CN115652935B - 一种超大直径钢护筒整体浮运下沉就位施工方法 - Google Patents
一种超大直径钢护筒整体浮运下沉就位施工方法 Download PDFInfo
- Publication number
- CN115652935B CN115652935B CN202211440816.7A CN202211440816A CN115652935B CN 115652935 B CN115652935 B CN 115652935B CN 202211440816 A CN202211440816 A CN 202211440816A CN 115652935 B CN115652935 B CN 115652935B
- Authority
- CN
- China
- Prior art keywords
- steel
- steel pile
- pile casing
- casing
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 238
- 239000010959 steel Substances 0.000 title claims abstract description 238
- 238000007667 floating Methods 0.000 title claims abstract description 56
- 238000010276 construction Methods 0.000 title claims abstract description 51
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 124
- 238000000034 method Methods 0.000 claims abstract description 14
- 230000008569 process Effects 0.000 claims abstract description 12
- 238000009434 installation Methods 0.000 claims abstract description 9
- 230000000903 blocking effect Effects 0.000 claims abstract description 4
- 230000008093 supporting effect Effects 0.000 claims description 13
- 238000002347 injection Methods 0.000 claims description 12
- 239000007924 injection Substances 0.000 claims description 12
- 230000007246 mechanism Effects 0.000 claims description 12
- 238000007789 sealing Methods 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 239000000725 suspension Substances 0.000 claims description 7
- 238000007599 discharging Methods 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 4
- 230000009471 action Effects 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 230000009189 diving Effects 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims 1
- 230000008859 change Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211440816.7A CN115652935B (zh) | 2022-11-17 | 2022-11-17 | 一种超大直径钢护筒整体浮运下沉就位施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211440816.7A CN115652935B (zh) | 2022-11-17 | 2022-11-17 | 一种超大直径钢护筒整体浮运下沉就位施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115652935A CN115652935A (zh) | 2023-01-31 |
CN115652935B true CN115652935B (zh) | 2024-04-05 |
Family
ID=85019282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211440816.7A Active CN115652935B (zh) | 2022-11-17 | 2022-11-17 | 一种超大直径钢护筒整体浮运下沉就位施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115652935B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967827A (zh) * | 2010-02-26 | 2011-02-09 | 中交一公局厦门工程有限公司 | 一种桥梁深水基础钢护筒施工方法 |
CN102140802A (zh) * | 2010-02-02 | 2011-08-03 | 中交二公局第五工程有限公司 | 封闭自浮式钢吊箱兼钻孔平台的设计方法 |
DE102010026711A1 (de) * | 2010-03-30 | 2011-10-06 | Werner Möbius Engineering GmbH | Halbtaucher zum Transport und/oder Ausführen von Arbeiten auf See sowie Verfahren zur Positionierung offshore |
CN104711930A (zh) * | 2015-02-06 | 2015-06-17 | 浙江国丰集团有限公司 | 超宽河道大直径管桥安装施工方法 |
CN206615556U (zh) * | 2017-03-18 | 2017-11-07 | 青岛新华友建工集团股份有限公司 | 一种大直径钢护筒运输用限位装置 |
CN107558479A (zh) * | 2017-08-08 | 2018-01-09 | 中铁四局集团第二工程有限公司 | 深水基础钢护筒整体定位安装方法 |
-
2022
- 2022-11-17 CN CN202211440816.7A patent/CN115652935B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102140802A (zh) * | 2010-02-02 | 2011-08-03 | 中交二公局第五工程有限公司 | 封闭自浮式钢吊箱兼钻孔平台的设计方法 |
CN101967827A (zh) * | 2010-02-26 | 2011-02-09 | 中交一公局厦门工程有限公司 | 一种桥梁深水基础钢护筒施工方法 |
DE102010026711A1 (de) * | 2010-03-30 | 2011-10-06 | Werner Möbius Engineering GmbH | Halbtaucher zum Transport und/oder Ausführen von Arbeiten auf See sowie Verfahren zur Positionierung offshore |
CN104711930A (zh) * | 2015-02-06 | 2015-06-17 | 浙江国丰集团有限公司 | 超宽河道大直径管桥安装施工方法 |
CN206615556U (zh) * | 2017-03-18 | 2017-11-07 | 青岛新华友建工集团股份有限公司 | 一种大直径钢护筒运输用限位装置 |
CN107558479A (zh) * | 2017-08-08 | 2018-01-09 | 中铁四局集团第二工程有限公司 | 深水基础钢护筒整体定位安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN115652935A (zh) | 2023-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108571621B (zh) | 浮箱式水浮龙门吊法管道沉管施工方法 | |
CN109780325B (zh) | 一种水厂取水隧道水下管道安装方法 | |
CN102720140B (zh) | 大跨度预应力砼连续梁深水桥墩施工工艺 | |
CN109487807B (zh) | 一种钢管桩围堰引孔换填施工方法 | |
CN106351241B (zh) | 紧临既有线大跨度连续梁深水基础施工方法 | |
CN113550340A (zh) | 一种深水入岩条件下无封底双壁钢围堰深水基础施工方法 | |
CN111058458A (zh) | 基于绞吸式地连墙局部替代排桩支护的施工方法及结构 | |
CN107620316B (zh) | 一种岩石河床大体积深水基础施工方法 | |
CN112647533A (zh) | 一种先桩法导管架基础桩内防漏浆施工系统及施工方法 | |
CN218506092U (zh) | 一种用于海上变电站分体浮运的c型装配式浮运结构 | |
CN109707002B (zh) | 大型取水头精确定位沉放安装装置及方法 | |
CN103938638A (zh) | 一种深水单壁钢围堰浮筒法的施工方法 | |
KR20110107888A (ko) | 임시 물막이 공사를 생략하는 수중교각공사공법. | |
CN108589543B (zh) | 适于岩层地质的筑岛钢板桩围堰式钻孔桩平台的施工方法 | |
CN110607797A (zh) | 一种取水头部水下施工的方法 | |
CN115652935B (zh) | 一种超大直径钢护筒整体浮运下沉就位施工方法 | |
CN101684869B (zh) | 重力式常压干式舱 | |
KR20040039271A (ko) | 교량 우물통 기초신설 및 기초보수 보강을 위한(철재형틀)슈가물막이 공법. | |
CN109162288B (zh) | 锁扣式钢管桩围堰施工装置及施工方法 | |
CN116513384A (zh) | 一种水上浮动平台装置及其安装方法 | |
CN215165200U (zh) | 一种低桩承台扶壁组合式坞墙结构 | |
CN212612569U (zh) | 一种桶式防波堤基础桶体的辅助下沉装置 | |
CN211898417U (zh) | 一种基于绞吸式地连墙局部替代排桩支护的施工结构 | |
CN208844593U (zh) | 锁扣式钢管桩围堰施工装置 | |
CN111155540A (zh) | 一种双壁钢围堰施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Yi Jianbo Inventor after: Huang Yu Inventor after: Xing Xuan Inventor after: Wei Zhaohong Inventor after: Fei Zhigao Inventor after: Ran Guangyue Inventor after: Lu Dawen Inventor after: Li Jianfeng Inventor before: Yi Jianbo Inventor before: Huang Yu Inventor before: Xing Xuan Inventor before: Wei Zhaohong Inventor before: Fei Zhigao Inventor before: Ran Guangyao Inventor before: Lu Dawen Inventor before: Li Jianfeng |
|
GR01 | Patent grant | ||
GR01 | Patent grant |