CN206591379U - A kind of band barricade capping beam for reducing high ferro Roadbed Deformation - Google Patents

A kind of band barricade capping beam for reducing high ferro Roadbed Deformation Download PDF

Info

Publication number
CN206591379U
CN206591379U CN201720100782.5U CN201720100782U CN206591379U CN 206591379 U CN206591379 U CN 206591379U CN 201720100782 U CN201720100782 U CN 201720100782U CN 206591379 U CN206591379 U CN 206591379U
Authority
CN
China
Prior art keywords
high ferro
barricade
capping beam
ferro roadbed
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720100782.5U
Other languages
Chinese (zh)
Inventor
于廷新
熊大生
张燕
涂启柱
王忠华
储团结
黄俊杰
梁伟
彭俊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
China Railway Corp
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd, China Railway Corp filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201720100782.5U priority Critical patent/CN206591379U/en
Application granted granted Critical
Publication of CN206591379U publication Critical patent/CN206591379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to engineering construction technology field, in particular to a kind of band barricade capping beam for reducing high ferro Roadbed Deformation.Capping beam including being fixed on support pile stake top;Described capping beam is the reinforced beam poured in the horizontal direction close to margin of foundation pit, and the upper end of capping beam is provided with the barricade being arranged in a vertical direction;Described barricade is to be fixed on margin of foundation pit to be used to stop the reinforced concrete structure that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side, barricade pours the upper surface for being fixed on capping beam, and the upper end of barricade is not less than the soil body height between high ferro roadbed and foundation ditch.The utility model reduces earth excavation at slope, reduces the disturbance of the destruction to high ferro surrounding soil, reduces high ferro roadbed, abutment, pipeline deformation, is easy to carry out high-frequency monitoring to support pile.Utility model support cost is low, it is convenient to construct, by field monitoring, and high ferro protecting effect is obvious, with very strong practicality.

Description

A kind of band barricade capping beam for reducing high ferro Roadbed Deformation
Technical field
The utility model is related to engineering construction technology field, in particular to a kind of band for reducing high ferro Roadbed Deformation Barricade capping beam.
Background technology
Deep pit digging is increasing by current high ferro, because design of basement all follows the maximized principle of basement, Cause deep basal pit and high ferro and high ferro relevant tube line-spacing close, and foundation pit supporting pile and capping beam top typically can all be put Slope 1~2m processing, slope excavate make whole margin of foundation pit apart from high ferro circuit closer to, such foundation pit structure make high ferro roadbed with The soil body between foundation ditch is formed to the inclined slope structure of foundation ditch, and during high ferro operation, high ferro roadbed is likely to occur roadbed Offset to foundation ditch side, cause big Roadbed Deformation occur, have a strong impact on the security of high ferro operation.And if by by supporting Stake is increased to ground and lateral supporting, the problem of can solve the problem that Roadbed Deformation to a certain extent is carried out to edge soil layer, but rises High support pile can cause foundation pit supporting construction cost significantly to rise, and the difficulty of the dismounting work in later stage can also be greatly increased, It is unfavorable for the progress of whole foundation pit construction.Capping beam upper level displacement simultaneously and settlement monitoring point are relatively low away from ground, and high ferro Side requires that monitoring frequency is high, is unfavorable for monitoring.
The content of the invention
There is shadow in the existing foundation pit supporting construction that the purpose of this utility model seeks to solve to mention in above-mentioned background technology High railway can be reduced there is provided one kind by ringing the problem of high ferro roadbed security, cost are high, Demolition Construction is difficult and influences high ferro to monitor The band barricade capping beam of base deformation.
The technical solution of the utility model is:A kind of band barricade capping beam for reducing high ferro Roadbed Deformation, its feature exists In:Capping beam including being fixed on support pile stake top;Described capping beam is to be located at high ferro roadbed bottom close to margin of foundation pit The reinforced beam poured in the horizontal direction, the upper end of capping beam is provided with the barricade being arranged in a vertical direction;Described gear Wall is to be fixed on margin of foundation pit to be used to stop the armored concrete that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side Structure, barricade pours the upper surface for being fixed on capping beam, and the soil body that the upper end of barricade is not less than between high ferro roadbed and foundation ditch is high Degree.
Being excavated on the soil body between further described high ferro roadbed and foundation ditch has gutter;Described gutter sidepiece Barricade is fitted in towards on the wall of high ferro roadbed side, the upper end in gutter does not protrude from soil body surface.
Concrete hardening layer has been poured in soil body surface between further described high ferro roadbed and foundation ditch;Described Concrete hardening layer one end is fixed on the sidepiece in gutter, and the other end extends to high ferro roadbed.
Further described capping beam maintains an equal level with the inner support in the top in foundation pit supporting construction;Described interior branch The end of support is fixedly connected with capping beam sidepiece.
Further described barricade upper end is provided with guardrail.
Advantage of the present utility model has:1st, the utility model, can be to foundation ditch by setting barrier wall structure in margin of foundation pit The soil body between high ferro roadbed is provided a supporting role, it is to avoid the generation for the high ferro Roadbed Deformation problem that soil body slipping is caused;
2nd, the utility model is by setting barrier wall structure, it is to avoid soil body slipping is entered in foundation ditch, solves traditional base Hole support pattern needs to be excavated into slope structure to the soil body of margin of foundation pit, reduces earthwork excavated volume, reduces construction Difficulty;
3rd, the utility model can strengthen the soil body by further being hardened to the soil body between foundation ditch and high ferro roadbed Rigidity, it is to avoid because high ferro run cause the soil body extruding influence high ferro roadbed stability.
The utility model reduces earth excavation at slope, reduces the disturbance of the destruction to high ferro surrounding soil, reduces height Railway base, abutment, pipeline deformation, are easy to carry out high-frequency monitoring to support pile.Utility model support cost is low, it is convenient to construct, By field monitoring, high ferro protecting effect is obvious, with very strong practicality.
Brief description of the drawings
Fig. 1:Structural representation of the present utility model;
1-barricade, 2-guardrail, 3-monitoring point for displacement, 4-gutter, 5-concrete hardening layer, 6-original design slope Face, 7-reduce and excavate the soil body, 8-capping beam, 9-support pile, 10-inner support.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1, a kind of band barricade capping beam for reducing high ferro Roadbed Deformation, the capping beam 8 of the present embodiment is close to base The reinforced beam poured in the horizontal direction of pit edge, capping beam 8 is located at the soil body surface between foundation ditch and high ferro roadbed The difficulty of construction of foundation pit supporting construction can be greatly lowered in lower section, the height of reduction capping beam 8, also reduce later stage supporting knot The difficulty of structure dismounting work.
Capping beam 8 is fixed on the upper end of support pile 9, and capping beam 8 maintains an equal level with the inner support 10 in uppermost position, beared down on one Beam 8 is fixedly connected with the end of inner support 10.The upper end of capping beam 8 has poured barricade 1, and the upper end of barricade 1 is provided with guardrail.Barricade 1 is used to stop the armored concrete knot that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side to be fixed on margin of foundation pit Structure, barricade 1 pours the upper end for being fixed on capping beam 8.The capping beam 8 and barricade 9 of the present embodiment are reinforced concrete structure, are led to Cross and be welded to connect the framework of steel reinforcement in capping beam 8 with the framework of steel reinforcement in barricade 9, by increasing capacitance it is possible to increase both bonding strengths.
Wherein, as shown in figure 1, the upper end of barricade 1 is not less than the soil body surface between high ferro roadbed and foundation ditch, in order to reduce The construction cost and difficulty of barricade 1, upper end and the soil body surface of the barricade 1 of the present embodiment maintain an equal level.The upper end of barricade 1 is provided with position Monitoring point 3 is moved, for monitoring the change of high ferro roadbed.Positional distance soil body surface is more closely, can become apparent from accurately herein Monitoring high ferro roadbed change.
Barricade 1 one is to reduce earthwork excavated volume, it is to avoid traditional mode need to excavate on the soil body it is domatic, such as Fig. 1 institutes Show, it is to reduce to excavate the soil body 7 that original, which designs the domatic part between barricade 1, by setting barricade 1 to reduce the excavation of the earthwork Amount, two be that can strengthen the rigidity of the soil body, it is to avoid the security of soil body moving influence high ferro roadbed.
During practical application, the influence in order to avoid rainfall to the soil body, soil of the present embodiment between high ferro roadbed and foundation ditch Being excavated on body has a gutter 4, and the sidepiece of gutter 4 is fitted in barricade 1 towards on the wall of high ferro roadbed side, gutter 4 it is upper End does not protrude from soil body surface.Precipitation is collected by gutter 4 and discharged, and will not produce influence to the soil body.
In addition, the present embodiment has poured concrete hardening layer 5 in the soil body surface also between high ferro roadbed and foundation ditch, mix Solidifying soil hardened layer 5 one end is fixed on the sidepiece in gutter 4, and the other end extends to high ferro roadbed.Concrete hardening layer 5 further increases The strong rigidity of the soil body, reduces the amount of contraction of the soil body, reduces the deformation quantity of high ferro roadbed, improve the safety of high ferro roadbed Property.
During practice of construction, when pouring capping beam 8, the steelframe skeleton in capping beam 8 is exposed into a part outside capping beam 8 Side, when pouring barricade 1, the steelframe skeleton in barricade 1 and the framework of steel reinforcement that exposes on capping beam 8 is welded to connect, then started Barricade 1 is poured, the concrete structure for making barricade 1 stable with the formation of capping beam 8.
Guardrail 2 is installed by expansion bolt, it is easy to disassemble to install, excavated on the soil body between barricade 1 and high ferro roadbed Gutter 4, then casting concrete hardened layer 5 carries out cure process to soil body surface on the soil body, completes construction.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, the utility model can also on the premise of the utility model spirit and scope are not departed from There are various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model will Protection domain is asked to be defined by appended claims and its equivalent.

Claims (5)

1. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation, it is characterised in that:Including being fixed on support pile (9) stake top Capping beam (8);Described capping beam (8) is the steel poured in the horizontal direction for being located at high ferro roadbed bottom close to margin of foundation pit Concrete Beam Reinforced, the upper end of capping beam (8) is provided with the barricade (1) being arranged in a vertical direction;Described barricade (1) is to be fixed on Margin of foundation pit is used to stop the reinforced concrete structure that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side, barricade (1) upper end for being fixed on capping beam (8) is poured, the upper end of barricade (1) is not less than the soil body surface between high ferro roadbed and foundation ditch.
2. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 1, it is characterised in that:Described Being excavated on the soil body between high ferro roadbed and foundation ditch has gutter (4);Described gutter (4) sidepiece is fitted in barricade (1) face To on the wall of high ferro roadbed side, the upper end of gutter (4) does not protrude from soil body surface.
3. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 2, it is characterised in that:Described Concrete hardening layer (5) has been poured in soil body surface between high ferro roadbed and foundation ditch;Described concrete hardening layer (5) one end The sidepiece of gutter (4) is fixed on, the other end extends to high ferro roadbed.
4. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 1, it is characterised in that:Described Capping beam (8) maintains an equal level with the inner support (10) in the top in foundation pit supporting construction;The end of described inner support (10) with Capping beam (8) sidepiece is fixedly connected.
5. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 1, it is characterised in that:Described Barricade (1) upper end is provided with guardrail.
CN201720100782.5U 2017-01-24 2017-01-24 A kind of band barricade capping beam for reducing high ferro Roadbed Deformation Active CN206591379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720100782.5U CN206591379U (en) 2017-01-24 2017-01-24 A kind of band barricade capping beam for reducing high ferro Roadbed Deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720100782.5U CN206591379U (en) 2017-01-24 2017-01-24 A kind of band barricade capping beam for reducing high ferro Roadbed Deformation

Publications (1)

Publication Number Publication Date
CN206591379U true CN206591379U (en) 2017-10-27

Family

ID=60128814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720100782.5U Active CN206591379U (en) 2017-01-24 2017-01-24 A kind of band barricade capping beam for reducing high ferro Roadbed Deformation

Country Status (1)

Country Link
CN (1) CN206591379U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113865551A (en) * 2021-08-06 2021-12-31 中铁七局集团第三工程有限公司 Open-ground combined foundation pit excavation monitoring and early warning system suitable for high slope and river channel double-step and operation method thereof
CN115182378A (en) * 2022-05-10 2022-10-14 中国建筑第八工程局有限公司 Retaining wall structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113865551A (en) * 2021-08-06 2021-12-31 中铁七局集团第三工程有限公司 Open-ground combined foundation pit excavation monitoring and early warning system suitable for high slope and river channel double-step and operation method thereof
CN113865551B (en) * 2021-08-06 2024-02-20 中铁七局集团第三工程有限公司 Air-ground combined foundation pit excavation monitoring and early warning system suitable for high slope and river double steps and operation method thereof
CN115182378A (en) * 2022-05-10 2022-10-14 中国建筑第八工程局有限公司 Retaining wall structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106801417B (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN111485901B (en) Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN104389320B (en) Construction method of pile foundation anchor rope prestress high retaining wall
CN101294447A (en) Buildings pile underpinning method
CN209194544U (en) Combined type foundation pit supporting construction
CN206591379U (en) A kind of band barricade capping beam for reducing high ferro Roadbed Deformation
CN202865850U (en) Near-end shield tunnel foundation pit excavation supporting structure
CN112031814A (en) Cave-entering construction method for crossing shallow-layer high-load highway
CN105064401A (en) Method for excavating and constructing large-area basement
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN106978814A (en) A kind of Fabricated Structure for Support of Excavation
CN103850692A (en) Shield construction protection method for annular flyover
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN105821771B (en) Overlength case bridge jacking construction technique and its constructing structure under high roadbed city expressway
CN205276324U (en) Push pipe work well
CN208293588U (en) A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages
CN216839463U (en) Combined support of welt local deep foundation pit in foundation pit
CN215292503U (en) Tunnel structure passing through karst cavity
CN105821818B (en) A kind of Soft Rock Area surge-chamber intersects hole section landslide immediate processing method
CN213016369U (en) Transverse elliptical deformation resistant shield tunnel reinforcing structure with embedded steel plates
CN209555946U (en) A kind of reparation structure that high embankment collapses

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant