CN115613398B - Prefabricated track structure for track traffic built-in pump house section and construction method - Google Patents

Prefabricated track structure for track traffic built-in pump house section and construction method Download PDF

Info

Publication number
CN115613398B
CN115613398B CN202211030155.0A CN202211030155A CN115613398B CN 115613398 B CN115613398 B CN 115613398B CN 202211030155 A CN202211030155 A CN 202211030155A CN 115613398 B CN115613398 B CN 115613398B
Authority
CN
China
Prior art keywords
prefabricated
track
shaped
shaped track
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211030155.0A
Other languages
Chinese (zh)
Other versions
CN115613398A (en
Inventor
陈鹏
段玉振
吴建忠
杨秀仁
徐寿伟
张宏亮
毛海和
翟贝贝
段海滨
夏青
金晋
焦雷
朱禹
李现博
刘观
张光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Design and Development Group Co Ltd
Original Assignee
Beijing Urban Construction Design and Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Design and Development Group Co Ltd filed Critical Beijing Urban Construction Design and Development Group Co Ltd
Priority to CN202211030155.0A priority Critical patent/CN115613398B/en
Publication of CN115613398A publication Critical patent/CN115613398A/en
Priority to EP23800304.0A priority patent/EP4350074A1/en
Priority to PCT/CN2023/095517 priority patent/WO2024041054A1/en
Application granted granted Critical
Publication of CN115613398B publication Critical patent/CN115613398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/008Drainage of track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/06Gully gratings
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Road Paving Structures (AREA)

Abstract

The track structure sequentially comprises steel rails, fasteners, prefabricated I-shaped track plates and filling adjustment layers from top to bottom, wherein the steel rails are fixed on the upper surfaces of the prefabricated I-shaped track plates through the fasteners on two sides, the filling adjustment layers are arranged below the prefabricated I-shaped track plates, the prefabricated I-shaped track plates comprise a track bearing table and prefabricated plates, the track bearing table and the prefabricated plates are integrally formed, the plane of the prefabricated I-shaped track plates is of an I-shaped structure, and the middle of the prefabricated I-shaped track plates is connected by a cross beam; therefore, the invention is used in the field of rail transit, replaces the traditional cast-in-situ built-in pump house track bed, has the characteristics of simple construction process, high construction speed, high construction precision, low labor intensity, good aesthetic property, good durability and the like, accords with the current direction of environmental protection, high efficiency and disease reduction of rail transit, and has huge social benefit.

Description

Prefabricated track structure for track traffic built-in pump house section and construction method
Technical Field
The invention relates to the technical field of rail transit, in particular to a prefabricated rail structure for a built-in pump house section of rail transit and a construction method.
Background
The track traffic built-in pump house section is mainly characterized in that a cast-in-place concrete track bed is adopted at present, the problems of poor construction quality, large labor consumption, low construction speed, poor reservation precision of a water pipe, frequent accumulated water, generally poor durability of the track bed, easy occurrence of block dropping, cracks and void of the track bed, large maintenance workload after operation and the like exist.
Therefore, in view of the above-mentioned drawbacks, the designer of the present invention, through intensive research and design, combines the experience and achievement of related industries engaged in for a long period of time, and researches and designs a prefabricated track structure for a built-in pump house section of track traffic and a construction method thereof, so as to overcome the above-mentioned drawbacks.
Disclosure of Invention
The invention aims to provide a prefabricated track structure for a track traffic built-in pump house section and a construction method, which can effectively solve the technical problems: the existing cast-in-place track structure of the built-in pump house section has the problems of poor construction quality, large labor consumption, low construction speed and the like, and due to poor reservation precision of the water pipe, water accumulation often occurs, so that the durability of the ballast bed is generally poor, diseases such as block dropping, cracks and void easily occur, and the maintenance workload is large after operation.
In order to achieve the above purpose, the invention discloses a prefabricated track structure for a built-in pump house section of track traffic, which sequentially comprises steel rails, fasteners, prefabricated I-shaped track plates and filling adjustment layers from top to bottom, wherein the steel rails are fixed on the upper surfaces of the prefabricated I-shaped track plates through the fasteners on two sides, and the filling adjustment layers are arranged below the prefabricated I-shaped track plates, and the prefabricated I-shaped track structure is characterized in that:
the prefabricated I-shaped track slab comprises a track bearing table and a prefabricated slab, wherein the track bearing table and the prefabricated slab are integrally formed, the plane of the prefabricated I-shaped track slab is of an I-shaped structure, the middle of the prefabricated I-shaped track slab is connected by a cross beam, two ends of the middle cross beam are provided with U-shaped openings, so that a U-shaped water collecting pit in the middle is formed, the section of the prefabricated I-shaped track slab is polygonal, the lower surfaces of two sides of the prefabricated I-shaped track slab are provided with slope structures for enhancing adaptability to the section of a tunnel, and a filling adjusting layer is filled between the bottom of the prefabricated I-shaped track slab and a shield segment.
Wherein: and hoisting sleeves are respectively arranged on the plate sides of the prefabricated I-shaped track plates.
Wherein: the top surface of the U-shaped opening of the prefabricated I-shaped track plate is provided with a ditch cover plate for people walking on a patrol road or people evacuation under emergency.
Wherein: and sealing waterproof materials are arranged at the joint of the prefabricated I-shaped track plate and the filling adjusting layer and the joint of the filling adjusting layer and the shield segment for sealing.
Wherein: the bottom of the filling adjusting layer below the middle cross beam of the prefabricated I-shaped track slab is embedded with a water passing pipe so that all U-shaped water collecting pits are communicated with each other.
Wherein: reinforcing steel bars are reserved or implanted at the bottom of the prefabricated I-shaped track plate.
Wherein: the filling adjustment layer is made of steel fiber fine stone concrete, self-compacting concrete or special mortar.
Wherein: the water passing pipe is round or polygonal.
The construction method of the prefabricated track structure for the track traffic built-in pump house section is also disclosed, and is characterized by comprising the following steps:
step one: prefabricating an I-shaped track slab, finishing track slab grinding tool processing, steel bar binding and precast slab concrete pouring in a factory, and carrying out track slab curing after prefabrication is finished to form a high-precision prefabricated I-shaped track slab;
step two: transporting and hoisting, namely transporting the prefabricated I-shaped track slabs to a track laying operation surface and then coarsely placing the prefabricated I-shaped track slabs;
step three: finely adjusting the prefabricated I-shaped track plate;
positioning and fixing the prefabricated I-shaped track plate, and supporting and fixing the prefabricated I-shaped track plate which is finely adjusted in place by adopting a frame plate bracket;
step five: binding reinforcing steel bars and embedding a water passing pipe;
step six: the periphery of the pump pit with the built-in track plate bottom is provided with templates;
step seven: filling and curing the concrete of the filling and adjusting layer;
step eight: installing a fastener;
step nine: installing a steel rail;
step ten: and (5) auxiliary construction.
From the above, the prefabricated track structure for the track traffic built-in pump house section and the construction method of the invention have the following effects:
1. the prefabricated I-shaped track slab and the construction method of the track bed built-in pump house section greatly reduce the steel bar binding and concrete pouring quantity.
2. The method has the characteristics of simple construction process, low labor intensity, high construction precision, high construction efficiency, good durability and the like, and solves the problems of the track structure of the cast-in-situ built-in pump room.
3. Can effectively replace the traditional cast-in-situ built-in pump house track bed, accords with the current direction of environmental protection, high efficiency and disease reduction of rail transit, and has huge social benefit.
The details of the present invention can be found in the following description and the accompanying drawings.
Drawings
Fig. 1 shows a front view of a prefabricated track structure for a track traffic built-in pump house segment according to the present invention.
Fig. 2 shows a top view of the present invention.
Detailed Description
Referring to fig. 1 and 2, a prefabricated track structure for a track traffic built-in pump house segment of the present invention is shown.
The prefabricated track structure for the track traffic built-in pump house section sequentially comprises a steel rail 1, a fastener 2, a prefabricated I-shaped track plate 3 and a filling adjustment layer 7 from top to bottom, wherein the steel rail 1 is fixed on the upper surface of the prefabricated I-shaped track plate 3 through the fasteners 2 on two sides, the filling adjustment layer 7 is arranged below the prefabricated I-shaped track plate 3, the prefabricated I-shaped track plate 3 comprises a track bearing table and a prefabricated plate, the track bearing table and the prefabricated plate are integrally formed, the plane of the prefabricated I-shaped track plate 3 is of an I-shaped structure (as shown in a top view of fig. 2), the prefabricated I-shaped track plate is connected with the middle through a cross beam, two ends of the middle cross beam are provided with U-shaped openings, so that a U-shaped water collecting pit 8 in the middle is formed, the cross section of the prefabricated I-shaped track plate 3 is polygonal, and inclined slope structures are arranged on the lower surfaces on two sides, so that the adaptability to the tunnel cross section is enhanced.
The prefabricated I-shaped track boards 3 are connected through the cross beams, the appearance is similar to an I shape, the filling adjusting layer 7 is only poured at the lower part of the I-shaped structure, and the filling adjusting layer is not poured in the U-shaped opening range of the two ends of the cross beams, so that equipment such as a water pump and the like can be arranged in the U-shaped structure range.
And a filling adjustment layer 7 is poured between the bottom of the prefabricated I-shaped track plate 3 and the shield segment, and the filling adjustment layer 7 is made of steel fiber fine stone concrete.
Wherein, the board side of prefabricated I shape track board 3 is provided with respectively lifts by crane sleeve pipe 5 to be used for fixed prefabricated I shape track board 3.
The top surface of the U-shaped opening of the prefabricated I-shaped track plate 3 is provided with a ditch cover plate 4 for walking of patrol staff or evacuation of staff in emergency.
The joint of the prefabricated I-shaped track plate 3 and the filling adjusting layer 7 and the joint of the filling adjusting layer 7 and the shield segment are provided with sealing waterproof materials 6 for sealing.
The bottom of the filling adjusting layer 7 below the middle cross beam of the prefabricated I-shaped track slab 3 is pre-embedded with a water passing pipe 9, so that the U-shaped water collecting pits 8 are communicated with each other.
Reinforcing steel bars can be reserved or implanted in the range of the shield segment at the bottom of the prefabricated I-shaped track plate 3, and connectivity of a ballast bed and the shield segment is enhanced.
Wherein, the filling adjustment layer can be made of steel fiber fine stone concrete, self-compacting concrete, special mortar and other materials with better fluidity.
Wherein, the board side or the board upper surface of the prefabricated I-shaped track board 3 is provided with a device such as a lifting sleeve for lifting or fixing the track board.
Wherein the water passing pipe can be round or polygonal.
The invention relates to a construction method of a prefabricated track structure for a track traffic built-in pump house section, which mainly comprises the following steps:
step one: the prefabricated I-shaped track plate 3 is prefabricated. Finishing machining of a rail plate grinding tool, binding of reinforcing steel bars and concrete pouring of a precast slab in a factory, and curing of the rail plate after the prefabrication is finished, so that the high-precision precast I-shaped rail plate 3 is formed.
Step two: and (5) transporting and hoisting. And conveying the prefabricated I-shaped track plate 3 to a construction site by adopting an automobile, conveying the prefabricated I-shaped track plate 3 to a rail laying operation surface by adopting a plate conveying vehicle, and carrying out rough placement after conveying the prefabricated I-shaped track plate to the rail laying operation surface.
Step three: and 3, finely adjusting the prefabricated I-shaped track plate. And fine adjustment is carried out on the prefabricated I-shaped track plate 3 by adopting a small gantry crane.
And fourthly, positioning and fixing the prefabricated I-shaped track plate 3. The prefabricated I-shaped track plate 3 which is finely adjusted in place is supported and fixed by a frame plate bracket. 4 or more supporting points are arranged on each prefabricated I-shaped track plate 3 according to the requirement.
Step five: the reinforcing steel bar is bound and embedded with the water passing pipe 9. And after the binding of the steel bars is completed, embedding the water passing pipe in the cross beam of the prefabricated I-shaped track plate 3.
Step six: the track slab bottom is provided with built-in pump pit surrounding templates. And (3) after the prefabricated I-shaped track plate 3 is fixed, installing a pump pit template of the built-in pump house section.
Step seven: and (5) filling and adjusting layer 7 with concrete, and curing. And (3) cleaning accumulated water at the bottom of the plate, pouring the filling adjustment layer 7, and taking out the support device of the prefabricated plate erected in the step (IV) after the strength of the filling adjustment layer 7 reaches a certain strength.
Step eight: and (5) installing a fastener. After the filling adjusting layer 7 reaches a certain strength, the upper fasteners are installed in the order of the lower elastic cushion plate of the iron cushion plate, the iron cushion plate and the lower elastic cushion plate of the rail.
Step nine: and (5) mounting the steel rail. The rail is moved to the working surface by a rail transport vehicle, discharged to the mounting point by the transport vehicle and spread, the rail is moved to the rail bearing groove of the fastener iron backing plate, and fastener components such as a gauge block, a connecting bolt, a spring strip and the like are mounted.
Step ten: and (5) auxiliary construction. After the construction of the main body structure is completed, the waterproof material in the pump pit is coated and the upper surface ditch cover plate is installed.
Therefore, the invention is used in the field of rail transit, replaces the traditional cast-in-situ built-in pump house track bed, has the characteristics of simple construction process, high construction speed, high construction precision, low labor intensity, good aesthetic property, good durability and the like, accords with the current direction of environmental protection, high efficiency and disease reduction of rail transit, and has huge social benefit.
It is to be clearly understood that the above description and illustration is made only by way of example and not as a limitation on the disclosure, application or use of the invention. Although embodiments have been described in the embodiments and illustrated in the accompanying drawings, the invention is not limited to the specific examples illustrated by the drawings and described in the embodiments as the best mode presently contemplated for carrying out the teachings of the invention, and the scope of the invention will include any embodiments falling within the foregoing specification and the appended claims.

Claims (6)

1. The construction method of the prefabricated track structure for the built-in pump house section of the track traffic is characterized by comprising the following steps:
step one: prefabricating an I-shaped track slab, finishing track slab grinding tool processing, steel bar binding and precast slab concrete pouring in a factory, and carrying out track slab curing after prefabrication is finished to form a high-precision prefabricated I-shaped track slab;
step two: transporting and hoisting, namely transporting the prefabricated I-shaped track slabs to a track laying operation surface and then coarsely placing the prefabricated I-shaped track slabs;
step three: finely adjusting the prefabricated I-shaped track plate;
positioning and fixing the prefabricated I-shaped track plates, wherein the prefabricated I-shaped track plates which are finely adjusted in place are supported and fixed by adopting a frame plate bracket, and each prefabricated I-shaped track plate is provided with 4 or more supporting points;
step five: binding reinforcing steel bars and embedding a water passing pipe, and embedding the water passing pipe in a cross beam of the prefabricated I-shaped track slab 3 after the binding of the reinforcing steel bars is completed;
step six: the periphery of the pump pit with the built-in track plate bottom is provided with templates;
step seven: filling and curing the concrete of the filling adjustment layer, cleaning accumulated water at the bottom of the plate, pouring the filling adjustment layer, and taking out the support device of the prefabricated plate erected in the fourth step after the strength of the filling adjustment layer reaches a certain strength;
step eight: the fastener is installed, and the installation sequence is an iron pad lower elastic pad, an iron pad and a rail lower elastic pad;
step nine: the method comprises the steps of installing a steel rail, namely, adopting a rail transport vehicle to discharge the steel rail to a working surface, scattering the steel rail to mounting points through the transport vehicle, poking the steel rail into a rail bearing groove of a fastener iron backing plate, and installing fastener components such as a gauge block, a connecting bolt, a spring strip and the like;
step ten: auxiliary construction;
the concrete structure is as follows: from last to including rail, fastener, prefabricated I shape track board and filling adjustment layer down in proper order, the rail is fixed in the upper surface of prefabricated I shape track board through the fastener of both sides, the below of prefabricated I shape track board is equipped with filling adjustment layer, its characterized in that:
the prefabricated I-shaped track slab comprises a track bearing table and a prefabricated slab, wherein the track bearing table and the prefabricated slab are integrally formed, the plane of the prefabricated I-shaped track slab is of an I-shaped structure, the middle of the prefabricated I-shaped track slab is connected by a cross beam, two ends of the middle cross beam are provided with U-shaped openings, so that a U-shaped water collecting pit in the middle is formed, the section of the prefabricated I-shaped track slab is polygonal, the lower surfaces of two sides of the prefabricated I-shaped track slab are provided with slope structures for enhancing the adaptability to the section of a tunnel, and a filling adjusting layer is filled between the bottom of the prefabricated I-shaped track slab and a shield segment;
the filling adjustment layer is only poured at the lower part of the I-shaped structure, and is not poured in the U-shaped opening ranges at the two ends of the cross beam, so that equipment can be arranged in the U-shaped structure range;
the bottom of a filling adjustment layer below the middle cross beam of the prefabricated I-shaped track slab is embedded with water pipes to enable all U-shaped water collecting pits to be communicated with each other, and the filling adjustment layer is made of steel fiber fine stone concrete or self-compacting concrete.
2. The construction method of the prefabricated track structure for the track traffic built-in pump house section according to claim 1, wherein the construction method comprises the following steps: and hoisting sleeves are respectively arranged on the plate sides of the prefabricated I-shaped track plates.
3. The construction method of the prefabricated track structure for the track traffic built-in pump house section according to claim 1, wherein the construction method comprises the following steps: the top surface of the U-shaped opening of the prefabricated I-shaped track plate is provided with a ditch cover plate for people walking on a patrol road or people evacuation under emergency.
4. The construction method of the prefabricated track structure for the track traffic built-in pump house section according to claim 1, wherein the construction method comprises the following steps: and sealing waterproof materials are arranged at the joint of the prefabricated I-shaped track plate and the filling adjusting layer and the joint of the filling adjusting layer and the shield segment for sealing.
5. The construction method of the prefabricated track structure for the track traffic built-in pump house section according to claim 1, wherein the construction method comprises the following steps: reinforcing steel bars are reserved or implanted at the bottom of the prefabricated I-shaped track plate.
6. The construction method of the prefabricated track structure for the track traffic built-in pump house section according to claim 1, wherein the construction method comprises the following steps: the water passing pipe is round or polygonal.
CN202211030155.0A 2022-08-26 2022-08-26 Prefabricated track structure for track traffic built-in pump house section and construction method Active CN115613398B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202211030155.0A CN115613398B (en) 2022-08-26 2022-08-26 Prefabricated track structure for track traffic built-in pump house section and construction method
EP23800304.0A EP4350074A1 (en) 2022-08-26 2023-05-22 Prefabricated track structure for built-in pump house section in rail transportation and construction method
PCT/CN2023/095517 WO2024041054A1 (en) 2022-08-26 2023-05-22 Prefabricated track structure for built-in pump house section in rail transportation and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211030155.0A CN115613398B (en) 2022-08-26 2022-08-26 Prefabricated track structure for track traffic built-in pump house section and construction method

Publications (2)

Publication Number Publication Date
CN115613398A CN115613398A (en) 2023-01-17
CN115613398B true CN115613398B (en) 2023-10-10

Family

ID=84856839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211030155.0A Active CN115613398B (en) 2022-08-26 2022-08-26 Prefabricated track structure for track traffic built-in pump house section and construction method

Country Status (3)

Country Link
EP (1) EP4350074A1 (en)
CN (1) CN115613398B (en)
WO (1) WO2024041054A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115613398B (en) * 2022-08-26 2023-10-10 北京城建设计发展集团股份有限公司 Prefabricated track structure for track traffic built-in pump house section and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205474612U (en) * 2016-03-01 2016-08-17 北京城建设计发展集团股份有限公司 Prefabricated track board of H type for urban rail transit
CN210561479U (en) * 2019-08-06 2020-05-19 中铁工程设计咨询集团有限公司 Plate type ballast bed structure for built-in pump room of subway
CN214362569U (en) * 2020-12-07 2021-10-08 中铁上海设计院集团有限公司 Prefabricated ballast bed structure of built-in pump house department for urban rail transit
CN215329049U (en) * 2021-08-05 2021-12-28 中铁二院工程集团有限责任公司 Track structure with drainage pump station in integral ballast bed
CN114183197A (en) * 2021-11-15 2022-03-15 粤水电建筑安装建设有限公司 Interval tunnel of urban rail transit is with built-in pump house
CN114808555A (en) * 2022-06-17 2022-07-29 中铁上海设计院集团有限公司 Prefabricated frame plate and application method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6316101B2 (en) * 2014-06-03 2018-04-25 大成建設株式会社 Railroad track and its construction method
CN115613398B (en) * 2022-08-26 2023-10-10 北京城建设计发展集团股份有限公司 Prefabricated track structure for track traffic built-in pump house section and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205474612U (en) * 2016-03-01 2016-08-17 北京城建设计发展集团股份有限公司 Prefabricated track board of H type for urban rail transit
CN210561479U (en) * 2019-08-06 2020-05-19 中铁工程设计咨询集团有限公司 Plate type ballast bed structure for built-in pump room of subway
CN214362569U (en) * 2020-12-07 2021-10-08 中铁上海设计院集团有限公司 Prefabricated ballast bed structure of built-in pump house department for urban rail transit
CN215329049U (en) * 2021-08-05 2021-12-28 中铁二院工程集团有限责任公司 Track structure with drainage pump station in integral ballast bed
CN114183197A (en) * 2021-11-15 2022-03-15 粤水电建筑安装建设有限公司 Interval tunnel of urban rail transit is with built-in pump house
CN114808555A (en) * 2022-06-17 2022-07-29 中铁上海设计院集团有限公司 Prefabricated frame plate and application method thereof

Also Published As

Publication number Publication date
CN115613398A (en) 2023-01-17
EP4350074A1 (en) 2024-04-10
WO2024041054A1 (en) 2024-02-29

Similar Documents

Publication Publication Date Title
CN100572011C (en) Post-tensioned method prestressed concrete box beam whole opening prefabricated construction method
CN104652210B (en) Assembled concrete traffic pavement and construction method thereof
CN107401091B (en) Assembled track structure and construction method thereof
CN101701439B (en) Steel reinforcement cage track skeleton method construction process of steel spring floating plate track
CN103352400B (en) Prefabricated embedded tracks plate
CN112941975B (en) Combined track slab, prefabricated slab track system and installation and construction method thereof
CN206245139U (en) precast slab ballast bed
CN115613398B (en) Prefabricated track structure for track traffic built-in pump house section and construction method
CN103321111A (en) Tramcar track continuous-laying construction method
CN105544612A (en) Inspection well construction method
CN109457568B (en) Construction process for prefabricated post-tensioning prestressed assembly pavement of bilateral superposed beam
CN106400613A (en) Ballastless track
CN113250050B (en) Airport pavement assembled plate replacement updating technical method
CN107354826B (en) The rapid constructing method of tunnel built-in type rail system
KR20040004819A (en) Method for changing steel bridge of supporting rail into concreat bridge
CN114032724A (en) Assembled recycled concrete rural pavement
CN101177926A (en) City railway trapezoidal crosstie vibration-damping ballast construction method
CN204475099U (en) A kind of assembly concrete traffic
CN203411862U (en) Prefabricated embedded track board
CN210134295U (en) Plate-type track system
CN206220537U (en) A kind of assembly type truss frame platform
CN210975382U (en) Prefabricated plate rail structure for urban rail transit overhead line
CN213772737U (en) Strut type straight-paving slab ballastless track system
CN111877054A (en) Prefabricated plate type track structure convenient for rapid construction and construction method thereof
CN210826938U (en) Track structure suitable for urban rail transit construction is supporting 8 types track board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant