CN115198998A - Fast assembling method for fast assembling elevator shaft - Google Patents

Fast assembling method for fast assembling elevator shaft Download PDF

Info

Publication number
CN115198998A
CN115198998A CN202210844000.4A CN202210844000A CN115198998A CN 115198998 A CN115198998 A CN 115198998A CN 202210844000 A CN202210844000 A CN 202210844000A CN 115198998 A CN115198998 A CN 115198998A
Authority
CN
China
Prior art keywords
section
waterproof cover
decorative layer
framework
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210844000.4A
Other languages
Chinese (zh)
Inventor
彭晖
毛先金
李生惠
杨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schmidt Elevator Co ltd
Original Assignee
Schmidt Elevator Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schmidt Elevator Co ltd filed Critical Schmidt Elevator Co ltd
Priority to CN202210844000.4A priority Critical patent/CN115198998A/en
Publication of CN115198998A publication Critical patent/CN115198998A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a fast-assembling method for a fast-assembling elevator shaft, which comprises the following steps: s1, installation before delivery: s11, production buckler, two section at least skeletons and two section at least decorative layers, skeleton top surface form and supply to participate in the jack of inserting, and the skeleton bottom is extended and is formed with and participates in, participates in and includes: the guide section is fixed with the insertion section, and the guide section is positioned below the insertion section; s12, mounting the decorative layer on the framework; s13, except for the lowermost waterproof cover, the bottom end of each waterproof cover is provided with the waterproof cover, and the waterproof cover corresponding to each section of framework is positioned above the guide section. S2, assembling the fast-assembling elevator shaft: s21, setting up an installation foundation on the ground; s22, hanging and conveying the lowest framework and the decorative layer, and positioning and installing the lowest framework and the decorative layer on the installation basis. This fast-assembling elevartor shaft mosaic structure solves among the prior art and need carry out the field assembly to the clearance between two adjacent decorative layers and lead to the problem that operating time is long.

Description

Fast assembling method for fast assembling elevator shaft
Technical Field
The invention relates to elevator shaft installation, in particular to a quick installation method of an elevator shaft.
Background
Along with the development of society, the demand of installing the elevartor shaft additional outside building is bigger and bigger, because how to improve the efficiency of installing the elevartor shaft additional, reduce the interference to the user, is the problem that must solve.
In order to solve the above problem, there is provided an assembled elevator hoistway including: at least two sections skeletons, the plug-in type is connected between two adjacent skeletons, specifically, each skeleton below all extends and is formed with the guide block, and each skeleton all is formed with and supplies guide block male jack to realized the in-process direction of hoist and mount and aimed at.
Although the above-mentioned structure can realize assembling the elevator shaft, still exist the shortcoming be: because the decorative layer is installed outside the framework, a large gap is formed between every two adjacent decorative layers after splicing, the adjacent decorative layers need to be decorated on site, and the assembling time is prolonged.
Disclosure of Invention
The invention provides a splicing structure of a fast-assembling elevator shaft, which solves the problem of long operation time caused by the fact that a gap between two adjacent decorative layers needs to be assembled on site in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention discloses a fast-assembling method for a fast-assembling elevator shaft, which comprises the following steps: s1, installation before delivery: s11, production buckler, two section at least skeletons and two section at least decorative layers, skeleton top surface form and supply to participate in the jack of inserting, and the skeleton bottom is extended and is formed with and participates in, participates in and includes: the guide section is fixed with the insertion section, and the guide section is positioned below the insertion section; s12, mounting the decorative layer on the framework; s13, except for the lowermost waterproof cover, the bottom end of each waterproof cover is provided with the waterproof cover, and the waterproof cover corresponding to each section of framework is positioned above the guide section. S2, assembling the fast-assembling elevator shaft: s21, setting up an installation foundation on the ground; s22, hanging and conveying the lowermost framework and the decorative layer on the mounting basis, and positioning and mounting the lowermost framework and the decorative layer; and S23, sequentially hoisting the upper frameworks and the decorative layer, so that the waterproof cover on the upper decorative layer surrounds the waterproof cover below until all the upper frameworks and the decorative layer are hoisted.
Preferably, the step S23 of hoisting the upper skeleton and the decoration layer includes the following steps: s231, hanging the upper framework and the decoration layer; s232, conveying the suspended upper framework and the suspended decorative layer to positions aligned with the lower framework and the suspended decorative layer, wherein the pins are aligned with the jacks; and S233, lowering the suspended upper framework and the decorative layer, so that the guide section is inserted into the insertion hole first, and after the guide section is completely inserted into the insertion hole, the waterproof cover begins to be positioned outside the lower decorative layer, and finally the lower framework supports the lower framework.
Preferably, after step S12 is performed, a slot is formed between the bottom end of the decoration layer and the frame.
Preferably, the waterproof cover includes: installation section, toper section and extension section, the installation section inserts to the slot in, and the installation section below is connected with the extension section through the toper section, and the installation section is connected with the top buckler and the extension section encircles outside the buckler of below in two adjacent bucklers.
Preferably, the step S13 of installing a waterproof cover at the bottom end of each section of waterproof cover comprises the following steps: s131, inserting the installation section of the waterproof cover into the slot; and S132, connecting the mounting section of the waterproof cover with the bottom edge of the decorative layer by using a screw.
Compared with the prior art, the invention has the following beneficial effects:
be located the guide section top through setting up the buckler, skeleton top surface and decorative layer top surface are on a plane, jack outlying plane is also the skeleton top surface so, when hanging in midair the top skeleton, the decorative layer and put the water cover in, although there is certain swing, but all swing slightly, the guide section is frustum type structure, the guide section can insert easily to the jack in, finally after the guide section inserts the jack completely, the buckler just contacts with the decorative layer in the below, can avoid the guide section direction to lead to the buckler to warp with the decorative layer after colliding with each other of below when suspended in top skeleton and top decorative layer like this, because the buckler still does not reach the decorative layer in the guide section direction location, consequently can not make the buckler warp, the pleasing to the eye of buckler appearance has been guaranteed, also guarantee that the buckler can not damage because of warping.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
Fig. 1 is a schematic structural view of a fast-assembling elevator shaft;
FIG. 2 is an enlarged view taken at A in FIG. 1;
FIG. 3 is a schematic view of a section of framework, a decorative layer and a waterproof cover;
FIG. 4 is a front view of a section of the frame, the decorative layer, and the waterproof cover;
FIG. 5 is an enlarged view at B in FIG. 4;
fig. 6 is a schematic view of the structure at the waterproof case.
Reference numerals: the waterproof structure comprises a framework 1, a decorative layer 2, a slot 20, a waterproof cover 3, an insertion section 31, a tapered section 32, an extension section 33, a pin 4, a guide section 41 and an insertion section 42.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the functions of the invention clearer and easier to understand, the invention is further explained by combining the drawings and the detailed implementation mode:
as shown in fig. 1 to 6, the invention discloses a fast-assembling method for a fast-assembling elevator shaft, which comprises the following steps: s1, installation before delivery: s11, production buckler 3, two section at least skeletons 1 and two section at least decorative layers 2, 1 top surface of skeleton forms and supplies to participate in 4 male jacks, and 1 bottom extension of skeleton is formed with participates in 4, participates in 4 and includes: a guiding section 41 and an insertion section 4231, wherein the guiding section 41 is fixed with the insertion section 4231, and the guiding section 41 is positioned below the insertion section 4231; s12, mounting the decoration layer 2 on the framework 1; s13, except for the lowermost waterproof cover 3, the waterproof cover 3 is installed at the bottom end of each waterproof cover 3, and the corresponding waterproof cover 3 in each section of framework 1 is located above the guide section 41. S2, assembling the fast-assembling elevator shaft: s21, setting up an installation foundation on the ground; s22, hanging and conveying the bottommost framework 1 and the decoration layer 2 on the mounting basis, and positioning and mounting the bottommost framework 1 and the decoration layer 2; and S23, sequentially hoisting the upper section of framework 1 and the upper section of decorative layer 2, so that the waterproof cover 3 on the upper decorative layer 2 surrounds the lower waterproof cover 3 until all the upper section of framework 1 and the upper section of decorative layer 2 are hoisted.
Each section of the framework 1 and the decoration layer 2 above the upper part are hoisted in the step S23, and the method comprises the following steps: s231, hanging the upper framework 1 and the decoration layer 2; s232, conveying the suspended upper framework 1 and the suspended decorative layer 2 to positions aligned with the lower framework 1 and the suspended decorative layer 2, wherein the pins 4 are aligned with the jacks; and S233, lowering the suspended upper framework 1 and the decoration layer 2, so that the guide section 41 is inserted into the insertion hole first, and after the guide section 41 is completely inserted into the insertion hole, the waterproof cover 3 is positioned outside the lower decoration layer 2, and finally the lower framework 1 supports the lower framework 1. In the process, the guide section 41 is completely inserted into the insertion hole, and then the upper waterproof cover 3 is sleeved outside the lower decorative layer 2, so that the phenomenon that the upper waterproof cover 3 collides with the lower decorative layer 2 in the moving process of the guide section 41 guiding the upper framework 1, the decorative layer 2 and the waterproof cover 3 is avoided, and the quality of the waterproof cover 3 is protected.
After the step S12, the slot 20 is formed between the bottom end of the decoration layer 2 and the frame 1. An installation foundation is provided for the installation of the waterproof cover 3, and the decorative layer 2 is positioned above the waterproof cover 3 at the joint of the waterproof cover 3.
The waterproof cover 3 includes: installation section, toper section 32 and extension 33, the installation section inserts to slot 20 in, and the installation section below is connected with extension 33 through toper section 32, and the installation section is connected with top buckler 3 and extension 33 encircles outside below buckler 3 in adjacent two bucklers 3. A certain distance between the extension 33 to the underlying decor layer 2 is achieved.
The step S13 of installing the waterproof cover 3 at the bottom end of each section of waterproof cover 3 comprises the following steps: s131, inserting the installation section of the waterproof cover 3 into the slot 20; and S132, connecting the installation section of the waterproof cover 3 with the bottom edge of the decorative layer 2 by using screws. The installation of the waterproof cover 3 and the decorative layer 2 is realized.
After step S2 is executed, step S3 needs to be executed, and step S3 is: glue is applied between the extension 33 of the waterproof cover 3 and the decorative layer 2. The abnormal sound caused by the gap between the extension section 33 of the waterproof cover 3 and the decorative layer 2 is avoided.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that various changes and modifications may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (5)

1. A method for quickly assembling an elevator shaft is characterized by comprising the following steps:
s1, installation before delivery:
s11, production buckler, two section at least skeletons and two section at least decorative layers, skeleton top surface form and supply to participate in the jack of inserting, and the skeleton bottom is extended and is formed with and participates in, participates in and includes: the guide section is fixed with the insertion section, and the guide section is positioned below the insertion section;
s12, mounting the decorative layer on the framework;
s13, except for the lowest waterproof cover, installing a waterproof cover at the bottom end of each waterproof cover, wherein the waterproof cover corresponding to each section of framework is positioned above the guide section;
s2, assembling the fast-assembling elevator shaft:
s21, setting up an installation foundation on the ground;
s22, hanging and conveying the lowermost framework and the decorative layer on the mounting basis, and positioning and mounting the lowermost framework and the decorative layer;
and S23, sequentially hoisting the upper frameworks and the decorative layers, so that the waterproof cover on the upper decorative layer is surrounded outside the lower waterproof cover until all the upper frameworks and the decorative layers are hoisted.
2. The fast-assembling method for the elevator shaft as claimed in claim 1, wherein the step S23 of hoisting the upper skeletons and the decorative layer comprises the steps of:
s231, hanging the upper framework and the decoration layer;
s232, conveying the suspended upper framework and the suspended decorative layer to positions aligned with the lower framework and the suspended decorative layer, wherein the pins are aligned with the jacks;
and S233, lowering the suspended upper framework and the decorative layer, so that the guide section is inserted into the insertion hole first, and after the guide section is completely inserted into the insertion hole, the waterproof cover begins to be positioned outside the lower decorative layer, and finally the lower framework supports the lower framework.
3. The method as claimed in claim 1 or 2, wherein after step S12 is performed, a slot is formed between the bottom end of the decorative layer and the frame.
4. The method as claimed in claim 3, wherein the flashing includes: installation section, toper section and extension section, the installation section inserts to the slot in, and the installation section below is connected with the extension section through the toper section, and the installation section is connected with the top buckler and the extension section encircles outside the buckler of below in two adjacent bucklers.
5. The fast-assembling elevator shaft method of claim 4 wherein the step S13 of installing a waterproof cover at the bottom end of each section of waterproof cover includes the steps of:
s131, inserting the installation section of the waterproof cover into the slot;
and S132, connecting the mounting section of the waterproof cover with the bottom edge of the decorative layer by using a screw.
CN202210844000.4A 2022-07-18 2022-07-18 Fast assembling method for fast assembling elevator shaft Pending CN115198998A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210844000.4A CN115198998A (en) 2022-07-18 2022-07-18 Fast assembling method for fast assembling elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210844000.4A CN115198998A (en) 2022-07-18 2022-07-18 Fast assembling method for fast assembling elevator shaft

Publications (1)

Publication Number Publication Date
CN115198998A true CN115198998A (en) 2022-10-18

Family

ID=83581249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210844000.4A Pending CN115198998A (en) 2022-07-18 2022-07-18 Fast assembling method for fast assembling elevator shaft

Country Status (1)

Country Link
CN (1) CN115198998A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05118091A (en) * 1991-10-29 1993-05-14 Ig Tech Res Inc Drip member
JP2000320028A (en) * 1999-05-11 2000-11-21 Sekisui Chem Co Ltd Outer wall panel
JP2003155177A (en) * 2001-11-20 2003-05-27 Toshiba Elevator Co Ltd Elevator hoistway and assembly therefor
CN204001324U (en) * 2014-07-25 2014-12-10 湖州梦怡装饰工程有限公司 A kind of waterproof curtain wall
JP2017180010A (en) * 2016-03-31 2017-10-05 トヨタホーム株式会社 Waterproof structure of building
CN108726316A (en) * 2018-08-15 2018-11-02 项达林 Building-block-type lift hoistway and its installation method
US20190154295A1 (en) * 2017-11-21 2019-05-23 Durasystems Barriers Inc. Pre-fabricated modular fire-rated conduit assembly
CN209957179U (en) * 2019-04-08 2020-01-17 广东凯兴达建筑科技有限公司 Modularization elevator well monomer and interim transfer device thereof
CN111197412A (en) * 2020-01-07 2020-05-26 陈艳彬 Assembled roof with elevator added in existing building and construction process thereof
CN211597545U (en) * 2019-11-06 2020-09-29 宝业集团股份有限公司 Prefabricated elevator shaft
CN112081343A (en) * 2020-09-29 2020-12-15 施密特电梯有限公司 Fast-assembling elevator well
CN113213308A (en) * 2021-04-23 2021-08-06 佛山长驰电梯部件有限公司 Elevator well frame convenient to equipment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05118091A (en) * 1991-10-29 1993-05-14 Ig Tech Res Inc Drip member
JP2000320028A (en) * 1999-05-11 2000-11-21 Sekisui Chem Co Ltd Outer wall panel
JP2003155177A (en) * 2001-11-20 2003-05-27 Toshiba Elevator Co Ltd Elevator hoistway and assembly therefor
CN204001324U (en) * 2014-07-25 2014-12-10 湖州梦怡装饰工程有限公司 A kind of waterproof curtain wall
JP2017180010A (en) * 2016-03-31 2017-10-05 トヨタホーム株式会社 Waterproof structure of building
US20190154295A1 (en) * 2017-11-21 2019-05-23 Durasystems Barriers Inc. Pre-fabricated modular fire-rated conduit assembly
CN108726316A (en) * 2018-08-15 2018-11-02 项达林 Building-block-type lift hoistway and its installation method
CN209957179U (en) * 2019-04-08 2020-01-17 广东凯兴达建筑科技有限公司 Modularization elevator well monomer and interim transfer device thereof
CN211597545U (en) * 2019-11-06 2020-09-29 宝业集团股份有限公司 Prefabricated elevator shaft
CN111197412A (en) * 2020-01-07 2020-05-26 陈艳彬 Assembled roof with elevator added in existing building and construction process thereof
CN112081343A (en) * 2020-09-29 2020-12-15 施密特电梯有限公司 Fast-assembling elevator well
CN113213308A (en) * 2021-04-23 2021-08-06 佛山长驰电梯部件有限公司 Elevator well frame convenient to equipment

Similar Documents

Publication Publication Date Title
CN201850685U (en) Unitized curtain wall system with outside glass wing and aluminum alloy decorative frame light effect
CN105625625A (en) Clamping type keel integrated suspended ceiling structure and installing method
CN115198998A (en) Fast assembling method for fast assembling elevator shaft
CN106401119A (en) Co-extrusion embossing hanging board and installation-connection method and installation-connection part for co-extrusion embossing hanging board
CN205314449U (en) Building decorative board dogging formula connecting device
CN204266426U (en) A kind of glass curtain wall vertical ornamental strip
CN105064588A (en) Novel duplex ceiling and mounting method thereof
CN217924635U (en) Fast-assembling elevartor shaft mosaic structure
CN209277487U (en) A kind of cellular system of overlength overhanging vertical decorative strip
CN106013660B (en) A kind of abatvoix and its installation method
CN209163132U (en) A kind of translucent construction wall
CN107514088A (en) Integrated modular flat-top and its construction method
CN212478247U (en) Suspended ceiling structure easy to close up
CN208996360U (en) A kind of wall surface wall board splicing construction
CN110761472A (en) Clamping hook type horizontal adjustment combined structure of light steel false beam step top base layer and manufacturing process
CN213868670U (en) Wall body external corner binding off system of decorating
CN214595424U (en) Novel L-shaped curtain box
CN213952835U (en) Luminous apex angle line mounting structure
CN205296535U (en) Integrated furred ceiling card formula fossil fragments mounting structure
CN212613497U (en) Wallboard connection structure that assembled was decorated
CN114180434B (en) Elevator shaft structure and installation method
CN220727977U (en) External wall decorative lamp strip
CN206219008U (en) Sedan-chair wall and elevator
CN215829758U (en) Acoustic control light-emitting side hanging plate
CN218758491U (en) Modular television wall combined installation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination