CN206591379U - A kind of band barricade capping beam for reducing high ferro Roadbed Deformation - Google Patents
A kind of band barricade capping beam for reducing high ferro Roadbed Deformation Download PDFInfo
- Publication number
- CN206591379U CN206591379U CN201720100782.5U CN201720100782U CN206591379U CN 206591379 U CN206591379 U CN 206591379U CN 201720100782 U CN201720100782 U CN 201720100782U CN 206591379 U CN206591379 U CN 206591379U
- Authority
- CN
- China
- Prior art keywords
- high ferro
- barricade
- capping beam
- ferro roadbed
- soil body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to engineering construction technology field, in particular to a kind of band barricade capping beam for reducing high ferro Roadbed Deformation.Capping beam including being fixed on support pile stake top;Described capping beam is the reinforced beam poured in the horizontal direction close to margin of foundation pit, and the upper end of capping beam is provided with the barricade being arranged in a vertical direction;Described barricade is to be fixed on margin of foundation pit to be used to stop the reinforced concrete structure that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side, barricade pours the upper surface for being fixed on capping beam, and the upper end of barricade is not less than the soil body height between high ferro roadbed and foundation ditch.The utility model reduces earth excavation at slope, reduces the disturbance of the destruction to high ferro surrounding soil, reduces high ferro roadbed, abutment, pipeline deformation, is easy to carry out high-frequency monitoring to support pile.Utility model support cost is low, it is convenient to construct, by field monitoring, and high ferro protecting effect is obvious, with very strong practicality.
Description
Technical field
The utility model is related to engineering construction technology field, in particular to a kind of band for reducing high ferro Roadbed Deformation
Barricade capping beam.
Background technology
Deep pit digging is increasing by current high ferro, because design of basement all follows the maximized principle of basement,
Cause deep basal pit and high ferro and high ferro relevant tube line-spacing close, and foundation pit supporting pile and capping beam top typically can all be put
Slope 1~2m processing, slope excavate make whole margin of foundation pit apart from high ferro circuit closer to, such foundation pit structure make high ferro roadbed with
The soil body between foundation ditch is formed to the inclined slope structure of foundation ditch, and during high ferro operation, high ferro roadbed is likely to occur roadbed
Offset to foundation ditch side, cause big Roadbed Deformation occur, have a strong impact on the security of high ferro operation.And if by by supporting
Stake is increased to ground and lateral supporting, the problem of can solve the problem that Roadbed Deformation to a certain extent is carried out to edge soil layer, but rises
High support pile can cause foundation pit supporting construction cost significantly to rise, and the difficulty of the dismounting work in later stage can also be greatly increased,
It is unfavorable for the progress of whole foundation pit construction.Capping beam upper level displacement simultaneously and settlement monitoring point are relatively low away from ground, and high ferro
Side requires that monitoring frequency is high, is unfavorable for monitoring.
The content of the invention
There is shadow in the existing foundation pit supporting construction that the purpose of this utility model seeks to solve to mention in above-mentioned background technology
High railway can be reduced there is provided one kind by ringing the problem of high ferro roadbed security, cost are high, Demolition Construction is difficult and influences high ferro to monitor
The band barricade capping beam of base deformation.
The technical solution of the utility model is:A kind of band barricade capping beam for reducing high ferro Roadbed Deformation, its feature exists
In:Capping beam including being fixed on support pile stake top;Described capping beam is to be located at high ferro roadbed bottom close to margin of foundation pit
The reinforced beam poured in the horizontal direction, the upper end of capping beam is provided with the barricade being arranged in a vertical direction;Described gear
Wall is to be fixed on margin of foundation pit to be used to stop the armored concrete that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side
Structure, barricade pours the upper surface for being fixed on capping beam, and the soil body that the upper end of barricade is not less than between high ferro roadbed and foundation ditch is high
Degree.
Being excavated on the soil body between further described high ferro roadbed and foundation ditch has gutter;Described gutter sidepiece
Barricade is fitted in towards on the wall of high ferro roadbed side, the upper end in gutter does not protrude from soil body surface.
Concrete hardening layer has been poured in soil body surface between further described high ferro roadbed and foundation ditch;Described
Concrete hardening layer one end is fixed on the sidepiece in gutter, and the other end extends to high ferro roadbed.
Further described capping beam maintains an equal level with the inner support in the top in foundation pit supporting construction;Described interior branch
The end of support is fixedly connected with capping beam sidepiece.
Further described barricade upper end is provided with guardrail.
Advantage of the present utility model has:1st, the utility model, can be to foundation ditch by setting barrier wall structure in margin of foundation pit
The soil body between high ferro roadbed is provided a supporting role, it is to avoid the generation for the high ferro Roadbed Deformation problem that soil body slipping is caused;
2nd, the utility model is by setting barrier wall structure, it is to avoid soil body slipping is entered in foundation ditch, solves traditional base
Hole support pattern needs to be excavated into slope structure to the soil body of margin of foundation pit, reduces earthwork excavated volume, reduces construction
Difficulty;
3rd, the utility model can strengthen the soil body by further being hardened to the soil body between foundation ditch and high ferro roadbed
Rigidity, it is to avoid because high ferro run cause the soil body extruding influence high ferro roadbed stability.
The utility model reduces earth excavation at slope, reduces the disturbance of the destruction to high ferro surrounding soil, reduces height
Railway base, abutment, pipeline deformation, are easy to carry out high-frequency monitoring to support pile.Utility model support cost is low, it is convenient to construct,
By field monitoring, high ferro protecting effect is obvious, with very strong practicality.
Brief description of the drawings
Fig. 1:Structural representation of the present utility model;
1-barricade, 2-guardrail, 3-monitoring point for displacement, 4-gutter, 5-concrete hardening layer, 6-original design slope
Face, 7-reduce and excavate the soil body, 8-capping beam, 9-support pile, 10-inner support.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1, a kind of band barricade capping beam for reducing high ferro Roadbed Deformation, the capping beam 8 of the present embodiment is close to base
The reinforced beam poured in the horizontal direction of pit edge, capping beam 8 is located at the soil body surface between foundation ditch and high ferro roadbed
The difficulty of construction of foundation pit supporting construction can be greatly lowered in lower section, the height of reduction capping beam 8, also reduce later stage supporting knot
The difficulty of structure dismounting work.
Capping beam 8 is fixed on the upper end of support pile 9, and capping beam 8 maintains an equal level with the inner support 10 in uppermost position, beared down on one
Beam 8 is fixedly connected with the end of inner support 10.The upper end of capping beam 8 has poured barricade 1, and the upper end of barricade 1 is provided with guardrail.Barricade
1 is used to stop the armored concrete knot that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side to be fixed on margin of foundation pit
Structure, barricade 1 pours the upper end for being fixed on capping beam 8.The capping beam 8 and barricade 9 of the present embodiment are reinforced concrete structure, are led to
Cross and be welded to connect the framework of steel reinforcement in capping beam 8 with the framework of steel reinforcement in barricade 9, by increasing capacitance it is possible to increase both bonding strengths.
Wherein, as shown in figure 1, the upper end of barricade 1 is not less than the soil body surface between high ferro roadbed and foundation ditch, in order to reduce
The construction cost and difficulty of barricade 1, upper end and the soil body surface of the barricade 1 of the present embodiment maintain an equal level.The upper end of barricade 1 is provided with position
Monitoring point 3 is moved, for monitoring the change of high ferro roadbed.Positional distance soil body surface is more closely, can become apparent from accurately herein
Monitoring high ferro roadbed change.
Barricade 1 one is to reduce earthwork excavated volume, it is to avoid traditional mode need to excavate on the soil body it is domatic, such as Fig. 1 institutes
Show, it is to reduce to excavate the soil body 7 that original, which designs the domatic part between barricade 1, by setting barricade 1 to reduce the excavation of the earthwork
Amount, two be that can strengthen the rigidity of the soil body, it is to avoid the security of soil body moving influence high ferro roadbed.
During practical application, the influence in order to avoid rainfall to the soil body, soil of the present embodiment between high ferro roadbed and foundation ditch
Being excavated on body has a gutter 4, and the sidepiece of gutter 4 is fitted in barricade 1 towards on the wall of high ferro roadbed side, gutter 4 it is upper
End does not protrude from soil body surface.Precipitation is collected by gutter 4 and discharged, and will not produce influence to the soil body.
In addition, the present embodiment has poured concrete hardening layer 5 in the soil body surface also between high ferro roadbed and foundation ditch, mix
Solidifying soil hardened layer 5 one end is fixed on the sidepiece in gutter 4, and the other end extends to high ferro roadbed.Concrete hardening layer 5 further increases
The strong rigidity of the soil body, reduces the amount of contraction of the soil body, reduces the deformation quantity of high ferro roadbed, improve the safety of high ferro roadbed
Property.
During practice of construction, when pouring capping beam 8, the steelframe skeleton in capping beam 8 is exposed into a part outside capping beam 8
Side, when pouring barricade 1, the steelframe skeleton in barricade 1 and the framework of steel reinforcement that exposes on capping beam 8 is welded to connect, then started
Barricade 1 is poured, the concrete structure for making barricade 1 stable with the formation of capping beam 8.
Guardrail 2 is installed by expansion bolt, it is easy to disassemble to install, excavated on the soil body between barricade 1 and high ferro roadbed
Gutter 4, then casting concrete hardened layer 5 carries out cure process to soil body surface on the soil body, completes construction.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, the utility model can also on the premise of the utility model spirit and scope are not departed from
There are various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model will
Protection domain is asked to be defined by appended claims and its equivalent.
Claims (5)
1. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation, it is characterised in that:Including being fixed on support pile (9) stake top
Capping beam (8);Described capping beam (8) is the steel poured in the horizontal direction for being located at high ferro roadbed bottom close to margin of foundation pit
Concrete Beam Reinforced, the upper end of capping beam (8) is provided with the barricade (1) being arranged in a vertical direction;Described barricade (1) is to be fixed on
Margin of foundation pit is used to stop the reinforced concrete structure that the soil body between high ferro roadbed and foundation ditch is moved to foundation ditch side, barricade
(1) upper end for being fixed on capping beam (8) is poured, the upper end of barricade (1) is not less than the soil body surface between high ferro roadbed and foundation ditch.
2. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 1, it is characterised in that:Described
Being excavated on the soil body between high ferro roadbed and foundation ditch has gutter (4);Described gutter (4) sidepiece is fitted in barricade (1) face
To on the wall of high ferro roadbed side, the upper end of gutter (4) does not protrude from soil body surface.
3. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 2, it is characterised in that:Described
Concrete hardening layer (5) has been poured in soil body surface between high ferro roadbed and foundation ditch;Described concrete hardening layer (5) one end
The sidepiece of gutter (4) is fixed on, the other end extends to high ferro roadbed.
4. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 1, it is characterised in that:Described
Capping beam (8) maintains an equal level with the inner support (10) in the top in foundation pit supporting construction;The end of described inner support (10) with
Capping beam (8) sidepiece is fixedly connected.
5. a kind of band barricade capping beam for reducing high ferro Roadbed Deformation as claimed in claim 1, it is characterised in that:Described
Barricade (1) upper end is provided with guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720100782.5U CN206591379U (en) | 2017-01-24 | 2017-01-24 | A kind of band barricade capping beam for reducing high ferro Roadbed Deformation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720100782.5U CN206591379U (en) | 2017-01-24 | 2017-01-24 | A kind of band barricade capping beam for reducing high ferro Roadbed Deformation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206591379U true CN206591379U (en) | 2017-10-27 |
Family
ID=60128814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720100782.5U Active CN206591379U (en) | 2017-01-24 | 2017-01-24 | A kind of band barricade capping beam for reducing high ferro Roadbed Deformation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206591379U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113865551A (en) * | 2021-08-06 | 2021-12-31 | 中铁七局集团第三工程有限公司 | Open-ground combined foundation pit excavation monitoring and early warning system suitable for high slope and river channel double-step and operation method thereof |
CN115182378A (en) * | 2022-05-10 | 2022-10-14 | 中国建筑第八工程局有限公司 | Retaining wall structure and construction method thereof |
-
2017
- 2017-01-24 CN CN201720100782.5U patent/CN206591379U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113865551A (en) * | 2021-08-06 | 2021-12-31 | 中铁七局集团第三工程有限公司 | Open-ground combined foundation pit excavation monitoring and early warning system suitable for high slope and river channel double-step and operation method thereof |
CN113865551B (en) * | 2021-08-06 | 2024-02-20 | 中铁七局集团第三工程有限公司 | Air-ground combined foundation pit excavation monitoring and early warning system suitable for high slope and river double steps and operation method thereof |
CN115182378A (en) * | 2022-05-10 | 2022-10-14 | 中国建筑第八工程局有限公司 | Retaining wall structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106801417B (en) | Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method | |
CN104452809A (en) | Ultra-shallow buried tunnel cover-excavation construction method | |
CN207633352U (en) | A kind of slope reinforcement structure for rapid rescue construction | |
CN105862930B (en) | A kind of protection structure to creating existing tunnel below underground engineering | |
CN111485901B (en) | Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel | |
CN102352590A (en) | Method for splicing highfill roadbed by adopting pile-sheet retaining wall | |
CN104389320B (en) | Construction method of pile foundation anchor rope prestress high retaining wall | |
CN101294447A (en) | Buildings pile underpinning method | |
CN209194544U (en) | Combined type foundation pit supporting construction | |
CN206591379U (en) | A kind of band barricade capping beam for reducing high ferro Roadbed Deformation | |
CN202865850U (en) | Near-end shield tunnel foundation pit excavation supporting structure | |
CN112031814A (en) | Cave-entering construction method for crossing shallow-layer high-load highway | |
CN105064401A (en) | Method for excavating and constructing large-area basement | |
CN204940298U (en) | A kind of Composite Enclosure Structure of base pit engineering | |
CN106978814A (en) | A kind of Fabricated Structure for Support of Excavation | |
CN103850692A (en) | Shield construction protection method for annular flyover | |
CN109577322A (en) | A kind of constructing device for inside soil body existing pile foundation pile extension | |
CN105821771B (en) | Overlength case bridge jacking construction technique and its constructing structure under high roadbed city expressway | |
CN205276324U (en) | Push pipe work well | |
CN208293588U (en) | A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages | |
CN216839463U (en) | Combined support of welt local deep foundation pit in foundation pit | |
CN215292503U (en) | Tunnel structure passing through karst cavity | |
CN105821818B (en) | A kind of Soft Rock Area surge-chamber intersects hole section landslide immediate processing method | |
CN213016369U (en) | Transverse elliptical deformation resistant shield tunnel reinforcing structure with embedded steel plates | |
CN209555946U (en) | A kind of reparation structure that high embankment collapses |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |