- CN115162591B CN115162591B CN202210905966.4A CN202210905966A CN115162591B CN 115162591 B CN115162591 B CN 115162591B CN 202210905966 A CN202210905966 A CN 202210905966A CN 115162591 B CN115162591 B CN 115162591B
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- grid
- plates
- frame
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6803—Joint covers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
- G06T7/0002—Inspection of images, e.g. flaw detection
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
- G06T7/10—Segmentation; Edge detection
- G06T7/12—Edge-based segmentation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
- G06T7/60—Analysis of geometric attributes
- G06T7/62—Analysis of geometric attributes of area, perimeter, diameter or volume
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2207/00—Indexing scheme for image analysis or image enhancement
- G06T2207/10—Image acquisition modality
- G06T2207/10004—Still image; Photographic image
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electromagnetism (AREA)
- Geometry (AREA)
- Mechanical Engineering (AREA)
- Quality & Reliability (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention provides a construction method and a construction system for a nine-grid assembled curtain wall, which comprise the steps of confirming the number of the nine-grid curtain walls and the number and the size of corner pieces, customizing, positioning and installing the nine-grid curtain walls, and the like.
Description
Technical Field
The invention relates to the technical field of nine-grid assembled curtain wall plate construction, in particular to a nine-grid assembled curtain wall construction method and system.
Background
The curtain wall is the outer wall enclosure of building, is the light wall body that has decorative effect that modern large-scale and high-rise building are commonly used, and current curtain adopts assembled to connect mostly, and traditional curtain wall structure as an organic whole is installed after lifting on the outer wall through taking lifting device in the installation, because the structure of integral type, when appearing partial damage, needs whole to tear down to change, simultaneously, the condition that the size does not correspond often appears in current assembled curtain wall in the construction, needs to modify the size of curtain wall and leads to the extension time limit for a project.
Disclosure of Invention
The embodiment of the invention provides a construction method and a construction system for a nine-grid assembled curtain wall, which are used for constructing a nine-grid curtain wall which is required by an outer wall surface and the number and the size of corner pieces are calculated through a measuring and calculating system according to the nine-grid curtain wall, wherein curtain wall boards arranged on the nine-grid curtain wall can be independently disassembled and assembled, and the problems that when partial damage occurs to the existing curtain wall, the whole curtain wall is required to be disassembled and replaced to cause replacement trouble, and the size of the curtain wall is required to be modified to cause the prolongation of the construction period under the condition that the size is frequently not corresponding to the existing curtain wall are solved.
In view of the above problems, the technical scheme provided by the invention is as follows:
a construction method of a nine-grid assembled curtain wall comprises the following steps:
step 1, confirming the number of the nine-grid curtain walls and the number and the size of corner pieces: obtaining the size of an outer wall, and calculating the number of required nine-grid curtain walls and the number and the size of corner pieces;
step 3, positioning: the mounting position of the nine-grid curtain wall is positioned on the elastic line of the outer wall surface;
step 4, mounting the nine-grid curtain wall, namely mounting the mounting frame at the mounting position in step 3, respectively inserting the pin shafts with the sections in the positive directions arranged on the rear sides of the curtain wall plates into the connecting sleeves arranged on the front sides of the mounting frame, arranging through holes on the curtain wall plates and the pin shafts, arranging threaded holes on the connecting sleeves, sequentially penetrating bolts through the curtain wall plates and the through holes arranged on the pin shafts, and then connecting the bolts with the threaded holes arranged on the connecting sleeves in threaded connection, so that the curtain wall plates are fixedly connected with the mounting frame.
In order to better realize the technical scheme of the invention, the following technical measures are adopted.
Further, the curtain board includes fixed frame, decorative board, actuation device and mount, the fixed frame sets up one side of mount, the round pin axle set up in the opposite side of mount, be provided with the recess on the fixed frame, the decorative board joint in the inside of recess, the decorative board with the decorative board carries out the joint through the grip tab, actuation device set up in on the decorative board.
Further, the actuation device includes first leading truck, first magnet, first elastic sheet, second leading truck, second magnet and second elastic sheet, first leading truck set up in inside one side of decorative board, the second leading truck set up in inside opposite side of decorative board, just first leading truck with all be provided with on the second leading truck with the opening of decorative board outside intercommunication, first elastic sheet set up in the opening part of first leading truck, first magnet set up in the inside of first leading truck, just first magnet with first elastic sheet is connected, the second elastic sheet set up in the opening part of second leading truck, the second magnet set up in the inside of second leading truck, just the second magnet with the second elastic sheet is connected, the actuation device set up in the decorative board keep away from one side of fixed frame.
Further, the number of the decorative plates is four, and the decorative plates are sequentially distributed on the upper part and the lower part of one side of the inside of the fixed frame, and on the upper part and the lower part of the other side of the inside.
Further, the first magnets distributed on the upper parts of one side and the other side in the fixed frame and the first magnets distributed on the lower parts of one side and the other side in the fixed frame are attracted by magnetic force, and the second magnets distributed on the upper parts and the lower parts of one side in the fixed frame and the second magnets on the upper parts and the lower parts of the other side in the fixed frame are attracted by magnetic force.
Further, four curtain board junctions are pegged graft and have sealing member, sealing member includes closing plate and sealing plate, the closing plate with the shape of sealing plate is the cross shape, the one end of sealing plate peg graft in four curtain board junctions, the closing plate install in the other end of sealing plate.
Further, the first connecting rod and the second connecting rod are respectively used for being connected with the fixed frame, and sealant is arranged between the corner piece and the adjacent corner piece and between the corner piece and the curtain wall plate.
The measuring and calculating system comprises an outer wall surface size acquisition module, a filling module, a segmentation calculation module and a corner structure calculation module:
the outer wall surface size acquisition module is used for acquiring the size of the outer wall surface and calculating the area of the outer wall surface;
the filling module is used for filling the size of the Sudoku curtain wall on the outer wall surface according to the outer wall surface area calculated by the outer wall surface size obtaining module;
the segmentation calculation module is used for deleting the nine-square curtain wall with the boundary exceeding the edge of the outer wall surface and forming the boundary of the nine-square curtain wall and the number of the nine-square curtain walls according to the boundary of the outer wall surface and the filled nine-square curtain wall;
the corner structure calculation module automatically calculates the sizes of the first connecting plate, the second connecting plate, the first connecting rod and the second connecting rod of the corner pieces and the number of the corner pieces according to the boundary of the nine-grid curtain wall obtained by the segmentation calculation module.
Compared with the prior art, the invention has the beneficial effects that: the construction is carried out after the number of the nine-grid curtain walls and the number and the size of the corner pieces required by the outer wall surface are calculated through the measuring and calculating system according to the nine-grid curtain walls, and curtain wall boards arranged on the nine-grid curtain walls can be independently disassembled and assembled, so that the problems that when part of the existing curtain wall is damaged, the whole curtain wall is required to be disassembled and replaced to cause replacement trouble, and the situation that the size of the curtain wall is frequently not corresponding to the size is required to be modified to cause the construction period to be prolonged are solved.
The foregoing description is only an overview of the present invention, and is intended to be implemented in accordance with the teachings of the present invention in order that the same may be more clearly understood and to make the same and other objects, features and advantages of the present invention more readily apparent.
Drawings
FIG. 1 is a schematic flow chart of a construction method of a squared figure assembled curtain wall, disclosed in an embodiment of the invention;
FIG. 2 is a schematic view of a perspective view of a squared figure curtain wall according to an embodiment of the present invention;
FIG. 3 is a schematic view of another view angle of a squared figure curtain wall according to an embodiment of the present invention;
FIG. 4 is a schematic view of a curtain wall panel according to an embodiment of the present invention;
FIG. 5 is an enlarged schematic view of the structure of FIG. 4A;
FIG. 6 is a schematic cross-sectional view of a curtain wall panel according to an embodiment of the present invention;
FIG. 7 is an enlarged schematic view of the structure of FIG. 6A;
FIG. 8 is a schematic view of a seal according to an embodiment of the present invention;
FIG. 9 is a schematic view of a corner fitting according to an embodiment of the present invention;
fig. 10 is a schematic structural diagram of a measurement system according to an embodiment of the present invention.
Reference numerals: 1. a measuring and calculating system; 11. an outer wall size acquisition module; 12. filling a module; 13. a segmentation calculation module; 14. a corner structure calculation module; 2. nine-grid curtain wall; 21. curtain wall plates; 211. a fixed frame; 2111. a groove; 2112. a clamping piece; 212. a decorative plate; 213. a suction device; 2131. a first guide frame; 2132. a first magnet; 2133. a first elastic sheet; 2134. a second guide frame; 2135. a second magnet; 2136. a second elastic sheet; 214. a fixing frame; 215. a pin shaft; 22. a mounting frame; 23. a connecting sleeve; 24. a bolt; 25. a seal; 251. a sealing plate; 252. a sealing sheet; 26. a corner piece; 261. a first connection plate; 262. a second connecting plate; 263. a first connecting rod; 264. a second connecting rod; 265. and (5) sealing glue.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-9, a construction method of a nine-grid assembled curtain wall comprises the following steps:
step 1, confirmation of the number of the nine-grid curtain walls 2 and the number and the size of the corner pieces 26: acquiring the outer wall size, and calculating the number of required nine-grid curtain walls 2 and the number and the size of corner pieces 26;
specifically, the dimension of the outer wall surface is obtained through the outer wall surface dimension obtaining module 11, the area of the outer wall surface is calculated, the filling module 12 fills the dimension of the nine-square-grid curtain wall 2 on the outer wall surface according to the outer wall surface area calculated by the outer wall surface dimension obtaining module 11, the division calculating module 13 deletes the nine-square-grid curtain wall 2 with the boundary exceeding the edge of the outer wall surface according to the boundary of the outer wall surface and the filled nine-square-grid curtain wall 2 and forms the boundary of the nine-square-grid curtain wall 2 and the number of the nine-square-grid curtain walls 2, and the corner structure calculating module 14 automatically calculates the dimension of the corner piece 26, the first connecting plate 261, the second connecting plate 262, the first connecting rod 263 and the second connecting rod 264 and the number of the corner pieces 26 according to the boundary of the nine-square-grid curtain wall 2 obtained by the division calculating module 13;
it should be noted that, through the above-mentioned measuring and calculating system 1, before carrying out curtain construction, through the size data of gathering the outer wall, calculate according to the size of outer wall and the size and the quantity of nine palace lattice curtain wall 2 to calculate the quantity and the size of corresponding corner piece 26, avoid appearing the problem that the size has problem in the work progress and need modify the size.
specifically, the curtain wall plate 21 includes a fixing frame 211, a decorative plate 212, a suction device 213 and a fixing frame 214, the fixing frame 211 is disposed on one side of the fixing frame 214, the pin shaft 215 is disposed on the other side of the fixing frame 214, a groove 2111 is disposed on the fixing frame 211, the decorative plate 212 is clamped in the groove 2111, the decorative plate 212 and the decorative plate 212 are clamped by a clamping piece 2112, and the suction device 213 is disposed on the decorative plate 212;
step 3, positioning: the elastic wires are arranged on the outer wall surface, and the installation position of the nine-grid curtain wall 2 is positioned;
step 4, mounting the nine-grid curtain wall 2, namely after mounting the mounting frame 22 at the mounting position in step 3, respectively inserting pin shafts 215 with positive cross sections arranged on the rear side of the curtain wall plates 21 into the connecting sleeve 23 arranged on the front side of the mounting frame 22, arranging through holes on the curtain wall plates 21 and the pin shafts 215, arranging threaded holes on the connecting sleeve 23, sequentially penetrating bolts 24 through the through holes arranged on the curtain wall plates 21 and the pin shafts 215, and then connecting the bolts with the threaded holes arranged on the connecting sleeve 23 in a threaded manner, and connecting and fixing the curtain wall plates 21 and the mounting frame 22.
When the nine-grid curtain wall 2 is damaged and needs to be replaced, the bolts 24 and the sealing members 25 on the corresponding curtain wall plates 21 are detached according to the damaged positions, so that the curtain wall plates 21 can be pulled out for replacement, and the problem that the whole curtain wall needs to be replaced is avoided.
The embodiment of the invention is also realized by the following technical scheme.
Referring to fig. 2 to 7, in the embodiment of the present invention, the engaging device 213 includes a first guide frame 2131, a first magnet 2132, a first elastic piece 2133, a second guide frame 2134, a second magnet 2135 and a second elastic piece 2136, the first guide frame 2131 is disposed at one side of the interior of the decorative plate 212, the second guide frame 2134 is disposed at the other side of the interior of the decorative plate 212, and both the first guide frame 2131 and the second guide frame 2134 are provided with openings communicating with the exterior of the decorative plate 212, the first elastic piece 2133 is disposed at the opening of the first guide frame 2131, the first magnet 2132 is disposed inside the first guide frame 2131, the first magnet 2132 is connected with the first elastic piece 2133, the second elastic piece 2136 is disposed at the opening of the second guide frame 2134, the second magnet 2135 is disposed in the second guide frame 2134, and the second magnet 2135 is connected to the second elastic piece 2136, the engaging device 213 is disposed on a side of the decorative plate 212 away from the fixing frame 211, the number of the decorative plate 212 is four, the two are sequentially disposed on an upper portion and a lower portion of one side of the inside of the fixing frame 211, the two are disposed on an upper portion and a lower portion of the other side of the inside of the fixing frame 211, the first magnet 2132 disposed on the upper portion of one side and the two are magnetically attracted to the first magnet 2132 disposed on the lower portion of one side and the other side of the inside of the fixing frame 211, and the two magnets 2135 disposed on the upper portion and the lower portion of the other side of the inside of the fixing frame 211 are magnetically attracted to each other.
Specifically, in the installation of the curtain wall plates 21 and the installation of the squared curtain wall 2, the first magnets 2132 and the first magnets 2132 on opposite sides of the adjacent curtain wall plates 21 attract each other, the second magnets 2135 and the second magnets 2135 attract each other, and the two first magnets 2132 and the two second magnets 2135 are attached to each other to clamp the first elastic piece 2133 and the second elastic piece 2136 to realize the sealing between the two curtain wall plates 21, so that the connection strength is enhanced and the sealing effect is also enhanced.
Referring to fig. 2 and 8, in the embodiment of the present invention, the sealing members 25 are inserted at the joints of the four curtain wall plates 21, the sealing members 25 include a sealing plate 251 and a sealing plate 252, the sealing plate 251 and the sealing plate 252 have a cross shape, one end of the sealing plate 252 is inserted at the joint of the four curtain wall plates 21, and the sealing plate 251 is mounted at the other end of the sealing plate 252.
Specifically, since it is difficult to seal the joints of the four curtain wall plates 21 by the first magnet 2132 and the second magnet 2135, the joints are sealed by inserting the sealing sheet 252 while being shielded by the sealing plate 251.
Referring to fig. 3 to 7, in the embodiment of the present invention, a first connecting rod 263 and a second connecting rod 264 are respectively used to connect with the fixing frame 211, and a sealant 265 is provided between the corner piece 26 and the adjacent corner piece 26 and curtain wall panel 21.
Specifically, after the installation of the box curtain wall 2 is completed, the first connecting rod 263 and the second connecting rod 264 of the corner piece 26 are respectively used for being connected with the fixed frame 211, and after the connection is completed, the sealant 265 is arranged between the corner piece 26 and the adjacent corner piece 26 and the curtain wall plate 21.
The concrete working principle is that the dimension of the outer wall surface is obtained through the outer wall surface dimension obtaining module 11, the area of the outer wall surface is calculated, the filling module 12 fills the dimension of the nine-square-grid curtain wall 2 on the outer wall surface according to the outer wall surface area calculated by the outer wall surface dimension obtaining module 11, the division calculating module 13 deletes the nine-square-grid curtain wall 2 with the boundary exceeding the edge of the outer wall surface according to the boundary of the outer wall surface and the filled nine-square-grid curtain wall 2 and forms the boundary of the nine-square-grid curtain wall 2 and the number of the nine-square-grid curtain walls 2, the corner structure calculating module 14 automatically calculates the dimension of the first connecting plate 261, the second connecting plate 262, the first connecting rod 263 and the second connecting rod 264 of the corner piece 26 according to the boundary of the nine-square-grid curtain wall 2 obtained by the division calculating module 13, the problem of dimensional errors is avoided, the pin shaft 215 arranged on the rear side of the curtain wall plate 21 is inserted into the connecting sleeve 23 arranged on the front side of the mounting frame 22, the bolt 24 sequentially penetrates through the curtain wall plate 21 and the through hole arranged on the pin shaft 215 and then is connected with the threaded hole arranged on the connecting sleeve 23, the curtain wall plate 21 is connected and fixed with the mounting frame 22, when the next curtain wall plate 21 is mounted, the first magnet 2132 on the opposite side of the adjacent curtain wall plate 21 is attracted by the first magnet 2132, the second magnet 2135 is attracted by the second magnet 2135, the two first magnets 2132 and the two second magnets 2135 are mutually attached to clamp the first elastic piece 2133 and the second elastic piece 2136 to realize the sealing between the two curtain wall plates 21, after the nine-square curtain wall plate 2 is mounted, the first connecting rod 263 and the second connecting rod 264 of the corner piece 26 are respectively connected with the fixed frame 211, and after the connection is completed, the sealant 265 is arranged between the corner piece 26 and the adjacent corner piece 26 and the curtain wall plate 21 to seal, when the nine-grid curtain wall 2 is damaged and needs to be replaced, the bolts 24 and the sealing pieces 25 on the corresponding curtain wall plates 21 can be detached according to the damaged positions, so that the curtain wall plates 21 can be pulled out for replacement, the problem that the whole curtain wall needs to be replaced is avoided, and the problems that when the existing curtain wall is partially damaged, the whole curtain wall needs to be detached for replacement to cause replacement trouble and the situation that the size of the curtain wall does not correspond to the size frequently occurs, and the size of the curtain wall needs to be modified to cause the prolonging of the construction period are solved.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present invention without departing from the spirit or scope of the invention. Thus, it is intended that the present invention also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.
Claims (8)
1. The construction method of the nine-grid assembled curtain wall is characterized by comprising the following steps of:
step 1, confirming the number of the nine-grid curtain walls and the number and the size of corner pieces: obtaining the size of an outer wall, and calculating the number of required nine-grid curtain walls and the number and the size of corner pieces;
step 2, customizing a nine-grid curtain wall and corner pieces: manufacturing a nine-grid curtain wall and corner pieces according to the number and the size confirmed in the step 1, wherein the nine-grid curtain wall comprises curtain wall plates and mounting frames, nine curtain wall plates are mounted on one mounting frame and are tightly attached to each other, the nine curtain wall plates are respectively connected with the mounting frames through bolts, the corner pieces comprise first connecting plates, second connecting plates, first connecting rods and second connecting rods, and the corner pieces are respectively connected with the curtain wall plates through the first connecting plates and the second connecting plates;
step 3, positioning: the mounting position of the nine-grid curtain wall is positioned on the elastic line of the outer wall surface;
step 4, mounting the nine-grid curtain wall, namely mounting the mounting frame at the mounting position in step 3, respectively inserting the pin shafts with the sections in the positive directions arranged on the rear sides of the curtain wall plates into the connecting sleeves arranged on the front sides of the mounting frame, arranging through holes on the curtain wall plates and the pin shafts, arranging threaded holes on the connecting sleeves, sequentially penetrating bolts through the curtain wall plates and the through holes arranged on the pin shafts, and then connecting the bolts with the threaded holes arranged on the connecting sleeves in threaded connection, so that the curtain wall plates are fixedly connected with the mounting frame.
2. The construction method of the nine-grid assembled curtain wall according to claim 1, which is characterized in that: the curtain wall plate comprises a fixing frame, a decorative plate, a suction device and a fixing frame, wherein the fixing frame is arranged on one side of the fixing frame, the pin shaft is arranged on the other side of the fixing frame, a groove is formed in the fixing frame, the decorative plate is clamped in the groove, the decorative plate and the decorative plate are clamped through a clamping piece, and the suction device is arranged on the decorative plate.
3. The construction method of the nine-grid assembled curtain wall according to claim 2, which is characterized in that: the actuating device comprises a first guide frame, a first magnet, a first elastic sheet, a second guide frame, a second magnet and a second elastic sheet, wherein the first guide frame is arranged on one side of the interior of the decorative plate, the second guide frame is arranged on the other side of the interior of the decorative plate, the first guide frame and the second guide frame are both provided with openings communicated with the exterior of the decorative plate, the first elastic sheet is arranged at the opening of the first guide frame, the first magnet is arranged in the interior of the first guide frame, the first magnet is connected with the first elastic sheet, the second elastic sheet is arranged at the opening of the second guide frame, the second magnet is arranged in the interior of the second guide frame, the second magnet is connected with the second elastic sheet, and the actuating device is arranged at one side of the decorative plate away from the fixed frame.
4. A construction method of a nine-grid assembled curtain wall according to claim 3, which is characterized in that: the number of the decorative plates is four, and the decorative plates are sequentially distributed on the upper part and the lower part of one side of the inside of the fixed frame, and the upper part and the lower part of the other side of the inside of the fixed frame.
5. The construction method of the nine-grid assembled curtain wall, which is characterized in that: the first magnets distributed on the upper parts of one side and the other side in the fixed frame are attracted with the first magnets distributed on the lower parts of one side and the other side in the fixed frame by mutual magnetic force, and the second magnets distributed on the upper parts and the lower parts of one side in the fixed frame are attracted with the second magnets on the upper parts and the lower parts of the other side in the fixed frame by mutual magnetic force.
6. The construction method of the nine-grid assembled curtain wall according to claim 1, which is characterized in that: the four curtain wall plate joints are inserted with sealing pieces, each sealing piece comprises a sealing plate and a sealing piece, the sealing plates and the sealing pieces are in cross shapes, one ends of the sealing pieces are inserted into the four curtain wall plate joints, and the sealing plates are arranged at the other ends of the sealing pieces.
7. The construction method of the nine-grid assembled curtain wall according to claim 2, which is characterized in that: the first connecting rod and the second connecting rod are respectively used for being connected with the fixed frame, and sealant is arranged between the corner piece and the adjacent corner piece and between the corner piece and the curtain wall plate.
8. A measuring and calculating system, applying the construction method of the nine-palace lattice type curtain wall according to any one of claims 1 to 7, which is characterized in that: the method comprises an outer wall size acquisition module, a filling module, a segmentation calculation module and a corner structure calculation module:
the outer wall surface size acquisition module is used for acquiring the size of the outer wall surface and calculating the area of the outer wall surface;
the filling module is used for filling the size of the Sudoku curtain wall on the outer wall surface according to the outer wall surface area calculated by the outer wall surface size obtaining module;
the segmentation calculation module is used for deleting the nine-square curtain wall with the boundary exceeding the edge of the outer wall surface and forming the boundary of the nine-square curtain wall and the number of the nine-square curtain walls according to the boundary of the outer wall surface and the filled nine-square curtain wall;
the corner structure calculation module automatically calculates the sizes of the first connecting plate, the second connecting plate, the first connecting rod and the second connecting rod of the corner pieces and the number of the corner pieces according to the boundary of the nine-grid curtain wall obtained by the segmentation calculation module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210905966.4A CN115162591B (en) | 2022-07-29 | 2022-07-29 | Construction method and system for nine-grid assembled curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210905966.4A CN115162591B (en) | 2022-07-29 | 2022-07-29 | Construction method and system for nine-grid assembled curtain wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115162591A CN115162591A (en) | 2022-10-11 |
CN115162591B true CN115162591B (en) | 2023-04-28 |
Family
ID=83477045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210905966.4A Active CN115162591B (en) | 2022-07-29 | 2022-07-29 | Construction method and system for nine-grid assembled curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115162591B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208267185U (en) * | 2018-03-14 | 2018-12-21 | 深圳广田方特科建集团有限公司 | Open cell formula stone curtain wall |
CN209941986U (en) * | 2019-04-09 | 2020-01-14 | 深圳市若成装饰设计工程有限公司 | Curtain wall construction convenient to installation |
CN211200855U (en) * | 2019-11-21 | 2020-08-07 | 李世宗 | Building curtain wall mounting and fixing device |
CN211572384U (en) * | 2020-01-08 | 2020-09-25 | 北京千山幕墙装饰工程有限公司 | Outer grid mounting structure of full hidden frame curtain wall |
CN213268502U (en) * | 2020-09-08 | 2021-05-25 | 广东钜能建设有限公司 | Building curtain wall mounting and fixing device |
JP2021155975A (en) * | 2020-03-26 | 2021-10-07 | 株式会社大林組 | Method for designing facade and method for constructing facade |
CN214785123U (en) * | 2021-04-26 | 2021-11-19 | 北京腾迪建设工程有限公司 | Wall aluminum plate mounting structure who assembles fast |
CN114372301A (en) * | 2021-10-19 | 2022-04-19 | 西安建筑科技大学 | BIM technology-based unit type curtain wall parametric modeling method |
CN216840101U (en) * | 2022-02-11 | 2022-06-28 | 武汉康辉装饰工程有限公司 | Locking device for curtain wall structure |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6804920B2 (en) * | 2002-06-05 | 2004-10-19 | X-Clad, Inc. | Tube-lock curtain wall system |
-
2022
- 2022-07-29 CN CN202210905966.4A patent/CN115162591B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208267185U (en) * | 2018-03-14 | 2018-12-21 | 深圳广田方特科建集团有限公司 | Open cell formula stone curtain wall |
CN209941986U (en) * | 2019-04-09 | 2020-01-14 | 深圳市若成装饰设计工程有限公司 | Curtain wall construction convenient to installation |
CN211200855U (en) * | 2019-11-21 | 2020-08-07 | 李世宗 | Building curtain wall mounting and fixing device |
CN211572384U (en) * | 2020-01-08 | 2020-09-25 | 北京千山幕墙装饰工程有限公司 | Outer grid mounting structure of full hidden frame curtain wall |
JP2021155975A (en) * | 2020-03-26 | 2021-10-07 | 株式会社大林組 | Method for designing facade and method for constructing facade |
CN213268502U (en) * | 2020-09-08 | 2021-05-25 | 广东钜能建设有限公司 | Building curtain wall mounting and fixing device |
CN214785123U (en) * | 2021-04-26 | 2021-11-19 | 北京腾迪建设工程有限公司 | Wall aluminum plate mounting structure who assembles fast |
CN114372301A (en) * | 2021-10-19 | 2022-04-19 | 西安建筑科技大学 | BIM technology-based unit type curtain wall parametric modeling method |
CN216840101U (en) * | 2022-02-11 | 2022-06-28 | 武汉康辉装饰工程有限公司 | Locking device for curtain wall structure |
Also Published As
Publication number | Publication date |
---|---|
CN115162591A (en) | 2022-10-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206360356U (en) | A kind of aluminum alloy pattern plate strenthening member | |
CN115162591B (en) | Construction method and system for nine-grid assembled curtain wall | |
JPS595751B2 (en) | Construction method for replacement sash | |
CN216713515U (en) | Modular curtain wall combined structure | |
CN216405818U (en) | Assembled building sealing waterproof device | |
CN209890036U (en) | Derrick structure for villa elevator | |
CN209806222U (en) | Industrial control cabinet structure | |
CN208830528U (en) | The grid system of modular surgical room | |
CN110886413A (en) | Connecting structure of assembled wall and mounting method thereof | |
CN211975601U (en) | Spliced type LED display screen steel structure support | |
CN219690907U (en) | Color steel plate convenient and quick to fix | |
CN221095533U (en) | Assembled connecting curtain wall for public building | |
CN111237306A (en) | Spliced LED display screen steel structure support and construction method | |
CN216589420U (en) | Box body connecting and positioning cone | |
CN220359554U (en) | Combined control box body | |
CN220319375U (en) | Window frame convenient to equipment | |
CN215829706U (en) | Mounting structure of pipeline integration frame | |
CN204878161U (en) | Furniture is with making things convenient for dismouting connection structure | |
CN220868545U (en) | Curtain wall mounting structure | |
CN216973828U (en) | Modular combined wallboard | |
CN213014910U (en) | Outer glass rib system of unit curtain wall | |
CN214144227U (en) | Assembled concrete wall that can splice | |
CN218668998U (en) | Door and window mounting structure | |
CN214405479U (en) | Tenon fourth of twelve earthly branches concatenation formula LED display screen steel structure support | |
CN212376015U (en) | Assembled shear force wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |