CN115573376A CN202210967335.5A CN202210967335A CN115573376A CN 115573376 A CN115573376 A CN 115573376A CN 202210967335 A CN202210967335 A CN 202210967335A CN 115573376 A CN115573376 A CN 115573376A
Authority
CN
China
Prior art keywords
transmission tower
tower foundation
circular transmission
circular
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210967335.5A
Other languages
Chinese (zh)
Inventor
何松洋
刘翔云
梁明
黄兴
李钟�
韩大刚
鄢秀庆
辜良雨
杨洋
高元
马海云
王劲
冯勇
蒲凡
李磊
肖兵
何江华
高见
向越
余国庆
龚涛
李林
张如宝
王波
余斌
罗海力
刘进通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN202210967335.5A priority Critical patent/CN115573376A/en
Publication of CN115573376A publication Critical patent/CN115573376A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Abstract

The invention provides a treatment method and a reinforcement device for circular transmission tower foundation cracking, wherein the treatment method comprises the following steps: drilling holes around the base cracks of the round transmission tower by adopting an oblique crack surface hole penetrating method, and grouting into the drilled holes to fill the cracks; carrying out confining pressure reinforcement on a circular transmission tower foundation by using a reinforcing device; after confining pressure reinforcement is completed, installing a reinforcement cage around the circular transmission tower foundation, and pouring concrete by relying on the reinforcement cage to form a protective shell on the outer side of the circular transmission tower foundation; the connecting gap between the circular transmission tower foundation and the transmission tower foot plate is filled, and the influence of nonuniform local voltage on the circular transmission tower foundation is eliminated. The reinforcing device comprises a hoop component, the hoop component is of an arc-shaped structure, and the two hoop components are spliced and assembled to form confining pressure on the circular transmission tower foundation. The reinforced circular transmission tower foundation is firmer and firmer, repeated cracking of the circular transmission tower foundation is avoided, and reliable operation of the transmission line is guaranteed.

Description

Treatment method and reinforcement device for circular transmission tower foundation cracking
Technical Field
The invention relates to the technical field of transmission tower foundations, in particular to a method for treating cracking of a circular transmission tower foundation and a reinforcing device.
Background
When a power transmission line is built, a concrete foundation is usually needed to be adopted to fix a power transmission tower, the quality of the power transmission tower foundation plays an important role in safe and stable operation of a power line, and if the power transmission tower foundation fails, serious safety accidents are easily caused.
Transmission tower contact divide into circular basis and square basis, wherein circular basis can be divided into and digs hole type basis and bored concrete pile type basis etc. along with the increase of operating duration, the fracture condition takes place for circular transmission tower basis easily, if do not handle the basis of fracture, the fracture further enlarges, will influence transmission tower's structural stability, cause the serious consequence such as shaft tower collapse easily, thereby cause huge economic loss, consequently need in time repair the circular transmission tower basis of fracture, in order to reduce the safety risk.
In engineering, a common repairing method is to wrap a layer of concrete outside the surface of a round transmission tower foundation and reinforce the round transmission tower foundation by using reinforcing steel bars, but the reinforcing method has poor durability and reliability, is difficult to radically solve the cracking problem, can crack repeatedly after being repaired, and wastes manpower and material resources.
Disclosure of Invention
The invention aims to at least solve one of the technical problems that the reliability and durability of the treatment of the circular transmission tower foundation cracking by adopting the existing method are poor, the cracking problem is difficult to solve at the source, repeated cracking is easy to occur, the economy is poor, and the safe and stable operation of a transmission line is influenced in the prior art.
Therefore, the invention provides a method for treating the cracking of the circular transmission tower foundation in a first aspect.
The invention provides a device for reinforcing the circular transmission tower foundation cracking in a second aspect.
The invention provides a method for treating cracking of a circular transmission tower foundation, which comprises the following steps:
s1, drilling holes around the cracks of a circular transmission tower foundation by adopting an oblique crack surface hole penetrating method, and grouting into the drilled holes to fill the cracks;
s2, carrying out confining pressure reinforcement on the circular transmission tower foundation by using a reinforcement device;
s3, after confining pressure reinforcement is completed, installing a reinforcement cage around the circular transmission tower foundation, and pouring concrete by relying on the reinforcement cage to form a protective shell on the outer side of the circular transmission tower foundation;
and S4, filling a connecting gap between the circular transmission tower foundation and a transmission tower foot plate, and eliminating the influence of uneven local voltage on the circular transmission tower foundation.
According to the technical scheme of the invention, the method for treating the circular transmission tower foundation cracking can also have the following additional technical characteristics:
further, S1 comprises the steps of:
s11, selecting at least two point positions around a crack of a circular transmission tower foundation to carry out oblique drilling, wherein the drilling needs to penetrate through the crack surface of the crack;
s12, temporarily plugging the drilled hole by using a grouting nozzle or a plugging plug;
s13, cleaning sundries and dust on the surface of the round transmission tower foundation;
s14, taking off the plugging matter on the drilled hole, and blowing dust in the drilled hole by using high-pressure gas;
and S15, injecting a filler into the drilled hole, and filling the cracks of the base of the round transmission tower.
Further, S2 comprises the steps of:
s21, installing reinforcing devices layer by layer from the top of the circular transmission tower foundation downwards, surrounding the circular transmission tower foundation by the reinforcing devices, and applying confining pressure to the circular transmission tower foundation;
s22, excavating surface soil around the circular transmission tower foundation along the vertical extending direction of the cracks to expose the cracks covered by the surface soil;
s23, when the vertical length of the exposed crack is enough to install the reinforcing device, grouting and filling the newly exposed crack according to the S1, and installing the reinforcing device after filling;
and S24, continuously excavating downwards, and repeating the steps S22 and S23 until the confining pressure reinforcement of the deepest part in the vertical direction of the crack is completed.
Further, in step S23, when the reinforcing device is installed, a pit wall template is installed in synchronization with the position of the excavated earth pit wall facing the reinforcing device.
Further, in the step S24, the vertical confining pressure reinforcement range of the circular transmission tower foundation is from the top of the circular transmission tower foundation to the position of the deepest vertical position of the crack, and then the vertical confining pressure reinforcement range extends downwards by 150-300 mm.
Further, the reinforcement cage in S3 is used as a framework for pouring a concrete protective shell around the round transmission tower foundation.
Further, S4 comprises the steps of:
s41, penetrating a # -shaped steel wire into a connecting gap between a circular transmission tower foundation and a transmission tower foot plate;
s42, supporting a formwork around the connecting position of the tower foot plate and the circular transmission tower foundation to form a grouting space;
s43, injecting grouting materials into the grouting space to fill a connecting gap between the circular transmission tower foundation and a transmission tower foot plate;
s44, after the grouting material is solidified, pouring concrete above the solidified grouting material to form a protective cap;
s45, after the protective cap is solidified, the die is removed.
Furthermore, the grouting material is a fluid high-strength non-shrinkage grouting material with the compressive strength grade of not less than 40 MPa.
The invention also provides a reinforcing device for the circular transmission tower foundation cracking, which is applied to the treatment method for the circular transmission tower foundation cracking in the technical scheme and comprises the following steps: the hoop components are of arc structures, at least two hoop components are spliced and assembled to form confining pressure on the circular transmission tower foundation, and if two semicircular steel plates or four quarter circular steel plates are adopted for splicing and assembling, the circular transmission tower foundation is subjected to confining pressure.
Specifically, the hoop components are semicircular steel plates, the two semicircular steel plates are assembled to form an approximately closed circular ring structure and restrain the circular transmission tower foundation, the confining pressure applied to the circular transmission tower foundation is adjusted by adjusting the relative distance between the two semicircular steel plates, the confining pressure applied by attention is not too large, and obvious indentation cannot be generated on the surface of the circular transmission tower foundation.
Furthermore, the surrounding hoop component comprises a surrounding plate and a vertical plate, wherein the two vertical plates are respectively arranged at two ends of the surrounding plate, and the vertical plate is connected with the vertical plate of the adjacent surrounding hoop component through a bolt.
Specifically, the vertical plates are arranged at the end parts of the surrounding plates and are arranged along the radial direction of the circular transmission tower foundation, the vertical plates are fixedly connected with the surrounding plates in a double-sided fillet weld connection mode, stiffening plates are arranged between the vertical plates and the surrounding plates, and the stiffening plates are respectively connected with the vertical plates and the surrounding plates in a welding mode and used for providing reliable support for the vertical plates and improving the overall strength of the surrounding hoop assembly; the vertical plate is connected with the vertical plate bolt on the adjacent other hoop component, a certain connecting gap is reserved, and the bolts are screwed down to enable the two semicircular hoop components to apply the hoop pressure to the circular transmission tower foundation.
In summary, due to the adoption of the technical characteristics, the invention has the beneficial effects that:
the circular transmission tower foundation is reinforced by vertical confining pressure through the hoop structure, so that the reinforced circular transmission tower foundation is firmer and firmer, the problem of uneven local pressure caused by a connecting gap between the tower foundation and a tower foot plate is solved starting from a cracking source, repeated cracking of the circular transmission tower foundation is avoided, and reliable and stable operation of a transmission line is guaranteed.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a flow chart of a method for treating cracking of a circular transmission tower foundation according to an embodiment of the invention;
fig. 2 is one of schematic diagrams of drilling by using an oblique slot-through face-hole method in the treatment method for the cracking of the circular transmission tower foundation according to the embodiment of the invention;
fig. 3 is a second schematic diagram of drilling by using an oblique crack surface hole method in the method for treating the cracking of the circular transmission tower foundation according to the embodiment of the invention;
FIG. 4 is a schematic diagram illustrating a principle that a circular transmission tower foundation cracks in the method for treating the circular transmission tower foundation cracks according to the embodiment of the invention;
FIG. 5 is an assembly schematic diagram of a reinforcing device in the method for treating the cracking of the circular transmission tower foundation according to an embodiment of the invention;
fig. 6 is a schematic diagram illustrating filling of a connection gap between a circular transmission tower foundation and a transmission tower footing plate in the method for managing cracking of the circular transmission tower foundation according to the embodiment of the present invention;
fig. 7 is a schematic view of penetrating a groined steel wire into a connecting gap in the method for treating the cracking of the circular transmission tower foundation according to the embodiment of the invention;
FIG. 8 is a schematic structural diagram of a hoop component in a cracked reinforcing device for a circular transmission tower foundation according to an embodiment of the invention;
fig. 9 is a side view of a hoop assembly in a cracked reinforcement device for a circular transmission tower foundation according to an embodiment of the invention.
Wherein, the correspondence between the reference numbers and the part names in fig. 1 to 9 is:
1. a circular transmission tower foundation; 2. a reinforcement device; 3. a reinforcement cage; 4. a tower footing plate; 5. a well-shaped steel wire; 6. a peripheral stirrup; 7. a template; 8. connecting the gaps;
11. a hoop assembly;
111. enclosing plates; 112. a vertical plate; 113. a stiffening plate; 114. and fixing bolt holes.
Detailed Description
In order that the above objects, features and advantages of the present invention can be more clearly understood, a more particular description of the invention will be rendered by reference to the appended drawings. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced otherwise than as specifically described herein, and thus the scope of the present invention is not limited by the specific embodiments disclosed below.
The following describes a method for treating cracks on a base of a circular transmission tower according to some embodiments of the present invention with reference to fig. 1 to 9.
Some embodiments of the application provide a method for treating cracking of a circular transmission tower foundation.
As shown in fig. 1 to 9, a first embodiment of the present invention provides a method for treating cracking of a circular transmission tower foundation, including the following steps:
s1, drilling holes around cracks of a circular transmission tower foundation 1 by adopting an oblique crack penetration face hole method, and grouting into the drilled holes to fill the cracks;
s1 specifically comprises the following steps:
s11, selecting at least two point positions around the crack of the circular transmission tower foundation 1 to carry out oblique drilling, wherein the drilling needs to penetrate through the crack surface of the crack; as shown in figures 2 and 3, two cracks are drilled, wherein holes are drilled around the cracks by a slant-through crack surface hole method, and the holes are drilled through the crack surface by 0.2-0.3 m.
According to the crack development condition on the circular transmission tower foundation 1, a phi 12mm hole is drilled by using a percussion drill for a penetrating crack or a deep crack, and a small hole is drilled by using the percussion drill according to the crack width and the crack depth condition for a non-penetrating crack.
S12, temporarily plugging the drilled hole by using a grouting nozzle, a plugging plug, a plugging cap, a plugging cover and the like to prevent external impurities or dust from entering the drilled hole;
s13, cleaning sundries and dust on the surface of the round transmission tower foundation 1;
s14, removing the plugging materials on the drilled holes, blowing dust in the drilled holes by using high-pressure gas, reducing sundries in the drilled holes as much as possible, and ensuring that gaps are filled to the maximum extent during subsequent grouting and filling;
and S15, injecting a filler into the drilled hole in a high-pressure injection mode to fill the crack of the circular transmission tower foundation 1, wherein the filler can be modified epoxy resin or cement paste and the like.
S2, carrying out confining pressure reinforcement on the circular transmission tower foundation 1 by using the reinforcing device 2, wherein the installation schematic of the reinforcing device 2 is shown in FIG. 5;
s2 specifically comprises the following steps:
s21, installing reinforcing devices 2 layer by layer from the top of the circular transmission tower foundation 1 downwards, wherein the reinforcing devices 2 surround the circular transmission tower foundation 1 and apply confining pressure to the circular transmission tower foundation 1; the method mainly aims to perform vertical confining pressure reinforcement on the circular transmission tower foundation 1 after the cracks are filled by the S1;
s22, excavating surface soil around the circular transmission tower foundation 1 along the vertical extending direction of the cracks to expose the cracks covered by the surface soil, wherein the range of an excavation plane is the range of reinforcing the circular transmission tower foundation 1 and then is expanded by 0.1m, namely the range of 0.1m is expanded on the basis of externally-wrapped concrete, and the excavation plane can be increased or decreased appropriately according to actual conditions;
s23, when the vertical length of the exposed crack is enough to install the reinforcing device 2, grouting and filling the newly exposed crack according to the S1, and installing the reinforcing device 2 after filling;
in the step S23, when the reinforcing device 2 is installed, a pit wall template 7 is synchronously installed at the position, opposite to the reinforcing device 2, of the excavated soil pit wall, so that a supporting and protecting effect is formed on the pit wall, collapse is prevented, and construction safety is guaranteed;
and S24, continuing downward excavation, and repeating the steps S22 and S23 until the confining pressure reinforcement of the deepest part in the vertical direction of the crack is completed.
In the step S24, the vertical confining pressure reinforcement range of the circular transmission tower foundation 1 is from the top of the circular transmission tower foundation 1 to the deepest position in the vertical direction of the crack, and then extends downwards by 150mm-300mm, specifically, may extend downwards by 200mm.
S3, after confining pressure reinforcement is completed, installing a reinforcement cage 3 around the circular transmission tower foundation 1, and pouring concrete by relying on the reinforcement cage 3 to form a protective shell on the outer side of the circular transmission tower foundation 1;
and S3, the reinforcement cage 3 is of a net structure and serves as a framework for pouring a concrete protective shell around the round transmission tower foundation 1, and the protective shell formed by wrapping concrete is restrained.
And S4, filling a connecting gap 8 between the circular transmission tower foundation 1 and the transmission tower foot plate 4, and eliminating the influence of uneven local voltage on the circular transmission tower foundation 1.
According to the investigation, one of the main reasons for the cracking of the circular transmission tower foundation 1 is that the local pressure applied to the circular transmission tower foundation 1 is uneven, the principle is as shown in fig. 4, when a transmission tower is erected in the construction process, a certain installation error exists in the tower, so that a connecting gap 8 exists between the tower foot plate 4 of the transmission tower and the connection surface of the concrete foundation, and along with the lengthening of the operation time, the connecting gap 8 is likely to be enlarged, so that the effective contact area between the tower foot plate 4 and the foundation is reduced, and the local pressure cracking of the circular transmission tower foundation 1 is caused.
To solve the above problem, S4 specifically includes the following steps:
s41, penetrating a # -shaped steel wire 5 into a connecting gap 8 between a circular transmission tower foundation 1 and a transmission tower foot plate 4; the groined steel wires 5 are net-shaped steel wires, and specifically, when the groined steel wires 5 are penetrated, single-stranded steel wires with the diameter of less than or equal to 4mm can be penetrated into the connecting gaps 8 one by one, the steel wires should penetrate through the connecting gaps 8 as much as possible, so that a plurality of steel wires are arranged in the connecting gaps 8 in a groined shape, and the distance between every two adjacent steel wires should be less than or equal to 150mm; and winding a peripheral stirrup 6 outside the tower foot plate 4, and fixing a steel wire on the peripheral stirrup 6, wherein the diameter of the peripheral stirrup 6 is less than or equal to 6mm.
S42, supporting a formwork around the connecting position of the tower foot plate 4 and the circular transmission tower foundation 1 to form a grouting space, wherein the grouting space is formed by formworks 7 arranged around the connecting position of the tower foot plate 4 and the circular transmission tower foundation 1 and used for restricting a grouting range, specifically, the formworks 7 can be circular or square and are matched with the shape of the tower foot plate 4, and the specified grouting range can be controlled according to the mode that the tower foot plate 4 is used as a foundation and is expanded by 50mm; the top of the template 7 is 40-60mm higher than the ground screw used for fixing the tower foot plate 4, and 50mm is selected in the embodiment;
s43, injecting grouting materials into the grouting space to fill a connecting gap 8 between the circular transmission tower foundation 1 and the transmission tower foot plate 4, wherein the grouting height is higher than that of the tower foot plate 4, and the connecting gap 8 is filled with the grouting materials as much as possible; the grouting material is high-flow-state high-strength shrinkage-free grouting material with the compressive strength grade of more than or equal to 40 MPa.
S44, after the grouting material is solidified, pouring concrete above the solidified grouting material to form a protective cap; the top of the protective cap is 40-60mm higher than the ground screw for fixing the tower foot plate 4 and can be as high as the formwork 7, and the formwork 7 plays a role in restraining concrete.
S45, after the protective cap is solidified, the die is removed.
The second embodiment of the present invention provides a reinforcing device 2 for cracks in a circular transmission tower foundation 1, and as shown in fig. 1 to 9, on the basis of the first embodiment, the reinforcing device is applied to step S2 of the method for managing cracks in a circular transmission tower foundation 1 described in the above embodiment, and specifically includes: the hoop components 11 are of arc structures, at least two hoop components 11 are spliced and assembled to form confining pressure on the circular transmission tower foundation 1, and if two semicircular steel plates or four quarter circular steel plates are adopted for splicing and assembling, the hoop components 11 are of arc structures.
Specifically, the hoop components 11 are semicircular steel plates, two semicircular steel plates are assembled to form an approximately closed circular ring structure and constrain the circular transmission tower foundation 1, the confining pressure applied to the circular transmission tower foundation 1 is adjusted by adjusting the relative distance between the two semicircular steel plates, the confining pressure applied needs to be noticed not to be too large, and obvious indentation cannot be generated on the surface of the circular transmission tower foundation 1.
Every two hoop components 11 form a set of reinforcing device 2, a plurality of sets of reinforcing devices 2 are installed on the circular transmission tower foundation 1 according to the step S2 to carry out vertical confining pressure reinforcement on the circular transmission tower foundation 1, and the vertical clear distance between every two adjacent sets of reinforcing devices 2 is smaller than or equal to 200mm.
Further, the strapping assembly 11 comprises a coaming 111 and a riser 112, two risers 112 are respectively arranged at two ends of the coaming 111, and the riser 112 is bolted with the riser 112 of the adjacent strapping assembly 11.
Specifically, the vertical plates 112 are arranged at the end portions of the surrounding plates 111 and are arranged along the radial direction of the circular transmission tower foundation 1, the vertical plates 112 are fixedly connected with the surrounding plates 111 in a double-sided fillet weld connection mode, stiffening plates 113 are arranged between the vertical plates 112 and the surrounding plates 111, and the stiffening plates 113 are respectively connected with the vertical plates 112 and the surrounding plates 111 in a welding mode and used for providing reliable support for the vertical plates 112 and improving the overall strength of the surrounding hoop assembly 11; riser 112 and adjacent another enclose riser 112 bolted connection on the hoop subassembly 11 to having certain joint gap, theoretical joint gap s is 40mm, also can carrying out the adaptability adjustment according to actual conditions, screws up the bolt and makes two semi-circular enclose hoop subassembly 11 exert to circular transmission tower basis 1 and enclose the pressure, screws up behind the bolt joint gap s and should reduce 2mm at least.
The enclosing plate 111 can be provided with a plurality of fixing bolt holes 114, and bolts are screwed into the fixing bolt holes 114, so that the enclosing plate 111 is circumferentially pre-tightened on the circular transmission tower foundation 1, and the enclosing plate 111 is fixed on the surface of the circular transmission tower foundation 1, so that the sliding is reduced.
In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A method for treating cracking of a circular transmission tower foundation is characterized by comprising the following steps:
s1, drilling holes around the cracks of a circular transmission tower foundation by adopting an oblique crack surface hole penetrating method, and grouting into the drilled holes to fill the cracks;
s2, carrying out confining pressure reinforcement on the circular transmission tower foundation by using a reinforcement device;
s3, after confining pressure reinforcement is completed, installing a reinforcement cage around the circular transmission tower foundation, and pouring concrete by relying on the reinforcement cage to form a protective shell on the outer side of the circular transmission tower foundation;
and S4, filling a connecting gap between the circular transmission tower foundation and a transmission tower foot plate, and eliminating the influence of uneven local voltage on the circular transmission tower foundation.
2. The treatment method for the cracking of the base of the round transmission tower according to claim 1, wherein S1 comprises the following steps:
s11, selecting at least two point positions around a crack of a circular transmission tower foundation to carry out oblique drilling, wherein the drilling needs to penetrate through the crack surface of the crack;
s12, temporarily plugging the drilled hole by using a grouting nozzle or a plugging plug;
s13, cleaning sundries and dust on the surface of the round transmission tower foundation;
s14, removing the plugging object on the drilled hole, and blowing dust in the drilled hole by using high-pressure gas;
and S15, injecting a filler into the drilled hole to fill the cracks of the circular transmission tower foundation.
3. The treatment method for the cracking of the base of the round transmission tower according to claim 1, wherein the S2 comprises the following steps:
s21, installing reinforcing devices layer by layer from the top of the circular transmission tower foundation downwards, surrounding the circular transmission tower foundation by the reinforcing devices, and applying confining pressure to the circular transmission tower foundation;
s22, excavating surface soil around the circular transmission tower foundation along the vertical extending direction of the cracks to expose the cracks covered by the surface soil;
s23, when the vertical length of the exposed crack is enough to install the reinforcing device, grouting and filling the newly exposed crack according to the S1, and installing the reinforcing device after filling;
and S24, continuing downward excavation, and repeating the steps S22 and S23 until the confining pressure reinforcement of the deepest part in the vertical direction of the crack is completed.
4. The method for treating the circular transmission tower foundation cracking as claimed in claim 3, wherein in step S23, when the reinforcing device is installed, a pit wall template is synchronously installed at a position, opposite to the reinforcing device, of the excavated soil pit wall.
5. The treatment method for the cracking of the circular transmission tower foundation according to claim 3, wherein in the step S24, the vertical confining pressure reinforcement range for the circular transmission tower foundation is from the top of the circular transmission tower foundation to the deepest position in the vertical direction of the crack, and then extends downwards by 150-300 mm.
6. The method for treating the cracking of the circular transmission tower foundation according to claim 1, wherein the steel reinforcement cage in the step S3 is used as a framework for pouring a concrete protective shell around the circular transmission tower foundation.
7. The treatment method for the cracking of the base of the round transmission tower according to claim 1, wherein the S4 comprises the following steps:
s41, penetrating a # -shaped steel wire into a connecting gap between a circular transmission tower foundation and a transmission tower foot plate;
s42, supporting a formwork around the connecting position of the tower foot plate and the circular transmission tower foundation to form a grouting space;
s43, injecting grouting materials into the grouting space to fill a connecting gap between the circular transmission tower foundation and a transmission tower foot plate;
s44, after the grouting material is solidified, pouring concrete above the solidified grouting material to form a protective cap;
s45, after the protective cap is solidified, the die is removed.
8. The treatment method for the foundation cracking of the round transmission tower according to claim 7, wherein the grouting material is a fluid high-strength non-shrinkage grouting material with a compressive strength grade of not less than 40 MPa.
9. A reinforcing device for circular transmission tower foundation cracking is characterized by being applied to the method for treating circular transmission tower foundation cracking according to any one of claims 1 to 8, and comprising the following steps: the hoop components are of arc structures, and at least two hoop components are spliced and assembled to form confining pressure on the circular transmission tower foundation.
10. The device of claim 9, wherein the hoop components comprise a shroud and risers, the risers are respectively arranged at two ends of the shroud, and the risers are connected with the risers of the adjacent hoop components through bolts.
CN202210967335.5A 2022-08-12 2022-08-12 Treatment method and reinforcement device for circular transmission tower foundation cracking Pending CN115573376A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210967335.5A CN115573376A (en) 2022-08-12 2022-08-12 Treatment method and reinforcement device for circular transmission tower foundation cracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210967335.5A CN115573376A (en) 2022-08-12 2022-08-12 Treatment method and reinforcement device for circular transmission tower foundation cracking

Publications (1)

Publication Number Publication Date
CN115573376A true CN115573376A (en) 2023-01-06

Family

ID=84580023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210967335.5A Pending CN115573376A (en) 2022-08-12 2022-08-12 Treatment method and reinforcement device for circular transmission tower foundation cracking

Country Status (1)

Country Link
CN (1) CN115573376A (en)

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174112A (en) * 2013-03-28 2013-06-26 葛洲坝集团试验检测有限公司 Grouting method of penetrability concrete cracks
US8726600B1 (en) * 2010-07-08 2014-05-20 Paul W. Schmitz Concrete crack inhibiting device
CN203654312U (en) * 2013-12-15 2014-06-18 河南省电力勘测设计院 Flexible template for pouring round protecting cap of electric transmission overhead line structure foundation bolt
CN203821939U (en) * 2013-12-30 2014-09-10 国家电网公司 Round tower foot plate for +/- 800kV ultra high voltage direct current line
CN204418205U (en) * 2015-01-15 2015-06-24 衡水新东方通讯设备有限公司 Iron tower foundation
CN104790424A (en) * 2015-04-17 2015-07-22 同济大学建筑设计研究院(集团)有限公司 Reinforcing system and reinforcing method of wind power generation tower foundation ring foundation
US9096985B1 (en) * 2006-09-21 2015-08-04 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
CN204728356U (en) * 2015-04-17 2015-10-28 同济大学建筑设计研究院(集团)有限公司 The hardened system of generation power foundation of wind power cyclic group plinth
CN105350565A (en) * 2015-12-07 2016-02-24 湖南皓诺工程有限公司 Wind power plant fan tower foundation repairing and reinforcing method
CN205329739U (en) * 2016-01-27 2016-06-22 中国能源建设集团湖南省电力设计院有限公司 Wind -powered electricity generation field aerogenerator tower section of thick bamboo basis reinforcing apparatus
CN205369329U (en) * 2015-12-07 2016-07-06 湖南皓诺工程有限公司 Reinforced structure is repaired on wind -powered electricity generation field fan pylon basis
CN106592660A (en) * 2016-12-21 2017-04-26 神华集团有限责任公司 Draught fan foundation restoration method
CN108487249A (en) * 2018-03-06 2018-09-04 中国电建集团华东勘测设计研究院有限公司 A kind of blower foundation reinforcement means
CN109680737A (en) * 2017-10-18 2019-04-26 中车株洲电力机车研究所有限公司 A kind of foundation of wind-driven generator unit drift correction construction method
CN110375947A (en) * 2019-07-05 2019-10-25 浙江大学 A kind of the field measurement device and test method of power transmission tower Shape Coefficient
CN111379669A (en) * 2020-03-24 2020-07-07 国电联合动力技术有限公司 Reinforcing device and reinforcing method for concrete table column of fan foundation
CN111424613A (en) * 2020-03-16 2020-07-17 中电建十一局工程有限公司 Method for treating through cracks of roller compacted concrete dam
CN112281927A (en) * 2020-11-25 2021-01-29 四川童燊防水工程有限公司 Construction method for treating leakage of independent foundation of frame column
CN112411605A (en) * 2020-11-30 2021-02-26 国网四川省电力公司电力科学研究院 Reinforcement reinforcing method and system for foundation anchor bolt of power transmission tower
CN113111451A (en) * 2021-03-18 2021-07-13 中国电力工程顾问集团西南电力设计院有限公司 Strip type calculation method for foot plate type boot plate of power transmission tower
CN113338365A (en) * 2021-06-25 2021-09-03 中国华能集团清洁能源技术研究院有限公司 Reinforced structure of onshore fan expanded foundation pipe pile and construction method
CN214272172U (en) * 2020-12-25 2021-09-24 三河风科能源科技有限公司 Wind power plant fan tower foundation repairing and reinforcing structure
US20220025605A1 (en) * 2020-07-22 2022-01-27 Zhejiang University High strength grouting method for single pile rock-socketed foundation of weakly weathered bed rock for offshare wind power

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9096985B1 (en) * 2006-09-21 2015-08-04 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
US8726600B1 (en) * 2010-07-08 2014-05-20 Paul W. Schmitz Concrete crack inhibiting device
CN103174112A (en) * 2013-03-28 2013-06-26 葛洲坝集团试验检测有限公司 Grouting method of penetrability concrete cracks
CN203654312U (en) * 2013-12-15 2014-06-18 河南省电力勘测设计院 Flexible template for pouring round protecting cap of electric transmission overhead line structure foundation bolt
CN203821939U (en) * 2013-12-30 2014-09-10 国家电网公司 Round tower foot plate for +/- 800kV ultra high voltage direct current line
CN204418205U (en) * 2015-01-15 2015-06-24 衡水新东方通讯设备有限公司 Iron tower foundation
CN104790424A (en) * 2015-04-17 2015-07-22 同济大学建筑设计研究院(集团)有限公司 Reinforcing system and reinforcing method of wind power generation tower foundation ring foundation
CN204728356U (en) * 2015-04-17 2015-10-28 同济大学建筑设计研究院(集团)有限公司 The hardened system of generation power foundation of wind power cyclic group plinth
CN205369329U (en) * 2015-12-07 2016-07-06 湖南皓诺工程有限公司 Reinforced structure is repaired on wind -powered electricity generation field fan pylon basis
CN105350565A (en) * 2015-12-07 2016-02-24 湖南皓诺工程有限公司 Wind power plant fan tower foundation repairing and reinforcing method
CN205329739U (en) * 2016-01-27 2016-06-22 中国能源建设集团湖南省电力设计院有限公司 Wind -powered electricity generation field aerogenerator tower section of thick bamboo basis reinforcing apparatus
CN106592660A (en) * 2016-12-21 2017-04-26 神华集团有限责任公司 Draught fan foundation restoration method
CN109680737A (en) * 2017-10-18 2019-04-26 中车株洲电力机车研究所有限公司 A kind of foundation of wind-driven generator unit drift correction construction method
CN108487249A (en) * 2018-03-06 2018-09-04 中国电建集团华东勘测设计研究院有限公司 A kind of blower foundation reinforcement means
CN110375947A (en) * 2019-07-05 2019-10-25 浙江大学 A kind of the field measurement device and test method of power transmission tower Shape Coefficient
CN111424613A (en) * 2020-03-16 2020-07-17 中电建十一局工程有限公司 Method for treating through cracks of roller compacted concrete dam
CN111379669A (en) * 2020-03-24 2020-07-07 国电联合动力技术有限公司 Reinforcing device and reinforcing method for concrete table column of fan foundation
US20220025605A1 (en) * 2020-07-22 2022-01-27 Zhejiang University High strength grouting method for single pile rock-socketed foundation of weakly weathered bed rock for offshare wind power
CN112281927A (en) * 2020-11-25 2021-01-29 四川童燊防水工程有限公司 Construction method for treating leakage of independent foundation of frame column
CN112411605A (en) * 2020-11-30 2021-02-26 国网四川省电力公司电力科学研究院 Reinforcement reinforcing method and system for foundation anchor bolt of power transmission tower
CN214272172U (en) * 2020-12-25 2021-09-24 三河风科能源科技有限公司 Wind power plant fan tower foundation repairing and reinforcing structure
CN113111451A (en) * 2021-03-18 2021-07-13 中国电力工程顾问集团西南电力设计院有限公司 Strip type calculation method for foot plate type boot plate of power transmission tower
CN113338365A (en) * 2021-06-25 2021-09-03 中国华能集团清洁能源技术研究院有限公司 Reinforced structure of onshore fan expanded foundation pipe pile and construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
RITA YI MAN LI ET. AL.: ""Ranking of Risks for Existing and New Building Works"", 《SUSTAINABILITY》, vol. 11, no. 10, 20 May 2019 (2019-05-20) *
陈加兴等: ""风机基础混凝土裂缝数值分析及加固方案研究"", 《河南科技》, vol. 40, no. 23, 15 August 2021 (2021-08-15) *

Similar Documents

Publication Publication Date Title
CA3082307C (en) Cementitious foundation cap with post-tensioned helical anchors and method for making the same
CN111764379B (en) Construction method and structure applied to reverse construction steel pipe pile
US20160201350A1 (en) Tower and method for assembling tower
CN107100192B (en) Local reinforcing device and method for foundation ring of wind generating set
KR100886922B1 (en) Footing reinforcing or structure recovering method
US10738436B1 (en) Tubular foundation for onshore wind turbine generators
KR100453108B1 (en) Eastablished building repairing or reinforcing system using reaction force by compression apparatus and the method using the same
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
JP4593577B2 (en) Pneumatic caisson and its construction method
JP5554176B2 (en) Method for reinforcing bearing capacity of track
CN115573376A (en) Treatment method and reinforcement device for circular transmission tower foundation cracking
CN110593258A (en) Existing building pile foundation steel sleeve pile reinforcing construction method and reinforcing structure
CN214940212U (en) Deep foundation pit supporting device
JP2977805B1 (en) Straightening method and straightening device for buildings with uneven settlement
CN115596031A (en) Reinforcing method for local fracturing of square concrete foundation of power transmission line
JP6345328B1 (en) Original position building method and original position structure
JPS6354093B2 (en)
US20200208612A1 (en) Bionic Root Foundation for Onshore Wind Turbine Generators
DK2677086T3 (en) Method for anchoring a structure to a seabed and underwater foundation
KR101816001B1 (en) Apparatus for supporting an augered pile and method thereof
RU2751107C1 (en) Method for dismantling a ground tubular anchor and a device for cutting its tubular rod
JP3353166B2 (en) Method of rebuilding building structure and basic structure used for it
KR200320447Y1 (en) Eastablished building repairing or reinforcing system using reaction force by compression apparatus
RU2807350C1 (en) Constructive and technological solution for foundation of intermediate support of high pile work type constructed in temporary enclosing structure
JP3536543B2 (en) Seismic isolation method for foundations of existing buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination