CN115750917A - Pipeline arrangement system for rail transit double-layer maintenance platform - Google Patents
Pipeline arrangement system for rail transit double-layer maintenance platform Download PDFInfo
- Publication number
- CN115750917A CN115750917A CN202211521666.2A CN202211521666A CN115750917A CN 115750917 A CN115750917 A CN 115750917A CN 202211521666 A CN202211521666 A CN 202211521666A CN 115750917 A CN115750917 A CN 115750917A
- Authority
- CN
- China
- Prior art keywords
- platform
- water supply
- partition plate
- air conditioner
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
A pipeline arrangement system for a double-layer track traffic maintenance platform comprises two groups of pipeline installation supports, wherein the two groups of pipeline installation supports are respectively provided with four groups of partition plates at equal intervals from top to bottom, a five-prevention pipe and a first low-voltage wiring groove are arranged on a first partition plate, an air conditioner water supply main pipe is arranged between the first partition plate and a second partition plate, an air conditioner water return main pipe is arranged between the second partition plate and a third partition plate, a water supply main pipe is arranged between the third partition plate and a fourth partition plate, and the air conditioner water supply main pipe and the air conditioner water return main pipe are respectively communicated with an air conditioner water supply branch pipe and an air conditioner water return branch pipe and are finally communicated with a post air conditioner; the water supply main pipe is connected with the first water tap, the second water tap and the water supply branch pipe, and the water supply branch pipe is connected with the third water tap and the fourth water tap; the invention can concentrate various pipelines to the top platform, is convenient for overhauling the pipelines, and solves the problems of difficult overhauling and the like caused by a plurality of overlapped and crossed layers of air pipes and water pipes of the traditional double-layer overhauling platform.
Description
Technical Field
The invention relates to the technical field of rail transit pipeline arrangement structures, in particular to a pipeline arrangement system for a rail transit double-layer overhaul platform.
Background
At present, in the domestic rail transit vehicle section or parking lot, in order to meet the requirement of overhauling operators to overhaul trains, a double-layer overhauling platform is generally adopted on a weekly and monthly inspection line for overhauling operation. The intermediate level of double-deck maintenance platform overhauls the platform and the top layer overhauls the platform and overhauls the operation for making things convenient for the maintainer usually, all need set up for the power supply, for drainage and corresponding pipeline arrangement to according to the operation demand, all will install air feed system near the frequent station of fixed point operation in each layer overhauls the platform, thereby for it provides heat dissipation refrigeration effect even, provides better operational environment for the maintainer. Therefore, there is a special demand for corresponding equipment and pipeline arrangement for systems for supplying wind, power and the like.
The pipeline arrangement forms of the double-layer maintenance platform are generally two, one is that a main water pipe and a main cable are centrally buried underground, and branch pipes are adopted to vertically extend upwards to various power supply and water supply equipment corresponding to each layer of maintenance platform; the disadvantage of this type of pipeline arrangement is that the pipeline arrangement is relatively costly to construct and is relatively difficult to repair when the pipeline fails.
Another common arrangement is that a main water pipe and a main air pipe are arranged on each layer, and water supply and air supply independently exist on each layer. The advantage of this kind of pipeline arrangement form is that each layer main water pipe and main tuber pipe exist independently, and it is more convenient to overhaul, nevertheless because every layer all will set up main water pipe and main tuber pipe, pipeline arrangement occupies more space, leads to the effective headroom of operation platform to show and reduces, and the pipeline is alternately more, causes the pipeline construction inconvenient.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides the pipeline arrangement system for the rail transit double-layer maintenance platform, and the pipeline arrangement form can concentrate various pipelines to the top-layer maintenance platform, so that the pipelines can be conveniently maintained; and the barrier structure that all kinds of pipelines and pipeline installing support formed jointly still can play the effect of overhauing the operation protection at the top layer in-process of overhauing to solve the tuber pipe and the water pipe of the double-deck platform of overhauing among the prior art and overlap alternately the number of piles many, overhaul difficult scheduling problem. In order to achieve the purpose, the invention is realized by the following technical scheme:
a pipeline arrangement system for a track traffic double-layer maintenance platform comprises two groups of pipeline installation supports which are parallel to a column respectively, wherein the two groups of pipeline installation supports are provided with a first partition plate, a second partition plate, a third partition plate and a fourth partition plate at equal intervals from top to bottom; a first water tap is arranged on the left water supply main pipe, a second water tap is arranged on the right water supply main pipe, a first hand washing pool and a second hand washing pool are respectively arranged below the first water tap and the second water tap, and the first hand washing pool and the second hand washing pool are both arranged on the top layer maintenance platform; the left water supply main pipe and the right water supply main pipe are in an intercommunicating design, the first water faucet is communicated with a water supply branch pipe, and the water supply branch pipe is also communicated with a fire-fighting water pipe; the first hand washing sink and the second hand washing sink are communicated with the main drainage pipe through drainage pipes;
the air conditioner water supply main pipe and the air conditioner water return main pipe are respectively communicated with the air conditioner water supply branch pipe and the air conditioner water return branch pipe, and the air conditioner water supply branch pipe and the air conditioner water return branch pipe respectively penetrate through the top layer overhauling platform, the middle layer overhauling platform and the bottom layer overhauling platform and are communicated with the post air conditioners in the middle layer overhauling platform and the bottom layer overhauling platform; the water supply branch pipe penetrates through the top layer overhauling platform and the middle layer overhauling platform respectively and is communicated with the third water faucet and the fourth water faucet, and the main drainage pipe penetrates through the middle layer overhauling platform and the bottom layer overhauling platform respectively and is communicated with the third hand washing sink and the fourth hand washing sink through drainage pipes;
the downside that top layer overhauld the platform and the downside that the intermediate level overhauld the platform all is provided with a plurality of fluorescent tubes and a plurality of second low pressure distribution groove.
Preferably, the two groups of pipeline mounting brackets are mounted close to the left side and the right side of the column and are perpendicular to the top layer maintenance platform.
Preferably, the equally spaced distances are set to 1-1.5 meters.
Preferably, the third water tap and the fourth water tap are respectively arranged above the third hand washing sink and the fourth hand washing sink, the third water tap and the third hand washing sink are arranged at a communication corridor of the middle layer overhauling platform, and the fourth water tap and the fourth hand washing sink are arranged at a communication corridor of the bottom layer overhauling platform.
Preferably, two sets of post air conditioners are arranged in the bottom layer overhauling platform and the middle layer overhauling platform.
Preferably, the pipeline mounting bracket, the first partition plate, the second partition plate, the third partition plate and the fourth partition plate are symmetrically distributed on two sides of the column.
Preferably, the air conditioner water supply branch pipe, the air conditioner water return branch pipe and the water supply branch pipe are arranged close to the side edge of the column and vertically extend to the bottom layer overhauling platform.
Preferably, the top layer overhaul platform, the middle layer overhaul platform and the bottom layer overhaul platform are sequentially arranged from top to bottom.
The invention has the beneficial effects that:
1. according to the invention, the pipeline mounting bracket is arranged at the side, close to the column, of the top-layer maintenance platform of the maintenance platform, the pipeline mounting bracket is utilized to mount the partition plates at intervals of 1-1.5 meters, and various pipelines are divided into multiple layers to form an installation structure similar to an F-shaped structure, namely, when viewed from top to bottom, the first layer is provided with the low-pressure wire groove and the five-prevention pipe, the second layer is provided with the air-conditioning water supply main pipe, the third layer is provided with the air-conditioning water return main pipe, and the fourth layer is provided with the water supply main pipe and the fire-fighting water pipe, and various pipelines are enabled to cling to the side of the column and extend from the top-layer maintenance platform to the middle-layer maintenance platform and the bottom-layer maintenance platform, so that the pipeline laying distance is greatly saved, the construction strength and the construction cost are saved, and the economy is remarkably improved;
2. the pipeline arrangement form of the invention can well centralize various pipelines to the top layer maintenance platform, thereby facilitating the pipeline maintenance and reducing the labor intensity of the pipeline maintenance, and the barrier structure formed by the installed pipelines and the pipeline installation support can play the role of operation protection in the top layer maintenance platform process.
Drawings
FIG. 1 is a schematic diagram of the piping arrangement system of the present invention.
In the figure: 1. post air conditioning; 2. a second low-voltage wiring duct; 3. a lamp tube; 4. a first low-voltage wiring duct; 5. a fourth separator; 6. a five-prevention pipe; 7. a pipeline mounting bracket; 8. a main water supply pipe of the air conditioner; 9. a return water main pipe of the air conditioner; 10. an air conditioner water supply branch pipe; 11. a water supply main pipe; 12. a fire hose; 13. an air conditioner backwater branch pipe; 14. a water supply branch pipe; 15. a main drain pipe; 16. a top layer maintenance platform; 17. an intermediate layer overhaul platform; 18. a bottom layer overhaul platform; 19. a first water tap; 20. a second faucet; 21. a third faucet; 22. a fourth faucet; 23. a first hand sink; 24. a second hand washing sink; 25. a third hand washing sink; 26. and fourthly, washing the hands in the sink.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in a specific case to those of ordinary skill in the art. The following describes an embodiment of the present invention based on its overall structure.
The invention will be further described with reference to the accompanying drawings and the detailed description below:
in order to make the objects, technical solutions and advantages of the present invention clearer and clearer, the present invention is further described below with reference to the accompanying drawings and examples.
Example 1:
as shown in fig. 1, a pipeline arrangement system for a rail transit double-deck maintenance platform comprises two groups of pipeline installation supports 7 which are respectively parallel to a column, wherein the two groups of pipeline installation supports 7 are respectively close to the left side and the right side of the column and are perpendicular to a top-layer maintenance platform 16, the two groups of pipeline installation supports 7 are provided with a first partition plate, a second partition plate, a third partition plate and a fourth partition plate 5 at equal intervals from top to bottom, the equal interval distance is set to be 1-1.5 meters, specifically, 1 meter, 1.25 meters, 1.5 meters and the like can be selected according to construction conditions, the pipeline installation supports 7, the first partition plate, the second partition plate, the third partition plate and the fourth partition plate 5 are further symmetrically distributed on two sides of the column, and therefore reasonable regulation of installation of various pipelines on the top-layer maintenance platform 16 is better promoted.
The pipeline installing support 7 is arranged on the side of the leaning column of the top layer overhauling platform 16, is used for supporting and fixing pipelines, and is used for concentrating various pipelines on the support to be installed, a plurality of clapboards are arranged on the pipeline installing support 7 and used for layering, so that different pipelines are arranged on the pipeline installing support 7 orderly from top to bottom, and the purpose of saving space is achieved.
The fire-fighting water pipe 12 is characterized in that a five-prevention pipe 6 and a first low-voltage wiring duct 4 are arranged on a first partition plate, an air-conditioning water supply main pipe 8 is arranged between the first partition plate and a second partition plate, an air-conditioning water return main pipe 9 is arranged between the second partition plate and a third partition plate, a water supply main pipe 11 is arranged between the third partition plate and a fourth partition plate 5, and a group of fire-fighting water pipes 12 are additionally arranged on any side between the third partition plate and the fourth partition plate 5 according to fire-fighting requirements, namely the fire-fighting water pipes 12 can be arranged on the left side or the right side, and the fire-fighting water pipes are specifically designed according to construction requirements; a first water tap 19 is arranged on the left water supply main pipe 11, a second water tap 20 is arranged on the right water supply main pipe 11, a first hand washing pool 23 and a second hand washing pool 24 are respectively arranged below the first water tap 19 and the second water tap 20, the first hand washing pool 23 and the second hand washing pool 24 are both arranged on the top layer overhaul platform 16, and the two hand washing pools are not communicated through a communication corridor; the left water supply main pipe 11 and the right water supply main pipe 11 are communicated, that is, the water flow of the second water tap 20 is provided through the left water supply main pipe 11, the first water tap 19 is also communicated with the water supply branch pipe 14, and the water supply branch pipe 14 is also communicated with the fire-fighting water pipe 12.
Top layer overhaul platform 16, intermediate level overhaul platform 17 and bottom layer overhaul platform 18 top-down arrange in order, all be provided with two sets of post air conditioners 1 in bottom layer overhaul platform 18 and the intermediate level overhaul platform 17, the downside that top layer overhauld platform 16 and intermediate level overhaul platform 17's downside still all is provided with a plurality of fluorescent tubes 3 and a plurality of second low pressure distribution groove 2, concrete quantity and position according to overhaul the platform construction needs design can. The air conditioner water supply main pipe 8 and the air conditioner water return main pipe 9 are respectively communicated with an air conditioner water supply branch pipe 10 and an air conditioner water return branch pipe 13, and the air conditioner water supply branch pipe 10 and the air conditioner water return branch pipe 13 respectively penetrate through a top layer overhauling platform 16, an intermediate layer overhauling platform 17 and a bottom layer overhauling platform 18 and are communicated with the post air conditioners 1 in the intermediate layer overhauling platform 17 and the bottom layer overhauling platform 18; the water supply branch pipe 14 respectively passes through the top layer overhaul platform 16 and the middle layer overhaul platform 17 to be communicated with a third water tap 21 and a fourth water tap 22; wherein, the sewage discharged by the first hand washing basin 23 and the second hand washing basin 24 is communicated with the main drainage pipe 15 through a sewage discharge pipe, and the main drainage pipe 15 is respectively communicated with the third hand washing basin 25 and the fourth hand washing basin 26 through the middle layer overhaul platform 17 and the bottom layer overhaul platform 18; the third water tap 21 and the fourth water tap 22 are also respectively arranged above the third hand washing sink 25 and the fourth hand washing sink 26, the third water tap 21 and the third hand washing sink 25 are arranged in a communication corridor of the middle layer overhauling platform 17, and the fourth water tap 22 and the fourth hand washing sink 26 are also arranged in a communication corridor of the bottom layer overhauling platform 18, so that the construction and material cost can be obviously reduced, and the middle layer overhauling platform 17 and the bottom layer overhauling platform 18 can share one hand washing sink and a sewage discharge system on the same layer.
Air conditioner water supply branch pipe 10, air conditioner return pipe 13, water supply branch pipe 14 all hug closely the post side and arrange and extend perpendicularly to bottom layer and overhaul platform 18, because the top layer of post left and right both sides is overhauld the platform 16 and is not communicated, install pipeline installing support 7 on the left and right both sides platform that pastes the post, the support passes through the baffle and separates for four layers, concentrate various pipelines and arrange on the support, formed from last down to look in proper order for the first layer arrange low pressure distribution groove and five prevent tub 6, the second floor arranges air conditioner water supply and is responsible for 8, the third floor arranges air conditioner return and is responsible for 9, the fourth floor arranges the overall arrangement of giving water and being responsible for 11 and fire-fighting water pipe 12. Namely, the structure formed by the pipeline mounting bracket 7 and the pipeline after mounting plays a role of a guard rail at the gap between the columns; and the side of the pipeline, which is attached to the pillar, upwards extends to the hand washing sink of the top layer overhaul platform 16 and the like, and downwards extends to the hand washing sink of the middle overhaul platform 17 and the bottom layer overhaul platform 18 and the post air conditioner 1 and the like, so that the space and the construction strength are greatly saved, and the construction length of the pipeline is also reduced.
The pipeline arrangement system is usually designed in an overhaul warehouse of a rail transit vehicle, and by utilizing the pipeline arrangement system, a better operation environment can be provided for overhaul personnel, and the requirement of the overhaul personnel for overhauling a train is met.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof, and it is therefore desired that the present embodiments be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, without any reference thereto being construed as limiting the claim concerned.
Claims (8)
1. A pipeline arrangement system for a track traffic double-layer maintenance platform is characterized by comprising two groups of pipeline installation supports which are parallel to a column respectively, wherein the two groups of pipeline installation supports are provided with a first partition plate, a second partition plate, a third partition plate and a fourth partition plate at equal intervals from top to bottom; a first water tap is arranged on the left water supply main pipe, a second water tap is arranged on the right water supply main pipe, a first hand washing pool and a second hand washing pool are respectively arranged below the first water tap and the second water tap, and the first hand washing pool and the second hand washing pool are both arranged on the top layer maintenance platform; the left water supply main pipe and the right water supply main pipe are in an intercommunicating design, the first water faucet is communicated with a water supply branch pipe, and the water supply branch pipe is also communicated with a fire-fighting water pipe; the first hand washing sink and the second hand washing sink are communicated with the main drainage pipe through drainage pipes;
the air conditioner water supply main pipe and the air conditioner water return main pipe are respectively communicated with the air conditioner water supply branch pipe and the air conditioner water return branch pipe, and the air conditioner water supply branch pipe and the air conditioner water return branch pipe respectively penetrate through the top layer overhauling platform, the middle layer overhauling platform and the bottom layer overhauling platform and are communicated with the post air conditioners in the middle layer overhauling platform and the bottom layer overhauling platform; the water supply branch pipe penetrates through the top layer overhauling platform and the middle layer overhauling platform respectively and is communicated with the third water faucet and the fourth water faucet, and the main drainage pipe penetrates through the middle layer overhauling platform and the bottom layer overhauling platform respectively and is communicated with the third hand washing sink and the fourth hand washing sink through drainage pipes;
the downside that top layer overhauld the platform and the downside that the intermediate level overhauld the platform all is provided with a plurality of fluorescent tubes and a plurality of second low pressure distribution groove.
2. The pipeline layout system for the rail transit double-deck service platform as claimed in claim 1, wherein two sets of the pipeline mounting brackets are mounted adjacent to the left and right sides of the column and perpendicular to the top deck service platform.
3. Pipeline arrangement system for a track traffic double deck service platform according to claim 1, characterized in that the equally spaced distances are set to 1-1.5 meters.
4. The piping arrangement system for a transportation double deck service platform according to claim 1, wherein the third and fourth water taps are disposed above a third and fourth hand wash basin, respectively, the third and third hand wash basins being disposed at the communication corridor of the intermediate deck service platform, and the fourth and fourth water taps being disposed at the communication corridor of the lower deck service platform.
5. The pipeline arrangement system for the rail transit double-deck maintenance platform according to claim 1, wherein two sets of post air conditioners are arranged in each of the bottom-deck maintenance platform and the middle-deck maintenance platform.
6. The pipeline arrangement system for the double-deck track traffic maintenance platform according to claim 1, wherein the pipeline mounting bracket, the first partition plate, the second partition plate, the third partition plate and the fourth partition plate are symmetrically distributed on two sides of the column.
7. The pipeline arrangement system for the track traffic double-layer maintenance platform according to claim 1, wherein the air conditioner water supply branch pipe, the air conditioner water return branch pipe and the water supply branch pipe are arranged close to the side edge of the pillar and vertically extend to the bottom maintenance platform.
8. The pipeline arrangement system for a track traffic double deck service platform of claim 1, wherein the top deck service platform, the middle deck service platform and the bottom deck service platform are arranged in sequence from top to bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211521666.2A CN115750917A (en) | 2022-11-30 | 2022-11-30 | Pipeline arrangement system for rail transit double-layer maintenance platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211521666.2A CN115750917A (en) | 2022-11-30 | 2022-11-30 | Pipeline arrangement system for rail transit double-layer maintenance platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115750917A true CN115750917A (en) | 2023-03-07 |
Family
ID=85341331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211521666.2A Pending CN115750917A (en) | 2022-11-30 | 2022-11-30 | Pipeline arrangement system for rail transit double-layer maintenance platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115750917A (en) |
-
2022
- 2022-11-30 CN CN202211521666.2A patent/CN115750917A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107171189A (en) | A kind of cable tunnel integrated with substation equipment basis | |
CN111197420A (en) | Garage pipeline integration system and garage | |
CN115750917A (en) | Pipeline arrangement system for rail transit double-layer maintenance platform | |
CN205956559U (en) | Pipeline gallows | |
CN215906846U (en) | Underground pipe gallery | |
CN210292091U (en) | Buried air conditioner installation system and air supply system thereof | |
CN210107609U (en) | Refrigerating room | |
CN209227866U (en) | Indoor pipeline arranging system and building | |
CN109149488B (en) | Urban railway pipeline arrangement structure and method | |
CN205557571U (en) | Prestressing force divides and adds series side storehouse drainage type underground pipe gallery | |
CN217758934U (en) | Single-layer basement with equipment pipe gallery | |
CN210107608U (en) | Refrigeration machine room convenient to overhaul | |
CN205557570U (en) | Prestressing force divides and adds series pipe storehouse formula underground pipe gallery side by side | |
CN219833704U (en) | Electric pipeline structure of detachable building and detachable building | |
CN210562302U (en) | Integrated municipal underground pipe gallery | |
CN217974571U (en) | Water feeding and sewage discharging system for railway motor train station and inspection warehouse | |
CN213143128U (en) | Pipeline system of corridor type garage | |
CN220521405U (en) | Utility tunnel structure is developed to rail transit vehicle base upper cover | |
CN219261113U (en) | Intensive pipe gallery | |
CN215977368U (en) | Be used for shield structure form utility tunnel technology node well | |
CN219196197U (en) | Civil air defense engineering drainage structures | |
CN205557567U (en) | Prestressing force divides to divide with serial compartment uses formula underground pipe gallery | |
CN217840324U (en) | Multi-layer container | |
CN214406688U (en) | Refrigeration machine room combination device for subway station | |
CN107882067A (en) | A kind of design and construction structure of contignation underground garage pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |