CN115162591A - Nine-grid assembled curtain wall construction method and system - Google Patents

Nine-grid assembled curtain wall construction method and system Download PDF

Info

Publication number
CN115162591A
CN115162591A CN202210905966.4A CN202210905966A CN115162591A CN 115162591 A CN115162591 A CN 115162591A CN 202210905966 A CN202210905966 A CN 202210905966A CN 115162591 A CN115162591 A CN 115162591A
Authority
CN
China
Prior art keywords
curtain
grid
curtain wall
wall surface
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210905966.4A
Other languages
Chinese (zh)
Other versions
CN115162591B (en
Inventor
许岳峰
贾宪
卫海亮
余星勇
孙皓
张骥
张淮峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Development and Construction Co Ltd
Original Assignee
China Construction Eighth Bureau Development and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau Development and Construction Co Ltd filed Critical China Construction Eighth Bureau Development and Construction Co Ltd
Priority to CN202210905966.4A priority Critical patent/CN115162591B/en
Publication of CN115162591A publication Critical patent/CN115162591A/en
Application granted granted Critical
Publication of CN115162591B publication Critical patent/CN115162591B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6803Joint covers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/0002Inspection of images, e.g. flaw detection
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/10Segmentation; Edge detection
    • G06T7/12Edge-based segmentation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/60Analysis of geometric attributes
    • G06T7/62Analysis of geometric attributes of area, perimeter, diameter or volume
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2207/00Indexing scheme for image analysis or image enhancement
    • G06T2207/10Image acquisition modality
    • G06T2207/10004Still image; Photographic image

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • General Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Geometry (AREA)
  • Mechanical Engineering (AREA)
  • Quality & Reliability (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention provides a nine-grid assembled curtain wall construction method and a system, which comprises the steps of confirming the number of nine-grid curtain walls and the number and the size of corner pieces, customizing the number of the nine-grid curtain walls and the corner pieces, positioning, installing the nine-grid curtain walls and the like.

Description

Nine-grid assembled curtain wall construction method and system
Technical Field
The invention relates to the technical field of nine-grid assembled curtain wall plate construction, in particular to a nine-grid assembled curtain wall construction method and system.
Background
The curtain is the outer wall enclosure of building, the light wall body that has decorative effect that modern large-scale and high-rise building are common, current curtain adopts the assembled to connect mostly, traditional curtain formula structure as an organic whole, in the installation, through taking lifting device to hoist and mount the installation after going up on the outer wall face, because be the structure of integral type, when the part damages appearing, need whole the changing of pulling down, and simultaneously, the condition that the size does not correspond often appears in current assembled curtain in the construction, the size that needs to revise the curtain leads to the extension period.
Disclosure of Invention
The embodiment of the invention provides a nine-grid assembled curtain wall construction method and a system, wherein construction is carried out after the number of nine-grid curtain walls and the number and the size of corner pieces required by an outer wall surface are calculated according to the nine-grid curtain wall by a measuring and calculating system, curtain wall plates arranged on the nine-grid curtain wall can be independently disassembled and assembled, and the problems that when part of the existing curtain wall is damaged, the whole curtain wall needs to be disassembled and replaced, replacement is troublesome, and the size of the curtain wall needs to be modified under the condition that the size does not correspond frequently, so that the construction period is prolonged are solved.
In view of the above problems, the technical solution proposed by the present invention is:
a nine-grid assembled curtain wall construction method comprises the following steps:
step 1, confirming the number of the nine-square lattice curtain walls and the number and the size of the corner pieces: obtaining the size of an outer wall, and calculating the number of required nine-grid curtain walls and the number and size of corner pieces;
step 2, customizing the number of the nine-square lattice curtain walls and corner pieces: manufacturing the number of the nine-check curtain walls and corner pieces according to the number and the size confirmed in the step 1, wherein each nine-check curtain wall comprises curtain wall plates and mounting frames, nine curtain wall plates are mounted on one mounting frame and are tightly attached to each other, the nine curtain wall plates are respectively connected with the mounting frames through bolts, each corner piece comprises a first connecting plate, a second connecting plate, a first connecting rod and a second connecting rod, and the corner pieces are respectively connected with the curtain wall plates through the first connecting plates and the second connecting plates;
step 3, positioning: snapping lines on the outer wall surface, and positioning the mounting position of the nine-grid curtain wall;
step 4, nine palace check curtain installation, with the mounting bracket install in behind the mounted position in step 3, respectively with the round pin axle that the cross-section that sets up on the curtain board rear side is the positive direction inserts the setting inside the adapter sleeve of mounting bracket front side, the curtain board with sell the epaxial through-hole of having seted up of axle, set up threaded hole on the adapter sleeve, with the bolt run through the curtain board in proper order with sell behind the through-hole of epaxial seting up with the threaded hole threaded connection who sets up on the adapter sleeve, will the curtain board with the mounting bracket is connected fixedly.
In order to better realize the technical scheme of the invention, the following technical measures are also adopted.
Further, the curtain wall board includes fixed frame, decorative board, actuation device and mount, fixed frame sets up one side of mount, the round pin axle set up in the opposite side of mount, be provided with the recess on the fixed frame, the decorative board joint in the inside of recess, the decorative board with the decorative board carries out the joint through the holding piece, actuation device set up in on the decorative board.
Further, the actuation device includes first leading truck, first magnet, first flexure strip, second leading truck, second magnet and second flexure strip, first leading truck arrange in the inside one side of decorative board, the second leading truck arrange in the inside opposite side of decorative board, just first leading truck with all be provided with on the second leading truck with the opening of the outside intercommunication of decorative board, first flexure strip set up in the opening part of first leading truck, first magnet set up in the inside of first leading truck, just first magnet with first flexure strip is connected, the second flexure strip set up in the opening part of second leading truck, second magnet set up in the inside of second leading truck, just second magnet with the second flexure strip is connected, the actuation device set up in the decorative board is kept away from one side of fixed frame.
Furthermore, the number of the decorative plates is four, and the decorative plates are sequentially distributed on the upper part and the lower part of one side inside the fixed frame and on the upper part and the lower part of the other side inside the fixed frame.
Further, distribute in inside one side of fixed frame and opposite side upper portion first magnet with distribute in inside one side of fixed frame and opposite side lower part first magnet mutual magnetic attraction, distribute in inside one side upper portion of fixed frame and second magnet and opposite side upper portion and lower part second magnet mutual magnetic attraction.
Furthermore, four the curtain board junction is pegged graft and is had the sealing member, the sealing member includes closing plate and gasket, the closing plate with the shape of gasket is cross shape, the one end of gasket peg graft in four the curtain board junction, the closing plate install in the other end of gasket.
Furthermore, the first connecting rod with the second connecting rod be used for respectively with fixed frame is connected, the corner spare with adjacent the corner spare and be provided with sealed glue between the curtain wallboard.
The measuring and calculating system comprises an outer wall surface size obtaining module, a filling module, a segmentation calculating module and a corner structure calculating module:
the external wall surface size acquisition module is used for acquiring the size of the external wall surface and calculating the area of the external wall surface;
the filling module is used for filling the size of the nine-square-grid curtain wall on the outer wall surface according to the outer wall surface area calculated by the outer wall surface size acquisition module;
the segmentation calculation module is used for deleting the nine-square-grid curtain walls with the boundaries exceeding the edges of the outer wall surface according to the boundaries of the outer wall surface and the filled nine-square-grid curtain walls to form the boundaries of the nine-square-grid curtain walls and the number of the nine-square-grid curtain walls;
and the corner structure calculation module automatically calculates the sizes of the first connecting plate, the second connecting plate, the first connecting rod and the second connecting rod of the corner piece and the number of the corner pieces according to the boundary of the squared figure curtain wall obtained by the segmentation calculation module.
Compared with the prior art, the invention has the beneficial effects that: the number of the nine-grid curtain walls and the number and the size of the corner pieces required by the outer wall surface are calculated according to the nine-grid curtain walls through the measuring and calculating system, the curtain wall plates arranged on the nine-grid curtain walls can be independently disassembled and assembled, and the problems that when parts of the existing curtain walls are damaged, the whole curtain walls are required to be disassembled and replaced, replacement is troublesome, and the size of the curtain walls is required to be modified under the condition that the size does not correspond to the existing curtain walls frequently, so that the construction period is prolonged are solved.
The foregoing description is only an overview of the technical solutions of the present invention, and the embodiments of the present invention are described below in order to make the technical means of the present invention more clearly understood and to make the above and other objects, features, and advantages of the present invention more clearly understandable.
Drawings
FIG. 1 is a schematic flow chart of a nine-grid assembled curtain wall construction method disclosed by the embodiment of the invention;
FIG. 2 is a schematic structural diagram of a view angle of a nine-square lattice curtain wall disclosed by the embodiment of the invention;
FIG. 3 is a schematic structural diagram of another view angle of the nine-square lattice curtain wall disclosed by the embodiment of the invention;
FIG. 4 is a schematic structural diagram of a curtain wall panel according to an embodiment of the present invention;
FIG. 5 is an enlarged view of the structure at A in FIG. 4;
FIG. 6 is a schematic cross-sectional view of a curtain wall panel according to an embodiment of the present invention;
FIG. 7 is an enlarged view of the structure at A in FIG. 6;
FIG. 8 is a schematic structural diagram of a sealing member according to an embodiment of the present invention;
FIG. 9 is a schematic structural diagram of a corner fitting according to an embodiment of the present invention;
fig. 10 is a schematic structural diagram of a measurement and calculation system according to an embodiment of the present invention.
Reference numerals are as follows: 1. a measuring and calculating system; 11. an outer wall surface size obtaining module; 12. a filling module; 13. a segmentation calculation module; 14. a corner structure calculation module; 2. a nine-square lattice curtain wall; 21. a curtain wall plate; 211. a fixing frame; 2111. a groove; 2112. a clamping piece; 212. a decorative plate; 213. a suction device; 2131. a first guide frame; 2132. a first magnet; 2133. a first elastic sheet; 2134. a second guide frame; 2135. a second magnet; 2136. a second elastic sheet; 214. a fixed mount; 215. a pin shaft; 22. a mounting frame; 23. a connecting sleeve; 24. a bolt; 25. a seal member; 251. sealing plates; 252. sealing the sheet; 26. a corner piece; 261. a first connecting plate; 262. a second connecting plate; 263. a first connecting rod; 264. a second connecting rod; 265. and (7) sealing the glue.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-9, a method for constructing a nine-grid assembled curtain wall includes:
step 1, confirming the number of the nine-square lattice curtain walls 2 and the number and the size of the corner pieces 26: obtaining the size of the outer wall, and calculating the number of the required nine-grid curtain walls 2 and the number and the size of the corner pieces 26;
specifically, the size of the outer wall surface is obtained through the outer wall surface size obtaining module 11, the area of the outer wall surface is calculated, the filling module 12 obtains the area of the outer wall surface calculated by the outer wall surface size obtaining module 11, the size of the nine-grid curtain wall 2 is filled on the outer wall surface, the dividing calculating module 13 deletes the nine-grid curtain wall 2 with the boundary exceeding the edge of the outer wall surface according to the boundary of the outer wall surface and the filled nine-grid curtain wall 2 to form the boundary of the nine-grid curtain wall 2 and the number of the nine-grid curtain wall 2, and the corner structure calculating module 14 automatically calculates the sizes of the first connecting plate 261, the second connecting plate 262, the first connecting rod 263 and the second connecting rod 264 of the corner piece 26 and the number of the corner piece 26 according to the boundary of the nine-grid curtain wall 2 obtained by the dividing calculating module 13;
it should be noted that, by the above-mentioned measuring and calculating system 1, before the curtain wall construction, after the size data of the outer wall is collected, the calculation is performed according to the size of the outer wall surface and the size and number of the nine-grid curtain wall 2, and the number and size of the corresponding corner pieces 26 are calculated, so as to avoid the problem that the size needs to be modified due to the problem of the size in the construction process.
Step 2, customizing the number of the nine-grid curtain walls 2 and the corner pieces 26: manufacturing the number of the nine-grid curtain walls 2 and the corner pieces 26 according to the number and the size determined in the step 1, wherein each nine-grid curtain wall 2 comprises curtain wall plates 21 and mounting frames 22, the nine curtain wall plates 21 are mounted on one mounting frame 22, the curtain wall plates 21 are tightly attached to each other, the nine curtain wall plates 21 are respectively connected with the mounting frames 22 through bolts 24, each corner piece 26 comprises a first connecting plate 261, a second connecting plate 262, a first connecting rod 263 and a second connecting rod 264, and each corner piece 26 is respectively connected with each curtain wall plate 21 through the first connecting plate 261 and the second connecting plate 262;
specifically, the curtain wall panel 21 includes a fixing frame 211, a decorative plate 212, an attraction device 213 and a fixing frame 214, the fixing frame 211 is disposed on one side of the fixing frame 214, the pin shaft 215 is disposed on the other side of the fixing frame 214, a groove 2111 is disposed on the fixing frame 211, the decorative plate 212 is clamped inside the groove 2111, the decorative plate 212 and the decorative plate 212 are clamped through a clamping piece 2112, and the attraction device 213 is disposed on the decorative plate 212;
step 3, positioning: snapping lines on the outer wall surface, and positioning the mounting position of the nine-grid curtain wall 2;
step 4, the installation of nine palace check curtain 2, install mounting bracket 22 behind the mounted position in step 3, it is positive direction's round pin axle 215 to insert the setting inside the adapter sleeve 23 of mounting bracket 22 front side with the cross-section that sets up on the curtain board 21 rear side respectively, the through-hole has been seted up on curtain board 21 and the round pin axle 215, set up threaded hole on the adapter sleeve 23, run through the through-hole that sets up on curtain board 21 and the round pin axle 215 with bolt 24 in proper order behind with the threaded connection of the screw hole of seting up on the adapter sleeve 23, be connected fixedly curtain board 21 and mounting bracket 22.
It should be noted that, when the nine-grid curtain wall 2 is damaged and needs to be replaced, the corresponding bolts 24 and the sealing members 25 on the curtain wall plate 21 are detached according to the damaged portion, so that the curtain wall plate 21 can be pulled out and replaced, and the problem that the whole curtain wall needs to be replaced is solved.
The embodiment of the invention is also realized by the following technical scheme.
Referring to fig. 2-7, in the embodiment of the present invention, the suction device 213 includes a first guiding frame 2131, a first magnet 2132, a first elastic piece 2133, a second guiding frame 2134, a second magnet 2135 and a second elastic piece 2136, the first guiding frame 2131 is disposed on one side of the interior of the decorative plate 212, the second guiding frame 2134 is disposed on the other side of the interior of the decorative plate 212, and the first guiding frame 2131 and the second guiding frame 2134 are both provided with an opening communicating with the exterior of the decorative plate 212, the first elastic piece 2133 is disposed at the opening of the first guiding frame 2131, the first magnet 2132 is disposed inside the first guiding frame 2131, the first magnet 2132 is connected with the first elastic piece 2133, the second elastic piece 2136 is disposed at the opening of the second guiding frame 2134, the second magnet 2135 is arranged inside the second guide frame 2134, the second magnet 2135 is connected with the second elastic piece 2136, the attraction device 213 is arranged on one side of the decorative plate 212 far away from the fixed frame 211, the number of the decorative plate 212 is four, the first magnet 2132 distributed on the upper part and the lower part of one side inside the fixed frame 211 and the first magnet 2132 distributed on one side and the lower part of the other side inside the fixed frame 211 are mutually attracted by magnetic force, and the second magnet 2135 distributed on the upper part and the lower part of one side inside the fixed frame 211 and the second magnet 2135 distributed on the upper part and the lower part of the other side are mutually attracted by magnetic force.
Specifically, in the process of installing the curtain wall boards 21 and installing the squared figure curtain wall 2, the first magnet 2132 and the first magnet 2132 on the opposite sides of the adjacent curtain wall boards 21 are attracted, the second magnet 2135 and the second magnet 2135 are attracted, and the two first magnets 2132 and the two second magnets 2135 are attached to each other to clamp the first elastic piece 2133 and the second elastic piece 2136, so that the sealing between the two curtain wall boards 21 is realized, the connecting strength is enhanced, and meanwhile, the sealing effect is enhanced.
Referring to fig. 2 and 8, in the embodiment of the present invention, the sealing members 25 are inserted into the joints of the four curtain walls 21, each sealing member 25 includes a sealing plate 251 and a sealing plate 252, the sealing plate 251 and the sealing plate 252 are cross-shaped, one end of each sealing plate 252 is inserted into the joint of the four curtain walls 21, and the sealing plate 251 is mounted at the other end of each sealing plate 252.
Specifically, since it is difficult to seal the joints of the four curtain plates 21 by the first magnets 2132 and the second magnets 2135, the joints are sealed by inserting the sealing sheet 252 and protected by the sealing plate 251.
Referring to fig. 3 to 7, in the embodiment of the present invention, a first connecting rod 263 and a second connecting rod 264 are respectively used to connect to the fixing frame 211, and a sealant 265 is disposed between the corner member 26 and the adjacent corner member 26 and between the corner member and the curtain wall panel 21.
Specifically, after the squared figure curtain wall 2 is installed, the first connecting rod 263 and the second connecting rod 264 of the corner piece 26 are respectively used for being connected with the fixing frame 211, and after the connection is completed, a sealant 265 is arranged between the corner piece 26 and the adjacent corner piece 26 and between the corner piece 26 and the curtain wall panel 21.
The specific working principle is that the size of the outer wall surface is obtained through the outer wall surface size obtaining module 11, the area of the outer wall surface is calculated, the filling module 12 fills the size of the nine-grid curtain wall 2 on the outer wall surface according to the outer wall surface area calculated by the outer wall surface size obtaining module 11, the dividing and calculating module 13 deletes the nine-grid curtain wall 2 with the boundary exceeding the edge of the outer wall surface according to the boundary of the outer wall surface and the filled nine-grid curtain wall 2 to form the boundary of the nine-grid curtain wall 2 and the number of the nine-grid curtain wall 2, the corner structure calculating module 14 automatically calculates the sizes of the first connecting plate 261, the second connecting plate 262, the first connecting rod 263 and the second connecting rod 264 of the corner piece 26 and the number of the corner piece 26 according to the boundary of the nine-grid curtain wall 2 obtained by the dividing and calculating module 13, and the problem of size error is avoided, inserting a pin shaft 215 arranged on the rear side of a curtain wall board 21 into a connecting sleeve 23 arranged on the front side of a mounting frame 22, sequentially penetrating a bolt 24 through holes arranged on the curtain wall board 21 and the pin shaft 215, then connecting the bolt with a threaded hole arranged on the connecting sleeve 23 in a threaded manner, connecting and fixing the curtain wall board 21 and the mounting frame 22, when the next curtain wall board 21 is mounted, attracting a first magnet 2132 and a first magnet 2132 on the opposite side of the adjacent curtain wall board 21, attracting a second magnet 2135 and a second magnet 2135, mutually attaching the two first magnets 2132 and the two second magnets 2135 to clamp the first elastic sheet 2133 and the second elastic sheet 2136 to realize the sealing between the two curtain wall boards 21, after the nine-grid curtain wall board 2 is mounted, respectively connecting a first connecting rod 263 and a second connecting rod 264 of a corner piece 26 with a fixed frame 211, and after the connection is finished, arranging a sealant 265 between the corner piece 26 and the adjacent corner piece 26 and the curtain wall board 21 to carry out sealing, when the nine-grid curtain wall 2 is damaged and needs to be replaced, the corresponding bolts 24 and the sealing pieces 25 on the curtain wall plate 21 are dismounted according to the damaged parts, so that the curtain wall plate 21 can be pulled out and replaced, the problem that the whole curtain wall needs to be replaced is solved, and the problems that when part of the existing curtain wall is damaged, the whole curtain wall needs to be dismounted for replacement, so that the replacement is troublesome, and the problem that the size of the curtain wall needs to be modified under the condition that the size does not correspond frequently occurs, so that the construction period is prolonged are solved.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. A nine-grid assembled curtain wall construction method is characterized by comprising the following steps:
step 1, confirming the number of the nine-square lattice curtain walls and the number and the size of the corner pieces: acquiring the size of an outer wall, and calculating the number of required nine-grid curtain walls and the number and size of corner pieces;
step 2, customizing the number of the nine-square lattice curtain walls and corner pieces: manufacturing the number of the nine-square-grid curtain walls and corner pieces according to the number and the size determined in the step 1, wherein each nine-square-grid curtain wall comprises curtain wall plates and mounting frames, the nine curtain wall plates are mounted on one mounting frame and are tightly attached to each other, the nine curtain wall plates are respectively connected with the mounting frames through bolts, each corner piece comprises a first connecting plate, a second connecting plate, a first connecting rod and a second connecting rod, and the corner pieces are respectively connected with the curtain wall plates through the first connecting plates and the second connecting plates;
step 3, positioning: snapping lines on the outer wall surface, and positioning the mounting position of the nine-grid curtain wall;
step 4, nine palace check curtain installation, with the mounting bracket install in behind the mounting position in step 3, respectively with the round pin axle that the cross-section that sets up on the curtain board rear side is positive direction inserts the setting inside the adapter sleeve of mounting bracket front side, the curtain board with sell the epaxial through-hole of having seted up of axle, set up threaded hole on the adapter sleeve, run through the curtain board with the bolt in proper order behind the through-hole of selling epaxial seting up with the threaded hole threaded connection who sets up on the adapter sleeve will the curtain board with the mounting bracket is connected fixedly.
2. The nine-grid assembled curtain wall construction method according to claim 1, characterized in that: the curtain wall board comprises a fixing frame, a decorative plate, an actuation device and a fixing frame, wherein the fixing frame is arranged on one side of the fixing frame, a pin shaft is arranged on the other side of the fixing frame, a groove is formed in the fixing frame, the decorative plate is connected with the inside of the groove in a clamped mode, the decorative plate is connected with the decorative plate in a clamped mode through a clamping piece, and the actuation device is arranged on the decorative plate.
3. The nine-grid assembled curtain wall construction method according to claim 2, characterized in that: the actuation device includes first leading truck, first magnet, first flexure strip, second leading truck, second magnet and second flexure strip, first leading truck erects and arranges in the inside one side of decorative board, the second leading truck erects and arranges in the inside opposite side of decorative board, just first leading truck with all be provided with on the second leading truck with the opening of the outside intercommunication of decorative board, first flexure strip set up in the opening part of first leading truck, first magnet set up in the inside of first leading truck, just first magnet with first flexure strip is connected, the second flexure strip set up in the opening part of second leading truck, second magnet set up in the inside of second leading truck, just second magnet with the second flexure strip is connected, the actuation device set up in the decorative board is kept away from one side of fixed frame.
4. The nine-grid assembled curtain wall construction method according to claim 3, wherein the method comprises the following steps: the number of the decorative plates is four, and the decorative plates are sequentially distributed on the upper portion and the lower portion of one side of the interior of the fixing frame and on the upper portion and the lower portion of the other side of the interior of the fixing frame.
5. The nine-grid assembled curtain wall construction method according to claim 4, characterized in that: the first magnets are distributed on the upper portion of one side and the upper portion of the other side inside the fixed frame, the first magnets are distributed on the lower portion of one side and the lower portion of the other side inside the fixed frame, the first magnets attract each other through magnetic force, and the second magnets are distributed on the upper portion and the lower portion of one side and the upper portion and the lower portion inside the fixed frame, and the second magnets attract each other through magnetic force.
6. The nine-grid assembled curtain wall construction method according to claim 1, characterized in that: four the curtain board junction is pegged graft and is had the sealing member, the sealing member includes closing plate and gasket, the closing plate with the shape of gasket is cross shape, the one end of gasket peg graft in four the curtain board junction, the closing plate install in the other end of gasket.
7. The nine-grid assembled curtain wall construction method according to claim 2, characterized in that: the first connecting rod with the second connecting rod be used for respectively with fixed frame is connected, the corner fittings with adjacent the corner fittings and be provided with sealed glue between the curtain board.
8. A measuring and calculating system, which applies the nine-grid assembled curtain wall construction method as claimed in any one of claims 1 to 7, and is characterized in that: the method comprises an outer wall surface size acquisition module, a filling module, a segmentation calculation module and a corner structure calculation module:
the outer wall surface size acquisition module is used for acquiring the size of the outer wall surface and calculating the area of the outer wall surface;
the filling module is used for filling the size of the nine-square-grid curtain wall on the outer wall surface according to the outer wall surface area calculated by the outer wall surface size acquisition module;
the segmentation calculation module is used for deleting the nine-square-grid curtain walls with the boundaries exceeding the edges of the outer wall surface according to the boundaries of the outer wall surface and the filled nine-square-grid curtain walls to form the boundaries of the nine-square-grid curtain walls and the number of the nine-square-grid curtain walls;
and the corner structure calculation module automatically calculates the sizes of the first connecting plate, the second connecting plate, the first connecting rod and the second connecting rod of the corner piece and the number of the corner pieces according to the boundary of the squared figure curtain wall obtained by the segmentation calculation module.
CN202210905966.4A 2022-07-29 2022-07-29 Construction method and system for nine-grid assembled curtain wall Active CN115162591B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210905966.4A CN115162591B (en) 2022-07-29 2022-07-29 Construction method and system for nine-grid assembled curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210905966.4A CN115162591B (en) 2022-07-29 2022-07-29 Construction method and system for nine-grid assembled curtain wall

Publications (2)

Publication Number Publication Date
CN115162591A true CN115162591A (en) 2022-10-11
CN115162591B CN115162591B (en) 2023-04-28

Family

ID=83477045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210905966.4A Active CN115162591B (en) 2022-07-29 2022-07-29 Construction method and system for nine-grid assembled curtain wall

Country Status (1)

Country Link
CN (1) CN115162591B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030226324A1 (en) * 2002-06-05 2003-12-11 Hogan Jerry C. Tube-lock curtain wall system
CN208267185U (en) * 2018-03-14 2018-12-21 深圳广田方特科建集团有限公司 Open cell formula stone curtain wall
CN209941986U (en) * 2019-04-09 2020-01-14 深圳市若成装饰设计工程有限公司 Curtain wall construction convenient to installation
CN211200855U (en) * 2019-11-21 2020-08-07 李世宗 Building curtain wall mounting and fixing device
CN211572384U (en) * 2020-01-08 2020-09-25 北京千山幕墙装饰工程有限公司 Outer grid mounting structure of full hidden frame curtain wall
CN213268502U (en) * 2020-09-08 2021-05-25 广东钜能建设有限公司 Building curtain wall mounting and fixing device
JP2021155975A (en) * 2020-03-26 2021-10-07 株式会社大林組 Method for designing facade and method for constructing facade
CN214785123U (en) * 2021-04-26 2021-11-19 北京腾迪建设工程有限公司 Wall aluminum plate mounting structure who assembles fast
CN114372301A (en) * 2021-10-19 2022-04-19 西安建筑科技大学 BIM technology-based unit type curtain wall parametric modeling method
CN216840101U (en) * 2022-02-11 2022-06-28 武汉康辉装饰工程有限公司 Locking device for curtain wall structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030226324A1 (en) * 2002-06-05 2003-12-11 Hogan Jerry C. Tube-lock curtain wall system
CN208267185U (en) * 2018-03-14 2018-12-21 深圳广田方特科建集团有限公司 Open cell formula stone curtain wall
CN209941986U (en) * 2019-04-09 2020-01-14 深圳市若成装饰设计工程有限公司 Curtain wall construction convenient to installation
CN211200855U (en) * 2019-11-21 2020-08-07 李世宗 Building curtain wall mounting and fixing device
CN211572384U (en) * 2020-01-08 2020-09-25 北京千山幕墙装饰工程有限公司 Outer grid mounting structure of full hidden frame curtain wall
JP2021155975A (en) * 2020-03-26 2021-10-07 株式会社大林組 Method for designing facade and method for constructing facade
CN213268502U (en) * 2020-09-08 2021-05-25 广东钜能建设有限公司 Building curtain wall mounting and fixing device
CN214785123U (en) * 2021-04-26 2021-11-19 北京腾迪建设工程有限公司 Wall aluminum plate mounting structure who assembles fast
CN114372301A (en) * 2021-10-19 2022-04-19 西安建筑科技大学 BIM technology-based unit type curtain wall parametric modeling method
CN216840101U (en) * 2022-02-11 2022-06-28 武汉康辉装饰工程有限公司 Locking device for curtain wall structure

Also Published As

Publication number Publication date
CN115162591B (en) 2023-04-28

Similar Documents

Publication Publication Date Title
CN115162591A (en) Nine-grid assembled curtain wall construction method and system
CN215368428U (en) Quick mosaic structure of concatenation subassembly and magnetism formula wallboard of inhaling
CN112627400A (en) Frame assembling structure of inclined ventilation type triangular glass curtain wall
JPS595751B2 (en) Construction method for replacement sash
CN205227540U (en) Air conditioner
CN108035464A (en) A kind of curtain wall decorative strip connector and curtain wall system
CN209890036U (en) Derrick structure for villa elevator
CN208830528U (en) The grid system of modular surgical room
CN206023958U (en) Display device fore shell and display device
CN209990002U (en) Decorative curtain wall adapter
CN2833085Y (en) Assisted frame for folding screen window and door
CN220319375U (en) Window frame convenient to equipment
CN220369816U (en) Novel connecting bracket
CN210151924U (en) Sunshine room skeleton
CN216896467U (en) Semi-permeable plastic support with bendable structure
CN220359554U (en) Combined control box body
CN216239189U (en) Plug-in type glass curtain wall
CN220868545U (en) Curtain wall mounting structure
CN209413075U (en) A kind of reversible corner curtain wall connector system
CN220377644U (en) Energy-saving assembled wallboard
CN215829706U (en) Mounting structure of pipeline integration frame
CN217400046U (en) Building curtain wall connecting device
CN215533335U (en) Frame is decorated to ammeter case
CN220139169U (en) Quick installation ponding-proof bridge frame
CN220014133U (en) Frame type building curtain wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant