CN114991492A - Construction method for connecting archaized building outer wall and ancient building blue brick wall body with main structure - Google Patents
Construction method for connecting archaized building outer wall and ancient building blue brick wall body with main structure Download PDFInfo
- Publication number
- CN114991492A CN114991492A CN202210606337.1A CN202210606337A CN114991492A CN 114991492 A CN114991492 A CN 114991492A CN 202210606337 A CN202210606337 A CN 202210606337A CN 114991492 A CN114991492 A CN 114991492A
- Authority
- CN
- China
- Prior art keywords
- wall
- building
- wall body
- brick
- ancient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011449 brick Substances 0.000 title claims abstract description 161
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 239000004567 concrete Substances 0.000 claims abstract description 54
- 238000009413 insulation Methods 0.000 claims abstract description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 25
- 238000000034 method Methods 0.000 claims description 9
- 238000004321 preservation Methods 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 9
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000005034 decoration Methods 0.000 abstract description 2
- 239000011150 reinforced concrete Substances 0.000 abstract description 2
- 238000000227 grinding Methods 0.000 description 10
- 238000011049 filling Methods 0.000 description 8
- 239000011505 plaster Substances 0.000 description 8
- 239000011440 grout Substances 0.000 description 7
- 238000011010 flushing procedure Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- ODINCKMPIJJUCX-UHFFFAOYSA-N Calcium oxide Chemical compound [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 description 4
- 238000007598 dipping method Methods 0.000 description 4
- 244000144730 Amygdalus persica Species 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 2
- 235000017491 Bambusa tulda Nutrition 0.000 description 2
- 241001330002 Bambuseae Species 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 2
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 2
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 2
- 229910001111 Fine metal Inorganic materials 0.000 description 2
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 2
- 235000006040 Prunus persica var persica Nutrition 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 2
- 238000013459 approach Methods 0.000 description 2
- 239000011425 bamboo Substances 0.000 description 2
- 235000012255 calcium oxide Nutrition 0.000 description 2
- 239000000292 calcium oxide Substances 0.000 description 2
- 235000009120 camo Nutrition 0.000 description 2
- 235000005607 chanvre indien Nutrition 0.000 description 2
- 210000000078 claw Anatomy 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 239000011487 hemp Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005498 polishing Methods 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000007790 scraping Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 238000005491 wire drawing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/28—Walls having cavities between, but not in, the elements; Walls of elements each consisting of two or more parts kept in distance by means of spacers, all parts being solid
- E04B2/30—Walls having cavities between, but not in, the elements; Walls of elements each consisting of two or more parts kept in distance by means of spacers, all parts being solid using elements having specially designed means for stabilising the position; Spacers for cavity walls
- E04B2/34—Walls having cavities between, but not in, the elements; Walls of elements each consisting of two or more parts kept in distance by means of spacers, all parts being solid using elements having specially designed means for stabilising the position; Spacers for cavity walls by filling material with or without reinforcements in small channels in, or in grooves between, the elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/90—Passive houses; Double facade technology
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
The invention relates to the technical field of archaized building construction, and discloses an archaized building outer wall and a construction method for connecting an archaized building green brick wall body with a main structure. The invention realizes the effective and reliable connection of the blue brick wall body of the outer vertical surface of the ancient building and the main structure of the modern building, the outer wall adopts blue brick thread seam wall decoration, the inner wall adopts aerated concrete blocks or reinforced concrete structures, and the heat insulation layer is arranged between the blue brick wall body and the main structure to meet the energy-saving requirement, so that the wall body not only meets the artistic effect of the ancient building, but also meets the structural safety performance and the use function of the modern building.
Description
Technical Field
The invention relates to the technical field of archaized building construction, in particular to a construction method for connecting an outer wall of an archaized building and a wall body of an archaized green brick with a main structure.
Background
In recent years, antique buildings are more and more, and the condensation weight, simplicity and texture of the antique buildings are the purposes required to be achieved by the antique buildings. The blue brick and tile house building inherits the ancient culture and the masonry style of China and is advocated by the archaized building. At present, the antique building of the blue brick wall surface is generally built upwards by using the blue bricks after foundation making, but the building speed is slow, the labor cost is high, the connection firmness between the blue brick wall body and the main structure of the modern building is poor, the problems of short service life, frequent later-stage repair and the like exist, a heat preservation layer is not arranged, and the energy-saving and consumption-reducing effects are poor. Therefore, how to effectively and reliably connect the blue brick wall body of the ancient building facade with the main structure of the modern building has important research significance.
Disclosure of Invention
In view of this, the invention aims to provide a construction method for connecting an exterior wall of an antique building and a blue brick wall body and a main structure of the antique building, which can effectively and reliably connect the blue brick wall body of the exterior wall of the antique building and the main structure of a modern building together, so that the wall body not only meets the artistic effect of the antique building, but also meets the structural safety performance and the use function of the modern building.
In order to achieve the purpose of the invention, the technical scheme is as follows:
archaize building outer wall, this building outer wall outside-in be ancient building blue or green brick wall body, heat preservation and major structure in proper order, wherein, ancient building blue or green brick wall body is blue or green brick silk seam wall, major structure is one of concrete structure wall body and aerated concrete block wall body.
As a further improvement of the invention, the building outer wall sequentially comprises a black brick silk-seam wall with the thickness of 140mm, a heat-insulating layer with the thickness of 100mm and a concrete structure wall from outside to inside.
As a further improvement of the invention, the building outer wall sequentially comprises a black brick silk-seam wall with the thickness of 140mm, a heat-insulating layer with the thickness of 100mm and an aerated concrete block wall with the thickness of 200mm from outside to inside, and the total thickness of the building outer wall is 440 mm.
A construction method for a drawknot of an ancient building green brick wall body and a concrete structure wall body is characterized in that a back wall and a concrete structure wall body drawknot rib are arranged at each 360mm height of the ancient building green brick wall body in a plum blossom point arrangement, and a group building mode adopts a silk seam cross seam five-layer and one-block group building; sequentially building a modulus bullet according to each group of the grey brick groups on the concrete wall, arranging a horizontal line, and opening holes at intervals of 300mm on the horizontal line for bar planting, wherein the bar planting depth is 10d, and the total length is 230 mm; pulling points are arranged on the concrete structure at intervals of 300mm in the horizontal direction and 360mm in the vertical direction, and the pulling points are arranged in a plum blossom shape; after the whole layer of the T-shaped bricks are built, grooving along the length direction of the ancient building green brick wall body, wherein the groove depth is 15mm, the groove width is 15mm, and simultaneously grooving along the position which is vertical to the length direction of the green brick wall body and is superposed with the embedded bars on the concrete member, wherein the groove width depth is the same as the groove depth; and embedding reinforcing steel bars in the grooves, and connecting the crossed parts of the reinforcing steel bars by lap joint or spot welding so as to achieve mutual tie of the ancient building black brick wall body and the concrete structure and ensure the stability of the ancient building black brick wall body.
The construction method of the pulling knot of the ancient building green brick wall body and the aerated concrete block wall body is characterized in that the construction of the ancient building green brick wall body and the construction of the aerated concrete block are carried out simultaneously, the height of the aerated concrete block is 300mm, five layers of parallel bricks and one layer of T-shaped bricks are built on the green bricks, through long wall pressing ribs are arranged in mortar joints every 300 h on the aerated concrete block wall body, the T-shaped bricks are embedded into the aerated block wall body for 40mm, and the T-shaped bricks are provided with pulling hooks at intervals of 980mm and are pulled with the aerated block wall body to be tied, so that the purpose of reliably connecting the green brick wall body and the aerated concrete block is achieved.
In the application, the construction method of the ancient black brick wall body is as follows:
1. line and sample snapping device
Cleaning a base layer, popping up the thickness, the length and the like of a wall by using ink lines, and performing trial swinging according to the arrangement form of I-shaped seams according to design requirements, namely 'sample swinging'. To determine the exact specification of "five-skinned" or "bladder face", the sample activity should be performed before the bricks are cut, and the sample activity is only for verification and appropriate adjustment. The silk seam wall body can be made of a 'five-scarped skin' brick, and can also be made of a 'bladder surface' brick, such as a bladder surface brick, and the bladder surface of the brick is conventionally placed downwards.
2. Wire fastening and lining foot
Two vertical wires tied at two ends are called as a wire drawing. Two transverse wires are tied between the pulling wires, the lower part is called a 'horizontal wire', and the upper part is called a 'cover wire' (the 'standing ruler' is taken away). Before the first layer of bricks is built, whether the base layer is uneven or not is checked, and if the base layer is uneven, deviation exists. It should be plastered with hemp-tipped blades, called "foot-lining".
3. Masonry
The ancient black brick wall body is designed to be a thread seam wall manufacturing method in the application,
laying on the table surface with the lining corners, and paving old mortar between the bricks. The mortar joint is generally 2-3 mm. The method for hanging ash is as follows: the brick is held by one hand, the edge of the exposed side of the brick is beaten with a tile cutter by the other hand to form a gray strip, and two small ash mounds called claw ash are beaten on the inward edge, so that the grout can flow in during grouting. The outer edge of the top seam of the brick is also provided with a plaster strip. The two sides of the large surface of the brick can be smeared with plaster strips or can be optionally provided with plaster piers (called as bench plaster). These operations are all carried out on the face of the brick facing downwards. In order to ensure the tightness of mortar joints, mortar strips called as 'locking mortar' can be also arranged on the outer edges of the built brick layers. After the bricks are laid, the residual ash extruded out of the bricks is scraped by a bricklayer, but gaps do not need to be drawn.
The key of the method for building the silk-seam wall is that the brick material is accurately cut and ground, the straightness and the consistent thickness of the mortar seam are emphasized, and the brick cannot move to the seam.
4. Stuffing filling
The gap between the wall body and the middle part of the grey brick is filled with rough bricks, namely stuffing. The filling is as high as possible consistent with the building height of the threaded wall, and a layer of T-shaped bricks and filling bricks are arranged for knotting every five layers of building.
5. Grouting and plastering line
Peach blossom pulp or quicklime pulp is used for grouting. The slurry should be poured in three times, the first time and the third time should be thinner, and the second time should be thicker. Before grouting, the wall surface can be dotted as necessary to prevent the grout from overflowing and polluting the wall surface. The first grouting is generally only grouting 1/3, which is called half-port grouting. However, the three times of grouting are called' point dropping, namely, the insufficient part is made up on the basis of twice grouting. Grouting should not be carried out in a way of avoiding voids or excessive quantities, otherwise, bricks can be propped open. After the pit is dropped, the mortar floating on the brick is scraped by a mortar scraping plate, and then the place filled with the mortar is smeared by a hemp knife, namely the 'line smearing' is also called as the 'locking notch'. The line is applied to prevent the grout on the upper layer from flowing down to prop the brick, so the line is an uneconomical process.
6. Laying step by step
When the brick is laid, the upper heel rope and the lower heel edge are needed, namely, the upper edge of the brick takes a horizontal line as a standard, and the lower edge takes the upper edge of the bottom layer brick as a standard. If obvious defects are found when the bricks are placed. And (5) cutting and grinding again. The four corners of the exposed portion, if not in the same plane, allow one corner to be raised out of the wall, i.e., "throw away", but not recessed into the wall, which would otherwise not be easily repaired. After a plurality of layers are laid, the laying can be continued after the laying is properly laid for half a day.
7. Dotting repair
Drying and activating: grinding the part of the brick higher than the brick joint by a grinding head;
dotting: filling the incomplete part of the brick or the sand holes on the brick with brick dust;
churning: and (4) polishing the marked place and the dried place by dipping the grinding head in water, and rubbing the whole wall surface once by dipping the grinding head in water to obtain the consistency of color and texture. The above process can be carried out at any time along with the approach of the laying.
Flushing: the whole wall surface is cleaned and washed by clean water and a soft brush, and a real brick solid joint is shown. The flushing is carried out after the wall is completely finished and before the scaffold is disassembled, so that the wall surface is prevented from being polluted due to construction.
8. Ploughing joint
The 'seam plowing' is needed when the wall body with the wire seam is laid well. Tools for seam plowing: the front end is cut into flat bamboo chips or made into a 'scraper-trough conveyer' by using fine metal wires with certain hardness. If there is a gap, the gap should be dotted and filled in advance. The plowing seam is arranged to be performed after flushing. When the seam is ploughed, the flat ruler plate is aligned with the mortar seam and stuck on the wall, and then the scraper-trough conveyer is used for extruding the seam on the mortar seam along the flat ruler plate. And ploughing the vertical seam after ploughing the horizontal seam.
When the construction of the ancient blue brick wall is carried out, the following points should be noted:
(1) when in dotting and repairing, the wall surface is strictly forbidden to be coated with green pulp, deep-moon white pulp and the like.
(2) When the wall body is built, the building can be continued after 1h of interval for every 1m of building height.
(3) And covering rain-proof cloth or film on the wall body in time after the wall body is built, and protecting the finished product.
The invention has the beneficial effects that: the invention belongs to antique engineering combining ancient construction and modern building, realizes effective and reliable connection between a blue brick wall body of an outer vertical surface of the ancient construction and a main structure of the modern building, adopts blue brick thread joint wall decoration for the outer wall, adopts aerated concrete blocks or reinforced concrete structures for the inner wall, and arranges a heat-insulating layer between the blue brick wall body and the main structure to meet the energy-saving requirement, so that the wall body not only meets the artistic effect of the ancient construction, but also meets the structural safety performance and the use function of the modern building.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
FIG. 1 is a schematic view of a drawknot of an ancient blue brick wall and a concrete structure wall;
FIG. 2 is a plan view of a drawknot of an ancient blue brick wall and a concrete structure wall;
FIG. 3 is a cross-sectional view of a drawknot of an ancient blue brick wall and a concrete structure wall;
FIG. 4 is a combination schematic view of an ancient brick wall and a concrete structure wall;
FIG. 5 is a schematic drawing of a drawknot of an ancient blue brick wall and an aerated concrete block wall;
FIG. 6 is a plan view of a drawknot of an ancient blue brick wall and an aerated concrete block wall;
FIG. 7 is a cross-sectional view of a drawknot of an ancient building blue brick wall and an aerated concrete block wall.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without making any creative effort shall fall within the protection scope of the present application.
Example 1
Archaize building outer wall, this building outer wall outside-in be ancient building blue or green brick wall body, heat preservation and major structure in proper order, wherein, ancient building blue or green brick wall body is blue or green brick silk seam wall, major structure is one of concrete structure wall body and aerated concrete block wall body.
Example 2
As shown in figures 1-4, the exterior wall of the antique building comprises a black brick silk seam wall with the thickness of 140mm, an insulating layer with the thickness of 100mm and a concrete structure wall from outside to inside in sequence.
A construction method for a drawknot of an ancient building green brick wall body and a concrete structure wall body is characterized in that a back wall and a concrete structure wall body drawknot rib are arranged at each 360mm height of the ancient building green brick wall body in a plum blossom point arrangement, and a group building mode adopts a silk seam cross seam five-layer and one-block group building; sequentially building a modulus and bouncing horizontal lines according to each group of the black bricks on the concrete wall, and opening holes at intervals of 300mm on the horizontal lines for embedding bars, wherein the embedded bars have the depth of 10d and the total length of 230 mm; setting pull nodes which are arranged on the concrete structure and are arranged with the ancient blue brick wall body at the interval of 300mm in the horizontal direction and 360mm in the vertical direction, wherein the pull nodes are arranged in a quincuncial shape; after the whole layer of the T-shaped bricks are built, grooving along the length direction of the ancient building green brick wall body, wherein the groove depth is 15mm, the groove width is 15mm, and simultaneously grooving along the position which is vertical to the length direction of the green brick wall body and is superposed with the embedded bars on the concrete member, wherein the groove width depth is the same as the groove depth; and steel bars are embedded in the grooves, and the crossed parts of the steel bars are connected by lap joint or spot welding, so that the mutual pulling of the ancient black brick wall body and the concrete structure is achieved, and the stability of the ancient black brick wall body is ensured.
Example 3
As shown in fig. 5-7, the antique building outer wall sequentially comprises a black brick silk seam wall with the thickness of 140mm, a heat insulation layer with the thickness of 100mm and an aerated concrete block wall body with the thickness of 200mm from outside to inside, and the total thickness of the antique building outer wall is 440 mm.
A construction method for a drawknot of an ancient building green brick wall body and an aerated concrete block wall body is characterized in that the construction of the ancient building green brick wall body and the construction of the aerated block concrete are carried out simultaneously, the height of the aerated concrete block is 300mm, five layers of T-shaped bricks are laid on the green bricks, a through long wall pressing rib is arranged in a mortar joint every 300 th height on the aerated concrete block wall body, the T-shaped bricks are embedded into the aerated block wall body for 40mm, and drag hooks are arranged on the T-shaped bricks at intervals of 980mm and are drawknot-connected with the aerated block wall body, so that the purpose of reliably connecting the green brick wall body and the aerated concrete block is achieved.
Example 4
In the application, the construction method of the ancient black brick wall body is as follows:
1. line and sample snapping device
Cleaning a base layer, popping up the thickness, the length and the like of the wall by using ink lines, and trying to swing according to the arrangement form of the I-shaped seam according to the design requirement, namely 'sample activity'. To determine the exact specification of "five-skinned" or "bladder face", the sample activity should be performed before the bricks are cut, and the sample activity is only for verification and appropriate adjustment. The silk seam wall body can be made of a 'five-scarped skin' brick, and can also be made of a 'bladder surface' brick, such as a bladder surface brick, and the bladder surface of the brick is conventionally placed downwards.
2. Wire fastening and lining foot
Two vertical wires tied at two ends are called as a wire drawing. Two transverse wires are tied between the pulling wires, the lower part is called a 'horizontal wire', and the upper part is called a 'cover wire' (the 'standing ruler' is taken away). Before the first layer of bricks is built, whether the base layer is uneven or not is checked, and if the base layer is uneven, deviation exists. It should be smoothed with hemp-tipped putty, called "foot lining".
3. Masonry
The ancient black brick wall body is designed to be a thread seam wall manufacturing method in the application,
laying on the table surface with the lining corners, and paving old mortar between the bricks. The mortar joint is generally 2-3 mm. The method for hanging ash is as follows: the brick is held by one hand, the edge of the exposed side of the brick is beaten with a tile cutter by the other hand, and two small ash piers called as 'claw ash' are beaten on the inward edge, so that the grout can flow in during grouting. The outer edge of the top seam of the brick is also provided with a plaster strip. Both sides of the large face of the brick can be plastered with plaster strips, and can also be optionally provided with plaster piers (called as bench plaster). These operations are all carried out on the face of the brick facing downwards. In order to ensure the tightness of the mortar joints, mortar strips, namely 'locking mortar', can be also formed on the outer edges of the built brick layers. After the bricks are laid, the residual ash extruded out of the bricks is scraped by a bricklayer but does not need to be scribed.
The key of the method for building the wire seam wall is that the brick material is accurately cut and ground, the straightness and the consistent thickness of the mortar seam are emphasized, and the brick cannot move along the seam.
5. Stuffing filling
The gap between the wall body and the middle part of the grey brick is filled with rough bricks, namely stuffing. The filling is as high as possible consistent with the building height of the threaded wall, and a layer of T-shaped bricks and filling bricks are arranged for knotting every five layers of building.
5. Grouting and plastering line
Peach blossom pulp or quicklime pulp is used for grouting. The slurry should be poured in three times, the first time and the third time should be thinner, and the second time should be thicker. Before grouting, the wall surface can be dotted as necessary to prevent the grout from overflowing and polluting the wall surface. The first grouting is generally only 1/3, which is called half grout. But the three times are called' point falling, namely, the insufficient place is made up on the basis of twice grouting. Grouting should be done without voids or excess, which would otherwise hold the bricks open. After the pit is dropped, the mortar floating on the brick is scraped by a mortar scraping plate, and then the place filled with the mortar is smeared by a hemp knife, namely the 'line smearing' is also called as the 'locking notch'. The line is applied to prevent the grout on the upper layer from flowing down to prop the brick, so the line is an uneconomical process.
6. Laying step by step
When the brick is laid, the upper heel rope and the lower heel edge are needed, namely, the upper edge of the brick takes a horizontal line as a standard, and the lower edge takes the upper edge of the bottom layer brick as a standard. If obvious defects are found when the bricks are placed. And (5) cutting and grinding again. If the four corners of the exposed part are not on the same plane, one corner is allowed to protrude out of the wall, i.e., the corner is allowed to be thrown away, but is not allowed to be recessed into the wall, otherwise the corner is not easy to repair. After a plurality of layers are laid, laying can be continued after laying for half a day.
7. Dotting repair
Drying and activating: grinding the part of the brick higher than the brick joint by a grinding head;
dotting: filling the incomplete part of the brick or the sand holes on the brick with brick dust;
churning: and (4) polishing the marked place and the dried place by dipping the grinding head in water, and rubbing the whole wall surface once by dipping the grinding head in water to obtain the consistency of color and texture. The process can be carried out at any time along with the approach of the laying.
Flushing: clean the whole wall surface with clean water and a soft brush, and show the real brick solid joint. The flushing is carried out after the wall is completely finished and before the scaffold is disassembled, so that the wall surface is prevented from being polluted due to construction.
8. Ploughing joint
The 'seam plowing' is needed when the wall body with the wire seam is laid well. Tools for plowing the seams: the front end is cut into flat bamboo chips or made into a 'scraper-trough conveyer' by using fine metal wires with certain hardness. If there is a gap, the gap should be dotted and filled in advance. The plowing seam is arranged to be performed after flushing. When the seam is ploughed, the flat ruler plate is aligned with the mortar seam and stuck on the wall, and then the scraper-trough conveyer is used for extruding the seam on the mortar seam along the flat ruler plate. And ploughing the vertical seam after ploughing the horizontal seam.
When the construction of ancient building blue brick wall body is carried out, the following points should be noted:
(1) when in dotting and repairing, the wall surface is strictly forbidden to be coated with green pulp, deep-moon white pulp and the like.
(2) When the wall is built, the building can be continued after the interval of 1h when the building height is 1 m.
(3) And covering rain-proof cloth or film on the wall body in time after the wall body is built, and protecting the finished product.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement, component separation or combination and the like made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims (5)
1. Archaize building outer wall, its characterized in that: the building outer wall sequentially comprises an ancient building grey brick wall body, a heat preservation layer and a main structure from outside to inside, wherein the ancient building grey brick wall body is a grey brick thread seam wall, and the main structure is one of a concrete structure wall body and an aerated concrete block wall body.
2. The exterior wall of an archaized building according to claim 1, wherein: the building outer wall sequentially comprises a black brick silk-seam wall with the thickness of 140mm, a heat preservation layer with the thickness of 100mm and a concrete structure wall from outside to inside.
3. The exterior wall of an archaized building according to claim 1, wherein: the building outer wall sequentially comprises a black brick silk seam wall with the thickness of 140mm, a heat insulation layer with the thickness of 100mm and an aerated concrete block wall body with the thickness of 200mm from outside to inside, and the total thickness of the building outer wall is 440 mm.
4. A construction method of the drawknot of the ancient blue brick wall and the concrete structure wall in the archaized building outer wall according to claim 2, which is characterized in that: the method comprises the following steps that a back wall and a concrete structure wall tie bar are arranged at one plum blossom point every 360mm of an ancient building green brick wall, and a combined building mode is that five layers of silk seam cross seams are adopted to be built in groups one by one; sequentially building a modulus bullet according to each group of the grey brick groups on the concrete wall, arranging a horizontal line, and opening holes at intervals of 300mm on the horizontal line for bar planting, wherein the bar planting depth is 10d, and the total length is 230 mm; setting pull nodes which are arranged on the concrete structure and are arranged with the ancient blue brick wall body at the interval of 300mm in the horizontal direction and 360mm in the vertical direction, wherein the pull nodes are arranged in a quincuncial shape; after the whole layer of the T-shaped bricks are built, grooving along the length direction of the ancient building green brick wall body, wherein the groove depth is 15mm, the groove width is 15mm, and simultaneously grooving along the position which is vertical to the length direction of the green brick wall body and is superposed with the embedded bars on the concrete member, wherein the groove width depth is the same as the groove depth; and steel bars are embedded in the grooves, and the crossed parts of the steel bars are connected by lap joint or spot welding, so that the mutual pulling of the ancient black brick wall body and the concrete structure is achieved, and the stability of the ancient black brick wall body is ensured.
5. A construction method for the drawknot of the antique building black brick wall and the aerated concrete block wall in the exterior wall of the antique building according to claim 3, which is characterized in that: construction of the ancient building green brick wall body and aerated block concrete construction are carried out simultaneously, the height of the aerated concrete block is 300mm, the green brick is used for building five layers of parallel bricks, wall ribs are arranged in mortar joints every 300mm above the aerated concrete block wall body, the ancient building green brick wall body is embedded into the aerated block wall body by 40mm, and 980mm of the interval between the green brick wall body and the aerated block wall body is pulled to be connected, so that reliable connection between the green brick wall body and the aerated concrete block is achieved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210606337.1A CN114991492A (en) | 2022-05-31 | 2022-05-31 | Construction method for connecting archaized building outer wall and ancient building blue brick wall body with main structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210606337.1A CN114991492A (en) | 2022-05-31 | 2022-05-31 | Construction method for connecting archaized building outer wall and ancient building blue brick wall body with main structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114991492A true CN114991492A (en) | 2022-09-02 |
Family
ID=83031752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210606337.1A Pending CN114991492A (en) | 2022-05-31 | 2022-05-31 | Construction method for connecting archaized building outer wall and ancient building blue brick wall body with main structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114991492A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1862608A2 (en) * | 2006-06-01 | 2007-12-05 | GIVETTI ALESSI, Rossano | Method for wall covering with old-brick imitation tiles |
CN201474116U (en) * | 2009-08-17 | 2010-05-19 | 北京城建亚泰建设工程有限公司 | Joint node for construction of ancient bricks and concrete structures |
CN106592810A (en) * | 2016-12-08 | 2017-04-26 | 陕西建工第三建设集团有限公司 | Construction method of wrapping fair brick masonry for concrete structure of historic building |
CN206376394U (en) * | 2017-01-05 | 2017-08-04 | 广东电白二建集团有限公司 | Building block blue bricks modelled after an antique combines clear water wall structures |
CN207260370U (en) * | 2017-09-30 | 2018-04-20 | 南京市园林规划设计院有限责任公司 | A kind of pseudo-classic architecture external wall structure |
CN212896942U (en) * | 2020-06-05 | 2021-04-06 | 苏州永腾建筑装饰有限公司 | Wall body for archaized building |
CN113775081A (en) * | 2021-09-18 | 2021-12-10 | 陕西建工第三建设集团有限公司 | Construction method of inner and outer leaf composite wall of pseudo-classic building |
CN215759756U (en) * | 2021-06-30 | 2022-02-08 | 山西五建集团有限公司 | Pseudo-classic architecture thread seam wall structure |
-
2022
- 2022-05-31 CN CN202210606337.1A patent/CN114991492A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1862608A2 (en) * | 2006-06-01 | 2007-12-05 | GIVETTI ALESSI, Rossano | Method for wall covering with old-brick imitation tiles |
CN201474116U (en) * | 2009-08-17 | 2010-05-19 | 北京城建亚泰建设工程有限公司 | Joint node for construction of ancient bricks and concrete structures |
CN106592810A (en) * | 2016-12-08 | 2017-04-26 | 陕西建工第三建设集团有限公司 | Construction method of wrapping fair brick masonry for concrete structure of historic building |
CN206376394U (en) * | 2017-01-05 | 2017-08-04 | 广东电白二建集团有限公司 | Building block blue bricks modelled after an antique combines clear water wall structures |
CN207260370U (en) * | 2017-09-30 | 2018-04-20 | 南京市园林规划设计院有限责任公司 | A kind of pseudo-classic architecture external wall structure |
CN212896942U (en) * | 2020-06-05 | 2021-04-06 | 苏州永腾建筑装饰有限公司 | Wall body for archaized building |
CN215759756U (en) * | 2021-06-30 | 2022-02-08 | 山西五建集团有限公司 | Pseudo-classic architecture thread seam wall structure |
CN113775081A (en) * | 2021-09-18 | 2021-12-10 | 陕西建工第三建设集团有限公司 | Construction method of inner and outer leaf composite wall of pseudo-classic building |
Non-Patent Citations (1)
Title |
---|
张廷荣,张强编: "砌体工程施工技术问答", 30 September 2005, 河南科学技术出版社, pages: 305 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746772B (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN109838065A (en) | A kind of ground brick flooring paving construction method | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN107989401A (en) | A kind of existing building external wall reconstruction structure and construction method | |
CN102808513B (en) | Crack controlling construction method for lightweight wall | |
CN108412093B (en) | Modern landscape decorative rammed earth wall and construction method thereof | |
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
CN106013509A (en) | Dry-method construction method for high-performance autolaved aerated concrete block wall | |
CN106639206A (en) | Construction process of colored heat-insulation and heat-preservation dry powder mortar | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN109750758A (en) | The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched | |
CN110273490A (en) | A kind of embedded lightweight wall plate steel building construction and construction method | |
CN108130992A (en) | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method | |
CN105625650B (en) | A kind of parapet of roofing flashing protective layer construction method | |
CN207829511U (en) | A kind of existing building external wall reconstruction structure | |
CN104695706A (en) | Construction method for AAC block free-loading wall | |
CN106592812A (en) | Construction method for in-situ processing and polishing bricks and constructing plain brick wall | |
CN107574936A (en) | A kind of heat preserving exterior wall construction technology | |
CN218493149U (en) | Mortar laying device for construction | |
CN114991492A (en) | Construction method for connecting archaized building outer wall and ancient building blue brick wall body with main structure | |
CN113530124B (en) | Construction method for preventing water-blocking wet plaster inside and outside volcanic rocks on wall surface | |
CN103806664A (en) | Construction technology of external thermal insulation mortar | |
CN207553357U (en) | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall | |
CN207063141U (en) | A kind of thermal-insulating waterproof building structure | |
CN107299731A (en) | A kind of anti-hollowing of mountain sand cement mortar plastering and cracking construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|