Curtain wall construction convenient to installation Download PDFInfo
- Publication number
- CN209941986U CN209941986U CN201920490692.0U CN201920490692U CN209941986U CN 209941986 U CN209941986 U CN 209941986U CN 201920490692 U CN201920490692 U CN 201920490692U CN 209941986 U CN209941986 U CN 209941986U
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- fixed
- guide sleeve
- guide
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 23
- 238000010276 construction Methods 0.000 title claims description 16
- 239000011521 glass Substances 0.000 claims description 22
- 238000003780 insertion Methods 0.000 claims description 12
- 230000037431 insertion Effects 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 230000001550 time effect Effects 0.000 abstract description 2
- 239000012634 fragment Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000011900 installation process Methods 0.000 description 3
- 238000009413 insulation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to a curtain wall structure convenient for installation, which comprises a curtain wall unit arranged in parallel with the outer wall of a building and a connecting component used for connecting the outer wall of the building and the curtain wall unit; the connecting assembly comprises a guide sleeve connected with the outer wall of the building, a guide rod connected with the guide sleeve in a sliding mode and a connecting column fixed with the guide rod, and one end, far away from the guide rod, of the connecting column is connected with the curtain wall unit; the guide sleeve is perpendicular to the wall body, and the guide sleeve and the guide rod are fixed through a fixing assembly; the fixed subassembly includes the jack of evenly seting up at guide sleeve up end and terminal surface down, set up recess on guide arm up end and the terminal surface down, fix the spring in the recess and fix the inserted block of keeping away from recess diapire tip at the spring, the inserted block with the jack cooperation of pegging graft, the jack with the inside intercommunication of guide sleeve. The utility model discloses have that the installation is convenient, the installation effectiveness is high, shorten engineering time's effect.
Description
Technical Field
The utility model belongs to the technical field of the technique of curtain and specifically relates to a curtain wall construction convenient to installation is related to.
Background
The curtain wall is the outer wall enclosure of the building, does not bear the weight, hangs like a curtain, so is also called as a curtain wall, and is a light building outer wall with decorative effect commonly used by modern large-storey and high-rise buildings. The curtain wall consists of a panel and a supporting structure system, can have certain displacement capacity or certain deformation capacity relative to the main structure, and does not bear the building outer protective structure or decorative structure acted by the main structure.
Chinese patent with publication number CN206917027U discloses a curtain wall structure, including being fixed in the fossil fragments on the building outer wall, the fossil fragments include fossil fragments crossbeam, fossil fragments stand, and the fixed participating in that is used for fixed curtain wall panel that is equipped with on the fossil fragments stand, is provided with vertical slot on the fossil fragments stand, and the notch portion is equipped with vertical elongated slot one, is equipped with the fixed block in the elongated slot one, is equipped with on the fixed block to be used for transversely inserting the breach of participating in, and the breach agrees with participating in, participates in to extend the notch portion and passes through bolted connection. The curtain wall panel of the curtain wall structure is fixed firmly and can be kept stable in windy weather.
The above prior art solutions have the following drawbacks: when the curtain wall panel is installed, the curtain wall panel needs to slide to the slot from top to bottom, and the curtain wall panel is very inconvenient in the actual operation process, so that the problem of inconvenient installation exists.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a curtain wall construction convenient to installation has that the installation is convenient, the installation effectiveness is high, shorten engineering time's effect.
The above technical purpose of the present invention can be achieved by the following technical solutions: a curtain wall structure convenient to install comprises a curtain wall unit arranged in parallel with an outer wall of a building and a connecting assembly used for connecting the outer wall of the building and the curtain wall unit; the connecting assembly comprises a guide sleeve connected with the outer wall of the building, a guide rod connected with the guide sleeve in a sliding mode and a connecting column fixed with the guide rod, and one end, far away from the guide rod, of the connecting column is connected with the curtain wall unit; the guide sleeve is perpendicular to the wall body, and the guide sleeve and the guide rod are fixed through the fixing assembly.
By adopting the technical scheme, the guide sleeve is fixed on the building outer wall, the connecting column is connected with the curtain wall unit, the sliding guide rod is arranged in the guide sleeve, the guide rod and the guide sleeve are fixed through the fixing component, and the curtain wall unit and the building outer wall can be fixed after the guide rod and the guide sleeve are fixed. The curtain wall unit is convenient to install and high in installation efficiency, so that the construction time can be further shortened, and the installation cost of the curtain wall is reduced.
The utility model discloses further set up to: the fixing assembly comprises jacks uniformly formed in the side walls of the two sides of the guide sleeve in the length direction, grooves formed in the side walls of the guide rod in the length direction, springs fixed in the grooves and inserting blocks fixed at the end parts, far away from the bottom walls of the grooves, of the springs, and the inserting blocks are in inserting fit with the jacks; the jack is communicated with the interior of the guide sleeve.
By adopting the technical scheme, after the connecting column is connected with the curtain wall unit, the guide rod slides into the guide sleeve, the spring is compressed under the limit of the inner wall of the guide sleeve, the insert block is positioned in the groove, the guide rod continues to slide until the insert block is inserted into the jack, and the spring is restored to the natural state at the moment. The jacks are uniformly arranged, so that the distance between the curtain wall unit and the building outer wall can be adjusted according to the installation process of the actual curtain wall unit.
The utility model discloses further set up to: the curtain wall unit includes glass board and is used for the curtain mount of fixed glass board, the cross section of curtain mount is cross, the curtain mount includes montant and horizontal pole, the horizontal pole with the montant is perpendicular and fix the both sides at montant center.
Through adopting above-mentioned technical scheme, the curtain is formed by the concatenation of curtain unit, and the area of single curtain unit is little, not only is convenient for install but also is convenient for transport.
The utility model discloses further set up to: the side walls of the two sides of the vertical rod in the length direction are respectively provided with a sliding chute, the opening direction of the sliding chutes is consistent with the length direction of the vertical rod, and the glass plate is in sliding fit with the sliding chutes; the glass plate fixing device is characterized in that slots matched with the glass plate in an inserting mode are formed in the upper end face and the lower end face of the cross rod, and the forming direction of the slots is consistent with the length direction of the cross rod.
Through adopting above-mentioned technical scheme, the connected mode of glass board and curtain mount is simple, firm, the installation effectiveness is high.
The utility model discloses further set up to: and rubber sheets are fixed on the side walls of the sliding groove and the slot.
Through adopting above-mentioned technical scheme, at spout and slot lateral wall fixed rubber piece, direct rigid contact between glass board and the curtain mount is avoided on the one hand, and on the other hand makes the glass board be difficult for breaking away from in spout and slot.
The utility model discloses further set up to: a through groove rotationally connected with the connecting column is formed in the center of the vertical rod, clamping blocks are symmetrically fixed on the side wall of one end, away from the guide rod, of the connecting column, guide grooves in sliding fit with the clamping blocks are symmetrically formed in the center of the vertical rod, the forming direction of the guide grooves is perpendicular to the length direction of the vertical rod, and the guide grooves are communicated with the through groove; an annular groove communicated with the through groove is formed in the vertical rod, and the diameter of the annular groove is equal to the diameter of the connecting column plus the total length of the fixture block; the inner wall of the through groove is symmetrically provided with clamping grooves matched with the clamping blocks in a clamping mode, and the arrangement direction of the clamping grooves is consistent with the length direction of the vertical rods.
Through adopting above-mentioned technical scheme, the spliced pole enters into the ring channel along leading to the groove, and the spliced pole rotates 90 degrees, to fixture block and draw-in groove butt, realizes the fixed of spliced pole and montant.
The utility model discloses further set up to: and a spring washer is arranged in the annular groove, one side of the spring washer is abutted against the bottom wall of the annular groove, and the other side of the spring washer is abutted against one end of the connecting column, which is close to the clamping block.
Through adopting above-mentioned technical scheme, set up spring washer and strengthen the joint strength of sleeve and montant, make the ring channel in sleeve and the montant closely laminate, prevent that sleeve and montant from being connected not hard up, lead to the unable fixed of curtain unit to drop.
The utility model discloses further set up to: and a flange plate is fixed at one end of the guide sleeve close to the building outer wall and is fixed with the building outer wall through bolts.
Through adopting above-mentioned technical scheme, set up the ring flange, can increase the area of contact between guide sleeve and the building outer wall, be convenient for fix guide sleeve on the building outer wall steadily.
The utility model discloses further set up to: the flange plate is provided with a reinforcing plate, and two adjacent sides of the reinforcing plate are respectively fixed with the flange plate and the guide sleeve.
Through adopting above-mentioned technical scheme, the adjacent both sides of reinforcing plate are fixed with ring flange and guide sleeve respectively, can strengthen the joint strength between ring flange and the guide sleeve.
To sum up, the beneficial technical effects of the utility model
1. When the guide post slides in the guide sleeve, the guide post and the guide sleeve can be fixed when the insert block sliding on the guide post is inserted into the slot on the side wall of the guide sleeve, so that the curtain wall unit and the building outer wall are fixed, the fixing mode of the curtain wall unit is simple, and the installation efficiency is high;
2. the jacks are arranged at equal intervals in the length direction of the guide sleeve, and the insertion blocks can be inserted into different jacks according to the requirements in the actual installation process of the curtain wall unit, so that the distance between the curtain wall unit and the building outer wall is changed;
3. set up spring washer in the ring channel and can strengthen the joint strength of sleeve and montant, make the ring channel in sleeve and the montant closely laminate, prevent that the sleeve from being connected not hard up with the montant, lead to the unable fixed of curtain unit to drop.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the curtain wall fixing frame of the present invention;
FIG. 3 is an enlarged schematic view of portion A of FIG. 2;
fig. 4 is an exploded view of the connection assembly of the present invention;
fig. 5 is a schematic view of a partial structure of the vertical rod of the present invention.
Reference numerals: 1. a curtain wall unit; 2. a connecting assembly; 21. a guide sleeve; 211. a flange plate; 212. a bolt; 213. a reinforcing plate; 22. a guide bar; 23. connecting columns; 231. a clamping block; 3. a glass plate; 4. a curtain wall fixing frame; 41. a vertical rod; 411. a chute; 412. a through groove; 413. a guide groove; 414. an annular groove; 415. a card slot; 416. a spring washer; 42. a cross bar; 421. a slot; 43. a rubber sheet; 5. a fixing assembly; 51. a jack; 52. a groove; 53. a spring; 54. and (5) inserting the blocks.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a curtain wall construction convenient to installation, include with building outer wall parallel arrangement's curtain unit 1 and be used for connecting building outer wall and curtain unit 1's coupling assembling 2.
As shown in fig. 1-2, the curtain wall unit 1 includes a glass plate 3 and a curtain wall fixing frame 4, the cross section of the curtain wall fixing frame 4 is cross-shaped, the curtain wall fixing frame 4 includes a vertical rod 41 and a cross rod 42, the length direction of the vertical rod 41 is consistent with the height direction of the building outer wall, the cross rod 42 is perpendicular to the vertical rod 41, and the cross rod 42 is fixed at two sides of the center of the vertical rod 41. The side walls of the two sides of the vertical rod 41 in the length direction are provided with sliding grooves 411 with T-shaped sections, the opening direction of the sliding grooves 411 is consistent with the length direction of the vertical rod 41, and the glass plate 3 is in sliding connection with the sliding grooves 411. Referring to fig. 3, the upper end surface and the lower end surface of the cross bar 42 are both provided with slots 421 engaged with the glass, and the length direction of the slots 421 is the same as the length direction of the cross bar 42. All be fixed with the sheet rubber 43 on the lateral wall of slot 421 and spout 411, set up sheet rubber 43, avoid direct rigid contact between glass board 3 and the curtain mount 4 on the one hand, on the other hand makes glass board 3 be difficult for breaking away from in spout 411 and slot 421. Two glass plates 3 are arranged on the curtain wall fixing frame 4 in parallel, and the double-layer glass plates 3 are arranged to improve the heat preservation, heat insulation and sound insulation effects of the curtain wall.
As shown in fig. 4, the connecting assembly 2 includes a guide sleeve 21, a guide rod 22 and a connecting column 23, the guide sleeve 21 is a rectangular parallelepiped rod with a hollow interior, a flange 211 is fixed at one end of the guide sleeve 21 close to the building outer wall, and the flange 211 is fixed with the building outer wall through a bolt 212. The flange plate 211 is arranged, so that the contact area between the guide sleeve 21 and the building outer wall can be increased, and the guide sleeve 21 can be conveniently and stably fixed on the building outer wall. Be connected with reinforcing plate 213 on the ring flange 211, reinforcing plate 213 is right trapezoid shape, and two adjacent right-angle sides of reinforcing plate 213 are fixed with the lateral wall of ring flange 211 and guide sleeve 21 respectively, set up the joint strength that reinforcing plate 213 can strengthen between ring flange 211 and the guide sleeve 21.
As shown in fig. 3, one end of the guide rod 22 is slidably connected to the guide sleeve 21, the other end of the guide rod is fixed to the connecting column 23, the guide rod 22 is in the shape of a rectangular rod, the connecting column 23 is in the shape of a cylinder, and one end of the connecting column 23, which is far away from the guide rod 22, is connected to the vertical rod 41. Guide arm 22 is fixed through fixed subassembly 5 with guide sleeve 21, and fixed subassembly 5 includes jack 51, recess 52, spring 53 and inserted block 54, and jack 51 is evenly seted up on guide sleeve 21 length direction's both sides lateral wall, and recess 52 is seted up on guide arm 22 length direction's both sides lateral wall, and spring 53 one end is fixed with the diapire of recess 52, and the other end is fixed with inserted block 54, and inserted block 54 is pegged graft with slot 421 and is cooperated. After the connecting column 23 is connected with the curtain wall unit 1, the guide rod 22 slides into the guide sleeve 21, the spring 53 is compressed under the limit of the inner wall of the guide sleeve 21, the insertion block 54 is positioned in the groove 52, the guide rod 22 continues to slide until the insertion block 54 is inserted into the insertion hole 51, and at the moment, the spring 53 returns to the natural state. The jacks 51 are uniformly formed, so that the distance between the curtain wall unit 1 and the outer wall of a building can be adjusted according to the installation process of the actual curtain wall unit 1.
As shown in fig. 5, a through groove 412 rotatably connected to the connecting rod 23 is formed in the center of the vertical rod 41, the fastening blocks 231 are symmetrically fixed on the side wall of the connecting rod 23 far away from the end of the guide rod 22, the vertical rod 41 is centrally symmetrically provided with a guide groove 413 in sliding fit with the fastening blocks 231, the opening direction of the guide groove 413 is perpendicular to the length direction of the vertical rod 41, and the guide groove 413 is communicated with the through groove 412. The vertical rod 41 is provided with an annular groove 414 penetrating the through groove 412, and the diameter of the annular groove 414 is equal to the diameter of the connecting column 23 plus the total length of the fixture block 231. The inner wall of the through groove 412 is symmetrically provided with clamping grooves 415 matched with the clamping blocks 231 in a clamping manner, and the opening direction of the clamping grooves 415 is consistent with the length direction of the vertical rod 41. The connecting column 23 enters the annular groove 414 along the through groove 412, and the connecting column 23 rotates by 90 degrees until the fixture block 231 abuts against the clamping groove 415, so that the fixing of the connecting column 23 and the vertical rod 41 is realized. A spring washer 416 is arranged in the annular groove 414, one side of the spring washer 416 is abutted with the bottom wall of the annular groove 414, and the other side of the spring washer 416 is abutted with one end of the connecting column 23 close to the fixture block 231. The rubber sheet 43 is fixed on the side walls of the sliding groove 411 and the slot 421, so that direct rigid contact between the glass plate 3 and the curtain wall fixing frame 4 is avoided, and the glass plate 3 is not easy to separate from the sliding groove 411 and the slot 421.
The implementation principle of the embodiment is as follows: after the guide sleeve 21 is fixed with the flange plate 211, the flange plate 211 is fixed on the building outer wall through the bolt 212, the connecting column 23 enters the annular groove 414 along the groove 52, the connecting column 23 rotates 90 degrees until the clamping block 231 abuts against the clamping groove 415, and the fixing of the connecting column 23 and the vertical rod 41 is realized. The guide rod 22 is slid into the guide sleeve 21, and when the insertion block 54 slid onto the guide post is inserted into the insertion slot 421 on the side wall of the guide sleeve 21, the guide post and the guide sleeve 21 can be fixed, so that the curtain wall unit 1 and the outer wall of the building can be fixed. The curtain wall unit 1 is convenient to install and high in installation efficiency, so that the construction time can be further shortened, and the installation cost of the curtain wall is reduced.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (9)
1. The utility model provides a curtain wall construction convenient to installation, includes curtain wall unit (1) with building outer wall parallel arrangement and is used for connecting building outer wall and curtain wall unit's (1) coupling assembling (2), its characterized in that: the connecting assembly (2) comprises a guide sleeve (21) connected with the outer wall of the building, a guide rod (22) connected with the guide sleeve (21) in a sliding mode and a connecting column (23) fixed with the guide rod (22), and one end, far away from the guide rod (22), of the connecting column (23) is connected with the curtain wall unit (1); the guide sleeve (21) is perpendicular to the wall, and the guide sleeve (21) and the guide rod (22) are fixed through a fixing component (5).
2. A curtain wall construction to facilitate installation according to claim 1, wherein: the fixing assembly (5) comprises insertion holes (51) uniformly formed in the side walls of the two sides of the guide sleeve (21) in the length direction, grooves (52) formed in the side walls of the two sides of the guide rod (22) in the length direction, springs (53) fixed in the grooves (52) and insertion blocks (54) fixed to the ends, far away from the bottom walls of the grooves (52), of the springs (53), and the insertion blocks (54) are in insertion fit with the insertion holes (51); the insertion hole (51) communicates with the inside of the guide sleeve (21).
3. A curtain wall construction to facilitate installation according to claim 1, wherein: curtain wall unit (1) includes glass board (3) and is used for curtain wall mount (4) of fixed glass board (3), the cross section of curtain wall mount (4) is cross, curtain wall mount (4) include montant (41) and horizontal pole (42), horizontal pole (42) with montant (41) are perpendicular and fix the both sides at montant (41) center.
4. A curtain wall construction to facilitate installation according to claim 3, wherein: the side walls of two sides of the vertical rod (41) in the length direction are provided with sliding grooves (411), the opening direction of each sliding groove (411) is consistent with the length direction of the vertical rod (41), and the glass plate (3) is in sliding fit with the sliding grooves (411); the upper end face and the lower end face of the cross rod (42) are provided with slots (421) which are matched with the glass plate (3) in an inserting mode, and the opening direction of the slots (421) is consistent with the length direction of the cross rod (42).
5. An easily installable curtain wall construction as claimed in claim 4 wherein: rubber sheets (43) are fixed on the side walls of the sliding groove (411) and the inserting groove (421).
6. A curtain wall construction to facilitate installation according to claim 3, wherein: a through groove (412) rotatably connected with the connecting column (23) is formed in the center of the vertical rod (41), clamping blocks (231) are symmetrically fixed on the side wall of one end, away from the guide rod (22), of the connecting column (23), guide grooves (413) in sliding fit with the clamping blocks (231) are symmetrically formed in the center of the vertical rod (41), the forming direction of the guide grooves (413) is perpendicular to the length direction of the vertical rod (41), and the guide grooves (413) are communicated with the through groove (412); an annular groove (414) communicated with the through groove (412) is formed in the vertical rod (41), and the diameter of the annular groove (414) is the same as the diameter of the connecting column (23) plus the total length of the fixture block (231); the inner wall of the through groove (412) is symmetrically provided with clamping grooves (415) matched with the clamping blocks (231) in a clamping mode, and the opening direction of the clamping grooves (415) is consistent with the length direction of the vertical rod (41).
7. An easily installable curtain wall construction as claimed in claim 6 wherein: a spring washer (416) is arranged in the annular groove (414), one side of the spring washer (416) is abutted against the bottom wall of the annular groove (414), and the other side of the spring washer is abutted against one end, close to the fixture block (231), of the connecting column (23).
8. A curtain wall construction to facilitate installation according to claim 1, wherein: and a flange plate (211) is fixed at one end, close to the building outer wall, of the guide sleeve (21), and the flange plate (211) is fixed with the building outer wall through a bolt (212).
9. An easily installable curtain wall construction according to claim 8 wherein: the flange plate (211) is provided with a reinforcing plate (213), and two adjacent sides of the reinforcing plate (213) are respectively fixed with the flange plate (211) and the guide sleeve (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920490692.0U CN209941986U (en) | 2019-04-09 | 2019-04-09 | Curtain wall construction convenient to installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920490692.0U CN209941986U (en) | 2019-04-09 | 2019-04-09 | Curtain wall construction convenient to installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209941986U true CN209941986U (en) | 2020-01-14 |
Family
ID=69127530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920490692.0U Expired - Fee Related CN209941986U (en) | 2019-04-09 | 2019-04-09 | Curtain wall construction convenient to installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209941986U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395614A (en) * | 2020-03-25 | 2020-07-10 | 江苏天茂建设有限公司 | Building curtain wall for indoor decoration |
CN111705983A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | Building curtain wall mounting structure |
CN112267613A (en) * | 2020-11-02 | 2021-01-26 | 深圳千里马装饰集团有限公司 | Adjustable hanging device |
CN113202217A (en) * | 2021-05-29 | 2021-08-03 | 上海贝律幕墙技术有限公司 | Skirt building stone curtain wall |
CN113216424A (en) * | 2021-06-21 | 2021-08-06 | 深圳市深宏飞建设工程有限公司 | Curtain wall decoration strip structure and installation process thereof |
CN113293973A (en) * | 2021-06-09 | 2021-08-24 | 深圳市维业装饰集团股份有限公司 | Green building curtain wall support installation method |
CN113356359A (en) * | 2021-06-16 | 2021-09-07 | 广州工程总承包集团有限公司 | Modular assembly type steel structure connecting piece |
CN114033083A (en) * | 2022-01-06 | 2022-02-11 | 北京中瑞祥合建筑工程有限公司 | Curtain wall system |
CN115162591A (en) * | 2022-07-29 | 2022-10-11 | 中建八局发展建设有限公司 | Nine-grid assembled curtain wall construction method and system |
CN118309224A (en) * | 2024-05-30 | 2024-07-09 | 山东港基建设集团有限公司 | Building outer wall system and construction method thereof |
-
2019
- 2019-04-09 CN CN201920490692.0U patent/CN209941986U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395614A (en) * | 2020-03-25 | 2020-07-10 | 江苏天茂建设有限公司 | Building curtain wall for indoor decoration |
CN111705983A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | Building curtain wall mounting structure |
CN112267613A (en) * | 2020-11-02 | 2021-01-26 | 深圳千里马装饰集团有限公司 | Adjustable hanging device |
CN113202217A (en) * | 2021-05-29 | 2021-08-03 | 上海贝律幕墙技术有限公司 | Skirt building stone curtain wall |
CN113293973A (en) * | 2021-06-09 | 2021-08-24 | 深圳市维业装饰集团股份有限公司 | Green building curtain wall support installation method |
CN113356359A (en) * | 2021-06-16 | 2021-09-07 | 广州工程总承包集团有限公司 | Modular assembly type steel structure connecting piece |
CN113216424A (en) * | 2021-06-21 | 2021-08-06 | 深圳市深宏飞建设工程有限公司 | Curtain wall decoration strip structure and installation process thereof |
CN114033083A (en) * | 2022-01-06 | 2022-02-11 | 北京中瑞祥合建筑工程有限公司 | Curtain wall system |
CN115162591A (en) * | 2022-07-29 | 2022-10-11 | 中建八局发展建设有限公司 | Nine-grid assembled curtain wall construction method and system |
CN115162591B (en) * | 2022-07-29 | 2023-04-28 | 中建八局发展建设有限公司 | Construction method and system for nine-grid assembled curtain wall |
CN118309224A (en) * | 2024-05-30 | 2024-07-09 | 山东港基建设集团有限公司 | Building outer wall system and construction method thereof |
CN118309224B (en) * | 2024-05-30 | 2024-09-24 | 山东港基建设集团有限公司 | Building outer wall system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209941986U (en) | Curtain wall construction convenient to installation | |
CN210507962U (en) | Building curtain wall supporting structure | |
CN110821034B (en) | House building builds quick concatenation formula assembly wall board | |
CN211200855U (en) | Building curtain wall mounting and fixing device | |
CN217480405U (en) | Assembled steel construction building | |
CN114204443B (en) | Electric power looped netowrk cabinet convenient to dismantle installation | |
CN215054327U (en) | Assembled frame glass curtain wall system | |
CN216239237U (en) | Mounting structure of semi-unit curtain wall | |
CN214306233U (en) | Stabilizing device for network construction | |
CN213682507U (en) | Light steel plate house convenient to disassemble and assemble for building construction | |
CN114215830A (en) | Assembled large-scale LED display screen | |
CN220848471U (en) | Plate capable of being fixed rapidly | |
CN216892972U (en) | A composite component of a prefabricated building wall panel and frame | |
CN113931357A (en) | Curtain wall connecting equipment for green building decoration | |
CN219343676U (en) | Assembled curtain wall | |
CN220504279U (en) | Modular assembly structure of stone curtain wall | |
CN222192231U (en) | Photovoltaic mounting structure for building top | |
CN220434425U (en) | Light steel house guardrail mounting structure | |
CN212670960U (en) | High daylighting curtain system | |
CN218990612U (en) | Assembled double-deck aluminum plate curtain | |
CN211597300U (en) | Glass curtain wall connecting system with decorative strips | |
CN211369107U (en) | A acoustic celotex board that is used for making things convenient for dismouting in downtown area | |
CN222477888U (en) | Connecting device and rock plate curtain wall structure mounting system | |
CN216516619U (en) | Light solid composite board capable of being spliced | |
CN221609171U (en) | Assembled building wall component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200114 |