CN115405123A - Stadium wall bar planting construction device and construction method thereof - Google Patents

Stadium wall bar planting construction device and construction method thereof Download PDF

Info

Publication number
CN115405123A
CN115405123A CN202211010221.8A CN202211010221A CN115405123A CN 115405123 A CN115405123 A CN 115405123A CN 202211010221 A CN202211010221 A CN 202211010221A CN 115405123 A CN115405123 A CN 115405123A
Authority
CN
China
Prior art keywords
clearance
thick bamboo
connecting plate
mounting panel
sponge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211010221.8A
Other languages
Chinese (zh)
Other versions
CN115405123B (en
Inventor
陈鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Changtai Construction Co ltd
Original Assignee
Sichuan Changtai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Changtai Construction Co ltd filed Critical Sichuan Changtai Construction Co ltd
Priority to CN202211010221.8A priority Critical patent/CN115405123B/en
Publication of CN115405123A publication Critical patent/CN115405123A/en
Application granted granted Critical
Publication of CN115405123B publication Critical patent/CN115405123B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Cleaning In General (AREA)

Abstract

The utility model belongs to the technical field of the technique of the bar planting construction and specifically relates to a gymnasium wall body bar planting construction equipment and construction method thereof is related to, gymnasium wall body bar planting construction equipment, the on-line screen storage device comprises a base, be provided with the lifter on the base, be provided with the mounting panel on the lifter, it is provided with the connecting plate all to slide on the top of mounting panel and the bottom, it strikes the brill to slide to be provided with on the connecting plate at mounting panel top, it is provided with a clearance section of thick bamboo to rotate on the connecting plate of mounting panel bottom, a clearance section of thick bamboo is located strikes under the brill, a clearance section of thick bamboo all is on a parallel with the length direction who clears up a section of thick bamboo with the slip direction that strikes the brill, be provided with on the mounting panel and be used for ordering about the gliding drive assembly of two connecting plates respectively, be provided with the rotation piece that is used for rotating a clearance section of thick bamboo on the connecting plate of mounting panel bottom, be provided with the brush hair on clearance section of thick bamboo's the lateral wall. This application has the effect that alleviates workman intensity of labour.

Description

Stadium wall bar planting construction device and construction method thereof
Technical Field
The application relates to the technical field of bar planting construction, in particular to a bar planting construction device for a wall of a gymnasium and a construction method thereof.
Background
In the construction process of a gymnasium, other functional areas are usually required to be built on a built main wall body, at the moment, a shear wall, an upper structure span, a beam and a column lengthening by jacking, a house story-adding column-connecting and the like are required to be added, and bar planting operation is required on the existing wall body, wherein bar planting is a technology for simply, conveniently and effectively connecting and anchoring a concrete structure. The steel bar planting mainly comprises the processes of drilling, hole washing, glue injection, steel bar planting, maintenance and the like, so that the concrete structure poured later is connected and anchored with the existing wall.
In view of the above-mentioned related technologies, the inventors found that after drilling, the tendon hole needs to be manually cleaned, which results in high labor intensity of operators.
Disclosure of Invention
In order to reduce the labor intensity of workers, the application provides a gymnasium wall bar planting construction device and a construction method thereof.
First aspect, the application provides a gymnasium wall body bar planting construction equipment adopts following technical scheme:
the utility model provides a gymnasium wall body bar planting construction equipment, the on-line screen storage device comprises a base, be provided with the lifter on the base, be provided with the mounting panel on the lifter, it is provided with the connecting plate all to slide on the top of mounting panel and the bottom, it strikes the brill to slide on the connecting plate at mounting panel top to be provided with, it is provided with a clearance section of thick bamboo to rotate on the connecting plate of mounting panel bottom, the length direction of a clearance section of thick bamboo is parallel with the length direction who strikes the brill, a clearance section of thick bamboo all is parallel with the length direction of a clearance section of thick bamboo with the slip direction that strikes the brill, be provided with on the mounting panel and be used for ordering about the gliding drive assembly of two connecting plates respectively, be provided with the rotation piece that is used for rotating a clearance section of thick bamboo on the connecting plate of mounting panel bottom, be provided with the brush hair on the lateral wall of a clearance section of thick bamboo, the diameter of a clearance section of thick bamboo is less than the drill bit diameter that strikes the brill, brush hair and the inside wall butt in muscle hole.
By adopting the technical scheme, the device is moved to the mark position on the wall body, the mounting plate is moved to the required height, so that the drill bit of the impact drill is opposite to the mark point, the impact drill is started, the connecting plate at the top of the mounting plate is moved independently through the driving assembly, and the connecting plate drives the impact drill to move so as to drill the wall body; move out the percussion drill again, adjust the height of mounting panel, make a clearance section of thick bamboo just to the bar hole, through the connecting plate of drive assembly individual removal mounting panel bottom, move a clearance section of thick bamboo into the bar hole of planting, and rotate a clearance section of thick bamboo, reciprocal move a clearance section of thick bamboo into and shift out the bar hole of planting, take dust, disintegrating slag out, thereby realized getting and clearing up the brill in the bar hole, workman's intensity of labour has been reduced, and, for manual cleaning, the efficiency of drilling clearance has been improved, when drilling and clearance, need not the workman and scramble the upper portion of scaffold frame to the wall body, thereby further the efficiency of work has been improved.
Optionally, the driving assembly comprises a first lead screw rotatably arranged on the mounting plate, a chute is formed in the mounting plate, the chute penetrates through two sides of the mounting plate, the first lead screw is located in the chute, a sliding block is connected to the first lead screw in a threaded manner, the sliding block is connected in the chute in a sliding manner, the mounting plate is provided with a first motor used for driving the first lead screw to rotate, and a connecting piece used for being connected with the sliding block is arranged on the connecting plate.
Through adopting above-mentioned technical scheme, through the connecting piece, be connected to the slider with the connecting plate that needs removed on, the manual work starts first motor, first motor drives the lead screw and rotates, and the lead screw drives the slider and slides in the spout, and the slider drives the connecting plate of connecting and removes to two connecting plates about the solitary sliding mounting panel of demand, thereby realized respectively to the removal of a clearance section of thick bamboo and percussion drill, only need set up a motor and can drive respectively, the cost is reduced.
Optionally, the connecting piece is including setting up the grafting piece on the connecting plate, the grafting piece slides and wears to establish on the connecting plate, the inserting groove has all been seted up at the both ends of slider, the grafting piece is pegged graft in the inserting groove, set up on the connecting plate and be used for ordering about the gliding electric putter of grafting piece, electric putter's piston rod and grafting piece are connected.
By adopting the technical scheme, the first electric push rod drives the insertion blocks to be inserted into the insertion grooves, so that the connection between the connecting plates and the sliding blocks is realized, the different insertion blocks are manually controlled to be inserted into the corresponding insertion grooves, and the sliding of the two connecting plates is respectively driven.
Optionally, the rotating part is sleeved with a toothed ring on the cleaning barrel, a first gear is rotatably arranged on the connecting plate at the bottom of the mounting plate and meshed with the toothed ring, and a second motor for driving the first gear to rotate is arranged on the connecting plate at the bottom of the mounting plate.
Through adopting above-mentioned technical scheme, start the second motor, the second motor drives first gear revolve, and first gear drives the ring gear and rotates, and the ring gear drives a clearance section of thick bamboo and rotates to realized that a clearance section of thick bamboo rotates along the depth direction back-and-forth movement to the limit in the bar planting hole, thereby be favorable to taking out the downthehole dust of bar planting and disintegrating slag, improved the effect of clearance.
Optionally, a splendid attire section of thick bamboo is equipped with a splendid attire section of thick bamboo in the clearance section of thick bamboo internal rotation cover, a splendid attire section of thick bamboo sets up with a clearance section of thick bamboo coaxial line, the built-in clearance liquid that is equipped with of a splendid attire section of thick bamboo, the tip of a splendid attire section of thick bamboo is provided with the adapter sleeve, the tip of adapter sleeve flushes with the tip of a clearance section of thick bamboo, it is provided with the connecting rod to slide in the splendid attire section of thick bamboo, the connecting rod runs through a splendid attire section of thick bamboo and extends to in the adapter sleeve, be provided with two limiting plates, two in the limiting plate is located the adapter sleeve, two be provided with the clearance sponge between the limiting plate, the intercommunicating pore has been seted up to the one end that a splendid attire section of thick bamboo is close to the limiting plate, and clearance liquid flows from the intercommunicating pore and takes the clearance sponge, clearance sponge compression is worked as when the clearance sponge shifts out in the bar planting hole, clearance sponge inflation and bar hole lateral wall butt, be provided with being used for ordering about the gliding second electric putter on the connecting plate, second electric putter's piston rod is connected with the connecting rod.
Through adopting above-mentioned technical scheme, brush on the clearance section of thick bamboo will plant muscle hole clearance back, the stall clearance section of thick bamboo, it is downthehole that a clearance section of thick bamboo stops to plant the muscle, remove the connecting rod again, will clear up the sponge and remove a clearance section of thick bamboo, the inflation of clearance sponge, the lateral wall butt in clearance sponge and planting muscle hole, and it has the cleaning fluid to adsorb on the clearance sponge, the connecting plate of reciprocating motion mounting panel bottom, the connecting plate drives the clearance sponge and cleans the muscle hole, the inside clean up in muscle hole will be planted, further improvement the effect of clearance, so that the firm degree of planting the muscle is improved.
Optionally, the connecting rod is a hollow tube, the connecting rod penetrates through the limiting plate, the connecting rod is communicated with an external air source, and the limiting plate is rotatably provided with an opening and closing plate for opening and closing an outlet at the end of the connecting rod.
Through adopting above-mentioned technical scheme, the brush on a clearance section of thick bamboo will plant muscle hole clearance back, and a stall clearance section of thick bamboo, a clearance section of thick bamboo stops in planting the muscle hole, with outside air supply intercommunication connecting rod, blows off downthehole floating dust, through cleaning, blows, the cleaning fluid clean, three step furthest will plant the downthehole clean up of muscle to guarantee the steadiness of planting the muscle.
Optionally, the lifter includes dead lever and slide bar, the dead lever is fixed on the base, slide bar sliding connection is on the dead lever, the dead lever internal rotation is provided with the second lead screw, and the second lead screw sets up with the dead lever coaxial line, second lead screw thread bush is established on the slide bar, the cover is equipped with the second gear on the second lead screw, it is provided with the third gear to rotate on the base, third gear and second gear meshing, be provided with on the base and be used for ordering about third gear pivoted third motor.
Through adopting above-mentioned technical scheme, when the height of mounting panel was adjusted to needs, start the third motor, the third motor drives third gear revolve, and the third gear drives second gear revolve, and the second gear drives the second lead screw and rotates, and the second lead screw drives the slide bar and slides on the dead lever to realized the regulation to mounting panel pole height, so that to the drilling and the clearance in bar planting hole of co-altitude not.
Optionally, the fixed rod is provided with an inclined strut for supporting the fixed rod, and one end of the inclined strut is connected with the base.
Through adopting above-mentioned technical scheme, the diagonal brace has improved the support capacity to the dead lever to the condition that the dead lever rocked when punching has been reduced.
In a second aspect, the application provides a construction method for reinforcing bars in a wall of a gymnasium, which adopts the following technical scheme:
the construction device for planting the steel bars on the wall of the gymnasium also comprises a steel bar planting device and a steel bar fixing device;
s1: positioning elastic lines, staggering the positions of the original structural steel bars according to the positions and the number of the steel bars in the design drawing, and marking out the positions of the embedded steel bars;
s2: drilling, namely moving the device to a mark position on a wall body, moving the mounting plate to a required height to enable a drill bit of the impact drill to be opposite to the mark point, starting the impact drill, connecting a connecting plate at the top of the mounting plate to the sliding block, and then moving the connecting plate at the top of the mounting plate to drill the wall body;
s3: washing holes, moving out the impact drill, moving the height of the mounting plate to ensure that a cleaning cylinder is facing to tendon holes, separating a connecting plate at the top of the mounting plate from a sliding block, connecting the connecting plate at the bottom of the mounting plate to the sliding block, moving the cleaning cylinder into the tendon planting holes, rotating the cleaning cylinder, reciprocally moving the cleaning cylinder into and out of the tendon planting holes to take out dust and broken slag, then stopping rotating the cleaning cylinder, stopping the cleaning cylinder in the tendon planting holes, communicating an external air source with a connecting rod, blowing floating dust in the holes, moving the connecting rod again, moving a cleaning sponge out of the cleaning cylinder, reciprocally moving the connecting plate at the bottom of the mounting plate, and cleaning the inside of the tendon planting holes;
s4: injecting glue, namely injecting a group of bar planting glue into the bar planting holes, wherein the glue injection amount in the holes is 80% of the pore volume of the bar planting holes;
s5: planting bars, namely immediately planting the bars after the holes are filled with glue, immediately putting the bars subjected to rust removal treatment into the hole, slowly screwing the bars in one way, and not reversely rotating the bars midway until the bars stretch into the bottom of the holes;
s6: curing and maintaining, positioning through a preset template after the steel bar is implanted, curing the bar-planting glue for 50 hours at normal temperature, performing a drawing test after the curing is finished, and performing subsequent operation after the steel bar is qualified.
In summary, the present application includes at least one of the following beneficial technical effects:
1. moving the device to a mark position on a wall body, moving the mounting plate to a required height to enable a drill bit of the impact drill to be opposite to a mark point, starting the impact drill, independently moving a connecting plate at the top of the mounting plate through a driving assembly, and driving the impact drill to move through the connecting plate to drill a hole in the wall body; moving out the impact drill, adjusting the height of the mounting plate to enable the cleaning barrel to be aligned with the rebar holes, independently moving the connecting plate at the bottom of the mounting plate through the driving assembly, moving the cleaning barrel into the rebar holes, rotating the cleaning barrel, reciprocally moving the cleaning barrel into and out of the rebar holes, and taking out dust and broken slag, so that drilling and cleaning of the rebar holes are achieved, labor intensity of workers is reduced, drilling cleaning efficiency is improved compared with manual cleaning, and when drilling and cleaning are conducted, workers do not need to climb a scaffold to the upper portion of a wall, so that working efficiency is further improved;
2. the brush on a clearance section of thick bamboo will plant muscle hole clearance back, and a stall clearance section of thick bamboo, a clearance section of thick bamboo stop in planting the muscle hole, with outside air supply intercommunication connecting rod, blow off downthehole floating dust, through cleaning, blow, the cleaning of washing liquid, three step furthest will plant the downthehole clean up of muscle to guarantee the steadiness of planting the muscle.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is an exploded view of the connection plate and mounting plate of the embodiment of the present application.
Fig. 3 is a cross-sectional view of an embodiment of the present application.
Fig. 4 is an enlarged schematic view of a portion a of fig. 3.
Fig. 5 is a schematic structural view of the opening and closing plate of the present application.
Description of reference numerals: 1. a base; 2. a lifting rod; 201. a fixing rod; 202. a slide bar; 3. mounting a plate; 4. a connecting plate; 5. percussion drilling; 6. cleaning the cylinder; 7. brushing; 8. a first lead screw; 9. a chute; 10. a slider; 11. a first motor; 12. an insertion block; 13. inserting grooves; 14. a first electric push rod; 15. a toothed ring; 16. a first gear; 17. a second motor; 18. a containing cylinder; 19. connecting sleeves; 20. a connecting rod; 21. a limiting plate; 22. cleaning the sponge; 23. a second electric push rod; 24. an air hose; 25. a shutter plate; 26. a second lead screw; 27. a second gear; 28. a third gear; 29. a third motor; 30. a diagonal brace; 31. a T-shaped slot; 32. a T-shaped block; 33. a U-shaped plate; 34. mounting blocks; 35. a torsion spring.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses gymnasium wall body bar planting construction equipment. Referring to fig. 1 and 2, gymnasium wall body bar planting construction equipment includes base 1, be fixed with lifter 2 on the base 1, lifter 2's top welded fastening has mounting panel 3, equal sliding connection has connecting plate 4 on mounting panel 3's the top and the bottom, sliding connection has percussion drill 5 on the connecting plate 4 at mounting panel 3 top, percussion drill 5 bolt fastening is on connecting plate 4, percussion drill 5's drill bit extends outside connecting plate 4, rotating connection has a cleaning barrel 6 on the connecting plate 4 of mounting panel 3 bottom, cleaning barrel 6 is located percussion drill 5 under, cleaning barrel 6's length direction is parallel with percussion drill 5's length direction, cleaning barrel 6 all is parallel with cleaning barrel 6's length direction with percussion drill 5's sliding direction, be provided with on mounting panel 3 and be used for ordering about the gliding drive assembly of two connecting plates 4 respectively, be provided with the rotation piece that is used for rotating cleaning barrel 6 on the connecting plate 4 of mounting panel 3 bottom, integrated into one piece has brush hair 7 on cleaning barrel 6's the lateral wall, cleaning barrel 6's diameter is less than percussion drill 5 the diameter of muscle diameter, brush hair 7 plants the inside wall in the muscle hole with the drill bit butt. The universal wheel is installed to the bottom of base 1 to in the removal to base 1.
Referring to fig. 2 and 3, the driving assembly includes a first lead screw 8 rotatably connected to the mounting plate 3, a chute 9 has been opened on the mounting plate 3, the chute 9 runs through two sides of the mounting plate 3, the first lead screw 8 is located in the chute 9, a slider 10 is screwed on the first lead screw 8, the slider 10 is slidably connected to the chute 9, the mounting plate 3 is provided with a first motor 11 for driving the first lead screw 8 to rotate, an output shaft of the first motor 11 is connected with the first lead screw 8, a rotation axis of the first lead screw 8 is parallel to a sliding direction of the connecting plate 4, one side of the connecting plate 4 close to the mounting plate 3 is welded and fixed with two T-shaped blocks 32, two T-shaped grooves 31 have been opened on the mounting plate 3, the two T-shaped grooves 31 are in one-to-one correspondence with the two T-shaped blocks 32, the T-shaped blocks 32 are slidably connected to the T-shaped grooves 31, the two T-shaped grooves 31 are located at two sides of the chute 9, the sliding direction of the T-32 is parallel to the sliding direction of the connecting plate 4, and connecting pieces for connecting with the slider 10 are arranged on the two connecting plates 4.
Referring to fig. 2 and 3, the connecting piece is including connecting the grafting piece 12 on connecting plate 4, and grafting piece 12 slides and wears to establish on connecting plate 4, and inserting groove 13 has all been seted up at the both ends of slider 10, and grafting piece 12 is pegged graft in inserting groove 13, and fixed being used for ordering about the gliding electric putter 14 of grafting piece 12 on connecting plate 4, and first electric putter 14's piston rod is connected with grafting piece 12, and the connecting plate 4 of mounting panel 3 both sides sets up equally. When the plug block 12 is plugged into the plug groove 13, the plug block 12 is partially located in the connecting plate 4.
At the beginning, the connecting plate 4 is positioned at one end close to the first motor 11, the piston rod extends out through the first electric push rod 14, the inserting block 12 is inserted into the inserting groove 13, the connecting plate 4 to be moved is connected to the sliding block 10, the first motor 11 is started, the first motor 11 drives the first lead screw 8 to rotate, the first lead screw 8 drives the sliding block 10 to slide in the sliding groove 9, and the sliding block 10 drives the connected connecting plate 4 to move; when another connecting plate 4 needs to be moved, the original connecting plate 4 is moved back to the initial position, the plugging block 12 is separated from the plugging groove 13, and the plugging block 12 on the other connecting plate 4 is plugged into the plugging groove 13; thereby can be according to two upper and lower connecting plates 4 of the solitary sliding mounting panel 3 of demand to realized respectively to the removal of a cleaning barrel 6 and percussion drill 5, only need set up a motor and can drive respectively, the cost is reduced.
Referring to fig. 1 and 3, the lifting rod 2 includes a fixing rod 201 and a sliding rod 202, one end of the fixing rod 201 is welded and fixed on the base 1, the sliding rod 202 is slidably connected on the fixing rod 201, one end of the sliding rod 202, which is far away from the fixing rod 201, is welded and fixed with a U-shaped plate 33, an end portion of the U-shaped plate 33 is welded and fixed on the mounting plate 3, the connecting plate 4 provided with the cleaning barrel 6 is located in the U-shaped plate 33, the fixing rod 201 and the sliding rod 202 are both square rods to limit rotation of the sliding rod 202 in the fixing rod 201, an inclined strut 30 used for supporting the fixing rod 201 is welded and fixed on the fixing rod 201, one end of the inclined strut 30 is welded and fixed with the base 1, and the other end of the inclined strut is welded and fixed with the fixing rod 201, so as to improve stability of the fixing rod 201.
Referring to fig. 1 and 3, a second lead screw 26 is rotatably connected in a fixing rod 201, the second lead screw 26 and the fixing rod 201 are coaxially arranged, the second lead screw 26 is threadedly sleeved on a sliding rod 202, a second gear 27 is fixedly sleeved at the end of the second lead screw 26 close to the base 1, a third gear 28 is rotatably connected in the base 1, the third gear 28 is engaged with the second gear 27, a third motor 29 for driving the third gear 28 to rotate is installed on the base 1, and an output shaft of the third motor 29 is connected with the third gear 28.
When the height of the mounting plate 3 needs to be adjusted, the third motor 29 is started, the third motor 29 drives the third gear 28 to rotate, the third gear 28 drives the second gear 27 to rotate, the second gear 27 drives the second lead screw 26 to rotate, and the second lead screw 26 drives the sliding rod 202 to slide on the fixed rod 201, so that the adjustment of the height of the mounting plate 3 rod is realized.
Referring to fig. 3 and 4, the rotating member includes a toothed ring 15 sleeved on the cleaning cylinder 6, a mounting block 34 is welded and fixed on the connecting plate 4 at the bottom of the mounting plate 3, the cleaning cylinder 6 is located at one side of the mounting block 34, a first gear 16 is rotatably connected to the mounting plate 3, the first gear 16 is engaged with the toothed ring 15, and a second motor 17 for driving the first gear 16 to rotate is installed on the mounting block 34. The second motor 17 is started, the second motor 17 drives the first gear 16 to rotate, the first gear 16 drives the gear ring 15 to rotate, and the gear ring 15 drives the cleaning barrel 6 to rotate, so that the cleaning barrel 6 is rotated along the depth direction in the bar planting hole, and dust and slag in the bar planting hole can be taken out.
Referring to fig. 3 and 4, a containing cylinder 18 is rotatably sleeved in the cleaning cylinder 6, the containing cylinder 18 is fixedly arranged on the mounting block 34 in a penetrating manner, the containing cylinder (18) and the cleaning cylinder 6 are coaxially arranged, cleaning liquid is filled in the containing cylinder 18, the cleaning liquid is alcohol or acetone, and after being scrubbed, the bar-planting holes can be quickly dried to facilitate subsequent glue injection treatment because the alcohol and the acetone are volatile; the tip welded fastening of splendid attire section of thick bamboo (18) has adapter sleeve 19, and the tip of adapter sleeve 19 flushes with the tip of a clearance section of thick bamboo 6, all installs the bearing between the inside wall of a clearance section of thick bamboo 6 and adapter sleeve 19, between the inside wall of a clearance section of thick bamboo 6 and a splendid attire section of thick bamboo 18 for a clearance section of thick bamboo 6 can rotate the cover and establish on a splendid attire section of thick bamboo 18.
Referring to fig. 3 and 4, a connecting rod 20 is slidably connected in the containing barrel 18, the connecting rod 20 is coaxially arranged with the containing barrel (18), the sliding direction of the connecting rod 20 is parallel to the length direction of the cleaning barrel 6, the connecting rod 20 runs through two ends of the containing barrel 18, one end of the connecting rod 20 extends into the connecting sleeve 19, the other end extends out of the mounting block 34, two limiting plates 21 are welded and fixed on the connecting rod 20, the two limiting plates 21 are located in the connecting sleeve 19 and abut against the inner wall of the connecting sleeve 19, a cleaning sponge 22 is fixed between the two limiting plates 21, the cleaning sponge 22 is fixedly sleeved on the connecting rod 20, the end of the cleaning sponge 22 close to the limiting plates 21 is a circular table, the diameter of the cleaning sponge 22 close to the end of the limiting plates 21 is smaller than the middle diameter of the cleaning sponge 22 far away from the limiting plates 21, a communicating hole is formed in one end of the containing barrel 18 close to the limiting plates 21, cleaning liquid flows from the communicating hole to the cleaning sponge 22, the cleaning sponge 22 is compressed in the connecting sleeve 19, when the cleaning sponge 22 is moved out of the reinforcing hole, the side wall of the cleaning sponge 22 is abutted against the side wall of the reinforcing hole, a second sliding electric piston rod 23 for driving the sliding of the connecting rod 20 and the push rod 20.
A clearance section of thick bamboo 6 stops downthehole at the bar planting, movable connecting rod 20, it shifts out a clearance section of thick bamboo 6 to clear up sponge 22, clearance sponge 22 inflation, the lateral wall butt in clearance sponge 22 and bar planting hole, and it has the clearance liquid to adsorb on the clearance sponge 22, the connecting plate 4 of 3 bottoms of reciprocating motion mounting panel, connecting plate 4 drives clearance sponge 22 and cleans the bar planting hole, the inside clean up in bar planting hole will be planted, further improvement the effect of clearance, so that improve the firm degree of bar planting.
Referring to fig. 3, fig. 4 and fig. 5, connecting rod 20 is the hollow tube, connecting rod 20 runs through limiting plate 21, the end connection of connecting rod 20 has breather hose 24, breather hose 24 and outside air supply intercommunication, limiting plate 21 keeps away from breather hose 24's one end and rotates and be connected with the board 25 that opens and close that is used for opening and close the export of connecting rod 20 tip, connecting rod 20 welded fastening has the pivot, it connects in the pivot to open and close board 25 rotate, the cover is equipped with in the pivot and is used for driving about the board 25 that opens and close towards the pivoted torsional spring 35 of one side that is close to breather hose 24, the one end of torsional spring 35 is fixed on opening and closing board 25, the other end is fixed in the pivot. When the air source is not communicated, the torsion spring 35 drives the opening and closing plate 25 to rotate to close the end part of the connecting rod 20, and after the air source is communicated, the pressure of air is greater than the elasticity of the torsion spring 35 to push the opening and closing plate 25 to rotate, so that the outlet of the connecting rod 20 is opened.
The brush on a clearance section of thick bamboo 6 will plant muscle hole clearance back, and the stall clearance section of thick bamboo 6 stops in planting the muscle hole, with outside air supply intercommunication connecting rod 20, blows off downthehole floating dust, through cleaning, blows, the cleaning liquid clean, three step furthest will plant the downthehole clean up of muscle to guarantee the steadiness of planting the muscle.
The embodiment of the application provides a gymnasium wall bar planting construction equipment's implementation principle does: moving the device to a mark position on a wall body, moving the mounting plate 3 to a required height, enabling a drill bit of the impact drill 5 to be opposite to the mark point, starting the impact drill 5, independently moving a connecting plate 4 at the top of the mounting plate 3, and driving the impact drill 5 to move by the connecting plate 4 to drill the wall body; moving out the impact drill 5, adjusting the height of the mounting plate 3 to enable the cleaning cylinder 6 to be aligned with the rebar holes, independently moving the connecting plate 4 at the bottom of the mounting plate 3, moving the cleaning cylinder 6 into the rebar holes, rotating the cleaning cylinder 6, reciprocally moving the cleaning cylinder 6 into and out of the rebar holes, and taking out dust and broken slag; after the brush on the cleaning barrel 6 cleans the bar planting holes, the cleaning barrel 6 stops rotating, the cleaning barrel 6 stays in the bar planting holes, an external air source is communicated with the connecting rod 20, and floating dust in the holes is blown out; remove connecting rod 20 again, shift out clearance sponge 22 and clear up a section of thick bamboo 6, clearance sponge 22 inflation, the lateral wall butt in clearance sponge 22 and bar planting hole to the absorption has the cleaning fluid on the clearance sponge 22, and connecting plate 4 of 3 bottoms of reciprocating motion mounting panel, connecting plate 4 drive clearance sponge 22 clean the bar planting hole, thereby realized getting and clearing up the brill in bar planting hole.
The embodiment of the application discloses a construction method for planting bars on a wall of a gymnasium, and with reference to fig. 1, the construction method for planting bars on the wall of the gymnasium uses a construction device for planting bars on the wall of the gymnasium, and further comprises the following steps;
s1: positioning elastic lines, staggering the positions of the original structural steel bars according to the positions and the number of the steel bars in the design drawing, and marking out the positions of the embedded steel bars;
s2: drilling, namely moving the device to a mark position on a wall body, moving the mounting plate 3 to a required height to enable a drill bit of the impact drill 5 to be opposite to the mark point, starting the impact drill 5, connecting a connecting plate 4 at the top of the mounting plate 3 to a sliding block 10, and then moving the connecting plate 4 at the top of the mounting plate 3 to drill the wall body;
s3: washing holes, moving out the impact drill 5, moving the height of the mounting plate 3 to enable the cleaning cylinder 6 to be aligned with tendon holes, separating the connecting plate 4 at the top of the mounting plate 3 from the sliding block 10, connecting the connecting plate 4 at the bottom of the mounting plate 3 to the sliding block 10, moving the cleaning cylinder 6 into the tendon holes, rotating the cleaning cylinder 6, reciprocally moving the cleaning cylinder 6 into and out of the tendon holes to take out dust and slag, then stopping rotating the cleaning cylinder 6, enabling the cleaning cylinder 6 to stay in the tendon holes, communicating an external air source with the connecting rod 20, blowing out floating dust in the holes, further moving the connecting rod 20, moving the cleaning sponge 22 out of the cleaning cylinder 6, reciprocally moving the connecting plate 4 at the bottom of the mounting plate 3, driving the cleaning sponge 22 to scrub the tendon holes and cleaning the inside of the tendon holes;
s4: injecting glue, namely after the bar planting holes are dried, injecting a group of bar planting glue into the bar planting holes, wherein the glue injection amount in the holes is 80% of the pore volume of the bar planting holes, extending an injection nozzle of an injector into the bottoms of the bar planting holes, and slowly injecting the bar planting glue to discharge air in the bar planting holes;
s5: planting bars, namely immediately planting the bars after filling glue into the holes, immediately putting the bars subjected to rust removal into the hole opening, slowly screwing in one way, and not reversely rotating halfway until the bars extend into the bottom of the holes;
s6: curing and maintaining, after the steel bar is implanted, positioning through a preset template, curing the bar-planting glue for 50 hours at normal temperature, performing a drawing test after the curing is finished, and performing subsequent operation after the inspection is qualified.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a gymnasium wall body bar planting construction equipment which characterized in that: including base (1), be provided with lifter (2) on base (1), be provided with mounting panel (3) on lifter (2), it is provided with connecting plate (4) all to slide on the top of mounting panel (3) and the bottom, it bores (5) to slide on connecting plate (4) at mounting panel (3) top, it is provided with a clearance section of thick bamboo (6) to rotate on connecting plate (4) of mounting panel (3) bottom, clearance section of thick bamboo (6) are located to strike under boring (5), the length direction of a clearance section of thick bamboo (6) is parallel with the length direction who strikes and bore (5), the sliding direction that clearance section of thick bamboo (6) and strike and bore (5) all is on a parallel with the length direction of a clearance section of thick bamboo (6), be provided with on mounting panel (3) and be used for ordering about gliding drive assembly of two connecting plates (4) respectively, be provided with the inside wall (4) that are used for rotating clearance section of thick bamboo (6) on connecting plate (3) bottom and rotate the rotation section of a clearance section of thick bamboo (6), be provided with brush hair (7) on the lateral wall of a clearance section of thick bamboo (6), the diameter of a clearance section of thick bamboo (6) is less than the diameter of impact planting hole (7) of drill bit (5), the diameter of drill bit (7) is less than the butt of planting.
2. The apparatus of claim 1, wherein: drive assembly sets up first lead screw (8) on mounting panel (3) including rotating, spout (9) have been seted up on mounting panel (3), spout (9) run through the both sides of mounting panel (3), first lead screw (8) are located spout (9), threaded connection has slider (10) on first lead screw (8), slider (10) sliding connection is in spout (9), mounting panel (3) are provided with and are used for ordering about first lead screw (8) pivoted first motor (11), two all be provided with on connecting plate (4) and be used for the connecting piece be connected with slider (10).
3. The apparatus of claim 2, wherein: the connecting piece is including setting up plug block (12) on connecting plate (4), plug block (12) slide and wear to establish on connecting plate (4), inserting groove (13) have all been seted up at the both ends of slider (10), plug block (12) are pegged graft in inserting groove (13), set up on connecting plate (4) and be used for ordering about the gliding electric putter (14) of plug block (12), the piston rod of first electric putter (14) is connected with plug block (12).
4. The apparatus of claim 1, wherein: rotate the piece and establish ring gear (15) on a clearance section of thick bamboo (6) including the cover, it is provided with first gear (16) to rotate on connecting plate (4) of mounting panel (3) bottom, first gear (16) and ring gear (15) meshing, be provided with on connecting plate (4) of mounting panel (3) bottom and be used for ordering about first gear (16) pivoted second motor (17).
5. The apparatus of claim 4, wherein: the utility model discloses a cleaning device, including a cleaning barrel (6), a splendid attire section of thick bamboo (18) is equipped with containing barrel (18) to the internal rotation cover of cleaning barrel (6), containing barrel (18) is built-in to be equipped with the clearance liquid, the tip of containing barrel (18) is provided with adapter sleeve (19), the tip of adapter sleeve (19) flushes with the tip of a cleaning barrel (6), it is provided with connecting rod (20) to slide in containing barrel (18), connecting rod (20) and a containing barrel (18) coaxial line set up, the slip direction of connecting rod (20) is on a parallel with the length direction of a cleaning barrel (6), connecting rod (20) run through containing barrel (18) and extend to adapter sleeve (19) in, be provided with two limiting plates (21) on connecting rod (20), two limiting plate (21) are located adapter sleeve (19), two be provided with clearance sponge (22) between limiting plate (21), containing barrel (18) is close to the one end of limiting plate (21) and has seted up the intercommunicating pore, clearance liquid is taken from the clearance in adapter sleeve (22), clearance hole (22) compression clearance sponge (22) is moved out when sponge (22) the sponge side expansion joint bar (22), sponge (22) is provided with the sponge (22) the sponge side expansion joint bar (22), the sponge) the sponge is used for the sponge (22) the clearance hole (22) the clearance is provided with the sponge side to the clearance connection plate (22) the sponge side to move out the sponge (22) the clearance wall (22), the piston rod of the second electric push rod (23) is connected with the connecting rod (20).
6. The apparatus of claim 5, wherein: the connecting rod (20) is a hollow tube, the connecting rod (20) penetrates through the limiting plate (21), the connecting rod (20) is communicated with an external air source, and the limiting plate (21) is provided with an opening and closing plate (25) which is used for opening and closing an outlet at the end part of the connecting rod (20) in a rotating mode.
7. The apparatus of claim 1, wherein: lifter (2) include dead lever (201) and slide bar (202), dead lever (201) are fixed on base (1), slide bar (202) sliding connection is on dead lever (201), dead lever (201) internal rotation is provided with second lead screw (26), and second lead screw (26) and dead lever (201) coaxial line set up, second lead screw (26) threaded sleeve is established on slide bar (202), the cover is equipped with second gear (27) on second lead screw (26), it is provided with third gear (28) to rotate on base (1), third gear (28) and second gear (27) meshing, be provided with on base (1) and be used for ordering about third gear (28) pivoted third motor (29).
8. The apparatus of claim 7, wherein: an inclined supporting rod (30) used for supporting the fixing rod (201) is arranged on the fixing rod (201), and one end of the inclined supporting rod (30) is connected with the base (1).
9. A construction method for planting bars on walls of a gymnasium is characterized by comprising the following steps: the use of the apparatus for the construction of the tendons in the wall of a gymnasium according to any one of claims 1 to 8, further comprising;
s1: positioning elastic lines, staggering the positions of the original structural steel bars according to the positions and the number of the steel bars in the design drawing, and marking out the positions of the embedded steel bars;
s2: drilling, namely moving the device to a mark position on a wall body, moving the mounting plate (3) to a required height, enabling a drill bit of the impact drill (5) to be over against a mark point, starting the impact drill (5), connecting the connecting plate (4) at the top of the mounting plate (3) to the sliding block (10), and then moving the connecting plate (4) at the top of the mounting plate (3) to drill the wall body;
s3: washing holes, moving out the impact drill (5), adjusting the height of the mounting plate (3) to enable the cleaning cylinder (6) to be aligned with the tendon holes, separating the connecting plate (4) at the top of the mounting plate (3) from the slider (10), connecting the connecting plate (4) at the bottom of the mounting plate (3) to the slider (10), moving the cleaning cylinder (6) into the tendon holes, rotating the cleaning cylinder (6), reciprocally moving the cleaning cylinder (6) into and out of the tendon holes, taking out dust and crushed slag, then stopping rotating the cleaning cylinder (6), enabling the cleaning cylinder (6) to stay in the tendon holes, communicating an external air source with the connecting rod (20), blowing out floating dust in the holes, then moving the connecting rod (20), moving the cleaning sponge (22) out of the cleaning cylinder (6), reciprocally moving the connecting plate (4) at the bottom of the mounting plate (3), and cleaning the interiors of the tendon holes;
s4: injecting glue, namely injecting a group of bar planting glue into the bar planting holes, wherein the glue injection amount in the bar planting holes is 80% of the pore volume of the bar planting holes;
s5: planting bars, namely immediately planting the bars after filling glue into the holes, immediately putting the bars subjected to rust removal into the hole opening, slowly screwing in one way, and not reversely rotating halfway until the bars extend into the bottom of the holes;
s6: curing and maintaining, positioning through a preset template after the steel bar is implanted, curing the bar-planting glue for 50 hours at normal temperature, performing a drawing test after the curing is finished, and performing subsequent operation after the steel bar is qualified.
CN202211010221.8A 2022-08-23 2022-08-23 Gymnasium wall bar planting construction device and construction method thereof Active CN115405123B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211010221.8A CN115405123B (en) 2022-08-23 2022-08-23 Gymnasium wall bar planting construction device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211010221.8A CN115405123B (en) 2022-08-23 2022-08-23 Gymnasium wall bar planting construction device and construction method thereof

Publications (2)

Publication Number Publication Date
CN115405123A true CN115405123A (en) 2022-11-29
CN115405123B CN115405123B (en) 2023-12-08

Family

ID=84161023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211010221.8A Active CN115405123B (en) 2022-08-23 2022-08-23 Gymnasium wall bar planting construction device and construction method thereof

Country Status (1)

Country Link
CN (1) CN115405123B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU490515A1 (en) * 1974-03-05 1975-11-05 Украинский Научно-Исследовательский Институт Спиртовой И Ликерно-Водочной Промышленности Part cleaning device
CN102486049A (en) * 2010-12-06 2012-06-06 上海伙隆实业有限公司 Filler wall masonry tie bar planting method
CN104612094A (en) * 2015-02-12 2015-05-13 嵊州德庆机械有限公司 Universal wheel borne bridge gas residue clearing device and use method thereof
JP2016128143A (en) * 2015-01-09 2016-07-14 株式会社安藤・間 Intra-hole cleaning roughening device
US9505039B1 (en) * 2014-08-11 2016-11-29 Gunnar Keith Green Tool for expanding a bore swab
CN207823537U (en) * 2017-12-23 2018-09-07 河南省康源生物工程技术有限公司 A kind of cleaning brush and the integrated medical glass test tube cleaning equipment of cleaning solution
CN209772845U (en) * 2019-03-19 2019-12-13 深圳市瑞辰易为科技有限公司 IGBT circuit board dust collector
CN210160113U (en) * 2019-07-12 2020-03-20 刘雨欣 Novel narrow-mouth bottle cleaning device
CN210248908U (en) * 2019-07-18 2020-04-07 安徽科技学院 Retractable test-tube brush is used in laboratory
CN111042007A (en) * 2019-12-10 2020-04-21 汪又菊 Planting rib anchoring method
CN111250447A (en) * 2020-01-15 2020-06-09 张利红 Sintering furnace belt cleaning device for silicon wafer processing
CN214644870U (en) * 2021-05-08 2021-11-09 四川清凤建设工程有限公司 Wall body drilling equipment for housing construction
CN113829515A (en) * 2020-06-08 2021-12-24 四川省第十五建筑有限公司 Wall drilling and reinforcing construction method
CN215319706U (en) * 2021-07-26 2021-12-28 福建省泉一建设发展有限公司 Building structure bar planting device
CN215443245U (en) * 2021-04-02 2022-01-07 中能雨稷(辽宁)建设工程有限公司 Building crack repairing device
CN217232213U (en) * 2022-04-27 2022-08-19 王萌 Drainage pipeline cleaning device

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU490515A1 (en) * 1974-03-05 1975-11-05 Украинский Научно-Исследовательский Институт Спиртовой И Ликерно-Водочной Промышленности Part cleaning device
CN102486049A (en) * 2010-12-06 2012-06-06 上海伙隆实业有限公司 Filler wall masonry tie bar planting method
US9505039B1 (en) * 2014-08-11 2016-11-29 Gunnar Keith Green Tool for expanding a bore swab
JP2016128143A (en) * 2015-01-09 2016-07-14 株式会社安藤・間 Intra-hole cleaning roughening device
CN104612094A (en) * 2015-02-12 2015-05-13 嵊州德庆机械有限公司 Universal wheel borne bridge gas residue clearing device and use method thereof
CN207823537U (en) * 2017-12-23 2018-09-07 河南省康源生物工程技术有限公司 A kind of cleaning brush and the integrated medical glass test tube cleaning equipment of cleaning solution
CN209772845U (en) * 2019-03-19 2019-12-13 深圳市瑞辰易为科技有限公司 IGBT circuit board dust collector
CN210160113U (en) * 2019-07-12 2020-03-20 刘雨欣 Novel narrow-mouth bottle cleaning device
CN210248908U (en) * 2019-07-18 2020-04-07 安徽科技学院 Retractable test-tube brush is used in laboratory
CN111042007A (en) * 2019-12-10 2020-04-21 汪又菊 Planting rib anchoring method
CN111250447A (en) * 2020-01-15 2020-06-09 张利红 Sintering furnace belt cleaning device for silicon wafer processing
CN113829515A (en) * 2020-06-08 2021-12-24 四川省第十五建筑有限公司 Wall drilling and reinforcing construction method
CN215443245U (en) * 2021-04-02 2022-01-07 中能雨稷(辽宁)建设工程有限公司 Building crack repairing device
CN214644870U (en) * 2021-05-08 2021-11-09 四川清凤建设工程有限公司 Wall body drilling equipment for housing construction
CN215319706U (en) * 2021-07-26 2021-12-28 福建省泉一建设发展有限公司 Building structure bar planting device
CN217232213U (en) * 2022-04-27 2022-08-19 王萌 Drainage pipeline cleaning device

Also Published As

Publication number Publication date
CN115405123B (en) 2023-12-08

Similar Documents

Publication Publication Date Title
CN108505937B (en) Drilling equipment for construction
CN206028111U (en) Quick sieving mechanism of iron nail for building decoration
CN219262280U (en) Drilling device for earth and stone side construction
CN112692930B (en) Drilling equipment is used in panel processing
CN111021681A (en) Wall plastering machine and using method
CN206011463U (en) A kind of marble drilling equipment for building
CN115405123A (en) Stadium wall bar planting construction device and construction method thereof
CN209273683U (en) Waste cleaning device after a kind of cutting of semi-finished product steam-pressing aero-concrete
CN113790022A (en) Drilling machine for highway construction
CN108526701A (en) One kind having automatic cleaning function laser marking machine
DE3011263A1 (en) MACHINE FOR DRILLING IN STONES
CN209597712U (en) A kind of telescopic down-the-hold drill bit cleaning device
CN115559186A (en) Cleaning device for repairing crack and use method thereof
CN110747841A (en) Ramming device for simulating urban wall ancient tamping process and using method thereof
CN215368887U (en) Coating wall prosthetic devices
CN111366400A (en) Manual-automatic geological detection sampling device
CN109647805A (en) A kind of wrench socket surface rapid cleaning device
CN209406893U (en) A kind of Automobile shaft cleaning device
CN221168713U (en) Civil construction template cleaning device
CN219359867U (en) Concrete drilling device
CN216299652U (en) Prefabricated component's mould platform scavenging machine
CN221194953U (en) Drilling device for geotechnical engineering investigation
CN111270834B (en) Indoor wall bottom whitewashes device
CN209243399U (en) A kind of cleaning device of overflow dye vat auxiliary tank
CN113477445B (en) Hydraulic composite well pipe repairing device for constructional engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant