CN206245139U - precast slab ballast bed - Google Patents

precast slab ballast bed Download PDF

Info

Publication number
CN206245139U
CN206245139U CN201621124754.9U CN201621124754U CN206245139U CN 206245139 U CN206245139 U CN 206245139U CN 201621124754 U CN201621124754 U CN 201621124754U CN 206245139 U CN206245139 U CN 206245139U
Authority
CN
China
Prior art keywords
precast slab
ballast bed
track
hole
cushion blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621124754.9U
Other languages
Chinese (zh)
Inventor
张法明
陈刚
杨保利
田伟
王红英
闫玉峰
郑艳
李丹
刘辉
张劼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANNXI CHANGMEI SCIENCE AND TECHNOLOGY Co Ltd
Original Assignee
SHANNXI CHANGMEI SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANNXI CHANGMEI SCIENCE AND TECHNOLOGY Co Ltd filed Critical SHANNXI CHANGMEI SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201621124754.9U priority Critical patent/CN206245139U/en
Application granted granted Critical
Publication of CN206245139U publication Critical patent/CN206245139U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides precast slab ballast bed.The precast slab ballast bed includes square precast slab, be formed at the precast slab center injected hole, two intervals located at the injected hole both sides spacing hole, be symmetrically set in the track of two spacing hole both sides and be stacked at the cushion blocking of the precast slab bottom.Precast slab ballast bed of the present utility model, efficiency high, high precision, steady quality, uniformity is good, while being installed using self-compacting concrete leveling, track construction efficiency high, precision is good, reduce the consumption of business's concrete in subway work, environmental protection and energy saving, finally using polyurethane cushion blocking precast slab ballast bed, the track vibration-reducing effect of excellent stabilization can be provided, quick-replaceable and the maintenance of follow-up ballast bed system is capable of achieving.

Description

Precast slab ballast bed
【Technical field】
The utility model is related to track traffic antivibration area, and in particular to a kind of precast slab ballast bed.
【Background technology】
As social development and people's living standard are improved, each big city proposes higher to Construction of Urban Rail Traffic It is required that, in order to reduce the interference to rail superior portion or surrounding property, in being Metro Design in special sector setting vibration-damping ballast One important measures.The problem of the resource contradiction for being brought with China's urbanization and the development of urban modernization in addition, built originally Stand in the building trade on cheap labour basis and face Cost Problems puzzlement, building industrialization by the manufacture that modernizes, Transport, install and scientific management big industrial mode of production, the transition and upgrade as building trade is the meaning that should have.Track is handed over A logical branch as construction industry and domestic new industry, exploitation cost performance is good and the outstanding cushion blocking of using effect is prefabricated Plate railway roadbed adapts to the development of urban rail transit construction industry.
Therefore, it is necessary to provide a kind of new precast slab ballast bed.
【Utility model content】
The purpose of this utility model is to provide a kind of factorial praluction, it is adaptable to which the damping type of the track traffic such as subway is pre- Making sheet railway roadbed.
The technical solution of the utility model is as follows:A kind of precast slab ballast bed, including square precast slab, be formed at The injected hole at the precast slab center, two intervals are located at the spacing hole of the injected hole both sides, are symmetrically set in two The track of the spacing hole both sides and it is stacked at the cushion blocking of the precast slab bottom.
Preferably, the cushion blocking is microvoid polyurethane cushion blocking.
Preferably, the precast slab width is symmetrically arranged on two with some pre-buried boom hoistings.
Preferably, the quantity of the pre-buried boom hoisting is four groups, and every group includes two bolts hole.
Preferably, the track includes a square protruding and some peaces for installing track in the projection Dress hole.
Preferably, the spacing hole is for square through hole and its inwall covers limiting buffer pad.
Preferably, the precast concrete intralamellar part is located at some reinforcing bars.
The utility model has the advantage that and effect compared with prior art:Factorial praluction damping type precast slab ballast bed, Efficiency high, high precision, steady quality, uniformity is good, while installed using self-compacting concrete leveling, track construction efficiency high, Precision is good, reduces the consumption of business's concrete in subway work, and environmental protection and energy saving, finally using polyurethane cushion blocking precast slab ballast bed, can be carried For the track vibration-reducing effect of excellent stabilization, quick-replaceable and the maintenance of follow-up ballast bed system are capable of achieving.
【Brief description of the drawings】
Fig. 1 is the utility model structural representation,
Fig. 2 is the utility model top view.
【Specific embodiment】
The utility model is described in further detail with implementation method below in conjunction with the accompanying drawings.
Fig. 1 is referred to, the precast slab ballast bed includes square precast slab 1, is formed at the precast concrete 5, two intervals of injected hole at the center of plate 1 are located at the spacing hole of the both sides of the injected hole 5, are symmetrically set in two spacing holes two The track 6 of side and it is stacked at the cushion blocking 2 of the bottom of the precast slab 1.
The injected hole 5 can irrigate self-compacting concrete in prefabricated board installs application process by it, to realize railway roadbed The leveling of plate.
The cushion blocking 2 is microvoid polyurethane cushion blocking;The precast slab 1 is taken with microvoid polyurethane cushion blocking Prefabrication process is compound or the later stage is compound, forms the prefabricated road bed board with effectiveness in vibration suppression.
The width of the precast slab 1 is symmetrically arranged on two with some pre-buried boom hoistings 3;Specifically, described The quantity of pre-buried boom hoisting 3 is four groups, and every group includes two bolts hole.The boom hoisting is used for the transhipment of prefabricated board, The jacking in maintenance process is changed in leveling support and railway roadbed that later stage prefabricated board is installed.
The track 6 includes a square protruding and some mounting holes for installing track in the projection, The track 6 can carry out (1mm is grading) adjustment according to the sweep demand of circuit, can meet various circuit radius need Ask.
The spacing hole is for square through hole and its inwall covers limiting buffer pad 4, the moulding by casting of the precast slab 1 When default limiting buffer pad 4, can form effective spacing after the casting complete of precast slab 1, it is described spacing at two Cushion pad 4, plays the horizontal and vertical position-limiting action of road bed board, while providing suitable lateral stiffness.
The inside of the precast slab 1 is located at some reinforcing bars;The track 6 is matched with fastener system, and described is held Rail platform 6 can manufacture the variable prefabricated board in lateral attitude by die adjustment, to adapt to the demand of route curve change.
The construction method of the utility model precast slab ballast bed, comprises the following steps:
1st, road bed board prefabricated mould prepares, steel reinforcement cage welds colligation, track plate prefabrication and pours
2nd, cushion blocking and road bed board are compound, and cushion blocking and road bed board is (cementing) compound
3rd, the storage of cushion blocking prefabricated board, transport
4th, track substrate (base) is cast-in-place (solidification)
5th, road bed board slightly spreads
According to measurement disjunction mark, prefabricated road bed board is laid according to circuit design requirement, and use support frame by road bed board branch Support, bottom is hanging.Road bed board elevation of top surface is set according to circuit designed elevation.
6th, road bed board accurate adjustment
Using three-term controller, track plates are installed into circuit design and are accurately adjusted according to measurement disjunction mark, road bed board center with Circuit design centre, road bed board height are adjusted and met completely with designed elevation.Last latched position, installs reaction frame additional and fixes.
In the way of 3 in Curve Segment road bed board should use " with straight Dai Qu " " being turned round by flat generation ", road bed board is adjusted to design position Put, install reaction frame additional and fix.
7th, self-compacting concrete perfusion leveling
The prefabricated road bed board bottom surrounding being first adjusted in place completely is blocked using template.The prefabricated road bed board four of template laminating Week, and air discharge duct (being arranged on stopend) is set in corner location.
Self-compacting concrete is poured into the hanging bottom of road bed board by the fill orifice set secondly by road bed board middle part, from close Real concrete Self-leveling is combined as a whole with substrate (base), realizes the complete closely connected support of prefabricated road bed board.
8th, fastener installation, laying of welded long rails
Treat that self-compacting concrete is fully achieved intensity, prefabricated road bed board construction is completed, after removing the construction equipments such as reaction frame, Load fastener system and rail in the track position of prefabricated road bed board.
9th, track condition accurate adjustment
By orbit parameters such as the accurate adjustment gauge of fastener, height above rail surfaces, fastener is tightened after adjustment is suitable and is locked completely steel Rail.
Above-described is only implementation method of the present utility model, it should be noted here that for the ordinary skill of this area For personnel, on the premise of the utility model creation design is not departed from, improvement can also be made, but these belong to this practicality New protection domain.

Claims (7)

1. a kind of precast slab ballast bed, it is characterised in that including square precast slab, be formed at the precast slab The injected hole at center, two intervals located at the injected hole both sides spacing hole, be symmetrically set in two spacing hole both sides Track and it is stacked at the cushion blocking of the precast slab bottom.
2. precast slab ballast bed according to claim 1, it is characterised in that:The cushion blocking is microvoid polyurethane cushion blocking.
3. precast slab ballast bed according to claim 1, it is characterised in that:The both sides of the precast slab width It is arranged with some pre-buried boom hoistings.
4. precast slab ballast bed according to claim 3, it is characterised in that:The quantity of the pre-buried boom hoisting is four groups, And every group include two bolts hole.
5. precast slab ballast bed according to claim 1, it is characterised in that:The track includes a square protruding and is located at Some mounting holes for installing track in the projection.
6. precast slab ballast bed according to claim 1, it is characterised in that:The spacing hole is that square through hole and its inwall cover Limit bit buffering pad.
7. precast slab ballast bed according to claim 1, it is characterised in that:The precast concrete intralamellar part is located at some steel Muscle.
CN201621124754.9U 2016-10-15 2016-10-15 precast slab ballast bed Active CN206245139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621124754.9U CN206245139U (en) 2016-10-15 2016-10-15 precast slab ballast bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621124754.9U CN206245139U (en) 2016-10-15 2016-10-15 precast slab ballast bed

Publications (1)

Publication Number Publication Date
CN206245139U true CN206245139U (en) 2017-06-13

Family

ID=58995776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621124754.9U Active CN206245139U (en) 2016-10-15 2016-10-15 precast slab ballast bed

Country Status (1)

Country Link
CN (1) CN206245139U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035200A (en) * 2018-01-08 2018-05-15 国储运通轨道交通科技有限公司 Bridge-type longeron damper rail system
CN108487290A (en) * 2018-03-12 2018-09-04 华信咨询设计研究院有限公司 It is cast-in-place to land basis and construction method with precast combined portable communication tower
CN109112901A (en) * 2018-09-14 2019-01-01 同济大学 A kind of preformed rubber concrete vibration reducing track plate
CN109112902A (en) * 2018-09-14 2019-01-01 同济大学 A kind of preformed rubber is concrete road bed
CN110424194A (en) * 2019-08-26 2019-11-08 中铁二院工程集团有限责任公司 The prefabricated ballast bed structure of vibration isolator and its construction method on a kind of bridge
CN111118964A (en) * 2020-03-31 2020-05-08 北京思达维科技有限公司 Composite roadbed cement board assembly and manufacturing method thereof
CN112626931A (en) * 2020-12-22 2021-04-09 中国铁路设计集团有限公司 Vibration-damping roadbed with periodic cushion layer for spot paving

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035200A (en) * 2018-01-08 2018-05-15 国储运通轨道交通科技有限公司 Bridge-type longeron damper rail system
CN108487290A (en) * 2018-03-12 2018-09-04 华信咨询设计研究院有限公司 It is cast-in-place to land basis and construction method with precast combined portable communication tower
CN109112901A (en) * 2018-09-14 2019-01-01 同济大学 A kind of preformed rubber concrete vibration reducing track plate
CN109112902A (en) * 2018-09-14 2019-01-01 同济大学 A kind of preformed rubber is concrete road bed
CN110424194A (en) * 2019-08-26 2019-11-08 中铁二院工程集团有限责任公司 The prefabricated ballast bed structure of vibration isolator and its construction method on a kind of bridge
CN111118964A (en) * 2020-03-31 2020-05-08 北京思达维科技有限公司 Composite roadbed cement board assembly and manufacturing method thereof
CN111118964B (en) * 2020-03-31 2020-08-14 北京思达维科技有限公司 Composite roadbed cement board assembly and manufacturing method thereof
CN112626931A (en) * 2020-12-22 2021-04-09 中国铁路设计集团有限公司 Vibration-damping roadbed with periodic cushion layer for spot paving

Similar Documents

Publication Publication Date Title
CN206245139U (en) precast slab ballast bed
CN101701439B (en) Steel reinforcement cage track skeleton method construction process of steel spring floating plate track
CN103321111B (en) Streetcar track connects the construction method of paving
CN103669114B (en) Ballast bed base prefabricated slab and application thereof
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN102912693B (en) Floating track bed precast slab and construction method for precast slab assembled floating track bed
CN104532690B (en) Separate type track structure is prefabricated and construction method
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN102720137B (en) Prefabrication construction method for trough girder sections of track traffic high-level bridge
CN101922158B (en) Device and method for integrally underpinned vibration isolation device of subway underpass building foundation
CN208604415U (en) A kind of board-like track structure of assembly type frame
CN102653931A (en) Elastic supporting vibration isolation member ballast bed
CN106436495A (en) Wide sleeper plate sticking type ballast track
CN206298785U (en) A kind of board-like binding type Ballast track of pillow wide
CN203755164U (en) Special hanging bracket for construction of post-pouring flange plates of acoustic barrier T-shaped beam
CN210621347U (en) Prefabricated roadbed structure of vibration isolation pad on bridge
CN202099699U (en) Elastic supporting vibration isolation component ballast bed
CN203795460U (en) Basic structure of ballasting tower crane
CN112045840B (en) Construction method of assembly type beam storage pedestal for prefabricating high-speed railway box beam
CN115613398A (en) Prefabricated track structure for built-in pump house section of track traffic and construction method
CN113026435B (en) Subway shield interval plate type ballastless track construction method
CN107245960A (en) A kind of segmented construction system updated for urban viaduct and method
CN210826938U (en) Track structure suitable for urban rail transit construction is supporting 8 types track board
CN108560330A (en) The scalable general railway roadbed of secondary pouring type and its construction method
CN211769949U (en) Movable arm type tower crane underframe ballast type foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zhang Faming

Inventor after: Liu Hui

Inventor after: Zhang Jie

Inventor after: Chen Gang

Inventor after: Yang Baoli

Inventor after: Zhou Hualong

Inventor after: Tian Wei

Inventor after: Wang Hongying

Inventor after: Yan Yufeng

Inventor after: Zheng Yan

Inventor after: Li Dan

Inventor before: Zhang Faming

Inventor before: Zhang Jie

Inventor before: Chen Gang

Inventor before: Yang Baoli

Inventor before: Tian Wei

Inventor before: Wang Hongying

Inventor before: Yan Yufeng

Inventor before: Zheng Yan

Inventor before: Li Dan

Inventor before: Liu Hui

CB03 Change of inventor or designer information