CN115596395A - Safe abandoned well plugging method - Google Patents

Safe abandoned well plugging method Download PDF

Info

Publication number
CN115596395A
CN115596395A CN202110773244.3A CN202110773244A CN115596395A CN 115596395 A CN115596395 A CN 115596395A CN 202110773244 A CN202110773244 A CN 202110773244A CN 115596395 A CN115596395 A CN 115596395A
Authority
CN
China
Prior art keywords
plugging
layer
cement
packer
releasing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110773244.3A
Other languages
Chinese (zh)
Inventor
张春堂
杨平阁
谢昕
郭守贵
盖潇征
肖昌
李旸
付玉红
周晓宇
邢璐薪
李浚申
焦健
李东
胡振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN202110773244.3A priority Critical patent/CN115596395A/en
Publication of CN115596395A publication Critical patent/CN115596395A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a safe abandoned well plugging method, and belongs to the technical field of oil field well plugging. The safety abandoned well plugging method comprises the following steps: separating a plugging layer and a layer to be plugged in the sleeve; placing a releasing packer into the casing and setting the releasing packer above the plugging layer; cementing the plugging layer; sealing the releasing packer, and pressurizing cement in the plugging layer to enable the cement to enter an oil layer of the plugging layer; and after the cement in the blocking layer is solidified, opening the blocking layer and the layer to be blocked, and blocking the layer to be blocked. The method for safely abandoning the well plugging can protect the casing, effectively reduce the risk of plugging construction, shorten the construction period, improve the plugging quality and reduce the construction cost.

Description

Safe abandoned well plugging method
Technical Field
The invention relates to the technical field of oil field well plugging, in particular to a safe abandoned well plugging method.
Background
At present, the plugging method of abandoned wells in Liaohe oil field is from top to bottom, drilling out after each plugging layer is plugged by a cement plug, and drilling out the cement plug to plug the next layer after the pressure test is qualified. This kind of shutoff mode, the cost is lower, but is great to the longer well of abandoning of service life danger coefficient, because the casing pipe of shutoff above the shutoff layer all will bear great cement injection pressure each time, so when the shutoff layer absorption effect is not good, can cause cement injection pressure to increase, makes risk coefficient greatly increased simultaneously, in case the casing pipe breaks this moment, will cause the engineering accident.
Disclosure of Invention
The invention provides a method for plugging a safe abandoned well, which solves or partially solves the technical problems that in the prior art, a casing pipe plugged above a plugging layer in the plugging method of the abandoned well bears larger cementing pressure each time, so that the risk coefficient is increased, and once the casing pipe is broken at the moment, an engineering accident is caused.
In order to solve the technical problem, the invention provides a method for plugging a safe abandoned well, which comprises the following steps: separating a plugging layer and a layer to be plugged in the sleeve; placing a releasing packer into the casing and setting the releasing packer above the plugging layer; cementing the plugging layer; sealing the releasing packer, and pressurizing cement in the plugging layer to enable the cement to enter an oil layer of the plugging layer; and after the cement in the blocking layer is solidified, opening the blocking layer and the layer to be blocked, and blocking the layer to be blocked.
Further, the separation of the plugging layer and the layer to be plugged in the casing comprises: and placing a cement plug into the sleeve, and arranging the cement plug between the blocking layer and the layer to be blocked.
Further, the cement plug is arranged 5-10 meters below the plugging layer.
Further, the placing of the releasing packer into the casing comprises: placing the releasing packer into the casing through a releasing string; and when the releasing packer reaches the upper part of the plugging layer, pressing the setting releasing packer to seal the releasing packer with the sleeve.
Further, the releasing packer is anchored on the inner wall of the casing through slips; and when the sealing of the releasing packer is finished, the releasing tubular column is taken out.
Further, the cementing the plugging layer comprises: and (4) penetrating the extruded plugging pipe column through the releasing packer to the bottom of the plugging layer, and performing cementing.
Further, the sealing a release packer and pressurizing cement within the plugging layer comprises: a sealing mandrel is arranged on the extrusion plugging pipe column; lifting the extrusion blocking pipe column to enable a sealing mandrel on the extrusion blocking pipe column to reach the central pipe of the releasing packer and sealing; pressurizing cement in the plugging layer through the extrusion plugging pipe column so that the cement enters an oil layer of the plugging layer; and when the pressurization is finished, the extrusion plugging pipe column is taken out.
Further, after the cement in the plugging layer is solidified, the safe abandoned well plugging method further comprises the following steps: running a reamer bit into the casing; and grinding the cement solidified at the plugging layer in the sleeve by the reaming bit, and performing pressure test.
Further, the step of opening the plugging layer and the layer to be plugged comprises the step of drilling the cement plug through the reaming bit when the pressure test is qualified; pulling out the reamer bit while the cement plug is drilled through; and plugging the layer to be plugged.
And further, when the plugging of the layer to be plugged is finished, the releasing packer is lifted out.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
the packer is separated from the layer to be plugged in the sleeve, the packer is placed in the sleeve and is arranged above the packer, the packer is injected with cement, the packer is sealed, and the cement in the packer is pressurized, so that the cement enters an oil layer of the packer, high pressure generated by the pressurized cement cannot be transmitted to the packer, the sleeve above the packer is fully protected, the plugging construction risk is effectively reduced, the construction period is shortened, the plugging quality is improved, the construction cost is reduced, after the cement in the layer to be plugged is solidified, the packer and the layer to be plugged are opened, the layer to be plugged is plugged, so that the high pressure generated by squeezing the cement in the layer to be plugged is blocked by the solidified cement at the part of the packer and cannot be transmitted to the above the packer, the sleeve is fully protected, the plugging construction risk is effectively reduced, the construction period is shortened, the plugging quality is improved, and the construction cost is reduced.
Drawings
Fig. 1 is a schematic plugging diagram of a safe abandoned well plugging method according to an embodiment of the present invention.
Detailed Description
Referring to fig. 1, the safety abandoned well plugging method provided by the embodiment of the invention comprises the following steps:
step 1, separating a plugging layer 3 and a layer 4 to be plugged in a sleeve 2.
And 2, putting the releasing packer 5 into the sleeve 2 and arranging the releasing packer above the plugging layer 3.
And 3, cementing the plugging layer 3.
And 4, sealing the releasing packer 5, and pressurizing cement in the plugging layer 3 to enable the cement to enter an oil layer of the plugging layer 3.
And 5, after the cement in the blocking layer 3 is solidified, opening the blocking layer 3 and the layer 4 to be blocked, and blocking the layer 4 to be blocked.
This application embodiment is owing to separate shutoff layer 3 and treat shutoff layer 4 in sleeve pipe 2, put into sleeve pipe 2 release packer 5, and set up in shutoff layer 3 top, carry out the cement injection to shutoff layer 3, seal up release packer 5, and pressurize the cement in shutoff layer 3, make cement get into in the oil reservoir of shutoff layer 3, so, the high pressure that extruded cement produced can not transmit more than the release shutoff 5 ware, sleeve pipe 2 more than sufficient protection release packer 5, effectively reduce shutoff construction risk, shorten construction cycle, improve the shutoff quality, reduce construction cost, because treat the cement solidification back in shutoff layer 3, unblock shutoff layer 3 and treat shutoff layer 4, treat shutoff layer 4 and carry out the shutoff, so, the high pressure that produces at the cement of treating shutoff layer 4 extrusion is hindered by the cement that shutoff layer department 3 solidifies, can not transmit more than shutoff layer 3, the sleeve pipe 2 has fully been protected, effectively reduced the shutoff risk, shorten the shutoff cycle, improve the construction quality, reduce construction cost.
Specifically, the separation of the plugging layer 3 from the layer to be plugged 4 within the casing 2 comprises:
put into sleeve pipe 2 with cement stopper 1 in, and set up at shutoff layer 3 and treat between shutoff layer 4, separate shutoff layer 3 and treat shutoff layer 4 through cement stopper 1, because cement stopper 1 cost is low, easily acquires, can reduce cost.
In the embodiment, the cement plug 1 is arranged 5-10 meters below the plugging layer 3, so that cement can enter the oil layer of the plugging layer 3.
In this embodiment, the cement plug 1 has a thickness of 10 meters, ensuring that the blocking layer 3 can be separated from the layer 4 to be blocked.
Specifically, placing the back-off packer 5 into the casing 2 comprises:
the back-off packer 5 is placed into the casing 2 through the back-off string.
When the releasing packer 5 reaches the upper part of the plugging layer 3, the setting releasing packer is pressed to seal the releasing packer 5 with the sleeve 2, and the high-pressure resistant releasing packer 5 is ensured to separate the sleeve at the position of the plugging layer 3 from the sleeve above the high-pressure resistant releasing packer 5.
The releasing packer 5 is anchored on the inner wall of the casing 2 through a slip, and the releasing packer 5 is firmly connected with the casing 2.
When the sealing of the releasing packer 5 is finished, the releasing string is released, and the releasing string is prevented from interfering the subsequent plugging process.
In this embodiment, the back-off packer 5 is fixedly disposed on the inner wall of the casing 2. Wherein, the releasing packer 5 can be a high pressure resistant large drift diameter releasing packer.
Specifically, cementing the plugging layer 3 includes:
and (3) penetrating the extrusion plugging pipe column 6 through the releasing packer 5 to the bottom of the plugging layer 3, and cementing. And the plugging layer 3 is cemented by adopting the extrusion plugging pipe column 6, so that the operation is convenient.
Specifically, sealing the packer 5, and pressurizing the cement in the plugging layer 3 includes:
and a sealing mandrel 7 is arranged on the extrusion plugging pipe column 6.
And lifting the pressing blocking pipe column 6 to enable the sealing mandrel 7 on the pressing blocking pipe column 6 to reach the central pipe of the releasing packer 5, and sealing.
The cement in the plugging layer 3 is pressurized by extruding the plugging pipe column 6, so that the cement enters the oil layer of the plugging layer 3.
And when the pressurization is finished, the extrusion blocking pipe column 6 is lifted out.
In the present embodiment, the entry of cement into the oil layer of the plugging layer 3 includes:
the casing 2 is provided with a plurality of perforations.
When the cement between the releasing packer 5 and the layer 4 to be plugged is pressurized by the extrusion plugging pipe column 6, the cement enters the oil layer of the plugging layer 3 through the perforation, and the plugging of the plugging layer 3 is ensured to be complete.
In the embodiment, when the cement in the plugging layer 3 is solidified, the extrusion plugging pipe column 6 is pulled out, so that the extrusion plugging pipe column 6 is prevented from interfering with the subsequent processes.
Specifically, after the cement in the plugging layer 3 is solidified, the safety abandoned well plugging method further comprises the following steps:
a reamer bit is lowered into the casing 2.
The cement solidified at the plugging layer 3 in the sleeve 2 is ground by the reaming bit, and pressure test is carried out to test whether the solidified cement at the plugging layer 3 meets the requirements.
Specifically, opening the plugging layer 3 and waiting for the plugging layer 4 includes:
and when the pressure test is qualified, drilling the cement plug 1 through the reaming bit.
When the cement plug 1 is drilled through, the reaming bit is lifted out to plug the layer 4 to be plugged.
In the embodiment, when the layer 4 to be plugged is plugged, the extrusion plugging pipe column 6 sequentially passes through the releasing packer 5 and the plugging layer 3 to reach the bottom of the layer 4 to be plugged, and cement is injected. By pressurizing the cement in the layer to be plugged 4 by the extrusion plugging pipe column 6, the cement enters the oil layer of the layer to be plugged 4 through the perforation, and the plugging of the layer to be plugged 4 is ensured to be complete. When the cement in the layer 4 to be plugged is solidified, the extrusion plugging pipe column 6 is pulled out, and the extrusion plugging pipe column 6 is prevented from interfering the subsequent processes.
Specifically, when the plugging of the layer 4 to be plugged is finished, the releasing packer 5 is lifted out, and the plugging process is completed.
Finally, it should be noted that the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to examples, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the claims of the present invention.

Claims (10)

1. A safe abandoned well plugging method is characterized by comprising the following steps:
separating a plugging layer and a layer to be plugged in the sleeve;
placing a releasing packer into the casing and setting the releasing packer above the plugging layer;
cementing the plugging layer;
sealing the releasing packer, and pressurizing cement in the plugging layer to enable the cement to enter an oil layer of the plugging layer;
and after the cement in the blocking layer is solidified, opening the blocking layer and the layer to be blocked, and blocking the layer to be blocked.
2. The method of plugging a safety abandoned well according to claim 1, wherein the step of separating the plugging layer from the layer to be plugged inside the casing comprises:
and putting a cement plug into the sleeve, and arranging the cement plug between the blocking layer and the layer to be blocked.
3. The method of plugging a safety abandoned well according to claim 2, wherein:
the cement plug is arranged 5-10 meters below the plugging layer.
4. The method of safely abandoning well plugging according to claim 1, wherein the placing of the packer into the casing comprises:
placing the releasing packer into the casing through a releasing string;
and when the releasing packer reaches the upper part of the plugging layer, pressing the setting releasing packer to seal the releasing packer with the casing.
5. The safety abandoned well plugging method according to claim 4, wherein:
the releasing packer is anchored on the inner wall of the casing through slips;
and when the sealing of the releasing packer is finished, the releasing tubular column is taken out.
6. The method of plugging a safety abandoned well according to claim 1 wherein the cementing of the plugging layer comprises:
and (4) penetrating the extruded plugging pipe column through the releasing packer to the bottom of the plugging layer, and performing cementing.
7. The method of safely abandoning well plugging according to claim 6, wherein the sealing a packer and pressurizing cement within the plugging layer comprises:
a sealing mandrel is arranged on the extrusion plugging pipe column;
lifting the extrusion blocking pipe column to enable a sealing mandrel on the extrusion blocking pipe column to reach the central pipe of the releasing packer and sealing;
pressurizing cement in the plugging layer through the extrusion plugging pipe column so that the cement enters an oil layer of the plugging layer;
and when the pressurization is finished, the extrusion blocking pipe column is taken out.
8. The safety abandoned well plugging method of claim 1, wherein after the cement in the plugging layer sets, the safety abandoned well plugging method further comprises:
running a reamer bit into the casing;
and grinding the cement solidified at the plugging layer in the sleeve by the reaming bit, and performing pressure test.
9. The method of plugging a safety abandoned well according to claim 8, wherein said opening a plugging layer with said layer to be plugged comprises:
when the pressure test is qualified, drilling the cement plug through the reaming bit;
pulling out the reamer bit while the cement plug is drilled through;
and plugging the layer to be plugged.
10. The safety abandoned well plugging method according to claim 1, wherein:
and when the plugging of the layer to be plugged is finished, the releasing packer is lifted out.
CN202110773244.3A 2021-07-08 2021-07-08 Safe abandoned well plugging method Pending CN115596395A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110773244.3A CN115596395A (en) 2021-07-08 2021-07-08 Safe abandoned well plugging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110773244.3A CN115596395A (en) 2021-07-08 2021-07-08 Safe abandoned well plugging method

Publications (1)

Publication Number Publication Date
CN115596395A true CN115596395A (en) 2023-01-13

Family

ID=84840725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110773244.3A Pending CN115596395A (en) 2021-07-08 2021-07-08 Safe abandoned well plugging method

Country Status (1)

Country Link
CN (1) CN115596395A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1456785A (en) * 2003-05-30 2003-11-19 中国石化胜利油田有限公司采油工艺研究院 Selective multi-stage inner pipe cementing process and cemented tubular column there from
CN103244071A (en) * 2012-02-09 2013-08-14 中国石油天然气股份有限公司 Method for plugging old underground gas storage well
RU2534309C1 (en) * 2013-08-13 2014-11-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of well abandonment
CN104632124A (en) * 2013-11-15 2015-05-20 中国石油天然气股份有限公司 Method for blocking severely polluted deep well sandstone reservoir
CN110067528A (en) * 2019-04-11 2019-07-30 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of injecting cement in oil well method and single current cementing tool
CN112324383A (en) * 2020-11-25 2021-02-05 中国石油集团渤海钻探工程有限公司 Plugging method for permanently abandoned oil-gas-water well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1456785A (en) * 2003-05-30 2003-11-19 中国石化胜利油田有限公司采油工艺研究院 Selective multi-stage inner pipe cementing process and cemented tubular column there from
CN103244071A (en) * 2012-02-09 2013-08-14 中国石油天然气股份有限公司 Method for plugging old underground gas storage well
RU2534309C1 (en) * 2013-08-13 2014-11-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of well abandonment
CN104632124A (en) * 2013-11-15 2015-05-20 中国石油天然气股份有限公司 Method for blocking severely polluted deep well sandstone reservoir
CN110067528A (en) * 2019-04-11 2019-07-30 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of injecting cement in oil well method and single current cementing tool
CN112324383A (en) * 2020-11-25 2021-02-05 中国石油集团渤海钻探工程有限公司 Plugging method for permanently abandoned oil-gas-water well

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
万桂锋;: "辽河海上油田弃置井封井技术研究与应用", 中国石油和化工标准与质量, no. 03, 8 February 2016 (2016-02-08) *
余秉森等: "油田废弃井和闲置井封堵要求与监管――兼谈美国加利福尼亚州经验", 国际石油经济, vol. 25, no. 1, 25 January 2017 (2017-01-25), pages 78 - 84 *
张平;刘世强;张晓辉;刘建梅;薛清祥;: "储气库区废弃井封井工艺技术", 天然气工业, no. 12, 25 December 2005 (2005-12-25) *
田家宏;邓校国;崔景义;王桂娟;: "注水泥封堵技术在吉林油田深层气井中的应用", 油气井测试, no. 03, 25 June 2009 (2009-06-25) *
郑明杰;: "复合封堵技术在锦16化学驱的应用", 内蒙古石油化工, no. 06, 30 March 2013 (2013-03-30) *

Similar Documents

Publication Publication Date Title
CN109630060B (en) Repeatable non-killing well completion production string and construction method
CN103899264B (en) The application process of Oil/gas Well screen casing top well cementation completion lifting prestressed ground anchor device
CN102268972B (en) Method for preventing setting failure of packer resulted from creeping of pipe string
CN108625830B (en) Ball throwing type layering sand prevention process pipe column and method thereof
CN109339862B (en) integral layered filling device
CN105545246B (en) A kind of recyclable packer of HTHP hydraulic pressure
CN112012667B (en) Oil testing and well completion integrated pipe string combined with fine pressure control technology
CN108868734A (en) Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method
CN111734377A (en) Well cementation fracturing technology and well cementation fracturing operation pipe column
CN106437605A (en) Packer
CA3041721C (en) Wireline well abandonment tool
CN115596395A (en) Safe abandoned well plugging method
CN108999576B (en) Separate injection sand prevention integrated pipe column and process
CN106223898B (en) Two horizontal well cementing and completion integrated pipe column devices that open
CN110106884B (en) Grouting construction method
GB1012773A (en) Method and apparatus for completing wells
CN110735619B (en) Single-layer extrusion filling pipe column in multiple oil layers
CN214091813U (en) Process pipe column capable of protecting oil-gas layer and realizing efficient gas lift liquid drainage
WO2016008339A1 (en) Drill-free stage collar of through-bottom type
RU2391491C1 (en) Method of completing auxiliary wellbore shaft construction and rig to this end
CN115853471A (en) Horizontal well blocking, filling and commingling production process pipe column and method
CN114607343A (en) Acid fracturing integrated pipe column and acid fracturing method
CN211201867U (en) Fracturing shutoff bridge plug
CN110469292B (en) Circulating channeling sealing method
CN115992652A (en) Open hole horizontal well cement packing sectional water control sand prevention completion string and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination