CN114837182A - Construction method for breaking and removing dummy pile head without circular cutting - Google Patents

Construction method for breaking and removing dummy pile head without circular cutting Download PDF

Info

Publication number
CN114837182A
CN114837182A CN202210391177.3A CN202210391177A CN114837182A CN 114837182 A CN114837182 A CN 114837182A CN 202210391177 A CN202210391177 A CN 202210391177A CN 114837182 A CN114837182 A CN 114837182A
Authority
CN
China
Prior art keywords
pile head
concrete
pile
construction method
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210391177.3A
Other languages
Chinese (zh)
Inventor
习佳龙
于浩
侯龙
赵民旭
蔡铁臣
贺应龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Northwest Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202210391177.3A priority Critical patent/CN114837182A/en
Publication of CN114837182A publication Critical patent/CN114837182A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Abstract

The invention discloses a construction method for breaking a virtual pile head without circular cutting, which comprises the steps of spraying a concrete retarder to a pile head part needing to be cleaned by using a high-pressure rotary spraying machine, reacting the retarder with pile head concrete, delaying the setting time of the pile head concrete, not affecting pile base concrete below the pile head concrete, and enabling the pile head concrete not to be finally set after the pile base concrete at the lower part is finally set, so that the pile head concrete is convenient and efficient to clean and chisel, the pile head does not need to be manually and circularly cut, a pile foundation main rib is stripped, the labor demand of pile head concrete chiseling construction is small, the process is simple, the working strength is high, dust and noise can not be generated in the breaking process, and environment and noise disturbing people can not be caused. The invention solves the problems of complicated construction and noise disturbing residents in the conventional virtual pile head circular cutting and removing.

Description

Construction method for breaking and removing dummy pile head without circular cutting
Technical Field
The invention relates to the technical field of building construction, in particular to a construction method for removing a virtual pile head without circular cutting.
Background
In order to meet the requirements of ultrahigh and large span of modern buildings, the building foundation mostly adopts a pile foundation form, and in the pile foundation construction process, the dummy pile head is particularly important to be treated as a part directly connected with a main body. The traditional virtual pile head processing scheme is characterized in that a pile foundation is subjected to over-grouting at a certain height in the construction process, after the concrete of the pile foundation is finally set, the pile foundation is subjected to girdling along the standard height line of the foundation, the concrete outside a reinforcing steel bar is crushed and stripped, then, holes are drilled around the pile foundation, a wedge-shaped steel chisel is uniformly punched, the concrete of the pile head is expanded to form a ring-cutting joint section, and then, the pile head is lifted out. In the construction process, pile heads need to be manually and circularly cut, main ribs of pile foundations need to be stripped, holes and expansion joints need to be punched in the pile heads, the manual demand is large, the working procedures are complex, the working strength is high, dust and noise are generated in the cutting and breaking processes, and environment and noise are easy to disturb residents.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information forms the prior art already known to a person skilled in the art.
Disclosure of Invention
In order to overcome the defects in the prior art, a construction method for removing the dummy pile head without circular cutting is provided so as to solve the problems that the construction is complicated and the noise disturbs people in the conventional dummy pile head circular cutting removal.
In order to realize the aim, the construction method for breaking the dummy pile head without circular cutting comprises the following steps:
pouring pile foundation concrete into the pile hole to reach the basic elevation line;
after pile foundation concrete is poured, pile head concrete is over-poured above a foundation elevation line of the pile hole, and simultaneously, a coagulant is jet-sprayed in the pile head concrete at high pressure, so that two concrete structures with different solidification times are formed above and below the foundation elevation line, and the pile head concrete is not finally solidified after the pile foundation concrete is finally solidified;
and when the pile foundation concrete is finally set and the pile head concrete is not finally set, chiseling the pile head concrete.
Further, the retarder is any one of calcium lignate, sodium lignate, calcium saccharate, sucrose, citric acid, glucose, tartaric acid, sodium trithionate, polyvinyl alcohol, hydroxymethyl cellulose or calcium superphosphate.
Further, the step of high-pressure rotary spraying of the coagulant in the pile head concrete comprises:
measuring and marking the basic height marking line through a measuring ruler rod;
installing the high-pressure rotary spraying machine in place;
putting a drill bit of the high-pressure rotary spraying machine down to the basic elevation line;
and uniformly spraying the retarder through the rotary spraying machine, so that the retarder and the pile head concrete are uniformly mixed and react to delay the setting time of the pile head concrete.
Further, when the pile head concrete is chiseled, the pile head concrete is formed at one time by using a manual pick.
The construction method for removing the virtual pile head without the circular cutting has the advantages that the high-pressure rotary spraying machine is utilized to spray the concrete retarder to the part of the pile head needing to be cleaned, the retarder reacts with the pile head concrete to delay the setting time of the pile head concrete, pile foundation concrete below the pile head concrete is not influenced, after the lower part of the pile foundation concrete is finally set, the pile head concrete is not finally set, the pile head concrete is further conveniently and efficiently cleaned and chiseled, the pile head does not need to be manually and circularly cut, a main reinforcement of a pile foundation is stripped, the manual demand of chiseling construction of the pile head concrete is small, the working procedure is simple, the working strength is high, dust and noise cannot be generated in the chiseling process, and environment and noise disturbing people are not caused.
Drawings
Other features, objects and advantages of the present application will become more apparent upon reading of the following detailed description of non-limiting embodiments thereof, made with reference to the accompanying drawings in which:
fig. 1 is a schematic structural diagram of a pile foundation according to an embodiment of the present invention.
Detailed Description
The present application will be described in further detail with reference to the following drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and not restrictive of the invention. It should be noted that, for convenience of description, only the portions related to the present invention are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Referring to fig. 1, the invention provides a construction method for removing a dummy pile head without cutting around, which comprises the following steps:
s1: and pouring pile foundation concrete 1 into the pile hole to a foundation elevation line A.
S2: after the pile foundation concrete is poured, pile head concrete 2 is over-poured above the foundation elevation line of the pile hole, and simultaneously, coagulant is sprayed in the pile head concrete in a high-pressure rotary mode, so that two concrete structures with different solidification times are formed above and below the foundation elevation line, and after the pile foundation concrete is finally solidified, the pile head concrete is not finally solidified.
The method comprises the following steps of:
s21, measuring and marking a basic height line through a measuring rod;
s22, installing the high-pressure rotary spraying machine 3 in place;
s23, putting a drill bit of the high-pressure jet grouting machine down to the basic elevation line;
and S24, uniformly spraying the retarder through the rotary spraying machine, so that the retarder is uniformly mixed with the pile head concrete and reacts to delay the setting time of the pile head concrete.
After the pile foundation concrete is poured, the retarder is rotationally sprayed in the designated height of the pile head by using the high-pressure rotary spraying machine, the setting time of the pile head concrete is prolonged, a setting time difference is formed between the pile head concrete and the pile foundation concrete at the lower part of the basic height marking line A, and the pile head concrete is cleaned by using the time difference.
In this embodiment, the retarder is any one of calcium lignosulfonate, sodium lignosulfonate, calcium saccharate, sucrose, citric acid, glucose, tartaric acid, sodium trithionate, polyvinyl alcohol, hydroxymethyl cellulose, or calcium superphosphate. Specifically, the retarding effects of the various retarders are shown in tables 1 and 2 below.
TABLE 1 retarding effect of retarder and retarding water reducer
Figure BDA0003595638170000031
TABLE 1 retardation effect of retarder and retarding water reducer
Figure BDA0003595638170000041
TABLE 2 Cement physical Properties of different amounts of blended superphosphate
Figure BDA0003595638170000042
S3: and when the pile foundation concrete is finally set and the pile head concrete is not finally set, chiseling the pile head concrete.
When the pile head concrete is chiseled, the manual pickaxe is used for forming the pile head concrete at one time.
The construction method of the invention can be used for removing the virtual pile head without ring cutting, the high-pressure rotary spraying machine is used for spraying the concrete retarder to the part of the pile head to be cleaned, the retarder reacts with the pile head concrete to delay the setting time of the pile head concrete, the pile base concrete below the pile head concrete is not influenced, after the lower part of the pile base concrete is finally set, the pile head concrete is not finally set, so that the pile head concrete is convenient and efficient to clean and chisel, the pile head is not required to be manually and annularly cut, the main reinforcement of a pile foundation is stripped, the labor requirement for chiseling the pile head concrete is small, the process is simple, the working strength is high, and no dust and noise are generated in the chiseling process, namely, the environment and noise are not disturbed.
The above description is only a preferred embodiment of the application and is illustrative of the principles of the technology employed. It will be appreciated by a person skilled in the art that the scope of the invention as referred to in the present application is not limited to the embodiments with a specific combination of the above-mentioned features, but also covers other embodiments with any combination of the above-mentioned features or their equivalents without departing from the inventive concept. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.

Claims (4)

1. A construction method for breaking and removing a dummy pile head without girdling is characterized by comprising the following steps:
pouring pile foundation concrete into the pile hole to reach the basic elevation line;
after pile foundation concrete is poured, pile head concrete is over-poured above a foundation elevation line of the pile hole, and simultaneously, a coagulant is jet-sprayed in the pile head concrete at high pressure, so that two concrete structures with different solidification times are formed above and below the foundation elevation line, and the pile head concrete is not finally solidified after the pile foundation concrete is finally solidified;
and when the pile foundation concrete is finally set and the pile head concrete is not finally set, chiseling the pile head concrete.
2. The construction method of claim 1, wherein the retarder is any one of calcium lignosulfonate, sodium lignosulfonate, sugar, sucrose, citric acid, glucose, tartaric acid, sodium trithionate, polyvinyl alcohol, hydroxymethyl cellulose or calcium superphosphate.
3. The construction method of claim 1, wherein the step of performing high-pressure rotary spraying of a coagulant in the pile head concrete comprises:
measuring and marking the basic height marking line through a measuring ruler rod;
installing the high-pressure rotary spraying machine in place;
putting a drill bit of the high-pressure rotary spraying machine down to the basic elevation line;
and uniformly spraying the retarder through the rotary spraying machine, so that the retarder and the pile head concrete are uniformly mixed and react to delay the setting time of the pile head concrete.
4. The construction method of ring-cutting-free virtual pile head of claim 1, wherein the pile head concrete is caused at one time by a manual pick when the pile head concrete is chiseled.
CN202210391177.3A 2022-04-14 2022-04-14 Construction method for breaking and removing dummy pile head without circular cutting Pending CN114837182A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210391177.3A CN114837182A (en) 2022-04-14 2022-04-14 Construction method for breaking and removing dummy pile head without circular cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210391177.3A CN114837182A (en) 2022-04-14 2022-04-14 Construction method for breaking and removing dummy pile head without circular cutting

Publications (1)

Publication Number Publication Date
CN114837182A true CN114837182A (en) 2022-08-02

Family

ID=82565858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210391177.3A Pending CN114837182A (en) 2022-04-14 2022-04-14 Construction method for breaking and removing dummy pile head without circular cutting

Country Status (1)

Country Link
CN (1) CN114837182A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000314131A (en) * 1999-04-28 2000-11-14 Mitsuo Oyanagi Pile head treatment method of concrete pile
JP2006037492A (en) * 2004-07-27 2006-02-09 Takenaka Komuten Co Ltd Pile head processing construction method of cast-in-place concrete pile
CN105735317A (en) * 2016-03-09 2016-07-06 中天路桥有限公司 Construction technology for removing pile heads of cast-in-place piles
CN208701688U (en) * 2018-08-08 2019-04-05 湖北金扬建设工程有限责任公司 The device of pore-creating perfusion addition retarder
CN111910622A (en) * 2020-07-13 2020-11-10 毕竞东 Construction method of bored pile without pile head

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000314131A (en) * 1999-04-28 2000-11-14 Mitsuo Oyanagi Pile head treatment method of concrete pile
JP2006037492A (en) * 2004-07-27 2006-02-09 Takenaka Komuten Co Ltd Pile head processing construction method of cast-in-place concrete pile
CN105735317A (en) * 2016-03-09 2016-07-06 中天路桥有限公司 Construction technology for removing pile heads of cast-in-place piles
CN208701688U (en) * 2018-08-08 2019-04-05 湖北金扬建设工程有限责任公司 The device of pore-creating perfusion addition retarder
CN111910622A (en) * 2020-07-13 2020-11-10 毕竞东 Construction method of bored pile without pile head

Similar Documents

Publication Publication Date Title
CN109678430B (en) High-strength impervious self-compacting concrete for pipe gallery box culvert and preparation method thereof
CN104446257B (en) A kind of mixed sand self-compacting concrete and pouring construction method thereof
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN103061432B (en) The construction method of light energy-saving thermal insulation non-bearing wall body
CN113323440A (en) Concrete gap repairing and anti-seepage treatment method
CN107237424A (en) A kind of agent structure and the drawknot construction method of filling wall
CN108793805B (en) Concrete admixture formula of steam-curing-free high-impermeability shield segment and curing process thereof
CN105649235A (en) Construction technique for MS dense thin-wall building block filling
CN102373713A (en) Construction method and device for preserved hole of equipment foundation bolt
CN114837182A (en) Construction method for breaking and removing dummy pile head without circular cutting
CN102031876A (en) Method for newly adding upright column for building
CN109208821A (en) A kind of built-in steel pipe Constructional Col-umn Construction method of ALC building block
CN106587844A (en) Permeable steam-pressing brisk and preparation method thereof
CN106320687A (en) Detachable wall connecting component for scaffold
CN206539016U (en) Constructional column pours device
CN206319404U (en) A kind of building precast exterior sheathing
CN101270578A (en) Follow type anchor wire secondary slip casting construction method
CN113482389A (en) Construction process for connecting newly-built wall body with original wall body
CN208441287U (en) A kind of concrete aerated insulating brick
CN102888906B (en) A kind of mosaic assembled wall and construction method thereof
CN112411577A (en) Novel construction method applied to backfill of comprehensive pipe gallery
CN207296076U (en) A kind of gap interstitital texture at the top of masonry wall between agent structure
JP4956175B2 (en) Structure and cutting method
CN209453839U (en) Slip casting sleeve with location structure
CN110241817A (en) A kind of impaired after-construction method of the friction pile stake holes of emergency repair engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination