
    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00—Program-control systems
    • G05B2219/30—Nc systems
    • G05B2219/36—Nc in input of data, input key till input tape
    • G05B2219/36289—Cutting, machining conditions by optimisation of time, cost, accuracy
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Automation & Control Theory (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Human Computer Interaction (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)
CN202080102042.XA 2020-07-13 2020-07-13 作业计划确定程序、作业计划确定方法以及信息处理装置 Pending CN115769159A (zh)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/027259 WO2022013921A1 (ja) 2020-07-13 2020-07-13 作業計画特定プログラム、作業計画特定方法、および情報処理装置

Publications (1)

Publication Number Publication Date
CN115769159A true CN115769159A (zh) 2023-03-07

Family

ID=79555294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202080102042.XA Pending CN115769159A (zh) 2020-07-13 2020-07-13 作业计划确定程序、作业计划确定方法以及信息处理装置

Country Status (5)

Country Link
US (1) US20230147377A1 (cg-RX-API-DMAC7.html)
EP (1) EP4180887A4 (cg-RX-API-DMAC7.html)
JP (1) JPWO2022013921A1 (cg-RX-API-DMAC7.html)
CN (1) CN115769159A (cg-RX-API-DMAC7.html)
WO (1) WO2022013921A1 (cg-RX-API-DMAC7.html)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7829374B2 (ja) * 2022-03-23 2026-03-13 株式会社東芝 作成システム、作成方法、プログラム、及び記憶媒体

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011028539A (ja) * 2009-07-27 2011-02-10 Amada Co Ltd 板材加工システム及び板材加工システムの加工スケジュール設定方法
JP2019049837A (ja) * 2017-09-08 2019-03-28 フルサト工業株式会社 生産指示装置、生産指示方法及びプログラム

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07314297A (ja) * 1994-05-25 1995-12-05 Toyota Motor Corp 素材加工システム
JP4369189B2 (ja) * 2003-09-22 2009-11-18 三菱電機株式会社 スケジューリングシステムおよびスケジューリングをコンピュータに実行させるためのプログラム
US7277768B2 (en) * 2004-11-05 2007-10-02 International Business Machines Corporation Method for production design and operations scheduling for plate design in the steel industry
US20110258087A1 (en) * 2010-04-14 2011-10-20 International Business Machines Corporation Analytics for setting up strategic inventory systems to handle small lot orders in the steel industry
PL3067193T3 (pl) 2011-07-22 2024-10-21 Packsize Llc Produkcja kafelkowa dla pary pudełek
JP5872101B1 (ja) * 2015-06-01 2016-03-01 株式会社Jls 面材切断加工指示装置と面材切断加工機と面材

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011028539A (ja) * 2009-07-27 2011-02-10 Amada Co Ltd 板材加工システム及び板材加工システムの加工スケジュール設定方法
JP2019049837A (ja) * 2017-09-08 2019-03-28 フルサト工業株式会社 生産指示装置、生産指示方法及びプログラム

Also Published As

Publication number Publication date
EP4180887A4 (en) 2023-08-16
WO2022013921A1 (ja) 2022-01-20
JPWO2022013921A1 (cg-RX-API-DMAC7.html) 2022-01-20
US20230147377A1 (en) 2023-05-11
EP4180887A1 (en) 2023-05-17

Similar Documents

Publication Publication Date Title
CN111699444B (zh) 控制装置、控制方法以及计算机可读记录介质
Wong et al. A comparison of hybrid genetic algorithm and hybrid particle swarm optimization to minimize makespan for assembly job shop
CN115700639B (zh) 智能生产排程方法、装置、设备及存储介质
Hyun et al. Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance
Abbasi et al. Production planning and performance optimization of reconfigurable manufacturing systems using genetic algorithm
CN112105994B (zh) 控制系统、装置与方法、学习装置与方法及介质
JP2012194712A (ja) 生産計画作成方法
WO2024212471A1 (zh) 一种焊接装配智能调度方法及系统
Corriveau et al. Genetic algorithms and finite element coupling for mechanical optimization
CN113052376B (zh) 生产排程方法及装置,存储介质和电子设备
Gan et al. Optimal control-limit maintenance policy for a production system with multiple process states
CN120387655A (zh) 一种基于数字孪生技术的智能制造管理方法、设备及介质
Quiza et al. Sustainability-focused optimization of fused-deposition component design and manufacturing
CN110288110A (zh) 一种oa板材套裁剪切生产控制优化方法
US20230147377A1 (en) Storage medium, work plan specifying method, and information processing device
Dolgui et al. MIP-based GRASP and genetic algorithm for balancing transfer lines
JP2009258863A (ja) 多品目多段工程動的ロットサイズスケジューリング方法
CN116739269A (zh) 基于调度优化模型的排程方法、装置、计算机设备及存储介质
CN116307132A (zh) 一种排料方法、装置、电子设备和计算机可读存储介质
JP2006031360A (ja) 生産ライン計画支援装置および生産ライン計画支援方法
Choy et al. A hybrid scheduling decision support model for minimizing job tardiness in a make-to-order based mould manufacturing environment
Chen et al. A fuzzy set approach for evaluating and enhancing the mid-term competitiveness of a semiconductor factory
JP2021189622A (ja) 情報処理装置、作業計画立案方法、および作業計画立案プログラム
CN116802575A (zh) 作业计划制定方法、作业计划制定程序、以及信息处理装置
JP4913882B2 (ja) 切断加工スケジューリング方法及び自動切断加工スケジューリング機能を組み込んだ立体型切断ネットワークシステム

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20230307

WD01 Invention patent application deemed withdrawn after publication