CN108868734A - Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method - Google Patents

Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method Download PDF

Info

Publication number
CN108868734A
CN108868734A CN201810369890.1A CN201810369890A CN108868734A CN 108868734 A CN108868734 A CN 108868734A CN 201810369890 A CN201810369890 A CN 201810369890A CN 108868734 A CN108868734 A CN 108868734A
Authority
CN
China
Prior art keywords
packer
sliding sleeve
soluble
solvable
ball seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810369890.1A
Other languages
Chinese (zh)
Inventor
李宪文
李喆
张燕明
肖元相
何明舫
高伟
史华
丁勇
马新星
赵倩云
胡阳明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810369890.1A priority Critical patent/CN108868734A/en
Publication of CN108868734A publication Critical patent/CN108868734A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/127Packers; Plugs with inflatable sleeve
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/129Packers; Plugs with mechanical slips for hooking into the casing
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/063Valve or closure with destructible element, e.g. frangible disc

Abstract

The present invention provides gas well solvable packer multiple fracturing completion integral partial pressure tubular columns and method, partial pressure tubular column includes the flow nipple for being installed on oil pipe bottom end, is successively arranged the hydraulic anchor three being mounted on oil pipe, soluble packer three, sand blast sliding sleeve two, soluble packer two, sliding sleeve setting ball seat two, sand blast sliding sleeve one, hydraulic anchor one, soluble packer one, sliding sleeve setting ball seat one and gauguste cutter from top to bottom above flow nipple;Sand blast sliding sleeve one, hydraulic anchor one, soluble packer one and sliding sleeve setting ball seat correspond to first segment fractured layer;Hydraulic anchor three and the corresponding final stage fractured layer of soluble packer three;Sand blast sliding sleeve two, soluble packer two and sliding sleeve setting ball seat two are equipped with multiple groups, respectively correspond intermediate fractured layer.Fracturing process and tubing string of the invention solve the problems, such as after pressure pit shaft variable diameter the problem of bringing to production, well logging and later period power tool tripping in and due to unsealing failure caused by extraction tubing string it is difficult.

Description

Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method
Technical field
The invention belongs to gas field gas well fracturing technique fields, and in particular to a kind of gas well is complete with solvable packer multiple fracturing Well integration partial pressure tubular column and method.
Background technique
The transformation of packer staged fracturing is that realize that hyposmosis, tight gas reservoir directional well multilayer are effectively employed important in casing One of technology, with fractured interval, with strong points, multilayer is employed, the continuous feature of fracturing process.It is mostly used in its fracturing process Sliding sleeve class opens tool, is designed between sliding sleeves at different levels using stage differential style, need to successively put into more corresponding by small with place grade sliding sleeve The unlatching that the pressure difference sliding sleeve of each fractured interval is completed to large-sized ball sealer is isolated with section has been transformed, ball sealer after pressure The ball sealer of seat is discharged by way of open flow, and sliding sleeve, ball seat stay in underground.But pressure break is returned with haydite and is spat when due to open flow, Haydite can deposit on packing element, and existing packer is caused to there is a problem of deblocking difficulty, and tubing string rises and do not come out, and influences gas well Production and the overhaul in later period and replacement flow string.Simultaneously as ball seat stays in underground, latus rectum is smaller in final pit shaft, causes Producing well is carried out it is fashionable under conventional production logging and later period underground operation tool, there are risk even result in greatly can not under Enter predetermined design position, if abrading-ball seat is bored in selection, drilling and grinding process risk is big, the period is long.
Summary of the invention
The object of the present invention is to provide a kind of gas well solvable packer multiple fracturing completion integral partial pressure tubular columns and side Method, overcome existing gas well packer multiple fracturing be transformed present in pipe caused by removing seal for packer is difficult, latus rectum is small in pit shaft Column cannot rise out, in addition can not tripping in predetermined design position the problem of.
For this purpose, the present invention provides the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well, including installation Flow nipple in oil pipe bottom end, flow nipple top are successively arranged the hydraulic anchor three being mounted on oil pipe, soluble envelope from top to bottom Every device three, sand blast sliding sleeve one, hydraulic anchor one, soluble packer one, sliding sleeve setting ball seat one and gauguste cutter;
The sand blast sliding sleeve one, hydraulic anchor one, soluble packer one and sliding sleeve setting ball seat one are one group, corresponding first segment pressure Parting;Hydraulic anchor three and soluble packer three are one group, corresponding final stage fractured layer.
Further include be located at sand blast sliding sleeve two between soluble packer three and sand blast sliding sleeve one along oil pipe from top to bottom, can Molten formula packer two, sliding sleeve setting ball seat two;Sand blast sliding sleeve two, soluble packer two and sliding sleeve setting ball seat two are one group, Equipped with multiple groups, each fractured layer between first segment fractured layer and final stage fractured layer is respectively corresponded.
The outer packing element of the soluble packer three, soluble packer two and soluble packer one is all made of solvable rubber Glue is made.
The sliding sleeve setting ball seat two and sliding sleeve setting ball seat one are made of solvable aluminum alloy materials.
The sliding sleeve setting ball seat two and one pressure-bearing 70Mpa of sliding sleeve setting ball seat or more.
The external slips of the hydraulic anchor three and hydraulic anchor one are made of solvable aluminum alloy materials.
Gas well divides method with solvable packer multiple fracturing completion integral, includes the following steps:
Step 1 carries out perforation to transformation layer position using cable transmission perforation;
Gas well is connected to oil pipe and tripping in pit shaft with solvable packer multiple fracturing completion integral partial pressure tubular column by step 2 It is interior, then oil pipe is suppressed, the lowermost soluble packer one is set, and carries out first layer pressure break;
Step 3, after first layer pressure break, well head pitching, ball fall into first segment fractured layer to sliding sleeve setting ball seat one On, differential sand blast sliding sleeve one is opened, and set the soluble packer two of intermediate fractured interval, carries out intermediate interval pressure break;
Step 4 successively puts into the ball of different-diameter in each layer according to the sequence that the diameter of ball is ascending, according to each layer Sequence successively opens the pitching sand blast sliding sleeve of each layer from bottom to top, carries out the pressure break of each layer, until final stage fractured layer pressure break It completes;
Step 5, after pressure break, mouth of shunting in a well carries out well head open flow, to each soluble packer because of pressure differential collapses, outer packing element It shrinks, soluble packer unseals automatically, and gas well uses solvable packer multiple fracturing completion integral partial pressure tubular column as production Tubing string stays in pit shaft, carries out drain production.
If returning drain with coming into contact with since pit shaft irregularly causes deblocking to fail, the outer packing element of soluble packer Can sol rubber start to dissolve under wellbore conditions, each soluble removing seal for packer is gradually expanded in soluble end, meanwhile, sliding sleeve is set Ball seat and the slips of hydraulic anchor also with the contact for returning drain and start to dissolve, as the carry out sliding sleeve setting ball seat of dissolution dissipates It falls, until being completely dissolved, gas well forms big full-bore with solvable packer multiple fracturing completion integral partial pressure tubular column in well, And then it is retained in pit shaft as flow string.
The slips of the outer packing element of soluble packer, sliding sleeve setting ball seat and hydraulic anchor is 6 under wellbore conditions in step 4 It is completely dissolved in it, gas well is movable with solvable packer multiple fracturing completion integral partial pressure tubular column.
Beneficial effects of the present invention:This gas well provided by the invention solvable packer multiple fracturing completion integral point Pressure pipe column and method have the characteristics that structure is simple, installation is convenient with constructing operation.Meanwhile this pressure break completion integral pipe Pit shaft variable diameter brings production, well logging and later period power tool tripping in and causes because unsealing failure after column solves the problems, such as pressure Extraction tubing string difficulty problem.Compared with prior art, the outer packing element of packer after pressure, be set to sliding sleeve tee and hydraulic anchor Slips all can gradually dissolve over time, can form larger full-bore after dissolution in pit shaft, can farthest play oil Gas well deliverability, reduce normally log well to the later period, the influence of the underground work such as well workover and later period storey increase design measure, and keep away The risk and cost of brill abrading-ball seat is exempted from.Meanwhile guarantee packer all unseals, and reduces later period extraction, replaces flow string Risk.
The present invention is described in further details below with reference to attached drawing.
Detailed description of the invention
Fig. 1 is that the gas field directional well of partial pressure three-layer is illustrated with solvable packer multiple fracturing completion integral partial pressure tubular column Figure.
Fig. 2 is that two layers of partial pressure of gas field directional well is illustrated with solvable packer multiple fracturing completion integral partial pressure tubular column Figure.
Description of symbols:1, flow nipple;2, gauguste cutter;3, sliding sleeve setting ball seat one;4, soluble packer one;5, water Power anchor one;6, sand blast sliding sleeve one;7, sliding sleeve setting ball seat two;8, soluble packer two;9, sand blast sliding sleeve two;10, soluble Packer three;11, hydraulic anchor three;12, oil pipe.
Specific embodiment
Embodiment 1:
A kind of solvable packer multiple fracturing completion integral partial pressure tubular column of gas well is present embodiments provided, as shown in Figure 1, packet The flow nipple 1 for being installed on 12 bottom end of oil pipe is included, 1 top of flow nipple is successively arranged the hydraulic anchor being mounted on oil pipe 12 from top to bottom 3 11, soluble packer 3 10, sand blast sliding sleeve 1, hydraulic anchor 1, soluble packer 1, one 3 and of sliding sleeve setting ball seat Gauguste cutter 2;
The sand blast sliding sleeve 1, hydraulic anchor 1, soluble packer 1 and sliding sleeve setting ball seat 1 are one group, correspond to first Section fractured layer;Hydraulic anchor 3 11 and soluble packer 3 10 are one group, corresponding final stage fractured layer.
As shown in Figure 1, the solvable packer multiple fracturing completion integral of gas well divides two layers of pressure break of pipe point, gas well is used can The application method and working principle of molten packer multiple fracturing completion integral partial pressure tubular column are as follows:
Step 1 carries out perforation to transformation layer position using cable transmission perforation;
Gas well is connected to oil pipe and tripping in pit shaft with solvable packer multiple fracturing completion integral partial pressure tubular column by step 2 It is interior, then oil pipe 12 is suppressed, the lowermost soluble packer 1 is set, and carries out first layer pressure break;
Step 3, after first layer pressure break, well head pitching, ball fall into first segment fractured layer to sliding sleeve setting ball seat one On 3, differential sand blast sliding sleeve 1 is opened, and sets the soluble packer 3 10 of final stage fractured layer, carries out final stage The pressure break of fractured layer;
Step 4, after pressure break, mouth of shunting in a well carries out well head open flow, to each soluble packer because of pressure differential collapses, outer glue Cylinder is shunk, and soluble packer unseals automatically.
If returning drain with coming into contact with since pit shaft irregularly causes deblocking to fail, the outer packing element of soluble packer Can sol rubber start to dissolve under wellbore conditions, each soluble removing seal for packer is gradually expanded in soluble end, meanwhile, sliding sleeve is set Ball seat and the slips of hydraulic anchor also with the contact for returning drain and start to dissolve, as the carry out sliding sleeve setting ball seat of dissolution dissipates It falls, until being completely dissolved, gas well forms big full-bore with solvable packer multiple fracturing completion integral partial pressure tubular column in well, And then it is retained in pit shaft as flow string.
Embodiment 2:
On the basis of embodiment 1, as shown in Fig. 2, gas well with solvable packer multiple fracturing completion integral partial pressure tubular column also Including sand blast sliding sleeve 29, the soluble being located at from top to bottom along oil pipe 12 between soluble packer 3 10 and sand blast sliding sleeve 1 Packer 28, sliding sleeve setting ball seat 27;Sand blast sliding sleeve 29, soluble packer 28 and sliding sleeve setting ball seat 27 are one group, Equipped with multiple groups, each fractured layer between first segment fractured layer and final stage fractured layer is respectively corresponded.
It is split as shown in Fig. 2, the solvable packer multiple fracturing completion integral of gas well divides the lamination of pipe part three, gas well is used can The application method and working principle of molten packer multiple fracturing completion integral partial pressure tubular column are as follows:
Step 1 carries out perforation to transformation layer position using cable transmission perforation;
Gas well is connected to oil pipe and tripping in pit shaft with solvable packer multiple fracturing completion integral partial pressure tubular column by step 2 It is interior, then oil pipe 12 is suppressed, the lowermost soluble packer 1 is set, and carries out first layer pressure break;
Step 3, after first layer pressure break, well head pitching, ball fall into first segment fractured layer to sliding sleeve setting ball seat one On 3, differential sand blast sliding sleeve 1 is opened, and sets the soluble packer 28 of intermediate fractured interval, carries out intermediate interval pressure It splits;
Step 4 successively puts into the ball of different-diameter in each layer according to the sequence that the diameter of ball is ascending, according to each layer Sequence successively opens the pitching sand blast sliding sleeve of each layer from bottom to top, carries out the pressure break of each layer, until final stage fractured layer pressure break It completes;The slips of the outer packing element of soluble packer, sliding sleeve setting ball seat and hydraulic anchor is completely molten in 6 days under wellbore conditions Solution, gas well are movable with solvable packer multiple fracturing completion integral partial pressure tubular column
Step 5, after pressure break, mouth of shunting in a well carries out well head open flow, to each soluble packer because of pressure differential collapses, outer packing element It shrinks, soluble packer unseals automatically.
Embodiment 3:
On the basis of embodiment 1, the soluble packer 3 10, soluble packer 28 and soluble packer 1 Outer packing element is all made of solvable rubber and is made.Sliding sleeve setting ball seat 27 and sliding sleeve setting ball seat 1 use solvable aluminum alloy materials system At.Sliding sleeve setting ball seat 27 and one 3 pressure-bearing 70Mpa of sliding sleeve setting ball seat or more.The hydraulic anchor 3 11 and hydraulic anchor 1 External slips are made of solvable aluminum alloy materials.
After the completion of pressure break, the outer packing element of soluble packer 3 10, soluble packer 28 and soluble packer 1 It is dissolved with the external slips of hydraulic anchor 3 11 and hydraulic anchor 1, reduces the sand setting on packing element top, greatly improve the peace of tubing string taking-up Quan Xing;Sliding sleeve setting ball seat 27 and sliding sleeve setting ball seat 1 dissolve, and tubular reduces at larger full-bore to the later period in well The influence of the underground work such as normal well logging, well workover and later period storey increase design measure, avoids the risk and cost for boring abrading-ball seat.
It should be strongly noted that can sol rubber and solvable aluminum alloy materials be current material, specific composition is not As protection point of the invention, no longer it is described in detail herein.
Embodiment 4:
A kind of gas well solvable packer multiple fracturing completion integral partial pressure method, includes the following steps:
Step 1 carries out perforation to transformation layer position using cable transmission perforation;
Gas well is connected to oil pipe and tripping in pit shaft with solvable packer multiple fracturing completion integral partial pressure tubular column by step 2 It is interior, then oil pipe 12 is suppressed, the lowermost soluble packer 1 is set, and carries out first layer pressure break;
Step 3, after first layer pressure break, well head pitching, ball fall into first segment fractured layer to sliding sleeve setting ball seat one On 3, differential sand blast sliding sleeve 1 is opened, and sets the soluble packer 28 of intermediate fractured interval, carries out intermediate interval pressure It splits;
Step 4 successively puts into the ball of different-diameter in each layer according to the sequence that the diameter of ball is ascending, according to each layer Sequence successively opens the pitching sand blast sliding sleeve of each layer from bottom to top, carries out the pressure break of each layer, until final stage fractured layer pressure break It completes;
Step 5, after pressure break, mouth of shunting in a well carries out well head open flow, to each soluble packer because of pressure differential collapses, outer packing element It shrinks, soluble packer unseals automatically, and gas well uses solvable packer multiple fracturing completion integral partial pressure tubular column as production Tubing string stays in pit shaft, carries out drain production.
Embodiment 5:
On the basis of embodiment 4, the solvable packer multiple fracturing completion integral of gas well divides method in separate stratum fracfturing Cheng Zhong, if returning drain with coming into contact with since pit shaft irregularly causes deblocking to fail, packing element is solvable outside soluble packer Rubber starts to dissolve under wellbore conditions, and each soluble removing seal for packer is gradually expanded in soluble end, meanwhile, sliding sleeve setting ball seat With the slips of hydraulic anchor also with the contact for returning drain and start to dissolve, as the carry out sliding sleeve setting ball seat of dissolution is scattered, Until being completely dissolved, gas well forms big full-bore with solvable packer multiple fracturing completion integral partial pressure tubular column in well, into And it is retained in pit shaft as flow string.
Embodiment 6:
On the basis of embodiment 4, it should be noted that the outer packing element of soluble packer, sliding sleeve setting ball seat in step 4 It is completely dissolved in 6 days under wellbore conditions with the slips of hydraulic anchor, gas well solvable packer multiple fracturing completion integral point Pressure pipe column is movable.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.The portion that the present embodiment does not describe in detail The well-known components and common structure or conventional means of part and the structure category industry, do not describe one by one here.

Claims (9)

1. the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well, it is characterised in that:Including being installed on oil pipe (12)The flow nipple of bottom end(1), flow nipple(1)Top is successively arranged is mounted on oil pipe from top to bottom(12)On hydraulic anchor three (11), soluble packer three(10), sand blast sliding sleeve one(6), hydraulic anchor one(5), soluble packer one(4), sliding sleeve sets Ball seat one(3)And gauguste cutter(2);
The sand blast sliding sleeve one(6), hydraulic anchor one(5), soluble packer one(4)With sliding sleeve setting ball seat one(3)It is one group, Corresponding first segment fractured layer;Hydraulic anchor three(11)With soluble packer three(10)It is one group, corresponding final stage fractured layer.
2. the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well as described in claim 1, it is characterised in that: It further include from top to bottom along oil pipe(12)It is located at soluble packer three(10)With sand blast sliding sleeve one(6)Between sand blast sliding sleeve two (9), soluble packer two(8), sliding sleeve setting ball seat two(7);Sand blast sliding sleeve two(9), soluble packer two(8)And sliding sleeve Setting ball seat two(7)It is one group, is equipped with multiple groups, respectively corresponds each pressure between first segment fractured layer and final stage fractured layer Parting.
3. the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well as described in claim 1, it is characterised in that: The soluble packer three(10), soluble packer two(8)With soluble packer one(4)Outer packing element be all made of it is solvable Rubber is made.
4. the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well as described in claim 1, it is characterised in that: The sliding sleeve setting ball seat two(7)With sliding sleeve setting ball seat one(3)It is made of solvable aluminum alloy materials.
5. the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well as claimed in claim 4, it is characterised in that: The sliding sleeve setting ball seat two(7)With sliding sleeve setting ball seat one(3)Pressure-bearing 70Mpa or more.
6. the solvable packer multiple fracturing completion integral partial pressure tubular column of gas well as described in claim 1, it is characterised in that: The hydraulic anchor three(11)With hydraulic anchor one(5)External slips be made of solvable aluminum alloy materials.
7. the gas well solvable packer multiple fracturing completion integral point as described in any claim in claim 1~6 The partial pressure method of pressure pipe column, which is characterized in that include the following steps:
Step 1 carries out perforation to transformation layer position using cable transmission perforation;
Gas well is connected to oil pipe and tripping in pit shaft with solvable packer multiple fracturing completion integral partial pressure tubular column by step 2 It is interior, then to oil pipe(12)It is suppressed, the lowermost soluble packer one(4)It sets, carries out first layer pressure break;
Step 3, after first layer pressure break, well head pitching, ball fall into first segment fractured layer to sliding sleeve setting ball seat one (3)On, open differential sand blast sliding sleeve one(6), and set the soluble packer two of intermediate fractured interval(8), carry out intermediate Interval pressure break;
Step 4 successively puts into the ball of different-diameter in each layer according to the sequence that the diameter of ball is ascending, according to each layer Sequence successively opens the pitching sand blast sliding sleeve of each layer from bottom to top, carries out the pressure break of each layer, until final stage fractured layer pressure break It completes;
Step 5, after pressure break, mouth of shunting in a well carries out well head open flow, to each soluble packer because of pressure differential collapses, outer packing element It shrinks, soluble packer unseals automatically, and gas well uses solvable packer multiple fracturing completion integral partial pressure tubular column as production Tubing string stays in pit shaft, carries out drain production.
8. gas well as claimed in claim 7 divides method with solvable packer multiple fracturing completion integral, it is characterised in that: If returning drain with coming into contact with since pit shaft irregularly causes deblocking to fail, packing element can sol rubber outside soluble packer Starting to dissolve under wellbore conditions, each soluble removing seal for packer is gradually expanded in soluble end, meanwhile, sliding sleeve setting ball seat and water The slips of power anchor also with the contact for returning drain and start to dissolve, as the carry out sliding sleeve setting ball seat of dissolution is scattered, until It is completely dissolved, gas well forms big full-bore, Jin Erzuo with solvable packer multiple fracturing completion integral partial pressure tubular column in well It is retained in pit shaft for flow string.
9. gas well as claimed in claim 7 divides method with solvable packer multiple fracturing completion integral, it is characterised in that: The slips of the outer packing element of soluble packer, sliding sleeve setting ball seat and hydraulic anchor is complete in 6 days under wellbore conditions in step 4 Dissolution, gas well are movable with solvable packer multiple fracturing completion integral partial pressure tubular column.
CN201810369890.1A 2018-04-24 2018-04-24 Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method Pending CN108868734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810369890.1A CN108868734A (en) 2018-04-24 2018-04-24 Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810369890.1A CN108868734A (en) 2018-04-24 2018-04-24 Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method

Publications (1)

Publication Number Publication Date
CN108868734A true CN108868734A (en) 2018-11-23

Family

ID=64327202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810369890.1A Pending CN108868734A (en) 2018-04-24 2018-04-24 Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method

Country Status (1)

Country Link
CN (1) CN108868734A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812248A (en) * 2019-02-28 2019-05-28 中国石油天然气股份有限公司 A kind of soluble flow controller and method
CN110206540A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of horizontal well annular space production profile test method and device
CN110454129A (en) * 2019-08-08 2019-11-15 中国石油天然气股份有限公司 A kind of gas well separate stratum fracfturing, the water integrated process pipe string of control
CN111622719A (en) * 2019-02-28 2020-09-04 中国石油天然气股份有限公司 Sand blasting perforation fracturing method for perforated production well
CN111980656A (en) * 2020-07-27 2020-11-24 克拉玛依市红都有限责任公司 Three-layer three-stage acid fracturing flow-back test integration method
CN112412423A (en) * 2020-11-13 2021-02-26 中国石油集团渤海钻探工程有限公司 Full-bore soluble throttling bottom valve for separate layer fracturing
CN112412404A (en) * 2020-11-13 2021-02-26 中国石油集团渤海钻探工程有限公司 Full-bore soluble sliding sleeve assembly multistage fracturing string for separate-layer fracturing and fracturing method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3918522A (en) * 1974-01-28 1975-11-11 Jr George O Suman Well completion method and system
CN1752404A (en) * 2004-09-20 2006-03-29 西安益友石油科技有限公司 Gas well separate layer fracturing and producing integrated well completing pipe string and technique
CN2866812Y (en) * 2005-10-18 2007-02-07 中国石油天然气股份有限公司 Natural gas well separate fracturing merging-layer extracting integral tubelar column
US20090223670A1 (en) * 2008-03-07 2009-09-10 Marathon Oil Company Systems, assemblies and processes for controlling tools in a well bore
CN201802376U (en) * 2010-09-07 2011-04-20 中国石油天然气股份有限公司 Barefoot well completion hydraulic power sand blast immovable pipe column staged fracturing string
CN202108491U (en) * 2011-05-13 2012-01-11 中国石油天然气股份有限公司 Gas well separate stratum fracturing and separate stratum testing integrated process pipe column
CN104100250A (en) * 2013-04-15 2014-10-15 中国石油化工股份有限公司 Integrated pipe column system and fracturing process method for staged fracturing well completion of open hole horizontal well
CN104453778A (en) * 2014-11-06 2015-03-25 中国石油天然气股份有限公司 Fracture sliding sleeve with dissoluble ball seat and fracturing method
CN105950920A (en) * 2016-05-17 2016-09-21 中国科学院金属研究所 Aluminum base alloy soluble in water and aqueous medium environments and preparation method thereof
CN106801590A (en) * 2017-01-20 2017-06-06 北京中科金腾科技有限公司 A kind of dissolvable slips and bridging plug
CN206513345U (en) * 2017-02-10 2017-09-22 四川省威沃敦化工有限公司 A kind of solvable bridging plug
CN207004477U (en) * 2017-05-28 2018-02-13 北京千永科技股份有限公司 Solvable bridging plug staged fracturing tool

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3918522A (en) * 1974-01-28 1975-11-11 Jr George O Suman Well completion method and system
CN1752404A (en) * 2004-09-20 2006-03-29 西安益友石油科技有限公司 Gas well separate layer fracturing and producing integrated well completing pipe string and technique
CN2866812Y (en) * 2005-10-18 2007-02-07 中国石油天然气股份有限公司 Natural gas well separate fracturing merging-layer extracting integral tubelar column
US20090223670A1 (en) * 2008-03-07 2009-09-10 Marathon Oil Company Systems, assemblies and processes for controlling tools in a well bore
CN201802376U (en) * 2010-09-07 2011-04-20 中国石油天然气股份有限公司 Barefoot well completion hydraulic power sand blast immovable pipe column staged fracturing string
CN202108491U (en) * 2011-05-13 2012-01-11 中国石油天然气股份有限公司 Gas well separate stratum fracturing and separate stratum testing integrated process pipe column
CN104100250A (en) * 2013-04-15 2014-10-15 中国石油化工股份有限公司 Integrated pipe column system and fracturing process method for staged fracturing well completion of open hole horizontal well
CN104453778A (en) * 2014-11-06 2015-03-25 中国石油天然气股份有限公司 Fracture sliding sleeve with dissoluble ball seat and fracturing method
CN105950920A (en) * 2016-05-17 2016-09-21 中国科学院金属研究所 Aluminum base alloy soluble in water and aqueous medium environments and preparation method thereof
CN106801590A (en) * 2017-01-20 2017-06-06 北京中科金腾科技有限公司 A kind of dissolvable slips and bridging plug
CN206513345U (en) * 2017-02-10 2017-09-22 四川省威沃敦化工有限公司 A kind of solvable bridging plug
CN207004477U (en) * 2017-05-28 2018-02-13 北京千永科技股份有限公司 Solvable bridging plug staged fracturing tool

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812248A (en) * 2019-02-28 2019-05-28 中国石油天然气股份有限公司 A kind of soluble flow controller and method
CN111622719A (en) * 2019-02-28 2020-09-04 中国石油天然气股份有限公司 Sand blasting perforation fracturing method for perforated production well
CN111622719B (en) * 2019-02-28 2022-06-03 中国石油天然气股份有限公司 Sand blasting perforation fracturing method for perforated production well
CN110206540A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of horizontal well annular space production profile test method and device
CN110206540B (en) * 2019-05-23 2024-04-02 广州海洋地质调查局 Method and device for testing annular output profile of horizontal well
CN110454129A (en) * 2019-08-08 2019-11-15 中国石油天然气股份有限公司 A kind of gas well separate stratum fracfturing, the water integrated process pipe string of control
CN111980656A (en) * 2020-07-27 2020-11-24 克拉玛依市红都有限责任公司 Three-layer three-stage acid fracturing flow-back test integration method
CN112412423A (en) * 2020-11-13 2021-02-26 中国石油集团渤海钻探工程有限公司 Full-bore soluble throttling bottom valve for separate layer fracturing
CN112412404A (en) * 2020-11-13 2021-02-26 中国石油集团渤海钻探工程有限公司 Full-bore soluble sliding sleeve assembly multistage fracturing string for separate-layer fracturing and fracturing method thereof

Similar Documents

Publication Publication Date Title
CN108868734A (en) Gas well solvable packer multiple fracturing completion integral partial pressure tubular column and method
CN102979495B (en) Many bunches of Limited entry fracturing tubing strings of open-hole horizontal well and fracturing process thereof
CN104453784B (en) A kind of solvable ball seat multistage fracturing sliding sleeve of controllable type
CN1860282B (en) Method of suspending, completing and working over a well
CN101624904B (en) Open hole completion well sand resistant pipe string of sidetracking branch well and inserting type acid cleaning filling inner pipe string thereof
CN106223917A (en) A kind of side tracked slim hole layered fracturing pipe string and method
CN103711469B (en) The switchable formula well-cementing staged-fracturing DP technology of horizontal well
CN109736737B (en) Method for snubbing tripping of reservoir gas drilling well
CN104213846B (en) Cased hole completion multistage frac water horizontal well selectivity mining tubular column and method of work thereof
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN112302586B (en) Production process for putting speed pipe column with choke at tail end in well
CN102454381B (en) Oil-gas reservoir barefoot well cementing and completion method and device
CN109630060A (en) A kind of complete well operation tubing string of repeatable no killing well and construction technology
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
CN101089360A (en) Well completion method and device of diverticulum with outer packer combined with sieve tube
CN106460477A (en) Downhole stimulation system
CN104481489B (en) A kind of gas well straight well coiled tubing pressure break and completion integral process
CN206668234U (en) A kind of ball-throwing type selective sand control process pipe string
CN107269245B (en) A method of it is insulated again for seperated layer water injection/oil recovery sand control section substratum
CN202500541U (en) Tubular column of gas well plumb shaft multi-level layering fracturing technology
CN206158709U (en) Support formula water injection string
CN205778740U (en) A kind of seesaw type sliding sleeve opener and etc. diameter through sleeve sliding sleeve
CN205605156U (en) Workover device is pressed in oil gas field area
CN101818619B (en) Well cementation and completion structure and process for cased branch well with temporarily-sealed opening
CN207598221U (en) A kind of layering squeezes sand preventing tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123