CN114875761A - Rapid repair structure for municipal road and construction method thereof - Google Patents

Rapid repair structure for municipal road and construction method thereof Download PDF

Info

Publication number
CN114875761A
CN114875761A CN202210575769.0A CN202210575769A CN114875761A CN 114875761 A CN114875761 A CN 114875761A CN 202210575769 A CN202210575769 A CN 202210575769A CN 114875761 A CN114875761 A CN 114875761A
Authority
CN
China
Prior art keywords
square groove
filling plate
prefabricated filling
prefabricated
wearing layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210575769.0A
Other languages
Chinese (zh)
Inventor
朱枫
阮剑明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiahu Ecological Construction Co ltd
Original Assignee
Zhejiang Jiahu Ecological Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiahu Ecological Construction Co ltd filed Critical Zhejiang Jiahu Ecological Construction Co ltd
Priority to CN202210575769.0A priority Critical patent/CN114875761A/en
Publication of CN114875761A publication Critical patent/CN114875761A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/096Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating and filling
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a municipal road rapid repairing structure and a construction method thereof, relates to road engineering, and aims to solve the problems that a large amount of crack pouring materials are easy to deform and have short service life, and the technical scheme is characterized in that: including road bed and cementation of fissures material, the square groove has been seted up on the road bed, and the square inslot is equipped with prefabricated filling plate, and the cementation of fissures material includes tie coat, waterproof bed course and anti-skidding wearing layer, and the tie coat setting is between prefabricated filling plate and square groove inside wall, and waterproof bed course setting is between prefabricated filling plate and square groove tank bottom, and anti-skidding wearing layer sets up on prefabricated filling plate, and the border fixed connection on anti-skidding wearing layer is close to the square groove opening part at the road bed. The prefabricated filling plate has the advantages that the use of the crack pouring material is more dispersed, the deformation amount of the crack pouring material is less when the repairing structure is pressed, the strength of the repairing structure is improved, the prefabricated filling plate can evenly distribute the pressure when the repairing structure is pressed, the stress of the repairing structure is even, and the repairing structure is more durable.

Description

Rapid repair structure for municipal road and construction method thereof
Technical Field
The invention relates to road engineering, in particular to a municipal road rapid repairing structure and a construction method thereof.
Background
The asphalt concrete pavement cracks, and the asphalt concrete pavement should be sealed and repaired in time, so that rainwater and other impurities are prevented from entering a pavement structure layer and a roadbed along the cracks, the bearing capacity of the pavement is reduced, and the local or flaky damage of the pavement is accelerated.
At present, the common asphalt pavement crack pouring process is divided into two types of non-slotting crack pouring and slotting crack pouring, the non-slotting crack pouring is divided into a hot operation method and a cold operation method, the hot operation method generally adopts common hot asphalt or modified hot asphalt to carry out the encapsulation of the cracks of the cyan pavement, when the common hot asphalt is adopted, the common hot asphalt has low softening point under the condition of high temperature, the phenomenon of oil flooding and being taken away by vehicles easily occurs, and the common hot asphalt becomes brittle and is easy to fall off when being full of green at low temperature; the modified heat full green paint is adopted, and because the modified gradually green paint has high viscosity and poor fluid permeability, and the gradually green paint poured into the pavement cracks is very little, the pavement cracks are easy to crack when the pavement cracks expand at low temperature, and the service life of repairing is short. The cold operation method is to use liquid drowning (emulsifying) polymer to modify liquid gradually-turning green and to encapsulate. Because the solvent is added into the gradual green of the polymer modified liquid, the low-temperature fluidity permeability of the gradual green is improved, but the high-temperature stability and the elastic recovery performance are reduced, the gradual green is easy to overflow and be taken away by vehicles to pollute the road surface in summer, and the gradual green is easy to pull and handy in winter. Therefore, the slot is not opened for crack pouring, the repaired crack is re-cracked at the original crack pouring position after a period of time, and a plurality of unchangeable and unsafe factors are caused to the travelling crane by each repair and maintenance operation.
The process method generally comprises the steps of cutting the pavement cracks forcibly through machinery to widen and deepen the pavement cracks, and then pouring the crack pouring glue to fill and seal the pavement cracks.
At present, the slotting and crack pouring of the asphalt pavement is most commonly in a 'square groove pouring type', and the slotting and crack pouring construction process flow is as follows: preparation work (including construction area closure), slotting, gap cleaning, gap filling and open traffic, wherein:
preparation work: inspecting the grooving machine and the crack pouring machine to ensure that the technical conditions are good; determining a crack repairing design scheme according to the concrete condition of the pavement crack; starting a crack pouring machine, adding the sealant into a sealant heating tank, heating the sealant, and stirring to a specified temperature; during heating, the crack sealing machine is pulled behind the truck, and sealant, partition wall, safety indication plate, groover, shoulder-back blower, etc. are installed on the truck and pulled to the preset construction site to enclose half of the road as construction area.
Grooving: and (4) adjusting the grooving depth of the grooving machine in advance according to the designed grooving size, and then performing grooving operation. During operation, the size of the groove is adjusted in time according to the width type of the crack, the minimum design requirement is met, and the minimum width requirement is met. When the notching machine runs, the cutting blade is kept to be matched with the crack.
Gap cleaning: and thoroughly cleaning dust in a range of thoroughly cleaning broken slag in the groove and dust in a range of at least 10cm on two sides of a crack by using a blower or a shoulder-back blower of the crack pouring machine, and ensuring that the notch is clean and dry.
Pouring a seam: when the temperature is changed to 5 ℃, the crack sealing machine needs to be provided with preheating equipment to preheat the groove part, and if the crack sealing machine is not preheated at the temperature, the bonding force of the sealant can be reduced; if the temperature is higher than 5 ℃, the preheating is not needed, but the preheated gap-filling effect is good. When the heating temperature of the sealant reaches about 190 ℃, the sealant is uniformly filled into the groove by a pressure nozzle with a strickle on the crack pouring machine, and the sealant is dragged to form a sealing layer with a certain width and thickness on two sides of the crack.
Opening traffic: after the sealant is used for pouring the seams, the traffic can be opened after the sealant is fully cooled and the broken slag on the road surface is cleaned.
When the road crack is great, the square groove can be seted up great to lead to filling the square groove and need using a large amount of cementation of fissures materials, a large amount of cementation of fissures materials take place deformation more easily, and life is not long.
Therefore, a new solution is needed to solve this problem.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a municipal road rapid repairing structure and a construction method thereof.
The technical purpose of the invention is realized by the following technical scheme: the utility model provides a structure is repaired fast to town road, includes road bed and cementation of fissures material, the square groove has been seted up on the road bed, be equipped with prefabricated filler plate in the square groove, the cementation of fissures material includes tie coat, waterproof bed course and anti-skidding wearing layer, the tie coat sets up between prefabricated filler plate and square groove inside wall, waterproof bed course sets up between prefabricated filler plate and square groove tank bottom, anti-skidding wearing layer sets up on prefabricated filler plate, anti-skidding wearing layer top surface is higher than the road bed top surface just the border fixed connection on anti-skidding wearing layer is close to square groove opening part at the road bed.
By adopting the technical scheme, the prefabricated filling plate is filled into the square groove, the strength of the prefabricated filling plate is higher than that of a crack pouring material, on one hand, the using amount of the crack pouring material can be reduced, the crack pouring material is more dispersed to use, the deformation amount of the crack pouring material is less when the repairing structure is pressed, the strength of the repairing structure is improved, on the other hand, the prefabricated filling plate is not easy to deform, the strength of the repairing structure cannot be influenced, the pressure can be evenly distributed when the repairing structure is pressed, the stress of the repairing structure is even, the local severe deformation of the repairing structure is prevented, the repairing structure is more durable, after the using amount of the crack pouring material is reduced, the repairing structure is dried more quickly, the traffic can be recovered smoothly in a short time, the bonding layer can play a role in buffering and improving the strength, and the prefabricated filling plate is more firmly installed in the square groove, the intensity of the structure is repaired in the improvement, and waterproof bed course can improve the waterproof ability of repairing the structure for it is more durable to repair the structure, and the skid resistant wearing layer can improve repair structure skid resistance ability and abrasive resistance, makes repair structure life longer, and the border on skid resistant wearing layer glues on the road bed, thereby can improve the road bed and repair the holistic joint strength of structure.
The invention is further configured to: the prefabricated filling plate comprises a plurality of connecting units with cross sections in rectangular shapes, a plurality of connecting rods are fixedly connected to the side walls of the connecting units, the connecting rods on the connecting units are connected through a plurality of sleeves, and the two ends of each sleeve are connected with the connecting pieces in a threaded mode.
By adopting the technical scheme, after the design size of the square groove, the prefabricated filling plate can be quickly formed and conveniently constructed by the connection between the connecting units, when the prefabricated filling plate is formed, the two ends of the sleeve are respectively fixed with the connecting rods of the adjacent connecting units by rotating the sleeve, so that the two adjacent connecting units can be fixed, and the distance between the two connecting units can be changed by different rotating amplitudes of the sleeve, so that the size of the two adjacent connecting units after connection can be adjusted, and so on, so that the connecting units can be combined into the prefabricated filling plate without shapes and different sizes, the prefabricated filling plate can be conveniently adapted to the square groove with any size, the installation and the disassembly are convenient, the subsequent adjustment is convenient, when the anti-sliding abrasion layer is laid, the anti-sliding abrasion layer can be filled into the gap between the two connecting units, and the connection strength between the prefabricated filling plate and the anti-sliding abrasion layer is further improved, the repairing structure is more stable and firm.
The invention is further configured to: the square groove inner side wall is fixedly connected with a plurality of connecting pieces, the connecting rods located at the edge of the prefabricated filling plate are in threaded connection with external pieces, and the connecting pieces are connected with the external pieces through bolts.
Through adopting above-mentioned technical scheme, through connecting piece and external member bolted connection to the prefabricated infill panel in the fixed square groove improves the stability of prefabricated infill panel, and then improves the intensity of repairing the structure.
The invention is further configured to: the square groove inner side wall is fixedly connected with a plurality of chemical bolts, and screws of the chemical bolts are welded with the connecting piece.
Through adopting above-mentioned technical scheme, after punching the installation chemical bolt, can fixed connection spare with the screw rod welding of connecting piece and chemical bolt for the installation of connecting piece is firm, improves the joint strength of square groove inner wall and prefabricated infill panel, and chemical bolt has acid and alkali-resistance, low temperature resistant, ageing-resistant, water stain-resistant, long-term load is stable in humid environment, advantages such as anti-seismic performance is good, makes its installation more durable as the connection carrier of connecting piece on the square groove inner wall.
The invention is further configured to: the surface of the connecting unit is provided with a plurality of contraction and expansion seams which penetrate through the two sides of the connecting unit.
Through adopting above-mentioned technical scheme, the setting of the seam that expands that contracts can reserve the space of the expanding with heat and contracting with cold of coupling unit under the temperature environment of difference, prevents that the expanding with heat and contracting with cold of coupling unit from destroying the road surface, improves the life of repairing the structure.
A construction method for a municipal road rapid repairing structure comprises the following steps:
s1, preparing, checking a grooving machine, designing the size of the prefabricated filling plate according to the designed grooving size, and splicing a plurality of connecting units to form the prefabricated filling plate;
s2, grooving, namely, pre-adjusting the grooving depth of the grooving machine according to the designed grooving size, and then performing grooving operation;
s3, cleaning the tank to ensure the square tank clean and dry;
s4, reserving the thickness of the waterproof cushion layer, driving a plurality of chemical bolts into the inner wall of the square groove, and welding the screw rods of the chemical bolts with the connecting piece;
s5, laying a waterproof cushion layer;
s6, laying a prefabricated filling plate on the waterproof cushion layer, sleeving the sleeve piece on the connecting piece, and fixing the sleeve piece through bolts;
s7, filling adhesive layers between the prefabricated filling plates and the inner side walls of the square grooves;
and S8, paving an anti-skid wearing layer with the horizontal height higher than that of the roadbed in the square groove, and fixedly connecting the edge of the anti-skid wearing layer to the opening of the roadbed close to the square groove.
The invention is further configured to: the anti-skid wearing layer comprises an asphalt base material and a modifier, wherein the modifier comprises a weather-resistant component, a plasticizing component, a tackifying component, an elasticity increasing component, a crosslinking component and a warm mixing agent, and the modifier comprises the weather-resistant component, the plasticizing component, the tackifying component, the warm mixing agent, the elasticity increasing component, the crosslinking component and the warm mixing agent in sequence.
By adopting the technical scheme, the temperature sensitivity of the modified asphalt is obviously improved by doping the weather-resistant component, the service life of the repair structure in different seasonal environments is prolonged, the repair paved by the asphalt modified by the elasticity-increasing component can reduce the cracking and softening of the pavement, so that the anti-skid wearing layer is not easy to freeze and skid, the service life of the repair structure is prolonged while the driving safety of the road is improved, the warm-mixing agent mainly generates dissolution and dispersion, the high-temperature viscosity in the asphalt modification process can be adjusted to a certain degree by adding the warm-mixing agent, the weather-resistant component can be added twice before and after the elasticity-increasing component is added, the weather-resistant component is preferably added to disperse as far as possible to exert the effect, the cross-linking component is added later to be responsible for chemical reactions such as intermolecular bonding, and the molecular chains of the modified components are mutually connected and recombined to form a chain shape and a network shape, the three-dimensional network structure of the modified asphalt is firmer, so that the various properties of the asphalt are improved.
The invention is further configured to: and step S3, cleaning the square groove by hot air blowing.
Through adopting above-mentioned technical scheme, the mode of blowing conveniently clears up the dust and the waste residue of square groove, and the clearance effect is better, and the hot-blast wind energy evaporates the water in the seam, lets the square groove inner wall reach certain temperature simultaneously, has improved the bonding effect of tie coat.
In conclusion, the invention has the following beneficial effects: the prefabricated filling plate is filled into the square groove, the strength of the prefabricated filling plate is higher than that of a crack pouring material, on one hand, the using amount of the crack pouring material can be reduced, the crack pouring material is more dispersed to use, the deformation amount of the crack pouring material is less when the repairing structure is pressed, the strength of the repairing structure is improved, on the other hand, the prefabricated filling plate is not easy to deform, the strength of the repairing structure cannot be influenced, the pressure can be evenly distributed when the repairing structure is pressed, the stress of the repairing structure is even, the local severe deformation of the repairing structure is prevented, the repairing structure is more durable, after the using amount of the crack pouring material is reduced, the repairing structure is dried more quickly, the traffic can be recovered smoothly in a short time, the bonding layer can play a role in buffering and improving the strength, the prefabricated filling plate is more firmly installed in the square groove, and the strength of the repairing structure is improved, the waterproof cushion layer can improve the waterproof ability of repairing the structure, makes the repair structure more durable, and the skid resistant wearing layer can improve repair structure skid resistant ability and wear resistance, makes repair structure life longer, and the border on skid resistant wearing layer glues on the road bed, thereby can improve the road bed and repair the holistic joint strength of structure.
Drawings
FIG. 1 is a cross-sectional view of the present invention;
FIG. 2 is a schematic view of the structure of the present invention except for the seam filling material;
fig. 3 is an enlarged view of a portion a in fig. 2.
In the figure: 1. a square groove; 2. prefabricating a filling plate; 3. a bonding layer; 4. a waterproof cushion layer; 5. an anti-skid wear layer; 6. a connection unit; 7. a connecting rod; 8. a sleeve; 9. a connecting member; 10. a kit; 11. a chemical bolt; 12. shrinking and expanding the seam; 13. and (7) roadbed.
Detailed Description
The invention is described in detail below with reference to the figures and examples.
A municipal road rapid repairing structure and a construction method thereof are disclosed, as shown in figure 1, figure 2 and figure 3, comprising a roadbed 13 and a crack pouring material, wherein a square groove 1 is arranged on the roadbed 13, a prefabricated filling plate 2 is bolted in the square groove 1, the prefabricated filling plate 2 comprises a plurality of connecting units 6 with rectangular cross sections, a plurality of shrinkage-expansion joints 12 penetrating through two sides of each connecting unit 6 are arranged on the surface of each connecting unit 6, the connecting units 6 are made of carbon steel, a galvanized layer is electroplated on each connecting unit 6, a plurality of connecting rods 7 are welded on the side walls of the connecting units 6, the connecting rods 7 on adjacent connecting units 6 are connected through a plurality of sleeves 8, two ends of each sleeve 8 are in threaded connection with a connecting piece 9, a plurality of connecting pieces 9 are fixedly connected on the inner side wall of the square groove 1, specifically, a plurality of chemical bolts 11 are arranged on the inner side wall of the square groove 1, the screw rods of the chemical bolts 11 are welded with the connecting pieces 9, a sleeve piece 10 is in threaded connection with the connecting rod 7 positioned on the edge of the prefabricated filling plate 2, the cover of external member 10 is established on connecting piece 9, all be equipped with the mounting hole of coaxial setting on external member 10 and the connecting piece 9, connecting piece 9 and the bolted connection of external member 10, the bolt passes the mounting hole of coaxial setting on external member 10 and the connecting piece 9, threaded connection has the nut of conflict external member 10 on the bolt, the cementation of fissures material includes tie coat 3, waterproof bedding 4 and anti-skidding wearing layer 5, tie coat 3 sets up between prefabricated infill panel 2 and 1 inside wall of square groove, waterproof bedding 4 sets up between prefabricated infill panel 2 and 1 tank bottom of square groove, anti-skidding wearing layer 5 sets up on prefabricated infill panel 2, the high and border bonding of anti-skidding wearing layer 5 top surface than 13 top surfaces of road bed is close to 1 opening part of square groove 13 in road bed 13.
A construction method for a municipal road rapid repairing structure comprises the following steps:
s1, preparing, checking a grooving machine, designing the grooving size, designing the size of the prefabricated filling plate 2 according to the grooving size, and splicing a plurality of connecting units 6 to form the prefabricated filling plate 2;
s2, grooving, namely, pre-adjusting the grooving depth of the grooving machine according to the designed grooving size, and then performing grooving operation;
s3, cleaning the square groove 1 by hot blast to ensure the square groove 1 clean and dry;
s4, reserving the thickness of the waterproof cushion layer 4, driving a plurality of chemical bolts 11 into the inner wall of the square groove 1, and welding the screw rods of the chemical bolts 11 with the connecting piece 9;
s5, laying a waterproof cushion layer 4, baking the waterproof roll material with fire, and then laying a cushion layer on the waterproof roll material;
s6, laying the prefabricated filling board 2 on the waterproof cushion layer 4, sleeving the sleeve 10 on the connecting piece 9, and fixing the sleeve through bolts;
s7, filling an adhesive layer 3 between the prefabricated filling plate 2 and the inner side wall of the square groove 1;
s8, paving an anti-skid wearing layer 5 with the horizontal height higher than that of a roadbed 13 in a square groove 1, wherein the edge of the anti-skid wearing layer 5 is fixedly connected to the roadbed 13 close to an opening of the square groove 1, the anti-skid wearing layer 5 comprises an asphalt base material and a modifier, the modifier comprises a weather-resistant component, a plasticizing component, a tackifying component, an elasticity increasing component, a crosslinking component and a warm mixing agent, the modifier is added in sequence of the weather-resistant component, the plasticizing component, the tackifying component, the warm mixing agent, the elasticity increasing component, the crosslinking component and the warm mixing agent, wherein the weather-resistant component is a styrene-butadiene-styrene block copolymer which is a thermoplastic elastomer, the plasticizing component is a phthalate polymer which can effectively improve the performances of water stability, temperature sensitivity, durability and the like of the asphalt mixture, and the tackifying component adopts terpene resin which has excellent thermal adhesiveness, oxidation resistance, thermal stability and the like, Compatibility and solubility, the elasticity-increasing component is waste rubber powder and is more environment-friendly, the crosslinking component is 0.5 percent of sulfur, molecular chains of all the modification components are mutually crosslinked and recombined to form a chain shape and a network shape, and the three-dimensional network structure of the modified asphalt is more stable so as to improve various performances of the asphalt.
The working principle is as follows: the prefabricated filling plate 2 can be quickly formed and conveniently constructed through the connection between the connecting units 6 after the square groove 1 is designed in size, when the prefabricated filling plate 2 is formed, the sleeve 8 is rotated to enable the two ends of the sleeve 8 to be respectively fixed with the connecting rods 7 of the adjacent connecting units 6, the two adjacent connecting units 6 can be fixed, the distance between the two connecting units 6 can be changed through different rotating amplitudes of the sleeve 8, the size of the two adjacent connecting units 6 after connection can also be adjusted, and the like, so that the connecting units 6 can be combined into the prefabricated filling plate 2 without shapes and sizes, the square groove 1 with any size can be conveniently adapted, the installation and the disassembly are convenient, and the subsequent adjustment is convenient,
punching installation chemical bolt 11 back, screw rod welding with connecting piece 9 and chemical bolt 11 can fixed connection 9, make the installation of connecting piece 9 firm, chemical bolt 11 has acid and alkali-resistance, low temperature resistant, it is ageing-resistant, water stain-resistant, long-term load is stable in humid environment, advantages such as anti-seismic performance is good, make its installation more durable as the connection carrier of connecting piece 9 on 1 inner wall of square groove, through connecting piece 9 and 10 bolted connection of external member, thereby prefabricated filling plate 2 in the fixed square groove 1, improve the stability of prefabricated filling plate 2, and then improve the intensity of repairing the structure.
The mode of blowing conveniently clears up the dust and the waste residue in the square groove 1, and the cleaning performance is better, and the hot blowing wind energy evaporates the water in the seam, lets 1 inner walls of square groove reach certain temperature simultaneously, has improved the bonding effect of tie coat 3.
The waterproof cushion 4 can improve the waterproof ability of the repair structure, so that the repair structure is more durable.
The prefabricated filling plate 2 is filled into the square groove 1, the strength of the prefabricated filling plate 2 is higher than that of a crack pouring material, on one hand, the using amount of the crack pouring material can be reduced, the crack pouring material is more dispersed to be used, the deformation amount of the crack pouring material is less when the repairing structure is pressed, the strength of the repairing structure is improved, on the other hand, the prefabricated filling plate 2 is not easy to deform, the strength of the repairing structure cannot be influenced, the pressure can be evenly distributed when the repairing structure is pressed, the stress of the repairing structure is even, the local severe deformation of the repairing structure is prevented, the repairing structure is more durable, after the using amount of the crack pouring material is reduced, the repairing structure is dried more quickly, the traffic can be recovered smoothly in a short time, the bonding layer 3 can play a role in buffering and improving the strength, and the prefabricated filling plate 2 is more firmly installed in the square groove 1, the strength of the repairing structure is improved, the space for expansion and contraction of the connecting unit 6 can be reserved by the arrangement of the expansion joint 12 under different temperature environments, the pavement is prevented from being damaged by expansion and contraction of the connecting unit 6, and the service life of the repairing structure is prolonged.
The antiskid wearing layer 5 can improve the antiskid capacity and the wear resistance of the repair structure, so that the service life of the repair structure is longer, the edge of the antiskid wearing layer 5 is adhered to the roadbed 13, the integral connection strength of the roadbed 13 and the repair structure can be improved, when the antiskid wearing layer 5 is laid, the antiskid wearing layer 5 can be filled in a gap between the two connecting units 6, so that the connection strength between the prefabricated filling plate 2 and the antiskid wearing layer 5 is further improved, the repair structure is more stable and firm, the doping of weather-resistant components can obviously improve the temperature sensitivity of the modified asphalt, the service life of the repair structure under different seasonal environments is prolonged, the repair paved by the asphalt with the elasticity-increasing component can reduce the cracking and softening of a road surface, the antiskid wearing layer 5 is not easy to freeze and skid, the running safety of a road is improved, and the service life of the repair structure is also prolonged, the warm mixing agent mainly generates dissolution and dispersion, and the high-temperature viscosity in the asphalt modification process can be adjusted to a certain degree by adding the warm mixing agent, so that the warm mixing agent can be added twice before and after the elasticity-increasing component is added, the weather-resistant component is preferentially added and can be dispersed as much as possible, so that the effect of the weather-resistant component can be exerted, and the later addition of the crosslinking component can be responsible for chemical reactions such as intermolecular bonding and the like, so that molecular chains of all the modification components are mutually connected and recombined to form chain and network shapes, so that the three-dimensional network structure of the modified asphalt is firmer, and the various properties of the asphalt are improved.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the invention may occur to those skilled in the art without departing from the principle of the invention, and are considered to be within the scope of the invention.

Claims (8)

1. The utility model provides a structure is repaired fast to town road which characterized in that: including road bed (13) and cementation of fissures material, square groove (1) has been seted up on road bed (13), be equipped with prefabricated filling plate (2) in square groove (1), the cementation of fissures material includes tie coat (3), waterproof bed course (4) and anti-skidding wearing layer (5), tie coat (3) set up between prefabricated filling plate (2) and square groove (1) inside wall, waterproof bed course (4) set up between prefabricated filling plate (2) and square groove (1) tank bottom, anti-skidding wearing layer (5) set up on prefabricated filling plate (2), anti-skidding wearing layer (5) top surface is higher than road bed (13) top surface just the border fixed connection of anti-skidding wearing layer (5) is close to square groove (1) opening part in road bed (13).
2. The rapid municipal road repair structure according to claim 1, wherein: prefabricated infill panel (2) include the linkage unit (6) of a plurality of transversal personally submitting rectangles, the equal fixedly connected with a plurality of connecting rods (7) of lateral wall of linkage unit (6), it is adjacent connecting rod (7) on linkage unit (6) are connected through a plurality of sleeves (8), the both ends and connecting piece (9) threaded connection of sleeve (8).
3. The rapid municipal road repair structure according to claim 2, wherein: the square groove (1) is characterized in that a plurality of connecting pieces (9) are fixedly connected to the inner side wall of the square groove (1), a sleeve piece (10) is connected to a connecting rod (7) on the edge of the prefabricated filling plate (2) in a threaded mode, and the connecting pieces (9) are connected with the sleeve piece (10) through bolts.
4. The rapid municipal road repair structure according to claim 3, wherein: the inner side wall of the square groove (1) is fixedly connected with a plurality of chemical bolts (11), and screws of the chemical bolts (11) are welded with the connecting piece (9).
5. The rapid municipal road repair structure according to claim 2, wherein: the surface of the connecting unit (6) is provided with a plurality of contraction and expansion seams (12) which penetrate through the two sides of the connecting unit.
6. A construction method of a municipal road rapid repair structure applied to the municipal road rapid repair structure of claims 1 to 4, characterized in that: the method comprises the following steps:
s1, preparing, checking a grooving machine, designing the grooving size, designing the size of the prefabricated filling plate (2) according to the grooving size, and splicing a plurality of connecting units (6) to form the prefabricated filling plate (2);
s2, grooving, namely, pre-adjusting the grooving depth of the grooving machine according to the designed grooving size, and then performing grooving operation;
s3, cleaning the tank to ensure that the square tank (1) is clean and dry;
s4, reserving the thickness of the waterproof cushion layer (4), driving a plurality of chemical bolts (11) into the inner wall of the square groove (1), and welding the screws of the chemical bolts (11) with the connecting piece (9);
s5, laying a waterproof cushion layer (4);
s6, laying a prefabricated filling plate (2) on the waterproof cushion layer (4), sleeving the sleeve (10) on the connecting piece (9) and fixing the sleeve by bolts;
s7, filling an adhesive layer (3) between the prefabricated filling plate (2) and the inner side wall of the square groove (1);
and S8, paving an anti-skid wearing layer (5) with the horizontal height higher than that of the roadbed (13) in the square groove (1), and fixedly connecting the edge of the anti-skid wearing layer (5) to the opening of the roadbed (13) close to the square groove (1).
7. The construction method of the municipal road rapid repair structure according to claim 6, wherein: the anti-skid wearing layer (5) comprises an asphalt base material and a modifier, wherein the modifier comprises a weather-resistant component, a plasticizing component, a tackifying component, an elasticity increasing component, a crosslinking component and a warm mixing agent, and the modifier comprises the weather-resistant component, the plasticizing component, the tackifying component, the warm mixing agent, the elasticity increasing component, the crosslinking component and the warm mixing agent in sequence.
8. The construction method of the municipal road rapid repair structure according to claim 6, wherein: and step S3, cleaning the square groove (1) by hot air blowing.
CN202210575769.0A 2022-05-24 2022-05-24 Rapid repair structure for municipal road and construction method thereof Pending CN114875761A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210575769.0A CN114875761A (en) 2022-05-24 2022-05-24 Rapid repair structure for municipal road and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210575769.0A CN114875761A (en) 2022-05-24 2022-05-24 Rapid repair structure for municipal road and construction method thereof

Publications (1)

Publication Number Publication Date
CN114875761A true CN114875761A (en) 2022-08-09

Family

ID=82677192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210575769.0A Pending CN114875761A (en) 2022-05-24 2022-05-24 Rapid repair structure for municipal road and construction method thereof

Country Status (1)

Country Link
CN (1) CN114875761A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086113A (en) * 2017-11-15 2018-05-29 广东省建筑科学研究院集团股份有限公司 A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN108316084A (en) * 2018-02-14 2018-07-24 练仕菊 A kind of asphalt pavement pit repairing technique
CN108797397A (en) * 2018-09-11 2018-11-13 安徽建筑大学 A kind of reparation construction method suitable for large longitudinal slope bridge floor
CN111364336A (en) * 2020-03-21 2020-07-03 江西省公路工程检测中心 Maintenance decision method for asphalt pavement major and medium maintenance
CN112501973A (en) * 2020-12-21 2021-03-16 江苏金贸科技发展有限公司 Concrete precast block for repairing cement road
CN113062164A (en) * 2021-03-05 2021-07-02 武汉理工大学 Double-layer composite full-prefabricated assembly type pavement and construction method
CN113215898A (en) * 2021-05-10 2021-08-06 交通运输部公路科学研究所 Assembled cement board force transmission component, cement board and preparation and construction methods thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086113A (en) * 2017-11-15 2018-05-29 广东省建筑科学研究院集团股份有限公司 A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN108316084A (en) * 2018-02-14 2018-07-24 练仕菊 A kind of asphalt pavement pit repairing technique
CN108797397A (en) * 2018-09-11 2018-11-13 安徽建筑大学 A kind of reparation construction method suitable for large longitudinal slope bridge floor
CN111364336A (en) * 2020-03-21 2020-07-03 江西省公路工程检测中心 Maintenance decision method for asphalt pavement major and medium maintenance
CN112501973A (en) * 2020-12-21 2021-03-16 江苏金贸科技发展有限公司 Concrete precast block for repairing cement road
CN113062164A (en) * 2021-03-05 2021-07-02 武汉理工大学 Double-layer composite full-prefabricated assembly type pavement and construction method
CN113215898A (en) * 2021-05-10 2021-08-06 交通运输部公路科学研究所 Assembled cement board force transmission component, cement board and preparation and construction methods thereof

Similar Documents

Publication Publication Date Title
KR100959407B1 (en) Concrete structure repair work method
CN101831186B (en) Road surface crack sealing and mending tape and preparation and construction process thereof
CN102251464B (en) Asphalt pavement crack pouring process and pavement crack repair agent
US4069182A (en) Elastomeric pavement repair composition
CN104109399B (en) A kind of pitch adhesive tape and preparation and construction method
KR101253598B1 (en) Method for repairing of paved road of asphalt concrete
WO2003106769A1 (en) Recyclable composite material and method of using composite
CN108166348A (en) A kind of asphalt pavement crack method for repairing and mending and repairing construction
KR100403390B1 (en) Construction Method of Bridge Deck Joints or Structure Junctions Using Polymer Modified Asphalt Sealant
CN102225855B (en) Wear-resistant noise-reducing thermal-insulating modified emulsified asphalt mortar paint
Gnatenko et al. Technological sides of crack sealing in asphalt pavements
KR101142195B1 (en) Compound for using an expansion joint, method for making the compound, expansion joint utilizing electricity polymer and method for constructing the expansion joint
KR100941747B1 (en) The bridge deck waterproofing system and application method
KR100869651B1 (en) Road surface repairing method using the rubafalt
CN114875761A (en) Rapid repair structure for municipal road and construction method thereof
KR101128981B1 (en) Manufacture method of water-proofing composites for bridge and water-proofing type construction method using the water-proofing composites
JPS6360307A (en) Method for repairing crack part in asphalt pavement
CN108797397B (en) A kind of reparation construction method suitable for large longitudinal slope bridge floor
RU143147U1 (en) WATERPROOF TAPE
CN204803705U (en) Concrete road surface expansion joint filleting structure
KR100337443B1 (en) Waterproofing materials with combined membrane and sheet and waterproofing method thereby
CN210826980U (en) Structure for plugging concrete pavement structure joint
KR101138875B1 (en) Method of constructing asphalt using rubberized asphalt self-adhesion type waterproof sheet
KR20100013722A (en) Constructing method for waterproofing bridge surface
CN105199666B (en) A kind of production of Road sealant and its construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication