CN209854577U - An Assembled Thin-Walled Box-Type Channel - Google Patents

An Assembled Thin-Walled Box-Type Channel Download PDF

Info

Publication number
CN209854577U
CN209854577U CN201920241768.6U CN201920241768U CN209854577U CN 209854577 U CN209854577 U CN 209854577U CN 201920241768 U CN201920241768 U CN 201920241768U CN 209854577 U CN209854577 U CN 209854577U
Authority
CN
China
Prior art keywords
prefabricated
cast
assembled thin
plate
walled box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920241768.6U
Other languages
Chinese (zh)
Inventor
陈露晔
王昌将
童庆
雷波
吴淀杭
王乐群
冯劲
林亚芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shuzhijiaoyuan Technology Co Ltd
Original Assignee
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority to CN201920241768.6U priority Critical patent/CN209854577U/en
Application granted granted Critical
Publication of CN209854577U publication Critical patent/CN209854577U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型公开了一种装配式薄壁箱型通道,其每个节段由一块预制顶板、两块预制侧板以及一块现浇底板组成,预制顶板为一水平放置的矩形板,预制侧板由一块竖直放置的主侧板及与主侧板垂直的底侧板组成,两侧板在交界部位设置倒角,预制侧板节段两端设置承插口;现浇底板为一水平放置的现浇矩形板;通过预制侧板与预制顶板、现浇底板的连接构成装配式薄壁箱型通道的标准节段;不同节段通过承插口连接在一起,节段接缝采用防水密封胶填充。本实用新型的优点在于:实现标准化设计、工厂化预制、装配式安装,模板简洁,构件质量好,机械化水平高,安装便捷牢固,现场零焊接,降低环境污染,减少现场人工消耗,施工效率高,能够有效缩短施工工期。

The utility model discloses an assembled thin-walled box-shaped channel, each section of which is composed of a prefabricated top board, two prefabricated side boards and a cast-in-place bottom board, the prefabricated top board is a rectangular board placed horizontally, and the prefabricated side board It consists of a vertically placed main side plate and a bottom side plate perpendicular to the main side plate. The two side plates are chamfered at the junction, and sockets are set at both ends of the prefabricated side plate segment; the cast-in-place bottom plate is a horizontally placed Cast-in-place rectangular slabs; the standard sections of prefabricated thin-walled box-shaped channels are formed by connecting prefabricated side panels, prefabricated roof panels, and cast-in-place bottom panels; different sections are connected together through sockets, and the joints of the sections are filled with waterproof sealant . The utility model has the advantages of: realizing standardized design, factory prefabrication, assembly installation, simple formwork, good component quality, high mechanization level, convenient and firm installation, zero welding on site, reducing environmental pollution, reducing on-site labor consumption, and high construction efficiency , can effectively shorten the construction period.

Description

一种装配式薄壁箱型通道An Assembled Thin-Walled Box-Type Channel

技术领域technical field

本实用新型属于公路或市政工程及地下通道工程技术领域,具体涉及一种装配式薄壁箱型通道。The utility model belongs to the technical field of highway or municipal engineering and underground passage engineering, in particular to an assembled thin-walled box-shaped passage.

背景技术Background technique

在现有公路或市政工程建设中,通道沿线分布数量较多,跨径较大的交通涵洞和过水涵洞普遍采用盖板涵或箱涵的结构形式,传统的施工方法是现浇法,也有部分预制装配式通道应用。In the construction of existing highways or municipal engineering, there are many passages distributed along the line, and the traffic culverts and water culverts with large spans generally adopt the structural form of slab culvert or box culvert. The traditional construction method is the cast-in-place method, and there are also Some prefabricated channel applications.

现浇通道施工一般在地基基础施工完成后进行,采用现场架立模板现浇混凝土施工。根据现浇方案施工工序及工艺的特点,使得现浇法施工具有先天不足,具体体现在以下几个方面:The cast-in-place channel construction is generally carried out after the foundation construction is completed, and the cast-in-place concrete construction is carried out by erecting formwork on site. According to the characteristics of the construction process and technology of the cast-in-place scheme, the cast-in-place method has inherent deficiencies, which are specifically reflected in the following aspects:

(1)施工工期较长,现场浇筑必须在地基处理完后进行,换填或管桩处理本身需要一定时间,现浇作业工序包括:钢筋绑扎焊接、模板架立、混凝土浇筑、模板拆除、混凝土养护,工艺复杂无法利用地基处理前期的时间。(1) The construction period is long, and the on-site pouring must be carried out after the foundation treatment is completed. It takes a certain amount of time to replace the filling or the pipe pile treatment itself. The maintenance and process are complicated and the time in the early stage of foundation treatment cannot be utilized.

(2)施工质量差,现场浇筑及养护受复杂工序和现场环境局限,建筑工人素质也参差不齐,通道混凝土浇筑质量和外观质量通常难以保证,气孔、蜂窝麻面、温度裂缝等病害时有发生,即使加强监督也难以有效避免。(2) Poor construction quality, on-site pouring and maintenance are limited by complex procedures and on-site environment, and the quality of construction workers is also uneven. It is usually difficult to guarantee the quality of channel concrete pouring and appearance quality, and diseases such as air holes, honeycomb pockmarks, and temperature cracks sometimes occur Even if supervision is strengthened, it is difficult to effectively avoid it.

(3)现场劳动力多,机械化程度低,现场立模、钢筋绑扎、喷水养护势必需要较多人力,现阶段我国劳动力年龄普遍较大,工效降低,陷入恶性循环。建筑民工的工资高企,建筑企业负担加重。(3) On-site labor force is large and the degree of mechanization is low. On-site formwork, steel bar tying, and water spray maintenance will inevitably require more manpower. At this stage, the labor force in my country is generally older, and work efficiency is reduced, falling into a vicious circle. The wages of construction migrant workers are high, and the burden on construction enterprises has increased.

(4)环境污染大,现浇施工不可避免带来环境污染,如泥浆流失、施工噪音、颗粒扬尘等。(4) Environmental pollution is high, and cast-in-place construction inevitably brings environmental pollution, such as mud loss, construction noise, particle dust, etc.

因此现浇方案存在工程造价高、施工复杂、施工效率低、工期缓慢、工程质量难以保证等诸多问题。Therefore, the cast-in-place solution has many problems such as high engineering cost, complicated construction, low construction efficiency, slow construction period, and difficulty in guaranteeing engineering quality.

现有装配式通道主要有盖板涵或箱涵。现有装配式盖板涵或箱涵存在不足之处,具体体现如下:The existing prefabricated passages mainly include slab culverts or box culverts. There are deficiencies in the existing prefabricated slab culverts or box culverts, which are specifically reflected as follows:

(1)装配式盖板涵仅顶板预制,侧墙和底板为适应现场环境仍采用现浇。(1) The prefabricated roof culvert is only prefabricated, and the side walls and bottom slabs are still cast-in-place to adapt to the site environment.

(2)装配式盖板涵采用侧墙处断缝并设圆弧形绞,构造较为复杂,块件之间拼缝较大,不利于现场吊装施工和防水处理。(2) The prefabricated cover culvert adopts broken joints at the side walls and arc-shaped strands. The structure is relatively complex, and the joints between the blocks are relatively large, which is not conducive to on-site hoisting construction and waterproof treatment.

(3)装配式箱涵尺寸较大,自重较大,运输不便且对吊装机械设备要求较高。(3) The prefabricated box culvert is large in size, heavy in weight, inconvenient for transportation and has high requirements for hoisting machinery and equipment.

(4)装配式箱涵需要横向顶推或拉紧,难以竖向承插,需要额外反力设备或拉索,导致施工不便。(4) The prefabricated box culvert needs to be pushed or pulled horizontally, it is difficult to be inserted vertically, and additional counter force equipment or cables are required, resulting in inconvenience in construction.

发明内容Contents of the invention

鉴于上述,本实用新型提供了一种装配式薄壁箱型通道,实现标准化设计、工厂化预制、装配式安装,模板简洁,构件质量好,机械化水平高,安装便捷牢固,现场零焊接,降低环境污染,减少现场人工消耗,施工效率高,能够有效缩短施工工期。In view of the above, the utility model provides a prefabricated thin-walled box-shaped channel, which realizes standardized design, factory prefabrication, and prefabricated installation. Environmental pollution, reduced on-site labor consumption, high construction efficiency, can effectively shorten the construction period.

一种装配式薄壁箱型通道,由多个节段拼接而成,每个节段为由一块预制顶板、两块预制侧板以及一块现浇底板组合成的空箱结构,所述预制侧板由一块水平放置的底侧板以及与底侧板垂直的主侧板组成,使得预制侧板横截面为倒T型结构,主侧板上沿搁置处设有锚栓钢筋,底侧板内侧设置有环形伸出钢筋,底侧板通过环形伸出钢筋及混凝土与现浇底板嵌套固接,预制侧板沿通道长度方向的两侧设有承插口(一侧为凸,另一侧为凹),预制顶板上开有供锚栓钢筋穿过的锚栓孔。A prefabricated thin-walled box-shaped channel, which is spliced by multiple segments, each segment is an empty box structure composed of a prefabricated top plate, two prefabricated side plates and a cast-in-place bottom plate, the prefabricated side The panel is composed of a horizontal bottom side panel and a main side panel perpendicular to the bottom side panel, so that the cross section of the prefabricated side panel is an inverted T-shaped structure. There are ring-shaped protruding steel bars, and the bottom and side plates are nested and fixed with the cast-in-place bottom plate through the ring-shaped protruding steel bars and concrete. Concave), the prefabricated roof is provided with anchor bolt holes for anchor bolt steel bars to pass through.

进一步地,主侧板与底侧板交界处设置有倒角。Further, a chamfer is provided at the junction of the main side plate and the bottom side plate.

进一步地,所述装配式薄壁箱型通道的长度方向根据现场实地情况采用由标准节段与调整节段组合拼接的实现形式。Further, the length direction of the prefabricated thin-walled box-shaped channel adopts the combination and splicing of standard segments and adjustment segments according to on-site conditions.

进一步地,所述预制侧板与预制顶板及现浇底板的配合连接构成装配式薄壁箱型通道的标准节段。Further, the mating connection of the prefabricated side panels, the prefabricated top panel and the cast-in-place bottom panel constitutes a standard segment of the prefabricated thin-walled box-shaped channel.

进一步地,所述装配式薄壁箱型通道的标准节段长度为2.5米,调整节段长度为1米。Further, the standard section length of the prefabricated thin-walled box channel is 2.5 meters, and the adjustment section length is 1 meter.

进一步地,所述预制顶板和预制侧板均采用工厂化预制的钢筋混凝土预制构件,现浇底板采用现场浇筑的钢筋混凝土构件。Further, the prefabricated top slab and the prefabricated side slabs are all made of factory prefabricated reinforced concrete components, and the cast-in-place bottom slab is made of on-site cast reinforced concrete components.

进一步地,所述预制顶板通过锚栓孔与预制侧板主侧板上沿的锚栓钢筋穿插搁置。Further, the prefabricated top plate is interspersed with the anchor bolt reinforcement on the main side plate of the prefabricated side plate through the anchor bolt holes.

进一步地,相邻节段之间通过承插口拼接在一起,节段接缝采用防水密封胶填充,节段接缝外侧采用止水带环形密封。Further, the adjacent segments are spliced together through sockets, the segment joints are filled with waterproof sealant, and the outside of the segment joints is annularly sealed with a waterstop belt.

本实用新型由工厂预制加工钢筋混凝土构件:顶板和侧板,侧板高度可根据实际需要灵活调节,预制完成后运输至现场进行安装,先将预制侧板安装就位,然后搁置预制顶板形成初始结构,再将两块预制侧板的底侧板连接,浇筑底板,最终形成永久稳定结构;标准节段通过承插口连接在一起,节段接缝采用防水密封胶填充节段接缝外侧采用止水带环形密封;箱型通道的长度可根据现场实地情况灵活调节不同标准节段、调整节段的组合。The utility model prefabricated and processed reinforced concrete components by the factory: top plate and side plate, and the height of the side plate can be flexibly adjusted according to actual needs. After the prefabrication is completed, it will be transported to the site for installation. Then connect the bottom and side panels of the two prefabricated side panels, pour the bottom panel, and finally form a permanent and stable structure; the standard segments are connected together through sockets, and the segment joints are filled with waterproof sealant outside the segment joints. The water belt is annularly sealed; the length of the box-shaped channel can be flexibly adjusted according to the actual situation on site, and the combination of different standard segments and adjustment segments can be flexibly adjusted.

与现有技术相比,本实用新型具有以下有益技术效果:Compared with the prior art, the utility model has the following beneficial technical effects:

1.标准化设计、工厂化制造、装配式安装,机械化水平高。1. Standardized design, factory manufacturing, prefabricated installation, high level of mechanization.

2.模板简洁、分块合理,构件质量好。2. The formwork is simple, the blocks are reasonable, and the components are of good quality.

3.现场钢筋零焊,环境污染降低,减少现场人工消耗。3. Zero welding of steel bars on site, reducing environmental pollution and reducing on-site labor consumption.

4.安装便捷牢固,施工效率提高,有效缩短施工工期。4. The installation is convenient and firm, the construction efficiency is improved, and the construction period is effectively shortened.

5.箱型薄壁构件,受力合理,经济节省。5. Box-shaped thin-walled components, reasonable force, economical and economical.

附图说明Description of drawings

图1为本实用新型通道节段的前视结构示意图。Fig. 1 is a front view structural schematic diagram of the channel segment of the present invention.

图2为本实用新型通道节段的后视结构示意图。Fig. 2 is a rear view structural schematic diagram of the channel segment of the present invention.

图3为本实用新型通道节段预制顶板的结构示意图。Fig. 3 is a schematic structural view of the channel segment prefabricated roof of the utility model.

图4为本实用新型通道节段预制侧板的前视结构示意图。Fig. 4 is a front view structural schematic diagram of the channel segment prefabricated side plate of the utility model.

图5为本实用新型通道节段预制侧板的后视结构示意图。Fig. 5 is a rear view structural schematic diagram of the prefabricated side panel of the channel segment of the utility model.

图6为本实用新型通道节段现浇底板的结构示意图。Fig. 6 is a structural schematic diagram of the channel segment cast-in-place floor of the utility model.

图7为本实用新型通道节段按通行及过水功能选取参数的横断面示意图。Fig. 7 is a cross-sectional schematic diagram of parameters selected according to the passage and water passing functions of the channel segment of the utility model.

图8为本实用新型通道四段拼装的结构示意图。Fig. 8 is a structural schematic diagram of the assembly of four passages of the utility model.

图9为本实用新型通道附属设施(预制边沟)的结构示意图。Fig. 9 is a structural schematic diagram of the auxiliary facility (prefabricated side ditch) of the utility model.

图10为本实用新型通道四段拼装结合附属设施的结构示意图。Fig. 10 is a schematic structural view of the four-section assembly of the channel of the present invention combined with ancillary facilities.

其中:1—预制顶板,11—锚栓孔,2—预制侧板,21—主侧板,22—底侧板,23—倒角(内),24—倒角(外),25—承插口(凸),26—承插口(凹),27—锚栓钢筋,28—环形伸出钢筋,3—现浇底板,4—预制边沟,5—沥青路面层,6—砂砾垫层,L—节段长度,B—标准宽,H—标准高。Among them: 1—prefabricated top plate, 11—anchor bolt hole, 2—prefabricated side plate, 21—main side plate, 22—bottom side plate, 23—chamfer (inner), 24—chamfer (outer), 25—bearing Socket (convex), 26—socket (concave), 27—anchor bolt reinforcement, 28—annular protruding reinforcement, 3—cast-in-place floor, 4—prefabricated side ditch, 5—asphalt pavement layer, 6—gravel cushion, L—segment length, B—standard width, H—standard height.

具体实施方式Detailed ways

为了更为具体地描述本实用新型,下面结合附图及具体实施方式对本实用新型的技术方案进行详细说明。In order to describe the utility model more specifically, the technical solutions of the utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

如图1~图6所示,本实用新型装配式薄壁箱型通道由多个节段拼接而成,每个节段由一块预制顶板1、两块预制侧板2以及一块现浇底板3组成,预制顶板1为一块水平放置的矩形板,板两端设置有锚栓孔11;预制侧板2由一块竖直放置的主侧板21及与主侧板21垂直的底侧板22组成,两侧板21和22构成的预制侧板2的横截面为倒T型结构,并在交界部位设置倒角23和24;预制侧板2的主侧板21上沿搁置处设置有锚栓钢筋27,底侧板22内侧设置有环形伸出钢筋28,预制侧板2节段两端设置有承插口25和26;现浇底板3为一块水平放置的现浇矩形板,与预制侧板2的底侧板22连结。As shown in Figures 1 to 6, the prefabricated thin-walled box-shaped channel of the utility model is spliced by multiple segments, and each segment consists of a prefabricated roof 1, two prefabricated side plates 2 and a cast-in-place bottom plate 3 The prefabricated top panel 1 is a horizontally placed rectangular panel with anchor bolt holes 11 arranged at both ends of the panel; the prefabricated side panel 2 is composed of a vertically placed main side panel 21 and a bottom side panel 22 perpendicular to the main side panel 21 , the cross-section of the prefabricated side panel 2 formed by the side panels 21 and 22 is an inverted T-shaped structure, and chamfers 23 and 24 are provided at the junction; anchor bolts are provided on the upper edge of the main side panel 21 of the prefabricated side panel 2 Steel bar 27, the inner side of bottom side plate 22 is provided with annular protruding steel bar 28, and the two ends of prefabricated side plate 2 are provided with socket sockets 25 and 26; 2 bottom side plate 22 connection.

如图7所示,通过预制侧板2与预制顶板1、现浇底板3的连接构成装配式薄壁箱型通道的标准节段,节段长度为L,按通行功能和过水功能选取标准宽B×标准高H。As shown in Figure 7, the standard section of the prefabricated thin-walled box-shaped channel is formed by the connection of the prefabricated side plate 2, the prefabricated roof 1, and the cast-in-place bottom plate 3. Width B×standard height H.

本实施方式中,装配式薄壁箱型通道的标准节段长度L为2.5米,调整节段长度L为1米,实现通道长度方向自由组合。In this embodiment, the standard segment length L of the assembled thin-walled box-shaped channel is 2.5 meters, and the adjusted segment length L is 1 meter to realize free combination in the channel length direction.

本实施方式中,预制顶板1和预制侧板2均为工厂化预制的钢筋混凝土预制构件,现浇底板3为现场浇筑的钢筋混凝土构件。In this embodiment, the prefabricated roof 1 and the prefabricated side slabs 2 are factory prefabricated reinforced concrete prefabricated components, and the cast-in-place bottom slab 3 is a reinforced concrete component cast on site.

本实施方式中,预制顶板1通过板两端设置的锚栓孔11与预制侧板2的主侧板21上沿的锚栓钢筋27嵌套搁置。In this embodiment, the prefabricated roof 1 is nested with the anchor bolts 27 on the upper edge of the main side panel 21 of the prefabricated side panel 2 through the anchor bolt holes 11 provided at both ends of the panel.

本实施方式中,预制侧板2通过底侧板22的环形伸出钢筋28与现浇底板3钢筋环形嵌套连接。In this embodiment, the prefabricated side panel 2 is connected to the cast-in-place bottom panel 3 by circularly nesting the reinforcing bars 28 protruding from the bottom side panel 22 .

本实施方式中,现浇底板3水平放置在两块预制侧板2的底侧板22之间。In this embodiment, the cast-in-place base plate 3 is placed horizontally between the bottom side plates 22 of the two prefabricated side plates 2 .

本实施方式中,标准节段之间通过承插口25和26连接在一起,节段接缝采用防水密封胶填充,节段接缝外侧采用止水带环形密封,如图8所示。In this embodiment, the standard segments are connected together through the sockets 25 and 26, the segment joints are filled with waterproof sealant, and the outside of the segment joints is sealed with a waterstop ring, as shown in FIG. 8 .

本实施方式中,箱式通道内部采用如图9所示的预制边沟4快速施工,夯实砂砾垫层6,在其上铺设路面结构层5。In this embodiment, the inside of the box-type channel is quickly constructed by using the prefabricated side ditch 4 as shown in FIG.

本实用新型装配式薄壁箱型通道的施工过程为:The construction process of the assembled thin-walled box-shaped channel of the utility model is as follows:

(1)根据通道涵位具体地质条件对地基基础进行加固处理,满足地基承载能力要求,施作调平层满足预制构件安放平整度要求;(1) Reinforce the foundation according to the specific geological conditions of the channel culvert to meet the requirements of the bearing capacity of the foundation, and apply a leveling layer to meet the flatness requirements of the prefabricated components;

(2)吊装首节段预制侧板2,安装撑杆确保预制侧板稳定;(2) hoisting the prefabricated side panel 2 of the first section, and installing struts to ensure the stability of the prefabricated side panel;

(3)吊装预制顶板1,形成稳定结构,在企口缝25周边采用防水密封胶进行涂抹填充,其余预制侧板延承插口25、26顺序竖向承插,吊装配套预制顶板2,直至预制侧板和预制顶板全部安装完毕;(3) Hoist the prefabricated roof 1 to form a stable structure, apply waterproof sealant around the tongue and groove 25 and fill it, and the remaining prefabricated side panels extend the sockets 25 and 26 vertically in sequence, and hoist the matching prefabricated roof 2 until the prefabricated The side panels and prefabricated roof panels are all installed;

(4)在预制顶板1和预制侧板2接缝外侧采用止水带包裹;(4) Wrap the outside of the joints of the prefabricated roof 1 and the prefabricated side panels 2 with waterstops;

(5)安装预制边沟4,夯实砂砾垫层6,在其上铺设路面结构层5;(5) Install the prefabricated side ditch 4, compact the gravel cushion 6, and lay the pavement structure layer 5 thereon;

(6)施作通道两侧洞门,完成拱型通道施工,如图10所示。(6) Construct the gates on both sides of the passage to complete the construction of the arch passage, as shown in Figure 10.

上述对实施例的描述是为便于本技术领域的普通技术人员能理解和应用本实用新型。熟悉本领域技术的人员显然可以容易地对上述实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本实用新型不限于上述实施例,本领域技术人员根据本实用新型的揭示,对于本实用新型做出的改进和修改都应该在本实用新型的保护范围之内。The above description of the embodiments is for those of ordinary skill in the art to understand and apply the utility model. It is obvious that those skilled in the art can easily make various modifications to the above-mentioned embodiments, and apply the general principles described here to other embodiments without creative efforts. Therefore, the utility model is not limited to the above-mentioned embodiments, and the improvements and modifications made by those skilled in the art according to the disclosure of the utility model should be within the protection scope of the utility model.

Claims (8)

1. The utility model provides an assembled thin wall box passageway forms by a plurality of segmentations concatenation, its characterized in that: every festival section is for the empty case structure that is made up by a prefabricated roof, two prefabricated curb plates and a cast-in-place bottom plate, prefabricated curb plate comprises the bottom side board that a level was placed and with bottom side board vertically main side board for prefabricated curb plate cross section is the type of falling T structure, is equipped with the crab-bolt reinforcing bar along shelving the department on the main curb plate, and bottom side inboard is provided with annular and stretches out the reinforcing bar, and bottom side board stretches out reinforcing bar and concrete and cast-in-place bottom plate nested rigid coupling through the annular, and prefabricated curb plate is equipped with the bell and spigot along channel length direction's both sides, and it has the anchor bolt hole that supplies the crab-bolt.
2. The assembled thin-walled box-type gallery of claim 1, further comprising: a chamfer is arranged at the junction of the main side plate and the bottom side plate.
3. The assembled thin-walled box-type gallery of claim 1, further comprising: the length direction of the assembled thin-wall box-type channel adopts an implementation form of combining and splicing a standard segment and an adjusting segment according to the field situation.
4. The assembled thin-walled box-type gallery of claim 3, wherein: the prefabricated side plates, the prefabricated top plate and the cast-in-place bottom plate are connected in a matched mode to form a standard segment of the assembled thin-wall box-type channel.
5. The assembled thin-walled box-type gallery of claim 3, wherein: the standard segment length of the assembled thin-wall box-type channel is 2.5 meters, and the adjusting segment length is 1 meter.
6. The assembled thin-walled box-type gallery of claim 1, further comprising: the prefabricated top plate and the prefabricated side plates are both prefabricated reinforced concrete prefabricated components prefabricated in an industrial mode, and the cast-in-place bottom plate is a reinforced concrete component poured in situ.
7. The assembled thin-walled box-type gallery of claim 1, further comprising: the prefabricated roof is alternatively laid with the anchor bolt reinforcing steel bars on the upper edge of the main side plate of the prefabricated side plate through the anchor bolt holes.
8. The assembled thin-walled box-type gallery of claim 1, further comprising: adjacent segments are spliced together through bell and spigot joints, segment joints are filled with waterproof sealant, and the outer sides of the segment joints are sealed in an annular mode through water stop belts.
CN201920241768.6U 2019-02-26 2019-02-26 An Assembled Thin-Walled Box-Type Channel Active CN209854577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920241768.6U CN209854577U (en) 2019-02-26 2019-02-26 An Assembled Thin-Walled Box-Type Channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920241768.6U CN209854577U (en) 2019-02-26 2019-02-26 An Assembled Thin-Walled Box-Type Channel

Publications (1)

Publication Number Publication Date
CN209854577U true CN209854577U (en) 2019-12-27

Family

ID=68932205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920241768.6U Active CN209854577U (en) 2019-02-26 2019-02-26 An Assembled Thin-Walled Box-Type Channel

Country Status (1)

Country Link
CN (1) CN209854577U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321712A (en) * 2020-02-20 2020-06-23 中国电建集团华东勘测设计研究院有限公司 Assembled fishway pool chamber structure and construction method
CN111733947A (en) * 2020-07-24 2020-10-02 南昌市城市规划设计研究总院 An improved structure of ultra-low headroom box culvert and its quick and easy construction method
CN113565024A (en) * 2021-08-27 2021-10-29 甘肃交设智远实业有限公司 An assembled UHPC composite trough plate culvert structure
CN117063846A (en) * 2023-10-12 2023-11-17 中昇东浩(深圳)科技有限公司 An integrally assembled pig farm

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321712A (en) * 2020-02-20 2020-06-23 中国电建集团华东勘测设计研究院有限公司 Assembled fishway pool chamber structure and construction method
CN111733947A (en) * 2020-07-24 2020-10-02 南昌市城市规划设计研究总院 An improved structure of ultra-low headroom box culvert and its quick and easy construction method
CN113565024A (en) * 2021-08-27 2021-10-29 甘肃交设智远实业有限公司 An assembled UHPC composite trough plate culvert structure
CN117063846A (en) * 2023-10-12 2023-11-17 中昇东浩(深圳)科技有限公司 An integrally assembled pig farm

Similar Documents

Publication Publication Date Title
CN104674847B (en) A kind of city integrated piping lane of prefabricated concrete
CN106854873B (en) Engineering method of prefabricated spliced open caisson type parking garage and parking garage
CN209854577U (en) An Assembled Thin-Walled Box-Type Channel
CN105201012B (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
CN105951876A (en) Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN207348091U (en) A kind of assembled pipe gallery
CN108149706A (en) Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof
CN106703077A (en) Prefabricated and assembled integral type underground pipe gallery structure
CN207498985U (en) A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template
CN111997088A (en) Groove type prefabricated assembly type cable duct bank and working well installation and construction method
CN106801436A (en) A kind of construction method for overlapping assembled underground pipe gallery
CN207998860U (en) A kind of assembled pipe gallery
CN107012887B (en) Prefabricated pin-connected panel node of arc top utility tunnel piecemeal
WO2024074079A1 (en) Prefabricated assembled reinforced concrete retaining wall and construction method therefor
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN105401593A (en) Assembly type square underground pipe gallery
CN210887303U (en) Superimposed prefabricated integrated pipe gallery structure
CN206052778U (en) A kind of steel and Combined concrete piping lane
CN212582739U (en) Prefabricated grout of concrete seals assembled inspection shaft
CN206529712U (en) Assembled steel reinforced concrete aliform type culvert opening
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN205369299U (en) Pin -connected panel precast reinforced concrete piping lane
CN209353364U (en) A kind of assembled case change basis
CN218508158U (en) Revolvable splicing construction access road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 928, yuhangtang Road, Xihu District, Hangzhou City, Zhejiang Province 310011

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Address before: 310006 No. 89 West Ring Road, Zhejiang, Hangzhou

Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING DESIGN & RESEARCH Co.,Ltd.

CP03 Change of name, title or address