- CN115142314A CN115142314A CN202210739935.6A CN202210739935A CN115142314A CN 115142314 A CN115142314 A CN 115142314A CN 202210739935 A CN202210739935 A CN 202210739935A CN 115142314 A CN115142314 A CN 115142314A
- Authority
- CN
- China
- Prior art keywords
- construction
- notch
- access road
- plate
- walkway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 95
- 238000000034 method Methods 0.000 title claims abstract description 30
- 230000008569 process Effects 0.000 title claims abstract description 24
- 230000007306 turnover Effects 0.000 title claims abstract description 12
- 238000003466 welding Methods 0.000 claims description 6
- 239000000428 dust Substances 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 abstract description 6
- 238000009434 installation Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
- E03F3/046—Open sewage channels
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/06—Gully gratings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Road Paving Structures (AREA)
Abstract
The invention provides a turnover splicing type construction access road and a construction process, wherein the turnover splicing type construction access road comprises the following components: a passage plate; the supporting piece is arranged on the lower end surface of the toilet board; a notch structure formed on one side wall surface of the toilet board; and a protruding structure formed on the other side wall surface of the sidewalk plate, wherein the notch structure and the protruding structure are coupled to integrally splice adjacent sidewalk plates. Compared with the prior art, the device can be repeatedly used, concrete pouring is not needed, so that the waste of resources can be avoided, a plurality of construction procedures are omitted, and the construction efficiency and the construction quality are improved. In addition, the dismantling process is simple and quick, the problems of dust emission and the like can not be caused, and the green construction process is realized.
Description
Technical Field
The invention relates to the technical field of construction access roads, in particular to a turnover splicing type construction access road and a construction process.
Background
At present, most of the temporary sidewalks in construction sites in China are formed by hardening and pouring concrete, and the construction sidewalks have the following defects: 1. the resource waste is large, and the materials need to be hardened and broken for multiple times in different construction stages, so that the resource waste is caused; 2. the construction efficiency is low, the construction of the construction access road needs to be smooth in site, compact in foundation, form erecting and pre-buried in pipeline, the working procedures are more, and the construction time is long; 3. the temporary sidewalk is broken, dust is easily generated to pollute the atmosphere, and the building garbage caused by the dust cannot be reused.
Disclosure of Invention
The present invention is directed to solving at least one of the problems of the prior art.
Therefore, the invention provides a turnover splicing type construction access way in a first aspect.
The invention provides a construction process of a turnover splicing type construction access road.
The invention provides a construction access road capable of being circularly spliced, which comprises:
a toilet board;
the supporting piece is arranged on the lower end surface of the toilet board;
a notch structure formed on one side wall surface of the toilet board;
and the protruding structure is formed on the other side wall surface of the pavement slab, wherein the notch structure and the protruding structure are coupled to splice the adjacent pavement slabs into a whole.
The invention provides a construction access road capable of being circularly spliced, which comprises access road plates, supporting pieces, a notch structure and a protruding structure. The access road plate is supported on the ground through the supporting piece, and the upper end face of the access road plate serves as a temporary access road to facilitate the passage of construction personnel. On above-mentioned basis, set up notch structure and protrusion structure respectively in the both sides of way board, notch structure and protrusion structure can form the connected form of coupling, consequently when the construction area is great, through with a plurality of way board concatenations, form the interim way that satisfies the construction requirements, make things convenient for constructor's current. Compared with the prior art, the device can be repeatedly used, concrete pouring is not needed, so that the waste of resources can be avoided, a plurality of construction procedures are omitted, and the construction efficiency and the construction quality are improved. In addition, the dismantling process is simple and quick, the problems of dust emission and the like can not be caused, and the green construction process is realized.
The rotatable splicing type construction access road according to the technical scheme of the invention can also have the following additional technical characteristics:
in the above technical solution, the notch structure is a splicing opening, the protrusion structure is a connecting protrusion, and the connecting protrusion is coupled with the splicing opening.
In this technical scheme, it is for piecing together the interface form to have injectd the notch structure to and the protrusion structure is the concatenation protrusion, during concrete installation, only need insert the concatenation mouth with the concatenation protrusion, can realize the process of assembling of a plurality of just boards, whole process is convenient and swift.
In the technical scheme, the number of the notch structures is a plurality, the number of the protruding structures corresponds to the number of the notch structures, and the notch structures and the protruding structures are uniformly distributed along the side wall surface of the pavement slab.
In this technical scheme, set up a plurality ofly with notch structure and protrusion structure, can guarantee the intensity and the quality of tie point, the atress drops when avoiding just the guidance tape to guarantee passerby's safety.
In the above technical solution, further comprising:
a fastener formed with a bolt hole positioned to correspond to the notch structure, the fastener being mounted to the bolt hole to lock the male structure to the notch structure.
In the technical scheme, the device further comprises a fastener. After the notch structure and the protruding structure are coupled, the lower end face of the fastener abuts against the protruding structure by mounting the fastener to the bolt hole, so that the protruding structure is prevented from sliding, and the connection strength of the toilet board is improved.
In the above technical solution, the fastener is a bolt structure.
In the technical scheme, the fastener is limited to be in a bolt structure. The disassembly and assembly processes are quick and the cost is low.
In the above technical solution, further comprising:
and the rainwater ditches are arranged on two sides of the excrement channel plate.
In the technical scheme, the device further comprises a rainwater ditch. The rainwater ditch is groove structure, can adopt the welded form to install the both sides of just guidance tape, realizes the function of rainy day drainage. Of course, the rain gutter and the sidewalk plate can also be detachably connected, such as bolted connection, so that the rain gutter can be conveniently detached and installed.
In the above technical solution, the method further comprises:
and the cover plate covers the rainwater ditch.
In the technical scheme, the device also comprises a cover plate. The cover plate covers the rainwater ditch, so that the damage caused by mistakenly stepping on the rainwater ditch by constructors in rainy days is avoided.
In the above technical solution, the supporting member is a supporting column structure, and the number of the supporting columns is several, and the supporting columns are arranged along two sides and a central line of the bottom of the sidewalk board.
In this technical scheme, support piece is the support column. The support column is used for supporting the access board, and in addition, the support plate and the access board can adopt a welding mode to improve the connection strength.
In the above technical solution, the toilet board is formed with a reserved pipe.
In the technical scheme, a reserved pipeline is formed on the sidewalk plate and used for wiring.
The invention also provides a construction process of the rotatable splicing type construction access road, which is applied to any one of the technical schemes and comprises the following steps:
welding the support to the raceway plate;
hoisting the processed pavement slab to a construction area;
splicing a plurality of toilet plates, inserting the protruding structures into the notch structures, and locking by fasteners;
after the construction of the construction area is completed, the plurality of access road plates are disassembled and then hoisted to the next construction area.
Compared with the prior art, the rotatable splicing type construction access road and the construction process provided by the invention have the following beneficial effects:
compared with the prior art, the device can be repeatedly used, concrete pouring is not needed, so that the waste of resources can be avoided, a plurality of construction procedures are omitted, and the construction efficiency and the construction quality are improved. In addition, the dismantling process is simple and quick, the problems of dust raising and the like can not be caused, and the green construction process is realized.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a front cross-sectional view of the construction walkway of the present invention with a turnover splicing construction;
FIG. 2 is a front view of the rotatable splicing construction access road of the present invention;
fig. 3 is a top view of the construction walkway of the present invention.
Wherein, the correspondence between the reference numbers and the component names in fig. 1 to 3 is:
1. a toilet board; 2. a support member; 3. a notch structure; 4. a protruding structure; 5. a fastener; 6. bolt holes; 7. a rain gutter; 8. a cover plate; 9. and reserving a pipeline.
Detailed Description
In order that the above objects, features and advantages of the present invention can be more clearly understood, a more particular description of the invention, taken in conjunction with the accompanying drawings and detailed description, is set forth below. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced otherwise than as specifically described herein, and thus the scope of the present invention is not limited by the specific embodiments disclosed below.
The rotatable spliced construction pavement and the construction process provided according to some embodiments of the invention are described below with reference to fig. 1 to 3.
Some embodiments of the present application provide a construction walkway that can be turnaround and spliced.
As shown in fig. 1 to 3, a first embodiment of the present invention provides a turnover splicing type construction pavement, including:
a toilet board 1;
a support member 2 provided on a lower end surface of the toilet board 1;
a notch structure 3 formed on one side wall surface of the toilet board 1;
and a protruding structure 4 formed on the other side wall surface of the sidewalk plate 1, wherein the notch structure 3 and the protruding structure 4 are coupled to integrally splice the adjacent sidewalk plates 1.
The invention provides a construction access road capable of being circularly spliced, which comprises an access road plate 1, a supporting piece 2, a notch structure 3 and a protruding structure 4. Wherein, the pavement slab 1 is supported on the ground through the supporting piece 2, and the upper end surface thereof is used as a temporary pavement, thereby facilitating the passage of constructors. On above-mentioned basis, set up notch structure 3 and protrusion structure 4 respectively in the both sides of just trackway board 1, notch structure 3 and protrusion structure 4 can form the connected form of coupling, consequently when the construction area is great, through with a plurality of just trackway boards 1 concatenation, form the interim just way that satisfies the construction requirements, make things convenient for constructor's current. Compared with the prior art, the device can be repeatedly utilized, concrete pouring is not needed, so that the waste of resources can be avoided, a plurality of construction procedures are omitted, and the construction efficiency and the construction quality are improved. In addition, the dismantling process is simple and quick, the problems of dust emission and the like can not be caused, and the green construction process is realized.
The second embodiment of the invention provides a construction sidewalk capable of being circularly spliced, and on the basis of the first embodiment, the notch structure 3 is a splicing opening, the protrusion structure 4 is a connecting protrusion, and the connecting protrusion is coupled with the splicing opening.
In this embodiment, it is for piecing together interface form to have injectd notch structure 3 to and protrusion structure 4 is the concatenation protrusion, during specific installation, only need insert the concatenation protrusion to the concatenation mouth, can realize the process of assembling of a plurality of just boards 1, whole process is convenient and swift.
The third embodiment of the invention provides a construction access road capable of being circularly spliced, and on the basis of any one of the embodiments, the number of the notch structures 3 is a plurality, the number of the protruding structures 4 corresponds to the number of the notch structures 3, and the notch structures 3 and the protruding structures 4 are uniformly distributed along the side wall surface of the access road plate 1.
In this embodiment, set up notch structure 3 and protrusion structure 4 a plurality ofly, can guarantee the intensity and the quality of tie point, the atress drops when avoiding just guidance tape 1 to guarantee passerby's safety.
A fourth embodiment of the present invention provides a construction walkway capable of revolving and splicing, and on the basis of any of the above embodiments, the construction walkway further includes:
and the fastener 5, the sidewalk plate 1 is provided with a bolt hole 6, the position of the bolt hole 6 is matched with that of the notch structure 3, and the fastener 5 is installed to the bolt hole 6 so as to lock the protruding structure 4 to the notch structure 3.
In this embodiment, a fastener 5 is also included. When the notch structure 3 and the projection structure 4 are coupled, the lower end surface of the fastener 5 abuts against the projection structure 4 by fitting the fastener 5 into the bolt hole 6, thereby preventing the projection structure 4 from slipping and improving the joint strength of the dash panel 1.
The fifth embodiment of the invention provides a construction access road capable of being circularly spliced, and on the basis of any one of the embodiments, the fastener 5 is in a bolt structure.
In the present embodiment, the fastener 5 is defined as a bolt structure. The disassembly and assembly processes are quick and the cost is low.
A sixth embodiment of the present invention provides a rotatable and splicing construction access road, and on the basis of any of the above embodiments, the construction access road further includes:
and rainwater ditches 7 arranged on both sides of the toilet board 1.
In this embodiment, a storm drain 7 is also included. The rain gutter 7 is of a groove structure and can be installed on two sides of the toilet board 1 in a welding mode, and the function of draining water in rainy days is achieved. Of course, the rain gutter 7 and the toilet board 1 may be detachably connected, such as by bolts, to facilitate the detachment and installation of the rain gutter 7.
A seventh embodiment of the present invention provides a construction walkway capable of revolving and splicing, and on the basis of any of the above embodiments, the construction walkway further includes:
and a cover plate 8 covering the rainwater ditch 7.
In this embodiment, a cover plate 8 is further included. The cover plate 8 covers the rainwater ditch 7, so that the injury caused by mistakenly stepping on the rainwater ditch 7 by constructors in rainy days is avoided.
The eighth embodiment of the invention provides a construction access road capable of being circularly spliced, and on the basis of any one of the above embodiments, the supporting pieces 2 are of a supporting column structure, and the number of the supporting columns is several, and the supporting columns are arranged along two sides and the central line of the bottom of the access road plate 1.
In the present embodiment, the support 2 is a support column. The supporting columns are used for supporting the excrement plate 1, and in addition, the supporting plates and the excrement plate 1 can adopt a welding mode to improve the connection strength.
The ninth embodiment of the invention provides a construction access road capable of being spliced in a turnover manner, and on the basis of any one of the above embodiments, a reserved pipeline 9 is formed on the access road plate 1.
In the present embodiment, the reserve duct 9 is formed in the toilet board 1, and the reserve duct 9 is used for routing.
The tenth embodiment of the invention provides a construction process of a rotatable splicing type construction pavement, which is applied to the rotatable splicing type construction pavement in any one of the technical schemes and comprises the following steps:
welding the support 2 to the ramp plate 1;
hoisting the processed pavement slab 1 to a construction area;
splicing a plurality of the toilet way plates 1, inserting the convex structures 4 into the concave structures 3 and locking the convex structures by the fasteners 5;
after the construction of this construction area is completed, the plurality of ramp boards 1 are disassembled and then hoisted to the next construction area.
In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. The utility model provides a can have enough to meet need concatenation formula construction way, its characterized in that includes:
a toilet board (1);
a support member (2) provided on the lower end surface of the toilet board (1);
a notch structure (3) formed on one side wall surface of the toilet board (1);
and the protruding structure (4) is formed on the other side wall surface of the sidewalk plate (1), wherein the notch structure (3) and the protruding structure (4) are coupled to splice the adjacent sidewalk plates (1) into a whole.
2. The turnaround-spliceable construction walkway of claim 1, wherein the notch structure (3) is a splice opening and the protrusion structure (4) is a connection protrusion, the connection protrusion and the splice opening being coupled.
3. A turnable splicing type construction access road according to claim 2, characterized in that the number of said notch structures (3) is several, the number of said protruded structures (4) corresponds to the number of notch structures (3), and said notch structures (3) and said protruded structures (4) are uniformly distributed along the side wall surface of the access road plate (1).
4. The turnaround and spliced construction walkway of claim 3, further comprising:
a fastener (5), the said toilet board (1) is formed with the bolt hole (6), the position of the said bolt hole (6) is right after the position of the notch structure (3), the said fastener (5) is mounted to the said bolt hole (6), in order to lock the protruding structure (4) in the notch structure (3).
5. The turnaround spliced construction walkway of claim 4,
the fastener (5) is of a bolt structure.
6. The rotatable splicing type construction pavement of any one of claims 1 to 5, further comprising:
and the rainwater ditches (7) are arranged at two sides of the excrement channel plate (1).
7. The turnaround split-joint construction access way of claim 6, further comprising:
and the cover plate (8) covers the rainwater ditch (7).
8. A turnable splicing construction walkway as claimed in any one of claims 1 to 5, wherein the supports (2) are of a support column structure, the number of support columns is several, and they are arranged along both sides and the centre line of the bottom of the walkway plate (1).
9. Turnaround-spliceable construction walkway according to claim 8, characterized in that the walkway plate (1) is formed with a reserve pipe (9).
10. A construction process of a turnover splicing type construction access road, which applies the turnover splicing type construction access road as claimed in any one of the claims 1 to 9, and is characterized by comprising the following steps:
welding the support (2) to the ramp plate (1);
hoisting the processed pavement slab (1) to a construction area;
splicing a plurality of toilet boards (1) to enable the protruding structures (4) to be inserted into the notch structures (3) and locked through the fasteners (5);
after the construction of the construction area is completed, the plurality of the sidewalk boards (1) are disassembled and then hoisted to the next construction area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210739935.6A CN115142314A (en) | 2022-06-28 | 2022-06-28 | Turnover splicing type construction access road and construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210739935.6A CN115142314A (en) | 2022-06-28 | 2022-06-28 | Turnover splicing type construction access road and construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115142314A true CN115142314A (en) | 2022-10-04 |
Family
ID=83410828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210739935.6A Pending CN115142314A (en) | 2022-06-28 | 2022-06-28 | Turnover splicing type construction access road and construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115142314A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013159998A (en) * | 2012-02-07 | 2013-08-19 | Toshin Kogyo Co Ltd | Simple covering plate |
CN209144600U (en) * | 2018-10-30 | 2019-07-23 | 湖南省第四工程有限公司 | A kind of Prefabricated road plate and temporary road |
CN112796189A (en) * | 2021-01-29 | 2021-05-14 | 中国建筑第七工程局有限公司 | Can have enough to meet need assembled road system |
CN213417462U (en) * | 2020-09-30 | 2021-06-11 | 中国建筑第七工程局有限公司 | Novel assembled road |
CN113322737A (en) * | 2021-06-18 | 2021-08-31 | 中铁建设集团有限公司 | Prefabricated road panel connecting structure and mounting method based on tongue-and-groove bent bolt connection |
CN216107900U (en) * | 2021-10-14 | 2022-03-22 | 梁文静 | Drainage side ditch structure for temporary road of fabricated concrete road board |
CN218508158U (en) * | 2022-06-28 | 2023-02-21 | 中国五冶集团有限公司 | Can have enough to meet need concatenation formula construction pavement |
-
2022
- 2022-06-28 CN CN202210739935.6A patent/CN115142314A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013159998A (en) * | 2012-02-07 | 2013-08-19 | Toshin Kogyo Co Ltd | Simple covering plate |
CN209144600U (en) * | 2018-10-30 | 2019-07-23 | 湖南省第四工程有限公司 | A kind of Prefabricated road plate and temporary road |
CN213417462U (en) * | 2020-09-30 | 2021-06-11 | 中国建筑第七工程局有限公司 | Novel assembled road |
CN112796189A (en) * | 2021-01-29 | 2021-05-14 | 中国建筑第七工程局有限公司 | Can have enough to meet need assembled road system |
CN113322737A (en) * | 2021-06-18 | 2021-08-31 | 中铁建设集团有限公司 | Prefabricated road panel connecting structure and mounting method based on tongue-and-groove bent bolt connection |
CN216107900U (en) * | 2021-10-14 | 2022-03-22 | 梁文静 | Drainage side ditch structure for temporary road of fabricated concrete road board |
CN218508158U (en) * | 2022-06-28 | 2023-02-21 | 中国五冶集团有限公司 | Can have enough to meet need concatenation formula construction pavement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7744307B2 (en) | Method for renovating of a traffic-carrying structure | |
CN207672354U (en) | Concrete pavement slab assembly connection structure | |
CN113668612A (en) | Modular combined prefabricated electric power working well and construction method thereof | |
CN218508158U (en) | Can have enough to meet need concatenation formula construction pavement | |
CN111254779A (en) | Embedding structure and method for improving pavement cracking around luminous floor tiles | |
CN209854577U (en) | Assembled thin-wall box-shaped channel | |
CN115142314A (en) | Turnover splicing type construction access road and construction process | |
CN209779683U (en) | Jigsaw assembled comprehensive pipe gallery | |
CN111364520A (en) | Prefabricated multi-way cable well and construction method thereof | |
CN218345839U (en) | Construction access road capable of being circulated | |
CN211776455U (en) | Movable rail encloses fender | |
KR100555250B1 (en) | Long span temporary bridge by the advance system, and the construction method of this | |
CN109826229B (en) | Concrete pile for constructing side wall of assembled pipe gallery | |
CN212195397U (en) | Assembled carwash groove | |
CN110777800A (en) | Construction method for dismantling foundation pit concrete purlin | |
KR102529660B1 (en) | Temporary installed structure for covering and construction method there of | |
JP2584443Y2 (en) | Lining board | |
CN211713652U (en) | Novel road surface landing stage board and system thereof | |
JP6276300B2 (en) | Open shield method | |
CN214657060U (en) | Supporting structure for covering and digging top of foundation pit | |
CN216892739U (en) | Assembled drainage inspection shaft | |
KR100274747B1 (en) | Method for installation of electric pole and supporting device of the same | |
KR102171474B1 (en) | Concrete Road Block and System using it | |
CN212153462U (en) | Prefabricated multi-pass cable shaft | |
CN220246597U (en) | Temporary bridge crossing device for maintaining tunnel transverse ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |