CN101270578A CNA2008100109723A CN200810010972A CN101270578A CN 101270578 A CN101270578 A CN 101270578A CN A2008100109723 A CNA2008100109723 A CN A2008100109723A CN 200810010972 A CN200810010972 A CN 200810010972A CN 101270578 A CN101270578 A CN 101270578A
Authority
CN
China
Prior art keywords
construction
grouting
slip casting
anchor
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100109723A
Other languages
Chinese (zh)
Inventor
张明洋
Original Assignee
张明洋
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张明洋 filed Critical 张明洋
Priority to CNA2008100109723A priority Critical patent/CN101270578A/en
Publication of CN101270578A publication Critical patent/CN101270578A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a building foundation construction method, in particular to a subsequent anchor cable secondary grouting construction method in a building foundation construction. The method includes the following steps: using a drill to drive the anchor rib and the grouting pipe of the anchor cable into a designed depth for one time simultaneously when drilling in; then grouting a solidifying liquid in a bore through the grouting pipe; taking a drill stem out and leaving the anchor bar and the grouting pipe initial setting of the solidifying liquid. Compared with the prior art, the invention solves the problem of no bore-forming in a sand layer anchor rod construction and leads the bore-forming and grouting to be finished for one time, solves the secondary grouting problem in the construction and reduces the construction cost. The method greatly reduces the construction cost of the anchor rod or the anchor cable in the sand layer and improves the construction speed. The cost is reduced by 30 percent and the efficiency is improved by 50 percent.

Description

Follow type anchor wire secondary slip casting construction method
Technical field
The present invention relates to a kind of construction foundation working method, particularly relate to the follow type anchor wire secondary slip casting construction method in a kind of construction foundation working.
Background technology
In the existing deep foundation pit support engineering, anchoring construction is used two kinds of methods always.A kind of is the anchor bolt construction method, and another kind is the anchor cable construction method.The former has, and construction is simple, the reliable advantage of anchoring.But its cost is higher.The anchor cable construction method because of its construction cost is low than the former, is progressively approved by market when having the supremacy clause that construction technology is easy, the Device-General formula is good.But some problems are also arranged in engineering is finished, mainly show as: when loose sandy soil layer carried out anchor cable construction, because the pore-forming difficulty, slip casting effect was undesirable, and stretching resistance is low.Cause the anchor cable operating efficiency to reduce, construction cost increases.
Summary of the invention
It is to have solved pore-forming difficult problem in the anchor cable construction that the present invention provides a kind of follow type anchor wire secondary slip casting construction method, purpose in order to solve the problems of the technologies described above exactly, has also solved the low problem of anchor cable uplift resistance simultaneously.
In order to solve the problems of the technologies described above, the present invention is achieved in that a kind of follow type anchor wire secondary slip casting construction method, and it comprises following processing step: use rig dowel and disposable designated depth of bringing into of Grouting Pipe with anchor cable when creeping into; Then by Grouting Pipe perfusion consolidation liquid in boring; Propose drilling rod and dowel and Grouting Pipe are stayed in the hole; Before the consolidation liquid initial set, carry out secondary grouting by Grouting Pipe.
Described anchor cable is substituted by anchor pole.
Described secondary grouting pressure generally be controlled at 0.5-2.5mpa between.
The described secondary grouting time is to carry out after 2-4 hour after the slip casting for the first time.
Advantage of the present invention and effect are as follows:
1, compares than conventional art and solved in the layer of sand anchor bolt construction the not problem of pore-forming, pore-forming slip casting is once finished.
2, solved the problem of secondary grouting in the construction.Secondary grouting pressure generally be controlled at 0.5-2.5mpa between
3, reduced construction cost, the method greatly reduces the cost that anchor pole or anchor cable are constructed in layer of sand, improved speed of application.Cost reduces by 30%, and efficient improves 50%
Through evidence job practices of the present invention is rationally advanced and actual effective good method, and it had both solved pore-forming difficult problem in the anchor cable construction, had also solved the low problem of anchor cable uplift resistance simultaneously.
The specific embodiment
Below description by the specific embodiment the present invention is described in further detail, but this can not be used for limitation of the present invention, those skilled in the art are according to basic thought of the present invention, can make various modifications or improvement, but only otherwise break away from basic thought of the present invention, all within the scope of the present invention.
A kind of follow type anchor wire secondary slip casting construction method of the present invention: use rig dowel and disposable designated depth of bringing into of Grouting Pipe with anchor cable when creeping into; Then by Grouting Pipe perfusion consolidation liquid in boring; Propose drilling rod and dowel and Grouting Pipe are stayed in the hole; Before the consolidation liquid initial set, carry out secondary grouting by Grouting Pipe.Wherein secondary grouting pressure generally be controlled at 0.5-2.5mpa between.The described secondary grouting time is to carry out after 2-4 hour after the slip casting for the first time.
Used anchor pole or anchor cable can be selected any one disclosed product now for use.

Claims (4)

1, a kind of follow type anchor wire secondary slip casting construction method is characterized in that it comprises following processing step: use rig dowel and disposable designated depth of bringing into of Grouting Pipe with anchor cable when creeping into; Then by Grouting Pipe perfusion consolidation liquid in boring; Propose drilling rod and dowel and Grouting Pipe are stayed in the hole; Before the consolidation liquid initial set, carry out secondary grouting by Grouting Pipe.
2, follow type anchor wire secondary slip casting construction method according to claim 1 is characterized in that described anchor cable is substituted by anchor pole.
3, follow type anchor wire secondary slip casting construction method according to claim 1, it is characterized in that described secondary grouting pressure generally be controlled at 0.5-2.5mpa between.
4,, it is characterized in that carrying out after 2-4 hour after the described secondary grouting time is for slip casting for the first time according to claim 1 or 3 described follow type anchor wire secondary slip casting construction methods.
CNA2008100109723A 2008-04-10 2008-04-10 Follow type anchor wire secondary slip casting construction method Pending CN101270578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100109723A CN101270578A (en) 2008-04-10 2008-04-10 Follow type anchor wire secondary slip casting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100109723A CN101270578A (en) 2008-04-10 2008-04-10 Follow type anchor wire secondary slip casting construction method

Publications (1)

Publication Number Publication Date
CN101270578A true CN101270578A (en) 2008-09-24

Family

ID=40004783

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100109723A Pending CN101270578A (en) 2008-04-10 2008-04-10 Follow type anchor wire secondary slip casting construction method

Country Status (1)

Country Link
CN (1) CN101270578A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535462A (en) * 2012-03-16 2012-07-04 广州中煤江南基础工程公司 Method for constructing anchor cable on sand layer
CN102704478A (en) * 2012-06-08 2012-10-03 黄水森 Building anchor rod construction technology
CN102817363A (en) * 2012-09-17 2012-12-12 凌宗明 Application of all-in-one machine for digging, drilling and anchoring in basement foundation pipe support engineering
CN103643964A (en) * 2013-12-03 2014-03-19 中铁十三局集团有限公司 Excavation leakage-prevention supporting method for water-less sandy-soil stratum tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535462A (en) * 2012-03-16 2012-07-04 广州中煤江南基础工程公司 Method for constructing anchor cable on sand layer
CN102704478A (en) * 2012-06-08 2012-10-03 黄水森 Building anchor rod construction technology
CN102704478B (en) * 2012-06-08 2015-04-22 黄水森 Building anchor rod construction technology
CN102817363A (en) * 2012-09-17 2012-12-12 凌宗明 Application of all-in-one machine for digging, drilling and anchoring in basement foundation pipe support engineering
CN103643964A (en) * 2013-12-03 2014-03-19 中铁十三局集团有限公司 Excavation leakage-prevention supporting method for water-less sandy-soil stratum tunnel

Similar Documents

Publication Publication Date Title
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN2652998Y (en) Bundled steel twisted wire anchor with rotary spray drill bit
CN103669346B (en) A kind of tuck inside the sleeve raft pipe and the application in landslide control
CN104631438B (en) Long auger guncreting uplift pile construction method
WO2014187171A1 (en) Method for networked reinforcement of cross boreholes of outburst coal seam
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN101270578A (en) Follow type anchor wire secondary slip casting construction method
CN101058980B (en) Construction method for self-feeding anchor pile
CN104047543A (en) Construction method for forming hole by large-diameter bored pile in high-strength rock stratum
CN104711987B (en) A kind of deep covering layer sleeving valve tube method controllable grouting method
CN104762072A (en) Penetrating selective plugging agent and preparation method and application method thereof
CN103161484B (en) A kind of lotion fixed length anchoring support method
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN105672486A (en) Method for embedding anchor bars in concrete
CN103938623A (en) Tubular pile construction method
CN102767353A (en) Comprehensive mining technology of drowned well
CN102286979A (en) Construction method for deep foundation pit supporting by adopting steel pipe piles-self-drilling prestressed anchor bars
CN205012333U (en) Recoverable FRP stock with enlarged footing
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN105970955A (en) Self-drilling type nail and pipe combined double-liquid grouting soil nail construction process
CN206144587U (en) Odd -shaped cross section cavity self -drilling stock
CN206693228U (en) A kind of anchor pole and ground substrate plate anti-floating system
CN203394469U (en) PE screen pipe well completion device for coalbed methane horizontal well
WO2013097377A1 (en) Porous secant pile drilling rig and construction technology thereof

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20090828

Address after: The eighty-first Middle School of Liaoning City, Shenyang Province, China Code: 110161

Applicant after: Zhang Zhixin

Address before: Liaoning city of Shenyang province Shenyang Huishan agricultural high tech Zone Huishan Street No. 123 post encoding: 110000

Applicant before: Zhang Mingyang

C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: ZHANG ZHIXIN

Free format text: FORMER OWNER: ZHANG MINGYANG

Effective date: 20090828

RJ01 Rejection of invention patent application after publication

Open date: 20080924

C12 Rejection of a patent application after its publication