CN114784708A - Composite cable installation method for newly-built jacket - Google Patents

Composite cable installation method for newly-built jacket Download PDF

Info

Publication number
CN114784708A
CN114784708A CN202210406529.8A CN202210406529A CN114784708A CN 114784708 A CN114784708 A CN 114784708A CN 202210406529 A CN202210406529 A CN 202210406529A CN 114784708 A CN114784708 A CN 114784708A
Authority
CN
China
Prior art keywords
composite cable
rope
jacket
cable
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210406529.8A
Other languages
Chinese (zh)
Other versions
CN114784708B (en
Inventor
秦铁男
封加全
王超
张馨予
朱东旭
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Komeier Marine Technology Co ltd
Original Assignee
Dalian Kingmile Anticorrosion Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Kingmile Anticorrosion Technology Co ltd filed Critical Dalian Kingmile Anticorrosion Technology Co ltd
Priority to CN202210406529.8A priority Critical patent/CN114784708B/en
Publication of CN114784708A publication Critical patent/CN114784708A/en
Application granted granted Critical
Publication of CN114784708B publication Critical patent/CN114784708B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle

Abstract

The invention discloses a method for installing a composite cable of a newly-built jacket, which comprises the following steps: the cable comprises a cable drum, an anchor chain, a traction rope, a composite cable and a cable joint head thereof, a steel wire rope sliding cable, a sliding ring, a ground traction winch and a top tensioning device. The composite cable part comprises a composite cable integrating an auxiliary anode and a reference electrode, a slip ring, a hook wire-dividing cover and a cable joint at the two ends of the composite cable; the suspension part comprises a steel wire rope sliding rope for guiding and suspending the composite cable, an anchor point, a guide pulley and a ground winch; the traction part comprises a traction rope for drawing the composite cable in place, a rope joint, a guide pulley and a ground winch which is the same as the steel wire rope sliding rope. The installation method utilizes the steel wire rope as a guide sliding rope for installing the composite cable in place, adopts the winch to pull the composite cable in place, is suitable for installing the tension type ICCP composite cable in the onshore horizontal construction stage of the deepwater jacket, has strong applicability and simple and convenient installation, can reduce the construction risk, and is particularly suitable for the deepwater jacket.

Description

Composite cable installation method for newly-built jacket
Technical Field
The invention relates to the technical field of composite cable installation of a jacket ICCP system, in particular to a composite cable installation method of a newly-built jacket.
Background
The tension type impressed current cathodic protection system is used as a common means for electrochemical protection and corrosion prevention and life prolonging of the offshore platform jacket. The method mainly comprises the steps of integrally packaging an auxiliary anode and a reference electrode on a composite cable with a built-in tensile bearing steel wire rope, and realizing the tensioning and installation of the composite cable by anchoring and tensioning the upper end and the lower end of a jacket so as to resist the transverse swing amplitude and fatigue fracture of the composite cable under the extreme ocean working condition. The tensioning type ICCP system can achieve vertical lowering and vertical tensioning on an in-service jacket platform at sea, but for a newly-built jacket, installation of underwater equipment such as a composite cable and the like needs to be completed in a land building stage, particularly for a horizontally-built deepwater jacket, the composite cable cannot be installed vertically, the composite cable can be installed horizontally only according to the posture of the jacket building stage, and the jacket is changed into a vertical service state along with the posture of the jacket after being righted by launching. In summary, for the horizontally-built deepwater jacket, a simple and feasible installation method with controllable risk is urgently needed to realize the installation of the composite cable in the jacket land area building stage.
Disclosure of Invention
The invention provides a method for installing a composite cable of a newly-built jacket, which aims to overcome the technical problem.
The invention discloses a method for installing a composite cable of a newly-built jacket, which comprises the following steps:
the method comprises the following steps: a cable drum working platform is built at the installation position of the composite cable (4) on the top of the conduit frame, and a temporary working platform or a scaffold is built at the bottom of the conduit frame corresponding to the installation position of the composite cable (4);
step two: arranging a plurality of detachable anchor points of the steel wire rope sliding ropes (1) on the jacket structure corresponding to the path of the composite cable (4) between the top of the jacket and the bottom of the jacket, wherein the detachable anchor points are used for the steel wire rope sliding ropes (1) to pass through so as to provide support for the sliding ropes;
step three: drawing the steel wire rope sliding rope (1) from the top of the jacket to the bottom of the jacket through anchor points along the way, and stretching the steel wire rope sliding rope (1) at the bottom of the jacket; the traction rope is pulled from the top of the jacket to the bottom of the jacket along with the steel wire rope sliding rope, and the traction rope does not pass through the anchor point;
step four: connecting a rope joint at the tail end of a composite cable (4) with the head end of a traction rope (2), recovering the traction rope (2) from the bottom of a jacket, synchronously releasing the composite cable (4) by a cable drum, installing a slip ring (3) on the composite cable (4), hanging the slip ring (3) on a steel wire rope slip rope (1), recovering the traction rope (2) from the bottom of the jacket, simultaneously releasing the composite cable wound on the cable drum, and hanging the composite cable (4) below the steel wire rope slip rope (1) through a plurality of slip rings (3);
step five: after the composite cable (4) reaches a preset position at the bottom of the jacket, the head end of the composite cable (4) is fixed on a corresponding tensioning device at the top of the jacket, and the tail end of the composite cable (4) is fixed on a corresponding anchoring ear plate at the bottom of the jacket; hoisting the composite cable by using a hanging strip which is arranged at the position of the limiting structure in advance, enabling the composite cable (4) to be positioned in the limiting structure, and locking the limiting structure to complete the limiting of the composite cable (4); dismounting the sling, and mounting other limit structures in the same way to complete the mounting of all limit structures of the composite cable (4);
step six: and tensioning the composite cable (4) by using a tensioning device according to the designed pre-tension.
Further, the fourth step includes:
and in the pulling process of the composite cable (4), the composite cable (4) and the steel wire rope sliding cable (1) are relatively fixed by using the sliding ring (3).
Further, after the sixth step, the method further includes:
and (3) removing the tensioning device of the steel wire rope sliding rope (1) at the bottom working platform of the jacket, removing the pre-tension of the steel wire rope, further removing the steel wire rope sliding rope (1), and then recovering the traction rope.
Further, the third step includes:
-pulling the wire rope strop (1) from the jacket top to the jacket bottom using a surface winch;
the head end of the hauling cable is left on the cable drum platform, and the tail end of the hauling cable is hauled to the ground winch through the anchoring pulley.
Further, the fourth step is to use a ground winch to recover the traction rope (2);
and step five, fixing the tail end of the composite cable (4) on a corresponding anchoring ear plate at the bottom of the jacket through an anchor chain.
Further, the number of the slip rings (3) arranged on the composite cable (4) is determined according to the stress analysis of the composite cable (4);
furthermore, the tension of the steel wire rope sliding rope (1) and the tension of the traction rope (3) are determined according to stress analysis;
further, the hauling cable is a steel wire rope or a Kevlar rope.
The invention aims at the problem that a newly-built deepwater jacket foundation composite cable is installed on the land. The installation process is more convenient, the installation risk is reduced, and the installation cost is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without inventive labor.
FIG. 1 is a schematic diagram of the arrangement of composite cables in an embodiment of the land installation method of composite cables for newly built platforms according to the present invention;
FIG. 2 is a schematic view of a composite cable installation process in an embodiment of the present invention; the illustrated state is that the steel wire rope is in place with a sliding rope and a traction rope;
FIG. 3 is a schematic view of a composite cable installation process in an embodiment of the present invention; the state shown in the figure is that the traction rope pulls the composite cable;
FIG. 4 is a schematic view of a composite cable installation process in an embodiment of the present invention; the state shown in the figure is that the composite cable is pulled to be in place and tensioned;
FIG. 5 is a schematic view of a composite cable installation process in an embodiment of the present invention; the state shown in the figure is that the steel wire rope, the traction rope and the slip ring are removed;
FIG. 6 is a schematic illustration of a wireline winch installation in an embodiment of the present invention;
FIG. 7 is a schematic illustration of an embodiment of the present invention illustrating the installation of a cable-slide support structure;
FIG. 8 is an enlarged schematic view of a cable sheave support structure in an embodiment of the present disclosure;
FIG. 9 is a schematic view of a slip ring according to an embodiment of the present invention;
fig. 10 is a schematic drawing of a composite cable anchoring section pulling arrangement in an embodiment of the present invention.
In the figure:
1. a steel wire rope is used for sliding; 2. a hauling rope; 3. a slip ring; 4. a composite cable; 5. a jacket; 6. lifting lugs; 7. and (6) anchoring points.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without inventive step based on the embodiments of the present invention, are within the scope of protection of the present invention.
When the composite cable 4 is installed, the pre-tensioned steel wire rope is used as a sliding rope, the composite cable 4 is hung on the pre-tensioned steel wire rope through the sliding ring 3, and the ground winch is used for dragging the composite cable 4 to be installed in place. The installation stage of the composite cable 4 is carried out after the construction of the main structure of the jacket 5 is completed and before the scaffold is dismantled.
As shown in fig. 1, 4 sets of composite cable-electrode systems are installed in the jacket-tensioned ICCP system, and as shown in fig. 2, the present invention discloses a method for installing composite cables of a newly-built platform on land, which includes:
the method comprises the following steps: and a cable drum working platform is built at the mounting position of the composite cable 4 at the top of the conduit frame, and a temporary working platform or a scaffold is built at the bottom of the conduit frame 5 corresponding to the position of the composite cable 4.
Because jacket 5 is too high, build work platform and scaffold manual operation when conveniently installing composite cable 4 to and cable drum work platform can place cable drum, be used for the wire rope cylinder and the haulage rope cylinder of strop.
Step two: and a plurality of steel wire rope sliding cable detachable anchor points 7 are welded on the structure of the jacket 5 corresponding to the path of the composite cable 4 between the top of the jacket 5 and the bottom of the jacket 5, and lifting lugs 6 and D-shaped shackles are adopted for the steel wire rope sliding cables 1 to pass through so as to provide support for the steel wire rope sliding cables. Specifically, a lifting lug 6 is welded at the top, and the steel wire rope sliding rope 1 supporting structure is formed by connecting the lifting lug 6 with a D-shaped shackle.
Step three: drawing the steel wire rope sliding rope 1 from the top of the jacket 5 to the bottom of the jacket 5 through anchor points along the way, and tensioning the steel wire rope sliding rope 1 at the bottom of the jacket; the traction rope is pulled from the top of the jacket to the bottom of the jacket along with a steel wire rope sliding rope, and the traction rope does not pass through the anchor point. In the embodiment, a ground winch is used for drawing the steel wire rope sliding rope 1 from the top of the jacket 5 to the bottom of the jacket 5, one end of the steel wire rope sliding rope 1 is fixed at the top of the jacket through a lifting lug 6, and the other end of the steel wire rope sliding rope is drawn through the ground winch; the head end of the hauling cable is left on the cable drum platform, and the tail end of the hauling cable is hauled to the ground winch through the anchoring fixed pulley. The traction rope is a steel wire rope and is dragged on the same winch with the sliding rope steel wire rope, and the ground winch is a double-winch.
Specifically, as shown in fig. 6, the winch is arranged on the ground at one end of the bottom of the jacket 5, the ground winch is connected with the hauling rope, and the other end of the hauling rope is connected with the composite cable arranged on the cable drum; preferably, the ground winch tractive force required will also be different for different cable inclination angles. The steel wire rope sliding rope 1 is anchored with the jacket 5 and tensioned, and is connected with the jacket 5 through a D-shaped shackle; the jacket 5 is provided with a plurality of lifting lugs 6 and D-shaped shackles to ensure that the sliding cable steel wire rope is completely lifted; as shown in fig. 10, the head end of the hauling cable is left on the cable drum platform, and the tail end of the hauling cable is hauled and recovered to the ground winch through the anchoring pulley for subsequent use.
Step four: as shown in fig. 3, a hauling rope 2 is hung on the steel wire rope sliding rope 1 through a slip ring 3, a knot head at the tail end of a composite cable 4 is connected with the head end of the hauling rope 2, the composite cable 4 is hung on the sliding rope through a hook, the hauling rope 2 is hauled and recovered through a ground winch on the ground, and the composite cable 4 is pulled to move along the steel wire rope sliding rope. Preferably, in the fourth step, the slip ring 3 is used to relatively fix the composite cable 4 and the steel wire rope 1 during the pulling process of the composite cable 4. Preferably, the traction ropes 2 are hauled using a surface winch.
Specifically, a traction rope 2 penetrates through a slip ring 3 to be hung on a steel wire rope slide rope 1 to prevent the traction rope 2 from sagging, the tail end of the traction rope 2 is connected with a ground winch, and the head end of the traction rope 2 is connected with a knot head at the tail end of a composite cable 4 arranged on a cable drum platform; starting a ground winch, pulling the composite cable 4 to move towards the bottom of the jacket 5 along the steel wire rope sliding rope by the traction rope 2, installing a sliding ring 3 at one end of the composite cable 4 at intervals in the moving process, connecting the sliding ring 3 with a hook, and hanging the composite cable 4 on the steel wire rope sliding rope 1 through the hook; preferably, one slip ring 3 is fixedly installed every 10 m; preferably, as shown in fig. 9, the slip ring 3 includes two opposite hook plates, and the composite cable 4 is fixed between the cambered surfaces of the two hook plates by fastening bolts.
As shown in fig. 7 and 8, when the slip ring 3 and the hook move to the support structure of the steel wire rope slip 1, the slip ring 3 is not stressed any more in order to facilitate the slip ring 3 and the hook to temporarily support the composite cable 4 through the support structure of the steel wire rope slip 1 by the bottom support; an operator hangs the slip ring 3 and the hook from one side of the supporting structure of the steel wire rope slip 1 to the other side; the temporary bottom support is then removed and the composite cable 4 continues to be pulled to ensure normal movement of the composite cable 4.
Step five: as shown in fig. 4, after the composite cable 4 reaches a preset position, the head end, i.e., the tensioning end socket head, of the composite cable 4 is fixed on the lifting lug 6 of the tensioning device corresponding to the top of the jacket 5, and the tail end of the composite cable 4 is fixed on the anchoring ear plate corresponding to the bottom of the jacket 5; hoisting the sling arranged at the position of the limiting structure in advance to enable the composite cable 4 to be positioned near the limiting structure, and closing and locking the limiting structure at the position of the composite cable 4 hoisted by the sling; and (4) dismounting the hanging strip, and mounting other limiting structures in the same way to complete the mounting of the limiting structure of the composite cable 4. Preferably, the tail end of the composite cable 4 is fixed on the corresponding anchoring ear plate at the bottom of the jacket 5 through an anchor chain, and pretension is applied to enable the composite cable to resist the impact force of sliding and launching of the jacket.
Specifically, after the composite cable 4 reaches a preset position, the traction rope 2 is recovered through a ground winch, and the composite cable 4 is fixedly connected to the jacket 5.
Specifically, the composite cable drum is hoisted to the working platform, and the base of the composite cable drum working platform is welded, so that the stability and reliability of the cable drum in the installation process of the composite cable are guaranteed.
Step six: the composite cable 4 is tensioned by the tensioning device according to the pre-tension, so that the use requirement is met.
Preferably, as shown in fig. 5, after the sixth step, the method further includes: and (3) removing the tensioning device of the steel wire rope sliding rope 1 at the bottom working platform of the jacket 5, removing the pre-tension of the steel wire rope, further removing the steel wire rope sliding rope 1, and then recovering the traction rope.
Specifically, after the composite cable 4 is in place and tensioned, the tensioning device of the steel wire rope sliding rope 1 at the bottom working platform of the jacket 5 is dismounted, the tensioning force of the steel wire rope sliding rope 1 is removed, the hook hung on the steel wire rope sliding rope 1 is loosened, the steel wire rope sliding rope 1 falls to the lower side of the composite cable 4, the steel wire rope sliding rope 1 is pulled out of the hook at the anchoring end, and the traction rope 2 and the steel wire rope sliding rope 1 are dismounted and recovered.
The invention has the beneficial effects that:
1. the horizontal installation of the tension type ICCP composite cable 4 on the horizontally-built jacket is realized, the installation process is more controllable, and the accidental falling risk of the composite cable is reduced.
2. The steel wire rope sliding rope is used as a path, the composite cable is pulled by a winch to be installed in place, the composite cable can accurately pass through the supporting structures of all horizontal layers in a three-dimensional space, and deflection of the composite cable caused by self weight in the horizontal installation process is resisted.
3. The installation method has strong applicability, is suitable for horizontally constructed jacket foundations of various water depths, and is particularly suitable for deep-water jacket platforms with the depth of 300 meters.
4. The method solves the problem that the composite cable is horizontally installed in place on the basis of horizontally building the jacket, and lays a foundation for promoting the application of the tension type ICCP system in the cathodic protection of a newly built jacket.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and these modifications or substitutions do not depart from the spirit of the corresponding technical solutions of the embodiments of the present invention.

Claims (8)

1. A composite cable installation method of a newly-built jacket is characterized by comprising the following steps:
the method comprises the following steps: a cable drum working platform is built at the installation position of the composite cable (4) on the top of the conduit frame, and a temporary working platform or a scaffold is built at the bottom of the conduit frame corresponding to the installation position of the composite cable (4);
step two: arranging a plurality of detachable anchor points of the steel wire rope sliding ropes (1) on the jacket structure corresponding to the path of the composite cable (4) between the top of the jacket and the bottom of the jacket, wherein the detachable anchor points are used for the steel wire rope sliding ropes (1) to pass through so as to provide support for the sliding ropes;
step three: drawing the steel wire rope sliding rope (1) from the top of the jacket to the bottom of the jacket through anchor points along the way, and stretching the steel wire rope sliding rope (1) at the bottom of the jacket; the traction rope is pulled from the top of the jacket to the bottom of the jacket along with the steel wire rope sliding rope, and the traction rope does not pass through the anchor point;
step four: connecting a knot head at the tail end of a composite cable (4) with the head end of a traction rope (2), recovering the traction rope (2) from the bottom of a jacket, synchronously releasing the composite cable (4) by a cable drum, installing a slip ring (3) on the composite cable (4), hanging the slip ring (3) on a steel wire rope slip rope (1), recovering the traction rope (2) from the bottom of the jacket, simultaneously releasing the composite cable wound on the cable drum, and hanging the composite cable (4) below the steel wire rope slip rope (1) through a plurality of slip rings (3);
step five: after the composite cable (4) reaches a preset position at the bottom of the jacket, the head end of the composite cable (4) is fixed on a corresponding tensioning device at the top of the jacket, and the tail end of the composite cable (4) is fixed on a corresponding anchoring ear plate at the bottom of the jacket; hoisting the composite cable by using a hanging strip which is pre-arranged at the position of the limiting structure, enabling the composite cable (4) to be positioned in the limiting structure, and locking the limiting structure to complete the limiting of the composite cable (4) at the position; dismounting the sling, and mounting other limit structures in the same way to complete the mounting of all limit structures of the composite cable (4);
step six: and tensioning the composite cable (4) by using a tensioning device according to the designed pre-tension.
2. The method of claim 1, wherein said step four comprises:
and in the pulling process of the composite cable (4), the composite cable (4) and the steel wire rope sliding cable (1) are relatively fixed by using the sliding ring (3).
3. The method according to claim 1 or 2, wherein after the sixth step, further comprising:
and (3) removing the tensioning device of the steel wire rope sliding rope (1) at the bottom working platform of the jacket, removing the pre-tension of the steel wire rope, further removing the steel wire rope sliding rope (1), and then recovering the traction rope.
4. A method according to any one of claims 1 to 3, wherein step three, comprises:
drawing the wire rope strop (1) from the jacket top to the jacket bottom using a surface winch;
the head end of the hauling cable is left on the cable drum platform, and the tail end of the hauling cable is hauled to the ground winch through the anchoring pulley.
5. Method according to any of claims 1 to 3, characterized in that said step four consists in recovering the traction ropes (2) using a ground winch;
and step five, fixing the tail end of the composite cable (4) on a corresponding anchoring ear plate at the bottom of the jacket through an anchor chain.
6. Method according to claim 1, characterized in that the number of slip rings (3) mounted on the composite cable (4) is determined from a force analysis of the composite cable (4).
7. Method according to claim 1, characterized in that the tension of the rope sheave (1) and the tension of the traction rope (3) are determined on the basis of force analysis.
8. The method of claim 1, wherein the pull line is a wire rope or a Kevlar rope.
CN202210406529.8A 2022-04-18 2022-04-18 Composite cable installation method for newly-built jacket Active CN114784708B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210406529.8A CN114784708B (en) 2022-04-18 2022-04-18 Composite cable installation method for newly-built jacket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210406529.8A CN114784708B (en) 2022-04-18 2022-04-18 Composite cable installation method for newly-built jacket

Publications (2)

Publication Number Publication Date
CN114784708A true CN114784708A (en) 2022-07-22
CN114784708B CN114784708B (en) 2022-11-08

Family

ID=82431695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210406529.8A Active CN114784708B (en) 2022-04-18 2022-04-18 Composite cable installation method for newly-built jacket

Country Status (1)

Country Link
CN (1) CN114784708B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002010423A (en) * 2000-06-16 2002-01-11 Aichi Corp Cable towing device
AU2006200061A1 (en) * 2006-01-09 2007-07-26 Chin Piao Huang Lifter
CN104167694A (en) * 2014-08-12 2014-11-26 铜陵有色金属集团铜冠矿山建设股份有限公司 Method for laying cable with hemp ropes in vertical shaft of mine
US20170338634A1 (en) * 2014-10-24 2017-11-23 Kobus Services Limited Winch and method of use
CN107541732A (en) * 2017-10-13 2018-01-05 大连科迈尔防腐科技有限公司 A kind of marine stretching anode system and its installation method
CN207550422U (en) * 2017-10-13 2018-06-29 大连科迈尔海洋工程技术有限公司 A kind of horizontal tensioning fixing device
CN108286249A (en) * 2018-01-09 2018-07-17 大连科迈尔防腐科技有限公司 A kind of tension type impressed current cathodic protection system and its mounting arrangements method
CN209419109U (en) * 2018-12-29 2019-09-20 徐州海伦哲特种车辆有限公司 A kind of bypass cable stringing special equipment
CN111893491A (en) * 2020-08-31 2020-11-06 大连科迈尔防腐科技有限公司 Jacket tensioning type corrosion prevention system and installation method
CN112030167A (en) * 2020-08-31 2020-12-04 大连科迈尔防腐科技有限公司 Method for installing composite cable of newly-built ocean platform
CN214255445U (en) * 2021-03-10 2021-09-21 中国电建集团重庆工程有限公司 Cable lifting sling and lifting equipment

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002010423A (en) * 2000-06-16 2002-01-11 Aichi Corp Cable towing device
AU2006200061A1 (en) * 2006-01-09 2007-07-26 Chin Piao Huang Lifter
CN104167694A (en) * 2014-08-12 2014-11-26 铜陵有色金属集团铜冠矿山建设股份有限公司 Method for laying cable with hemp ropes in vertical shaft of mine
US20170338634A1 (en) * 2014-10-24 2017-11-23 Kobus Services Limited Winch and method of use
CN107541732A (en) * 2017-10-13 2018-01-05 大连科迈尔防腐科技有限公司 A kind of marine stretching anode system and its installation method
CN207550422U (en) * 2017-10-13 2018-06-29 大连科迈尔海洋工程技术有限公司 A kind of horizontal tensioning fixing device
CN108286249A (en) * 2018-01-09 2018-07-17 大连科迈尔防腐科技有限公司 A kind of tension type impressed current cathodic protection system and its mounting arrangements method
CN209419109U (en) * 2018-12-29 2019-09-20 徐州海伦哲特种车辆有限公司 A kind of bypass cable stringing special equipment
CN111893491A (en) * 2020-08-31 2020-11-06 大连科迈尔防腐科技有限公司 Jacket tensioning type corrosion prevention system and installation method
CN112030167A (en) * 2020-08-31 2020-12-04 大连科迈尔防腐科技有限公司 Method for installing composite cable of newly-built ocean platform
CN214255445U (en) * 2021-03-10 2021-09-21 中国电建集团重庆工程有限公司 Cable lifting sling and lifting equipment

Also Published As

Publication number Publication date
CN114784708B (en) 2022-11-08

Similar Documents

Publication Publication Date Title
US8235228B2 (en) Method and apparatus for deep water deployment operations
CA2973867C (en) Subsea wellhead assembly
US10858223B2 (en) Deepwater hoisting system and method
JP2006519138A (en) Installation method of tension leg type platform
RU2182883C2 (en) Deep-water load-lowering device
KR20140141442A (en) Installing apparatus for marine file
CN113966435A (en) Wind driven generator mounting and dismounting device and construction method using same
US11549614B2 (en) Method and system for laying a submarine pipeline
JP2002540329A (en) Method of mounting a plurality of risers or tendons and a ship performing the method
CN109537476B (en) Pin lug type double-temporary-rope self-balancing pulling type suspension bridge sling replacement underpinning device
CN110844003B (en) Method for replacing mooring anchor legs by lifting double ships
CN114784708B (en) Composite cable installation method for newly-built jacket
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN110789669B (en) System and method for recycling and putting down reclaimed water buoy in deep water single-point mooring
CN111155822A (en) Steel strand installation method for wind driven generator support tower frame prestressed structure
CN106207884B (en) Cable connecting arrangement is bridged between ocean platform
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
RU2232863C2 (en) Craneless method for mounting and dismounting drilling derricks, mast and tower constructions with enlarged sections
CN114382015A (en) Construction method for vertical rotation of special-shaped steel main tower of cable-stayed bridge
CN108613663B (en) Ocean vertical profile automatic observation system and method based on ocean oil platform
CN104386598A (en) Dismantling method for tower crane jib
CN113213323A (en) Double-rope mode hoisting structure installation method
CN112467629B (en) Deep well shaft high-voltage cable laying method
CN218520918U (en) Real abdomen formula steel crane roof beam installation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 116000 Miao Ling Village, Lingshui Town, Ganjingzi District, Dalian City, Liaoning Province

Patentee after: Dalian Komeier Marine Technology Co.,Ltd.

Address before: 116000 room 1008, TAD building, 537 Huangpu Road, hi tech park, Dalian, Liaoning

Patentee before: DALIAN KINGMILE ANTICORROSION TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address