CN115182378A - Retaining wall structure and construction method thereof - Google Patents

Retaining wall structure and construction method thereof Download PDF

Info

Publication number
CN115182378A
CN115182378A CN202210506940.2A CN202210506940A CN115182378A CN 115182378 A CN115182378 A CN 115182378A CN 202210506940 A CN202210506940 A CN 202210506940A CN 115182378 A CN115182378 A CN 115182378A
Authority
CN
China
Prior art keywords
retaining wall
crown beam
crown
wall body
anchored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210506940.2A
Other languages
Chinese (zh)
Inventor
周志健
马俊峰
刘飞
王岩峰
魏鹏
姚文山
乔浩
夏建永
陈毅
吴涛
胡军
王博
宫凤杉
潘国庆
张加鑫
郭建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202210506940.2A priority Critical patent/CN115182378A/en
Publication of CN115182378A publication Critical patent/CN115182378A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ

Abstract

The invention discloses a retaining wall structure and a construction method thereof, wherein the retaining wall structure comprises: the supporting piles are arranged along the circumferential direction of the foundation pit, and crown beams are formed by pouring the upper parts of the supporting piles; one end of the embedded steel bar is anchored in the crown beam, and the other end of the embedded steel bar extends above the crown beam; and the retaining wall body is poured above the crown beam, and the other end of the embedded steel bar is anchored in the retaining wall body. The invention solves the problems of time and labor waste, high construction cost and long construction period of the existing retaining wall.

Description

Retaining wall structure and construction method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a retaining wall structure and a construction method thereof.
Background
The retaining wall is a structure for supporting roadbed filling or hillside soil and preventing the filling or soil from deforming and losing stability. In the cross section of the retaining wall, the part directly contacted with the foundation is called a base; the top surface of the wall opposite the base is called the wall top; the front end of the base is called a wall toe; the rear end of the base is called a butt.
The construction of current retaining wall wastes time and energy, and the cost is higher, and the time limit for a project is longer.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information forms the prior art that is already known to a person skilled in the art.
Disclosure of Invention
In order to overcome the defects in the prior art, a retaining wall structure and a construction method thereof are provided so as to solve the problems that the construction of the existing retaining wall is time-consuming and labor-consuming, the construction cost is high and the construction period is long.
To achieve the above object, there is provided a retaining wall construction including:
the supporting piles are arranged along the circumferential direction of the foundation pit, and crown beams are formed by pouring the upper parts of the supporting piles;
planting bars, wherein one end of each planting bar is anchored in the crown beam, and the other end of each planting bar extends to the upper part of the crown beam; and
the retaining wall body is poured above the crown beam, and the other end of the embedded steel bar is anchored in the retaining wall body.
Furthermore, many the outside of a fender pile is beaten and is equipped with the waterproof curtain, the waterproof curtain is followed the circumference direction of foundation ditch sets up the round.
Furthermore, the crown beam is provided with a circle along the circumferential direction of the foundation pit, and an inner support is arranged on the inner side of the crown beam.
Further, the inner support is a concrete support.
Furthermore, a hardening and reinforcing layer is poured on the top of the soil body on the outer side of the retaining wall body, and the hardening and reinforcing layer is flush with the top of the retaining wall body.
Furthermore, the retaining wall is arranged on one side of the crown beam far away from the foundation pit.
The invention provides a construction method of a retaining wall structure, which comprises the following steps:
pouring a plurality of supporting piles along the circumferential direction of the foundation pit, and pouring the upper parts of the supporting piles to form a crown beam;
implanting embedded bars into the upper part of the crown beam, so that one ends of the embedded bars are anchored in the crown beam, and the other ends of the embedded bars extend to the upper part of the crown beam;
and pouring a retaining wall body above the crown beam, so that the other end of the embedded bar is anchored in the retaining wall body.
The retaining wall structure has the beneficial effects that the retaining wall structure fully utilizes the supporting piles and the crown beams which are good and stable in stress condition, and the retaining wall body is poured between the crown beams, so that the retaining wall structure has the characteristics of simple construction, safe stress, attractive appearance and the like, and not only can reduce the deformation and settlement of components, but also can save the cost.
Drawings
Other features, objects and advantages of the present application will become more apparent upon reading of the following detailed description of non-limiting embodiments thereof, made with reference to the accompanying drawings in which:
fig. 1 is a schematic structural view of a retaining wall structure according to an embodiment of the present invention.
Fig. 2 is a sectional view of a retaining wall construction according to an embodiment of the present invention.
Fig. 3 is an enlarged schematic view of an upper portion of a retaining wall structure according to an embodiment of the present invention.
Detailed Description
The present application will be described in further detail with reference to the following drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and not restrictive of the invention. It should be noted that, for convenience of description, only the portions related to the present invention are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1 to 3, the present invention provides a retaining wall construction including: a plurality of supporting piles 1, planting bars 2 and a retaining wall body 3.
In this embodiment, a plurality of support piles 1 are arranged in one turn in the circumferential direction of the foundation pit. And the crown beam 11 is formed on the upper parts of the plurality of supporting piles 1 in a pouring way. The crown beam is provided with a circle along the circumferential direction of the foundation pit and is a closed loop.
One end of the embedded bar 2 is anchored in the crown beam 11, and the other end of the embedded bar 2 extends to the upper part of the crown beam 11.
The retaining wall body 3 is cast over the crown beam 11. In this embodiment, the retaining wall body is a concrete retaining wall body. The other end of the planting bar 2 is anchored in the retaining wall body 3.
In a preferred embodiment, a waterproof curtain 4 is arranged outside the plurality of supporting piles 1. The waterproof curtain 4 is provided with a circle of closed loop along the circumferential direction of the foundation pit.
In this embodiment, after the plurality of support piles are completely poured, the crown beam is poured on the top of the support pile, and the crown beam 11 is arranged in a circle along the circumferential direction of the foundation pit. The inner support 6 is mounted on the inner side of the crown beam 11.
In a preferred embodiment, the inner support 6 is a concrete support.
In this embodiment, a hardened reinforcing layer 7 is cast on the top of the soil outside the retaining wall body 3. The hardened reinforcing layer 7 is flush with the top of the retaining wall body 3.
Referring to fig. 3, a retaining wall is disposed on a side of the crown beam 11 away from the excavation.
The invention provides a construction method of a retaining wall structure, which comprises the following steps:
s1: and pouring a plurality of supporting piles 1 along the circumferential direction of the foundation pit, and pouring the upper parts of the plurality of supporting piles 1 to form crown beams 11.
S2: and implanting the embedded bars 2 into the upper part of the crown beam 11, so that one ends of the embedded bars 2 are anchored in the crown beam 11, and the other ends of the embedded bars 2 extend to the upper part of the crown beam 11.
S3: and pouring the retaining wall body 3 above the crown beam 11, so that the other end of the embedded bar 2 is anchored in the retaining wall body 3.
The retaining wall structure fully utilizes the supporting piles and the crown beams which are good and stable in stress condition, and the retaining wall body is poured between the crown beams, so that the retaining wall structure has the characteristics of simple construction, safe stress, attractive appearance and the like, and not only can reduce deformation and settlement of components, but also can save cost.
The foregoing description is only exemplary of the preferred embodiments of the application and is illustrative of the principles of the technology employed. It will be appreciated by a person skilled in the art that the scope of the invention as referred to in the present application is not limited to the embodiments with a specific combination of the above-mentioned features, but also covers other embodiments with any combination of the above-mentioned features or their equivalents without departing from the inventive concept. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.

Claims (7)

1. A retaining wall construction, comprising:
the supporting piles are arranged along the circumferential direction of the foundation pit, and crown beams are formed by pouring the upper parts of the supporting piles;
one end of the embedded steel bar is anchored in the crown beam, and the other end of the embedded steel bar extends above the crown beam; and
the retaining wall body is poured above the crown beam, and the other end of the embedded steel bar is anchored in the retaining wall body.
2. A retaining wall construction according to claim 1, characterized in that a waterproof curtain is driven outside a plurality of the support piles, the waterproof curtain being provided in a circle in a circumferential direction of the foundation pit.
3. A retaining wall construction according to claim 1, characterized in that the crown beams are arranged in a circle in the circumferential direction of the foundation pit, and inner supports are installed at the inner sides of the crown beams.
4. A retaining wall construction according to claim 3 wherein the inner support is a concrete support.
5. A retaining wall construction according to claim 1, characterized in that the top of the soil mass outside the retaining wall body is cast with a hardened reinforcing layer, which is flush with the top of the retaining wall body.
6. A retaining wall construction according to claim 5, characterized in that the retaining wall is provided on the side of the crown beam remote from the foundation pit.
7. A construction method of a retaining wall structure according to any one of claims 1 to 6, characterized by comprising the steps of:
pouring a plurality of supporting piles along the circumferential direction of the foundation pit, and pouring the upper parts of the supporting piles to form crown beams;
implanting a planting bar at the upper part of the crown beam, so that one end of the planting bar is anchored in the crown beam, and the other end of the planting bar extends to the upper part of the crown beam;
and pouring a retaining wall body above the crown beam, so that the other end of the embedded bar is anchored in the retaining wall body.
CN202210506940.2A 2022-05-10 2022-05-10 Retaining wall structure and construction method thereof Pending CN115182378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210506940.2A CN115182378A (en) 2022-05-10 2022-05-10 Retaining wall structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210506940.2A CN115182378A (en) 2022-05-10 2022-05-10 Retaining wall structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN115182378A true CN115182378A (en) 2022-10-14

Family

ID=83514192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210506940.2A Pending CN115182378A (en) 2022-05-10 2022-05-10 Retaining wall structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN115182378A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206591379U (en) * 2017-01-24 2017-10-27 中铁第四勘察设计院集团有限公司 A kind of band barricade capping beam for reducing high ferro Roadbed Deformation
CN207211158U (en) * 2017-08-23 2018-04-10 甘肃中建市政工程勘察设计研究院 Assembled pile board wall foundation pit supporting construction
CN207419519U (en) * 2017-11-15 2018-05-29 江苏省岩土工程公司 A kind of campshed supporting is with helping the structural system that arm-type barricade is combined
CN109403341A (en) * 2018-10-31 2019-03-01 中建局集团建设发展有限公司 A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method
KR20190083466A (en) * 2018-01-04 2019-07-12 롯데건설 주식회사 Retaining wall and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206591379U (en) * 2017-01-24 2017-10-27 中铁第四勘察设计院集团有限公司 A kind of band barricade capping beam for reducing high ferro Roadbed Deformation
CN207211158U (en) * 2017-08-23 2018-04-10 甘肃中建市政工程勘察设计研究院 Assembled pile board wall foundation pit supporting construction
CN207419519U (en) * 2017-11-15 2018-05-29 江苏省岩土工程公司 A kind of campshed supporting is with helping the structural system that arm-type barricade is combined
KR20190083466A (en) * 2018-01-04 2019-07-12 롯데건설 주식회사 Retaining wall and construction method thereof
CN109403341A (en) * 2018-10-31 2019-03-01 中建局集团建设发展有限公司 A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method

Similar Documents

Publication Publication Date Title
CN105735325B (en) A kind of intensive permanent support assembled basement structure system and construction method
KR101105092B1 (en) A precast retaining panel and construction method of the same with half pc type backfill
CN201567566U (en) Precast assembled prestress underground continuous wall
CN115182378A (en) Retaining wall structure and construction method thereof
CN216839463U (en) Combined support of welt local deep foundation pit in foundation pit
CN101748749B (en) Prefabricated prestressing diaphragm wall and construction method thereof
CN205636751U (en) Assembled forming structures system towards secret building of multilayer
CN111794245A (en) Deep foundation pit supporting structure utilizing existing underground structure and construction method
CN113668554B (en) Construction method of foundation pit supporting structure adjacent to building
CN202830969U (en) Rectifying and reinforcing structure of cantilever retaining wall
CN205636750U (en) Permanent supporting assembled cellar structure system of intensification
CN211113674U (en) Double-row column supporting structure of foundation pit
CN213773385U (en) Deep foundation pit supporting structure utilizing existing underground structure
JP7112939B2 (en) Joint structure between pile and foundation concrete, precast concrete body, and construction method
CN212983867U (en) Foundation pit supporting structure of soil nail enhanced three-row miniature steel pipe pile frame
CN113653064A (en) Front-support rear-pull type foundation pit enclosure system and construction method thereof
CN208328940U (en) A kind of support system
CN219772981U (en) Building envelope of roof is done conversely to underground space
CN102926384A (en) Prefabricated broaching pile adopting post grouting and construction method thereof
CN209989829U (en) Connection structure of raft, column and pile
CN111877354A (en) Top-down construction method unearthing hole beam plate structure and construction method
RU2082851C1 (en) Precast pile
CN216275717U (en) Deep foundation pit soil retaining excavation supporting structure for deep and thick soft soil area
CN216586512U (en) Assembled compound stake of rim plate node
CN214738333U (en) Permanent-faced combined box culvert foundation reinforcing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination