CN114922701B - 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 - Google Patents
三炉两机母管制生物质电厂汽轮机压力和功率控制系统 Download PDFInfo
- Publication number
- CN114922701B CN114922701B CN202210575776.0A CN202210575776A CN114922701B CN 114922701 B CN114922701 B CN 114922701B CN 202210575776 A CN202210575776 A CN 202210575776A CN 114922701 B CN114922701 B CN 114922701B
- Authority
- CN
- China
- Prior art keywords
- value
- power
- main steam
- steam pressure
- actual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D17/00—Regulating or controlling by varying flow
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D15/00—Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
- F01D15/10—Adaptations for driving, or combinations with, electric generators
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Turbines (AREA)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210575776.0A CN114922701B (zh) | 2022-05-25 | 2022-05-25 | 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 |
PCT/CN2022/111659 WO2023226202A1 (fr) | 2022-05-25 | 2022-08-11 | Système de commande de pression et de puissance de turbine à vapeur d'une centrale électrique à biomasse à système collecteur à deux turbines et à trois chaudières |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210575776.0A CN114922701B (zh) | 2022-05-25 | 2022-05-25 | 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114922701A CN114922701A (zh) | 2022-08-19 |
CN114922701B true CN114922701B (zh) | 2023-09-05 |
Family
ID=82809673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210575776.0A Active CN114922701B (zh) | 2022-05-25 | 2022-05-25 | 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN114922701B (fr) |
WO (1) | WO2023226202A1 (fr) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922701B (zh) * | 2022-05-25 | 2023-09-05 | 哈尔滨汽轮机厂有限责任公司 | 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4448026A (en) * | 1981-09-25 | 1984-05-15 | Westinghouse Electric Corp. | Turbine high pressure bypass pressure control system |
JP2004316998A (ja) * | 2003-04-15 | 2004-11-11 | Toshiba Corp | ボイラ制御装置 |
CN102707692A (zh) * | 2012-05-31 | 2012-10-03 | 杭州和利时自动化有限公司 | 基于dcs的垃圾焚烧发电厂设备控制方法、系统和发电厂 |
CN102748080A (zh) * | 2012-07-03 | 2012-10-24 | 山东电力研究院 | 基于主蒸汽压力变化的火电机组负荷控制方法 |
CN107769273A (zh) * | 2017-11-03 | 2018-03-06 | 杭州澎康自动化科技有限公司 | 一种汽轮机负荷分配控制方法及系统 |
CN109488394A (zh) * | 2018-10-19 | 2019-03-19 | 哈尔滨汽轮机厂有限责任公司 | 百万核电汽轮机控制系统机堆协调的控制方法 |
CN110578565A (zh) * | 2019-08-23 | 2019-12-17 | 广西电网有限责任公司电力科学研究院 | 分布式联合循环发电机组协同调峰与供热的系统与方法 |
CN113431651A (zh) * | 2021-06-29 | 2021-09-24 | 西安热工研究院有限公司 | 一种低负荷一炉带两机的运行系统 |
CN113756898A (zh) * | 2021-09-06 | 2021-12-07 | 贵州电网有限责任公司 | 一种火电厂停炉的汽机定速备用运行方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2347970T3 (es) * | 2005-07-29 | 2010-11-26 | Ansaldo Energia S.P.A. | Un metodo y un sistema para la reconversion operativa de pares de turbo-unidades de vapor pre-existentes. |
CN106410860B (zh) * | 2015-07-31 | 2019-04-23 | 宝山钢铁股份有限公司 | 多燃料混烧直流炉发电机组一次调频方法 |
CN105888743B (zh) * | 2016-04-12 | 2017-11-07 | 国网上海市电力公司 | 一种超临界机组deh侧一次调频方法 |
CN109322714B (zh) * | 2018-09-30 | 2021-07-06 | 西安陕鼓动力股份有限公司 | Shrt机组变频升转速过程中汽轮机的负荷控制方法 |
CN113006885A (zh) * | 2021-03-23 | 2021-06-22 | 攀钢集团西昌钢钒有限公司 | 一种汽轮发电机组定压运行控制方法 |
CN114922701B (zh) * | 2022-05-25 | 2023-09-05 | 哈尔滨汽轮机厂有限责任公司 | 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 |
-
2022
- 2022-05-25 CN CN202210575776.0A patent/CN114922701B/zh active Active
- 2022-08-11 WO PCT/CN2022/111659 patent/WO2023226202A1/fr unknown
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4448026A (en) * | 1981-09-25 | 1984-05-15 | Westinghouse Electric Corp. | Turbine high pressure bypass pressure control system |
JP2004316998A (ja) * | 2003-04-15 | 2004-11-11 | Toshiba Corp | ボイラ制御装置 |
CN102707692A (zh) * | 2012-05-31 | 2012-10-03 | 杭州和利时自动化有限公司 | 基于dcs的垃圾焚烧发电厂设备控制方法、系统和发电厂 |
CN102748080A (zh) * | 2012-07-03 | 2012-10-24 | 山东电力研究院 | 基于主蒸汽压力变化的火电机组负荷控制方法 |
CN107769273A (zh) * | 2017-11-03 | 2018-03-06 | 杭州澎康自动化科技有限公司 | 一种汽轮机负荷分配控制方法及系统 |
CN109488394A (zh) * | 2018-10-19 | 2019-03-19 | 哈尔滨汽轮机厂有限责任公司 | 百万核电汽轮机控制系统机堆协调的控制方法 |
CN110578565A (zh) * | 2019-08-23 | 2019-12-17 | 广西电网有限责任公司电力科学研究院 | 分布式联合循环发电机组协同调峰与供热的系统与方法 |
CN113431651A (zh) * | 2021-06-29 | 2021-09-24 | 西安热工研究院有限公司 | 一种低负荷一炉带两机的运行系统 |
CN113756898A (zh) * | 2021-09-06 | 2021-12-07 | 贵州电网有限责任公司 | 一种火电厂停炉的汽机定速备用运行方法 |
Non-Patent Citations (1)
Title |
---|
母管制锅炉压力协调优化控制系统的实现;朱洪军;周佐;;自动化与仪表(第10期);第34-38页 * |
Also Published As
Publication number | Publication date |
---|---|
WO2023226202A1 (fr) | 2023-11-30 |
CN114922701A (zh) | 2022-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203224772U (zh) | 660mw超临界机组一次调频控制系统 | |
KR20080015730A (ko) | 가스 터빈 엔진의 제어 방법 및 시스템 | |
CN105372991A (zh) | 供热机组多煤种混烧工况克服主蒸汽压力波动控制方法 | |
CN104932566B (zh) | 一种提高单元发电机组锅炉快速调整能力的控制系统及方法 | |
CN114922701B (zh) | 三炉两机母管制生物质电厂汽轮机压力和功率控制系统 | |
CN101504135B (zh) | 锅炉-汽轮机单元的汽压均衡控制器 | |
US8789371B2 (en) | Power generation apparatus | |
JP2015151912A (ja) | ガス供給装置、発電プラント、及び発電プラントの制御方法 | |
CN209742979U (zh) | 多台汽轮发电机组热负荷平衡分配控制装置 | |
Lin et al. | Coordinated control strategy of concentrating solar power plant for power system frequency regulation | |
CN113595105B (zh) | 一种利用绝热压缩空气储能实现电网调频的方法和系统 | |
CN110824905B (zh) | 一种发电机组非正常解列工况孤网运行方法 | |
JP2578328B2 (ja) | 背圧タ−ビン発電機の出力制御方法 | |
CN110195677B (zh) | 一种并列分布式海流能液压传动发电机组及其控制方法 | |
KR100511125B1 (ko) | 화력 발전소에서 터빈 속도 조정율을 위한 보일러 터빈 협조 제어 시스템 | |
RU61349U1 (ru) | Система автоматического регулирования мощности парогазовой установки с воздействием на регулирующие органы газотурбинной установки и паровой турбины | |
CN110552791A (zh) | 一种燃机气门调频持续响应控制方法 | |
CN110970926A (zh) | 一种火电厂基于节能技术的辅助调频装置及其控制方法 | |
CN219452196U (zh) | 660mw机组多功能协调控制寻优系统 | |
CN116951535A (zh) | 一种压水堆核能热电联产控制方法及系统 | |
CN112502799A (zh) | 一种控制发电机组配汽方式的优化系统 | |
CN214124848U (zh) | 一种电蒸汽锅炉耦合工业蒸汽调峰及调频系统 | |
CN112984490B (zh) | 火电机组汽泵再循环阀自动调节变速率开关的组态系统 | |
CN111472852B (zh) | 一种发电机组基于中间点焓值调频逻辑优化方法 | |
Zhong-xu et al. | Optimization Design on Boiler-turbine Coordinated Control System with Automatic Generation Control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230117 Address after: 150000 building 3, high tech production base, Nangang District, Harbin City, Heilongjiang Province Applicant after: HARBIN TURBINE Co.,Ltd. Applicant after: HADIAN POWER EQUIPMENT NATIONAL ENGINEERING RESEARCH CENTER CO.,LTD. Address before: 150046 No. three power road 345, Xiangfang District, Heilongjiang, Harbin Applicant before: HARBIN TURBINE Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |