CN1148494C - Technology for forming pile by under-reaming and grouting - Google Patents

Technology for forming pile by under-reaming and grouting Download PDF

Info

Publication number
CN1148494C
CN1148494C CNB001328921A CN00132892A CN1148494C CN 1148494 C CN1148494 C CN 1148494C CN B001328921 A CNB001328921 A CN B001328921A CN 00132892 A CN00132892 A CN 00132892A CN 1148494 C CN1148494 C CN 1148494C
Authority
CN
China
Prior art keywords
pile
grouting
reaming
forming process
bearing capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB001328921A
Other languages
Chinese (zh)
Other versions
CN1293290A (en
Inventor
珠 李
李珠
黄鹤
梁仁旺
白晓红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB001328921A priority Critical patent/CN1148494C/en
Publication of CN1293290A publication Critical patent/CN1293290A/en
Application granted granted Critical
Publication of CN1148494C publication Critical patent/CN1148494C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a novel pile forming process of a concrete filling pile, particularly to a pile forming process of a reaming and rear grouting pile. The present invention comprises a pile hole forming process of a reaming and filling pile and a pile forming process of a rear grouting filling pipe. The force transport mechanism of the reaming and rear grouting pile is specific, and pile body quality is good; the bearing capacity of a steel reinforced concrete filling pile can be largely raised, engineering cost is reduced, and the construction period of pile foundation engineering is shortened; compared with an ordinary reinforced concrete filling pile, 100% of bearing capacity can be raised, 50% of raw materials is saved, and 50% of construction period is shortened; compared with a rear grouting pile and a squeezed branch pile, 15% of bearing capacity can be enhanced, and 10% of raw materials is saved. The present invention has outstanding and obvious effect.

Description

The process of forming pile by under-reaming and grouting
Technical field
The present invention relates to the construction field of building foundation, be specially a kind of process of forming pile by under-reaming and grouting.
Background technology
The deposited reinforced concrete pile that adopts in the geotechnical engineering field at present mainly contains three kinds of ordinary reinforced concrete castinplace piles, grouting behind shaft or drift lining deposited reinforced concrete pile, extruding-enlarging branch tray deposited reinforced concrete pile.The two kinds of castinplace piles in back are new concrete castinplace piles of releasing in the recent period, the problem that post grouting pile exists grouting amount to be difficult to determine, the bad bearing capacity that not only can not reduce construction costs but also can not effectively improve stake of grouting amount control; The transfer law of compacted bearing disk pile power is indeterminate, and whether compacted bearing disk pile has permanent, stable bearing capacity does not have experimental data and theory analysis to prove at present, and this is disadvantageous to promoting the use of of compacted bearing disk pile.Post grouting pile and compacted bearing disk pile still require than higher the mud thickness in stake week and the control of pile bottom sediment amount, and this is to shortening the construction period and guaranteeing that the quality of stake is disadvantageous.
Summary of the invention
Purpose of the present invention is the defective that overcomes the existing concrete castinplace pile, and a kind of pile-formation process method---process of forming pile by under-reaming and grouting of new castinplace pile is provided.
The present invention adopts following measure to realize: the process of this expansion bottom post-grouting pile comprises the moulding and the grouting behind shaft or drift lining bored pile piling technology method two parts in bottom-enlarging filling pile stake hole.The stake hole of extruding-enlarging branch tray deposited reinforced concrete pile of the prior art vertically is provided with a plurality of dishes, be used to improve its bearing capacity, but because there is above-mentioned deficiency in it, the present invention has only kept a dish at the bottom of stake, form the bottom-enlarging filling pile hole, and the process of grouting behind shaft or drift lining bored pile piling is above-mentioned maturation process method, therefore, content of the present invention comes down to the improvement of extruding-enlarging branch tray bored pile piling technology and combining of grouting behind shaft or drift lining bored pile piling technology, it has utilized post grouting pile technology to improve the pile peripheral friction force of castinplace pile simultaneously, eliminating pile bottom sediment and compacted bearing disk pile technology increases the advantage of bearing capacity of pile tip, overcome the defective and the deficiency of post grouting pile technology and compacted bearing disk pile technology, this combination has produced outstanding, significant effect.Because grouting behind shaft or drift lining bored pile piling technology method is existing maturation process, the present invention does not do concrete description to it in claims.
Expansion bottom post-grouting stake power transport mechanism of the present invention is clear and definite, pile quality is good, can increase substantially deposited reinforced concrete pile bearing capacity, reduce construction costs, shorten construction period of pile foundation engineering, compare with the ordinary reinforced concrete castinplace pile and can improve bearing capacity 100%, save raw material 50%, shorten the construction period 50%, compare with compacted bearing disk pile with post grouting pile and can improve bearing capacity 15%, save raw material 10%, remarkably productive, obvious.Other can form on the ground in a hole applicable to general cohesive soil, silt, sandy soil, gravelly sand, cobble, strong-weathered rock etc. in this expansion bottom post-grouting stake.
Description of drawings
Accompanying drawing is the structural representation of the concrete enforcement of process of the present invention;
The specific embodiment
The present invention is specifically described as follows below in conjunction with accompanying drawing: the pile-formation process method of this expansion bottom post-grouting stake comprises the moulding and the grouting behind shaft or drift lining bored pile piling technology in bottom-enlarging filling pile stake hole, during concrete enforcement, utilize special equipment to get bottom-enlarging filling pile stake hole 1, carry out grouting behind shaft or drift lining perfusion pile-formation process then, this technology comprises the steps: to be lowered to reinforcing cage in the stake hole, the reinforcing cage middle part is around slip casting flexible pipe 4 porose on it, be connected with middle part slip casting flexible pipe 2 with the slip casting all flex tee, be arranged vertically the bottom slip casting steel pipe 3 that the end has one way valve 6 hole week along stake, be provided with the high pressure valve 7 of avoiding slip casting to reflux in the upper end of Grouting Pipe; To stake hole concrete perfusion, when treating that concrete strength reaches 70% left and right sides of design strength, be pressed into cement paste by bottom and middle part Grouting Pipe respectively, eliminate pile bottom sediment and all inherent shortcomings of stake by the modes such as expansion, compacted and splitting densification of oozing of slurries, improve stake pedosphere face, make the soil body in the Zhou Yiding scope obtain reinforcing, soil strength increases, increase pile side resistance, improve the bearing capacity of stake end.

Claims (1)

1, a kind of process of forming pile by under-reaming and grouting is characterized by: this process comprises the moulding and the grouting behind shaft or drift lining bored pile piling technology two parts in bottom-enlarging filling pile stake hole.
CNB001328921A 2000-11-10 2000-11-10 Technology for forming pile by under-reaming and grouting Expired - Fee Related CN1148494C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB001328921A CN1148494C (en) 2000-11-10 2000-11-10 Technology for forming pile by under-reaming and grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB001328921A CN1148494C (en) 2000-11-10 2000-11-10 Technology for forming pile by under-reaming and grouting

Publications (2)

Publication Number Publication Date
CN1293290A CN1293290A (en) 2001-05-02
CN1148494C true CN1148494C (en) 2004-05-05

Family

ID=4595457

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB001328921A Expired - Fee Related CN1148494C (en) 2000-11-10 2000-11-10 Technology for forming pile by under-reaming and grouting

Country Status (1)

Country Link
CN (1) CN1148494C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162247B (en) * 2010-02-21 2013-02-27 韩顺和 Construction method of branch cast-in-place pile
CN101793027B (en) * 2010-04-02 2015-02-25 孔超 Core-grouted static pressure anchor rod pile
CN104074184B (en) * 2014-05-07 2017-01-25 孔超 Pile base post-grouted expanded-base bored pile
CN104805834B (en) * 2015-04-29 2016-08-03 上海市机械施工集团有限公司 In-situ deposited prefabricated integrated pile (ICP stake) and preparation method thereof

Also Published As

Publication number Publication date
CN1293290A (en) 2001-05-02

Similar Documents

Publication Publication Date Title
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN105625294A (en) Composite foundation and construction method thereof
CN104234034B (en) After a kind of first draining, plugging plate holds the construction method of formula embankment
CN204000851U (en) The stake of a kind of outsourcing water permeability concrete reinforced pipe gravel slip-casting
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN1148494C (en) Technology for forming pile by under-reaming and grouting
CN206666956U (en) A kind of highway subgrade soft soil slope composite reinforcing structure
CN110820772A (en) Bulk accumulation body side slope slide-resistant pile and structured cementing combined reinforcing method and construction process
CN106087976A (en) A kind of prefabricated friction pile of new concrete and pile sinking process
CN105421446B (en) A kind of construction method of composite soil extruding solidification prefabricated pile for treatment of soft foundation
CN104746512A (en) Reinforced cement soil composite pile and method for forming the pile
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN104480947A (en) Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN212772306U (en) Device for improving vertical compression-resistant bearing capacity of steel pipe anchor rod static pressure pile
CN104594331B (en) A kind of method that highway high roadbed culvert foundation is reinforced
CN212656252U (en) Novel transmission line tower foundation
CN204530685U (en) A kind of cement-soil stiff composite pile
CN202124857U (en) Splitting pile
CN101892665A (en) Construction method for grouting and vibro-replacement stone pile composite foundation
CN106939596A (en) A kind of cast-in-place slub type slurry drilled pile
CN207959201U (en) Synchronous grouting pile for prestressed pipe
CN205857160U (en) A kind of prefabricated friction pile of new concrete
CN214993782U (en) Bored concrete pile structure with sleeve device

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040505

Termination date: 20141110

EXPY Termination of patent right or utility model