CN114934678B - Integral type shipping, sliding, installing and constructing method for full glass curtain wall - Google Patents

Integral type shipping, sliding, installing and constructing method for full glass curtain wall Download PDF

Info

Publication number
CN114934678B
CN114934678B CN202210356866.0A CN202210356866A CN114934678B CN 114934678 B CN114934678 B CN 114934678B CN 202210356866 A CN202210356866 A CN 202210356866A CN 114934678 B CN114934678 B CN 114934678B
Authority
CN
China
Prior art keywords
curtain wall
bracket
outer frame
sliding
square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210356866.0A
Other languages
Chinese (zh)
Other versions
CN114934678A (en
Inventor
刘喆
丁广城
赵昌
黄疆宇
林永振
卢倞
陈伟鹏
肖创
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU XIEAN CONSTRUCTION ENGINEERING CO LTD
Original Assignee
GUANGZHOU XIEAN CONSTRUCTION ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU XIEAN CONSTRUCTION ENGINEERING CO LTD filed Critical GUANGZHOU XIEAN CONSTRUCTION ENGINEERING CO LTD
Priority to CN202210356866.0A priority Critical patent/CN114934678B/en
Publication of CN114934678A publication Critical patent/CN114934678A/en
Application granted granted Critical
Publication of CN114934678B publication Critical patent/CN114934678B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an integral type shipping and sliding installation construction method of a full glass curtain wall, which belongs to the technical field of curtain wall installation. The effect of reducing the working strength of workers and facilitating transportation is achieved.

Description

Integral type shipping, sliding, installing and constructing method for full glass curtain wall
Technical Field
The invention relates to the technical field of curtain wall installation, in particular to an integral type consignment sliding installation construction method of a full glass curtain wall.
Background
In the installation and construction of the full glass curtain wall, the transportation of curtain wall glass is particularly frequent, and because the curtain wall glass is large in area and fragile, the transportation by using a cart is inconvenient, the transportation is generally carried out by adopting a carrying mode of four persons lifting horizontally, and finally the curtain wall glass is hoisted to an installation position.
With respect to the related art in the above, the inventors consider that there are the following drawbacks: the curtain wall glass has large area, heavy weight, more labor-consuming manual transportation and large working strength of staff, so that the curtain wall glass still has room for improvement.
Disclosure of Invention
In order to lighten the working strength of workers during carrying, the invention provides a transfer trolley.
The invention provides a transfer trolley which adopts the following technical scheme:
the integral type consignment, slippage and installation construction method of the full glass curtain wall comprises the following steps:
s1: and (3) preparation of construction: prefabricating a delivery truck and a bracket, binding curtain wall glass to the surface of the bracket, and binding and fixing the curtain wall glass and the bracket by using a traction rope;
s2: and (3) overall consignment: sleeving a bracket on the periphery of the delivery vehicle, pulling a traction rope, and applying horizontal acting force on the delivery vehicle by the bracket under the traction of the traction rope, wherein the delivery vehicle and curtain wall glass slide to a construction position together;
s3: and (3) lifting and installing: and connecting the traction rope with lifting equipment, and lifting the bracket and curtain wall glass to the curtain wall installation position and completing the installation.
Through adopting above-mentioned technical scheme, fix curtain glass board ligature in advance on the bracket, then lay curtain glass and bracket on the delivery truck in the lump, so that curtain glass stabilizes at the delivery truck, the haulage rope plays the promotion effect at the delivery truck in-process that slides, distance that the installer lifted by means of the delivery truck has been shortened, be favorable to alleviateed installer's working strength, in addition, the haulage rope plays the linking effect in the hoist and mount step, be convenient for link up hoist and mount construction, bracket and curtain glass hoist together wholly, stability when being favorable to improving curtain hoist and mount.
Preferably, the delivery vehicle comprises a square skeleton, a plywood arranged on the upper surface of the square skeleton and travelling wheels arranged on the lower surface of the square skeleton.
Through adopting above-mentioned technical scheme, square-way skeleton and plywood form the loading surface of delivery car jointly, when placing the article when moving, the plywood is laid as the surface course, with the load evenly distributed in square-way skeleton, square-way skeleton is as main bearing part, plays the effect of firm support, and the setting of walking wheel is favorable to the removal of moving car body.
Preferably, the square skeleton is provided with a stop support leg, and the stop support leg extends downwards.
Through adopting above-mentioned technical scheme, when the shutdown is in the middle of needs, stop the landing leg and support ground for stop stabilizer blade and walking wheel form stable bearing structure, in order to the article temporary parking.
Preferably, the number of the parking support legs is 2, and two parking support legs are symmetrically distributed on two sides of the square skeleton.
Through adopting above-mentioned technical scheme, rationally set up fulcrum quantity and position, be favorable to improving the steadiness when the mobile vehicle parks.
Preferably, the bracket comprises an outer frame and a plurality of reinforcing strips arranged on the inner side of the outer frame.
Through adopting above-mentioned technical scheme, the strengthening strip can improve frame intensity, when hoisting curtain wall glass plate piece, can lift by crane the frame, and lift glass plate piece in the lump, and hoist and curtain wall glass need not to contact, cracked probability when being favorable to reducing curtain wall glass hoist and mount.
Preferably, when the bracket is mounted on the delivery vehicle, the outer frame is sleeved on the periphery of the square-through framework, and the lower surfaces of the reinforcing strips are abutted against the upper end surfaces of the plywood.
Through adopting above-mentioned technical scheme to with the whole card of bracket in the square skeleton periphery of delivery vehicle, the load that the bracket undertaken passes through the reinforcement bar and transmits to the plywood, and during the removal, the frame inboard exerts thrust in square skeleton, and then drives the delivery vehicle and remove, has easy dismounting's advantage simultaneously.
Preferably, the surface of the bracket is provided with a rubber cushion block.
Through adopting above-mentioned technical scheme, when curtain glass ligature at the bracket, curtain glass and rubber cushion butt, rubber cushion play the cushioning effect, and glass is steady in being favorable to transporting, does not receive concentrated stress damage.
Preferably, the bracket is provided with a drawstring for connecting a traction rope.
By adopting the technical scheme, the connecting points are arranged between the traction rope brackets, so that the whole sliding operation of the curtain wall glass is facilitated.
Preferably, the wide edge of the outer frame is penetrated with two connecting grooves along the thickness direction of the outer frame, and the opening of the connecting groove faces the inner side of the wide edge of the outer frame; the two connecting grooves are in one-to-one correspondence with the two ends of the pull belt, and the two ends of the pull belt respectively penetrate into the corresponding connecting grooves from the outer side of the wide edge of the outer frame; the two connecting grooves are respectively and slidably connected with a sliding block, the sliding blocks slide along the width direction of the outer frame, and two ends of the pull belt are respectively and fixedly connected with the sliding blocks in the corresponding connecting grooves; the sliding block is provided with an inserting rod, the connecting end of the pull belt and the inserting rod are both positioned on the same side of the corresponding sliding block, one side of the sliding block, which is away from the inserting rod, is provided with an elastic piece, and the elastic piece is fixed with the side wall of the connecting groove; two connecting blocks are fixed on the outer side of the square through framework, the two connecting blocks are in one-to-one correspondence with the two connecting grooves, a limiting groove is formed in one side, opposite to each other, of each connecting block, and the two inserting rods are in one-to-one correspondence with the two limiting grooves; when the outer frame is sleeved on the periphery of the square-through framework, the connecting blocks are contained in the corresponding connecting grooves, and the inserting rods face the corresponding limiting grooves; when the pulling rope pulls the pull belt, the two sliding blocks move in the directions away from each other, the inserting rods are inserted into the corresponding limiting grooves, and the elastic piece is in a stretching state.
Because the construction pavement is uneven, jolt is easy in the slip process of the delivery vehicle, the risk that the bracket breaks away from the square-through framework exists, and because the area of the curtain wall glass is far larger than that of the plywood, unlocking and locking operations are not easy to perform, therefore, through the clamping fit of the design connecting block and the connecting groove, the inserted link is in plug fit with the jack, and the pulling rope continuously applies pulling force to the pulling belt in the slip process, so that the sliding block and the inserted link are forced to slide, the locking purpose of the bracket and the delivery vehicle is realized, the risk that the curtain wall glass breaks away from the delivery vehicle is reduced, and the transportation safety is improved; when transporting to the construction position, the haulage rope removes the pulling force to the haulage rope, and the slider resets under the effect of elastic component, and the inserted bar is taken out and is taken out the spacing groove to realize the unblock mesh, solved the inconvenient problem of unblock, be favorable to improving installation effectiveness.
Drawings
Fig. 1 is a schematic view of a state of a whole glass curtain wall in an integral type shipping, sliding, installing and constructing method for a curtain wall glass according to an embodiment of the present application.
Fig. 2 is an exploded view of a bracket and a carrier vehicle in an integral type shipping slip installation construction method of an all-glass curtain wall according to an embodiment of the present application.
Fig. 3 is a schematic view of a state of a bracket and a carrier vehicle assembled in the integral type carrying and sliding installation construction method of the full glass curtain wall according to the embodiment of the application.
Fig. 4 is a schematic diagram of the cooperation of the outer frame and the square skeleton in the integral type shipping, sliding and installing construction method of the full glass curtain wall according to the embodiment of the application.
Reference numerals illustrate: 1. a delivery vehicle; 11. a walking wheel; 12. a square skeleton; 121. a resting support leg; 122. a connecting block; 123. a limit groove; 13. plywood; 2. a nylon belt; 3. curtain wall glass; 4. a bracket; 41. an outer frame; 411. a rubber cushion block; 412. pulling a belt; 413. a slide block; 414. an elastic member; 415. a rod; 416. a connecting groove; 42. reinforcing strips.
Detailed Description
The invention is described in further detail below with reference to FIGS. 1-4.
The embodiment of the invention discloses an integral type shipping, sliding and installing construction method of a full glass curtain wall, which comprises the following steps of:
s1: and (3) preparation of construction: referring to fig. 1 and 2, the curtain wall glass 3 is bound to the surface of the bracket 4 by prefabricating the carrier vehicle 1 and the bracket 4, and is bound and fixed with the bracket 4 by using a traction rope.
The delivery vehicle 1 comprises a square-way framework 12 serving as a main bearing component, a plywood 13 paved on the upper surface of the square-way framework 12 and travelling wheels 11 installed and fixed on the lower surface of the square-way framework 12. Two stop support legs 121 made of square tubes are welded and fixed below the square tube framework 12, and the two stop support legs 121 are symmetrically distributed at the long edges of two sides of the square tube framework 12 and extend downwards so as to be temporarily parked.
The bracket 4 includes a rectangular outer frame 41 and a plurality of reinforcing bars 42 welded and fixed to the inner side of the outer frame 41, and the reinforcing bars 42 function to improve the strength of the outer frame 41. The reinforcing bars 42 are made of steel plates, the reinforcing bars 42 and the outer frame 41 together constitute the bracket 4, and mounting slots are formed at the bottom of the bracket 4 so that the bracket 4 can be assembled with the carrier vehicle 1.
The rubber cushion block 411 is fixed on the upper surface of the outer frame 41, so that the condition that the outer frame 41 is in direct contact with the curtain wall glass 3 is reduced.
The curtain wall glass 3 and the outer frame 41 are temporarily bound by nylon belts 2. A pull strap 412 is mounted on the outer side of the wide edge of the outer frame 41 for connecting a traction rope, and provides a force application point for subsequent sliding and hoisting operations.
S2: and (3) overall consignment: the bearing platform formed by the square skeleton 12 and the plywood 13 is embedded in the installation position at the bottom of the bracket 4, at this time, the outer frame 41 is sleeved on the periphery of the delivery vehicle 1, and the lower surface of the reinforcing strip 42 is abutted against the upper end surface of the plywood 13.
Referring to fig. 3 and 4, in order to enhance the connection stability between the bracket 4 and the carrier vehicle 1, in the step of prefabricating the carrier vehicle 1 and the bracket 4, two connection grooves 416 are formed through the wide side of the outer frame 41 in the thickness direction thereof, and the connection grooves 416 are opened toward the inner side of the wide side of the outer frame 41. The two connecting grooves 416 are in one-to-one correspondence with the two ends of the pull belt 412, and the two ends of the pull belt 412 respectively penetrate into the corresponding connecting grooves 416 from the outer side of the wide side of the outer frame 41; a slide block 413 is slidably connected to each of the two connecting grooves 416, the slide block 413 slides along the width direction of the outer frame 41, and two ends of the pull belt 412 are fixedly connected to the slide blocks 413 in the corresponding connecting grooves 416; the sliding block 413 is fixed with the inserted bar 415, and the link and the inserted bar 415 of stretching strap 412 all are located the same side that corresponds the sliding block 413, and the sliding block 413 deviates from the one side of inserted bar 415 and is fixed with the elastic component 414, and the elastic component 414 is the spring specifically, and the elastic component 414 is fixed with the lateral wall of connecting groove 416. Two connecting blocks 122 are fixed on the outer side of the square through framework 12, the two connecting blocks 122 are in one-to-one correspondence with the two connecting grooves 416, limiting grooves 123 are formed in the opposite sides of the two connecting blocks 122, and the two inserting rods 415 are in one-to-one correspondence with the two limiting grooves 123. When the outer frame 41 is fitted around the square frame 12, the connection blocks 122 are accommodated in the corresponding connection grooves 416, and the insertion bars 415 face the corresponding stopper grooves 123.
When carrying out the transportation of sliding to curtain wall glass 3, a staff pulls the haulage rope forward, and two to four staff protect curtain wall glass 3, prevent that curtain wall glass 3 from colliding with the wall in the transportation process again.
The traction rope applies traction force to the pull belt 412, the pull belt 412 is pulled to force the two sliding blocks 413 to move in the direction away from each other, and the inserting rods 415 are inserted into the corresponding limiting grooves 123, so that the locking purpose of the bracket 4 and the delivery vehicle 1 is achieved. The elastic member 414 is in a stretched state at this time.
The bracket 4 applies horizontal acting force to the delivery vehicle 1 under the traction of the traction rope, and the delivery vehicle 1 and the curtain wall glass 3 slide to the construction position together.
S3: and (3) lifting and installing: after the curtain wall glass 3 is conveyed to the construction position, the delivery vehicle 1 is parked, the pulling rope does not apply pulling force to the pulling belt 412 any more, the two sliding blocks 413 are reset under the elastic action of the elastic piece 414, and the inserting rod 415 is separated from the corresponding limiting groove 123, so that the aim of quick unlocking is fulfilled.
And then, connecting a traction rope with hoisting equipment, hoisting the electric hoist by using the hoisting equipment, hoisting the bracket 4 and the curtain wall glass 3 to the installation position of the curtain wall in a lump and completing the installation, and finally unbinding the bracket 4 and the curtain wall glass 3, wherein the bracket 4 plays a role in stably and stably hoisting the curtain wall glass 3 in the hoisting process, so that the condition that the hoisting tool is directly connected with the curtain wall glass 3 is avoided, and the probability that the curtain wall glass 3 is damaged by concentrated stress is reduced.
The above embodiments are not intended to limit the scope of the present invention, so: all equivalent changes in structure, shape and principle of the invention should be covered in the scope of protection of the invention.

Claims (4)

1. The integral type consignment, slippage and installation construction method of the full glass curtain wall is characterized in that: the method comprises the following steps:
s1: and (3) preparation of construction: the curtain wall glass (3) is bound to the surface of the bracket (4) and is bound and fixed with the bracket (4) by a traction rope;
s2: and (3) overall consignment: the bracket (4) is sleeved on the periphery of the delivery vehicle (1) and pulls the traction rope, the bracket (4) applies horizontal acting force to the delivery vehicle (1) under the traction of the traction rope, and the delivery vehicle (1) and the curtain wall glass (3) slide to a construction position together;
s3: and (3) lifting and installing: connecting a traction rope with lifting equipment, and lifting the bracket (4) and curtain wall glass (3) to the curtain wall installation position together to finish installation;
the delivery vehicle (1) comprises a square-way framework (12), a plywood (13) arranged on the upper surface of the square-way framework (12) and a travelling wheel (11) arranged on the lower surface of the square-way framework (12);
the bracket (4) comprises an outer frame (41) and a plurality of reinforcing strips (42) arranged on the inner side of the outer frame (41);
the bracket (4) is provided with a drawstring (412), and the drawstring (412) is used for connecting a traction rope;
the wide edge of the outer frame (41) is penetrated with two connecting grooves (416) along the thickness direction of the outer frame, and the connecting grooves (416) are opened towards the inner side of the wide edge of the outer frame (41); the two connecting grooves (416) are in one-to-one correspondence with the two ends of the pull belt (412), and the two ends of the pull belt (412) respectively penetrate into the corresponding connecting grooves (416) from the outer side of the wide edge of the outer frame (41); the two connecting grooves (416) are respectively and slidably connected with a sliding block (413), the sliding blocks (413) slide along the width direction of the outer frame (41), and two ends of the pull belt (412) are respectively and fixedly connected with the sliding blocks (413) in the corresponding connecting grooves (416); the sliding block (413) is provided with an inserting rod (415), the connecting end of the pull belt (412) and the inserting rod (415) are both positioned on the same side of the corresponding sliding block (413), one side of the sliding block (413) away from the inserting rod (415) is provided with an elastic piece (414), and the elastic piece (414) is fixed with the side wall of the connecting groove (416); two connecting blocks (122) are fixed on the outer side of the square-through framework (12), the two connecting blocks (122) are in one-to-one correspondence with the two connecting grooves (416), limit grooves (123) are formed in the opposite sides of the two connecting blocks (122), and the two inserting rods (415) are in one-to-one correspondence with the two limit grooves (123); when the outer frame (41) is sleeved on the periphery of the square-through framework (12), the connecting blocks (122) are accommodated in the corresponding connecting grooves (416), and the inserting rods (415) face the corresponding limiting grooves (123); when the pulling rope pulls the pull belt (412), the two sliding blocks (413) move in the directions away from each other, the inserting rods (415) are inserted into the corresponding limiting grooves (123), and the elastic piece (414) is in a stretching state.
2. The method for integral shipping, sliding and installing and constructing the full glass curtain wall according to claim 1, which is characterized in that: the square skeleton (12) is provided with a stopping support leg (121), and the stopping support leg (121) extends downwards.
3. The method for integral shipping, sliding and installing and constructing the full glass curtain wall according to claim 1, which is characterized in that: when the bracket (4) is installed on the delivery vehicle (1), the outer frame (41) is sleeved on the periphery of the square-shaped framework (12), and the lower surfaces of the reinforcing strips (42) are abutted to the upper end surfaces of the plywood (13).
4. The method for integral shipping, sliding and installing and constructing the full glass curtain wall according to claim 1, which is characterized in that: the surface of the bracket (4) is provided with a rubber cushion block (411).
CN202210356866.0A 2022-04-06 2022-04-06 Integral type shipping, sliding, installing and constructing method for full glass curtain wall Active CN114934678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210356866.0A CN114934678B (en) 2022-04-06 2022-04-06 Integral type shipping, sliding, installing and constructing method for full glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210356866.0A CN114934678B (en) 2022-04-06 2022-04-06 Integral type shipping, sliding, installing and constructing method for full glass curtain wall

Publications (2)

Publication Number Publication Date
CN114934678A CN114934678A (en) 2022-08-23
CN114934678B true CN114934678B (en) 2023-05-02

Family

ID=82862009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210356866.0A Active CN114934678B (en) 2022-04-06 2022-04-06 Integral type shipping, sliding, installing and constructing method for full glass curtain wall

Country Status (1)

Country Link
CN (1) CN114934678B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0176102B1 (en) * 1984-09-27 1988-08-10 Hans Pfab Transporting rack, particularly for stacks of flat glass
CN105649241B (en) * 2015-12-31 2018-06-19 中国建筑第八工程局有限公司 The installation method of restricted clearance Curtain Wall glass
CN206091336U (en) * 2016-10-11 2017-04-12 中国建筑股份有限公司海拓工程分公司 Precast concrete pile cap transports trailer
CN112874591A (en) * 2018-12-29 2021-06-01 孙静洁 Brick transfer equipment used in building field
CN214112573U (en) * 2020-12-16 2021-09-03 中国建筑土木建设有限公司 Self-control steel reinforcement cage and pipe transport vechicle
CN214456134U (en) * 2021-03-15 2021-10-22 中国五冶集团有限公司 Transportation hoist device of overweight glass of overlength

Also Published As

Publication number Publication date
CN114934678A (en) 2022-08-23

Similar Documents

Publication Publication Date Title
CN106892281B (en) Container matching system suitable for loading coil steel and use method of system
CN103201195A (en) Removable frame systems for vehicle shipping
KR101820768B1 (en) Transporting vehicle moving on the rail for transporting load on the stairway
CN111232034A (en) Laboratory gas-marking bottle transfer car (buggy)
CN114934678B (en) Integral type shipping, sliding, installing and constructing method for full glass curtain wall
US6283700B1 (en) Apparatus and method for detaching cables from a center beam railcar
CN113771901B (en) Crawler-type goods reinforcing apparatus
CN212148911U (en) Laboratory gas-marking bottle transfer car (buggy)
CN201367041Y (en) Platform car for transporting heavy things
CN109081140B (en) Vehicle-mounted cargo handling equipment
CN111827124A (en) T-beam transverse prestress tensioning auxiliary device, mounting method and using method
CN112406974A (en) Hydraulic jacking type carrying vehicle for cement electric poles
CN212611994U (en) Device for moving and fixing decorative plate of steel box girder bridge
CN213265623U (en) Transmission device, walking and lifting machine and crawler stair-climbing, walking and lifting integrated machine
CN220374532U (en) Trolley for transporting transverse plates on wall surfaces
CN117509425B (en) A monorail crane lifting beam for colliery monorail crane locomotive
CN219635280U (en) I-steel transport vechicle
CN220011043U (en) Conveyer that hoist and mount were used
CN216761868U (en) Commodity circulation tray transport vechicle
CN216545948U (en) Portable heavy flatbed tarpaulin covering device of dismantling
CN218560870U (en) Electromechanical device mounting and transferring tool
CN212174270U (en) Equipment transporter for confined spaces
CN213083230U (en) Walking and lifting integrated machine
CN216687339U (en) Liftable traction lifting device who removes
CN219137421U (en) Railway bridge engineering steel beam installation construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant